FORMWORK/SHUTTERING
CMR COLLEGE OF ENGINEERING AND TECHNOLOGY
PRESENTATION BY: N.NATESH(12H51A0142)
CONTENTS
• DEFINITION OF FORMWORK
• REQUIREMENTS OF A GOOD FORMWORK
• CATEGORIES OF FORMWORK
• TYPES OF FORMWORK
• PROCESS OF FORMWORK CONSTRUCTION
• DESHUTTERING
• FAILURE OF FORMWORK
• SAFETY PRECAUTION
DEFINITION OF FORMWORK
Formwork is a mould or open box, like container into
which fresh concrete is poured and compacted.
 When the concrete is set, the formwork is removed and
a solid mass is produced in the shape of the inner face of
the formwork.
It should be capable of carrying all imposed dead and
live loads apart from its own weight.
REQUIREMENTS OF A GOOD FORMWORK
 Materials should be cheap and reusable.
 Swelling and shrinkage should be minimum .
 Surface should be smooth, and afford easy stripping.
 Light in weight, so that easy to transfer.
 It should be practically water proof, so that it should not absorb
water from concrete.
 The material of formwork should not warp or get distorted when
exposed to the elements.
 The joints in the formwork should be tight against leakage of
cement grout.
 Deflection should be minimum.
CATEGORIES OF FORMWORK
CONVENTIONAL: The formwork is built on site out of timber or moisture-
resistant particle board. It is easy to produce but time-consuming for larger
structures, and the plywood facing has a relatively short lifespan. It is still used
extensively where the labour costs are lower than the costs for procuring
reusable formwork.
MODERN-DAY FORMWORK: This formwork system are mostly
modular, which are designed for speed and efficiency. The main
types of formwork systems in used now are
 Table form/flying formwork
 System column formwork
 Slip formwork
 Tunnel formwork
SLIP FORMWORK
ENGINEERED/PRE-FABRICATED FORMWORK: This formwork is
built out of prefabricated modules with a metal frame (usually steel
or aluminium) and covered on the application (concrete) side with
material having the wanted surface structure (steel, aluminium,
timber, etc.).
Major objectives considered in formwork
 Quality
 Safety
 Economy
Quality:
Forms must be designed and built with sufficient
stiffness and accuracy so that the size, shape, position, and
finish of the cast concrete are maintained.
Safety:
Forms must be built sufficient strength and factor of
safety so that they have the capable of all supporting
loads.
Economy:
Forms must be built efficiently, minimizing time and
cost.
TYPES OF FORMWORK MATERIALS
 TIMBER
 STEEL
 PLASTIC
 ALUMINIUM
TIMBER FORMWORK:
 Most common material used for
bracing the member, hence called
as the traditional formwork.
 Can easily be cut to size on site.
ADVANTAGES OF TIMBER FORMWORK:
 Easy handling because its light weight.
 Easy to disassemble.
 Damaged parts can be replaced with new one.
 It has good thermal insulation which makes it
useful to be used in colder regions.
 Reduced site labour.
 Can be built to exceed 60 year design life.
DISADVANTAGES OF TIMBER FORMWORK:
 Can’t be used for long, have limited reuse.
 If timber is dry, it will absorb moisture from wet
concrete which could weaken the resultant concrete
member.
 Timber with high moisture content (more than 20%
moisture content), wet concrete will shrink & cup
leading to open joints & leakage of grout.
STEEL FORMWORK:
 Steel forms are stronger,
durable and have longer life
than timber formwork and
their reuses are more in
number.
 Steel forms can be installed
and dismantled with greater
ease and speed.
ADVANTAGES OF STEEL FORMWORK:
 Very strong and able to carry loads
 Easy to be fixed.
 Uniform size and surface.
 Can be used for more number of times.
 More durable than timber formwork.
 No shrinkage of formwork occurs.
DISADVANTAGES OF STEEL FORMWORK:
 More expensive than wood.
 Due to high weight handling is difficult.
 Excessive loss of heat.
 Limited size and shape.
PLASTIC FORMWORK:
ADVANTAGES OF PLASTIC FORMWORK:
 Light weight.
 Reusable.
 Chemical resistant.
 Fungus and termites resistant.
 Can be easily cut and nail by using wood working.
 Damages on the formwork can be easily removed.
 Very useful for complex shaped and special features.
DISADVANTAGES OF PLASTIC FORMWORK:
 Expensive at first.
 Load carrying capacity low.
 Damage the plastic by the heat.
ALUMINIUM FORMWORK:
 Aluminium is strong and light,
and consequently fewer,
supports and ties are required.
ADVANTAGES OF ALUMINIUM FORMWORK:
 Monolithic crack free structures.
 Doesn’t require timber or plywood for construction
activities.
 Casting of walls and slabs possible simultaneously.
 Doesn’t required skilled labour.
DISADVANTAGES OF ALUMINIUM FORMWORK:
 Architectural changes are not possible on the structure.
 Due to the tremendous speed of construction, working
capital finance needs to the planned in advance.
PROCESS OF FORMWORK
CONSTRUCTION
FORMWORK FOR VARIOUS STRUCTURAL MEMBERS
FORMWORK FOR WALL
It consists of
-Timber sheeting
-Vertical posts
-Horizontal member
-Rackers
-Stakes
-Wedges
Wall formwork and its components
Wall formwork
FORMWORK FOR COLUMN
 It consists of
-Side and end planks
-Yoke
-Nuts and bolts
 Two end and two side planks are joined by
the yokes and bolts.
Erection sequence for a column:
Prior to positioning column formwork check that steel for the column has been inspected and cleared f
or casting.
- Position formwork for the column from predetermined grids.
- Plumb formwork both ways and securely support using adjustable steel props.
- The propping angle should be 45° to the floor.
- Ensure the steel props are safely secured to the column formwork and
the floor, and that adjustment for pushing and pulling is operational.
- Set out the positions of column clamps from a storey rod.
- Transfer the column clamp positions from the storey rod onto column formwork.
- Use nails to support the arms of column clamps while wedging.
- Position and wedge the bottom, middle and top clamps sets.
- Check the formwork at the top for square.
- Position and wedge the remainder of the column clamps.
- Using a plumb bob suspended from a gauge block plumb the column
 When all the column formwork is securely propped a final check must be ma
de for plumb and column alignment before and immediately after the
concrete has been poured and vibrated.
Formwork for staircase
 Points to consider when designing
staircase formwork:
Stair formwork must support the weight
of concrete.
Because of the slope of the stair, some of
the force is transmitted to the sideways. All
formwork must be well tied together to
prevent sideway movement.
Erection sequence for a beam:
 Marking out and setting height for formwork
 Assemble and position props, adjustable head jacks, formworks,
bearers and spreaders.
 Construct and erect sidewalls and beam soffit.
 Position of sole plates.
DESHUTTERING
 “DESHUTTERING” means the process of removing the shuttering.
Order and method of removing formwork:
 Shuttering forming vertical faces of walls, beams
and columns should be removed first. Shuttering
forming soffit to slab should be removed next.
 Shuttering forming soffit to beams or other
heavy loaded members should be removed in the
end.
Time of removal of formwork:
Sl.
No Structural Member
OPC
(Ordinary Portland Cement)
Rapid Hardening
Cement
1 Beam sides, walls & Columns 2-3 Days 2 Days
2 Slab (Vertical Supports remains intact) 4 Days 3 Days
3 Slab (Complete Formwork removal) 10 Days 5 Days
4 Beams (Removal of Sheeting, Props
remains intact)
8 Days 5 Days
5 Beams & Arches (Complete formwork
removal) (up to 6 m span)
14 Days 5-8 Days
6 Beams & Arches (Complete formwork
removal) (more than 6 m span)
21 Days 8-10 Days
Cost of formwork:
For normal works formwork costs about 30-40% of
the concrete cost.
Failure of formwork
 Generally some unexpected event causes one
member to fail, then others become overloaded
or misaligned and the entire formwork
structure collapses.
 Vibration.
 Inadequate bracing.
 Unstable soil under foundations.
 Inadequate control of concrete placement.
 Lack of attention of formwork details.
 Inadequate cross bracing and horizontal
bracing of shores.
 Passing traffic.
 Movement of workers and equipment on the
formwork.
SAFETY PRECAUTION
 Material used for the construction of formwork must fulfill the
specification.
 Formwork is fixed firmly and properly.
 Construction area must be protected to prevent vandalism of
formwork.
 Warning sign must be put up at the area where the formwork
is fixed to prevent entrance of people that may damage the
formwork.
 The formwork must be inspected before the concrete is poured.
Formwork
Formwork

More Related Content

What's hot

Slipform
SlipformSlipform
Slipform
Rahul Razz
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
JenilPatel22
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
মু সা
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
Seminar Links
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
Puneet Chhonker
 
Shoring
ShoringShoring
Jacketing
JacketingJacketing
Jacketing
SHAIKH ARSHAD
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
Aishwarya Deopujari
 
Formwork
FormworkFormwork
Formwork
Jitesh Dhule
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
Bilal Ansari
 
blockwork
 blockwork blockwork
blockwork
catherinelindsay
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
Prabhat chhirolya
 
Formwork
FormworkFormwork
Formwork
Shakil Ahmmad
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
I'mMiss Lily
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
kamariya keyur
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonry
KHUSHBU SHAH
 
Mivan tech
Mivan techMivan tech
Mivan tech
rishi mahajan
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
Simran Aggarwal
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
Esri India
 
Stone masonry
Stone masonryStone masonry
Stone masonry
Jitesh Dhule
 

What's hot (20)

Slipform
SlipformSlipform
Slipform
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Shoring
ShoringShoring
Shoring
 
Jacketing
JacketingJacketing
Jacketing
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Formwork
FormworkFormwork
Formwork
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
blockwork
 blockwork blockwork
blockwork
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
 
Formwork
FormworkFormwork
Formwork
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonry
 
Mivan tech
Mivan techMivan tech
Mivan tech
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
 
Stone masonry
Stone masonryStone masonry
Stone masonry
 

Viewers also liked

Slip formwork technique
Slip formwork techniqueSlip formwork technique
Slip formwork technique
Ghanashyam Prajapati
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
Aisyah Asyikin
 
Ibs part1
Ibs part1Ibs part1
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
Ankit Singhai
 
Handling of Concrete
Handling of ConcreteHandling of Concrete
Handling of Concrete
Kezar Ali. Shah
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
Musahiddin Md Zainal
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
Light weight concrete
Light weight concreteLight weight concrete
Light weight concrete
Anil Shastry
 
lightweight concrete
lightweight concretelightweight concrete
lightweight concrete
Agatha Fred
 

Viewers also liked (9)

Slip formwork technique
Slip formwork techniqueSlip formwork technique
Slip formwork technique
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
Handling of Concrete
Handling of ConcreteHandling of Concrete
Handling of Concrete
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Light weight concrete
Light weight concreteLight weight concrete
Light weight concrete
 
lightweight concrete
lightweight concretelightweight concrete
lightweight concrete
 

Similar to Formwork

Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
Kishor Ade
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 
Formwork
FormworkFormwork
Formwork
kajol panchal
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
SAGAR RAUT
 
Formwork
FormworkFormwork
Formwork
snehakaira
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
ErankajKumar
 
Formwork
FormworkFormwork
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
UjasPandya2
 
Shuttering PPT.pptx
Shuttering PPT.pptxShuttering PPT.pptx
Shuttering PPT.pptx
wwwuditmeghwal2000
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
santoshkumar gurme
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
KHUSHBU SHAH
 
Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
Formwork
FormworkFormwork
Formwork
rmeena99
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
Mr Amol Ghogare
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
LiesaStone
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
ssuserc0bf9b
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
Anoop Banshiwal
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETE
Brijesh Alig
 
Precast concrete
Precast concretePrecast concrete
Precast concrete
SnehaKothari13
 

Similar to Formwork (20)

Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork
FormworkFormwork
Formwork
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 
Formwork
FormworkFormwork
Formwork
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Formwork
FormworkFormwork
Formwork
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
Shuttering PPT.pptx
Shuttering PPT.pptxShuttering PPT.pptx
Shuttering PPT.pptx
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETE
 
Precast concrete
Precast concretePrecast concrete
Precast concrete
 

Recently uploaded

Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
NaveenNaveen726446
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
aarusi sexy model
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
supriyaDicholkar1
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
dulbh kashyap
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 

Recently uploaded (20)

Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 

Formwork

  • 1. FORMWORK/SHUTTERING CMR COLLEGE OF ENGINEERING AND TECHNOLOGY PRESENTATION BY: N.NATESH(12H51A0142)
  • 2. CONTENTS • DEFINITION OF FORMWORK • REQUIREMENTS OF A GOOD FORMWORK • CATEGORIES OF FORMWORK • TYPES OF FORMWORK • PROCESS OF FORMWORK CONSTRUCTION • DESHUTTERING • FAILURE OF FORMWORK • SAFETY PRECAUTION
  • 3. DEFINITION OF FORMWORK Formwork is a mould or open box, like container into which fresh concrete is poured and compacted.  When the concrete is set, the formwork is removed and a solid mass is produced in the shape of the inner face of the formwork. It should be capable of carrying all imposed dead and live loads apart from its own weight.
  • 4.
  • 5. REQUIREMENTS OF A GOOD FORMWORK  Materials should be cheap and reusable.  Swelling and shrinkage should be minimum .  Surface should be smooth, and afford easy stripping.  Light in weight, so that easy to transfer.  It should be practically water proof, so that it should not absorb water from concrete.  The material of formwork should not warp or get distorted when exposed to the elements.  The joints in the formwork should be tight against leakage of cement grout.  Deflection should be minimum.
  • 6. CATEGORIES OF FORMWORK CONVENTIONAL: The formwork is built on site out of timber or moisture- resistant particle board. It is easy to produce but time-consuming for larger structures, and the plywood facing has a relatively short lifespan. It is still used extensively where the labour costs are lower than the costs for procuring reusable formwork.
  • 7. MODERN-DAY FORMWORK: This formwork system are mostly modular, which are designed for speed and efficiency. The main types of formwork systems in used now are  Table form/flying formwork  System column formwork  Slip formwork  Tunnel formwork
  • 8.
  • 9.
  • 11. ENGINEERED/PRE-FABRICATED FORMWORK: This formwork is built out of prefabricated modules with a metal frame (usually steel or aluminium) and covered on the application (concrete) side with material having the wanted surface structure (steel, aluminium, timber, etc.).
  • 12. Major objectives considered in formwork  Quality  Safety  Economy
  • 13. Quality: Forms must be designed and built with sufficient stiffness and accuracy so that the size, shape, position, and finish of the cast concrete are maintained. Safety: Forms must be built sufficient strength and factor of safety so that they have the capable of all supporting loads. Economy: Forms must be built efficiently, minimizing time and cost.
  • 14. TYPES OF FORMWORK MATERIALS  TIMBER  STEEL  PLASTIC  ALUMINIUM
  • 15. TIMBER FORMWORK:  Most common material used for bracing the member, hence called as the traditional formwork.  Can easily be cut to size on site.
  • 16.
  • 17. ADVANTAGES OF TIMBER FORMWORK:  Easy handling because its light weight.  Easy to disassemble.  Damaged parts can be replaced with new one.  It has good thermal insulation which makes it useful to be used in colder regions.  Reduced site labour.  Can be built to exceed 60 year design life.
  • 18. DISADVANTAGES OF TIMBER FORMWORK:  Can’t be used for long, have limited reuse.  If timber is dry, it will absorb moisture from wet concrete which could weaken the resultant concrete member.  Timber with high moisture content (more than 20% moisture content), wet concrete will shrink & cup leading to open joints & leakage of grout.
  • 19. STEEL FORMWORK:  Steel forms are stronger, durable and have longer life than timber formwork and their reuses are more in number.  Steel forms can be installed and dismantled with greater ease and speed.
  • 20.
  • 21. ADVANTAGES OF STEEL FORMWORK:  Very strong and able to carry loads  Easy to be fixed.  Uniform size and surface.  Can be used for more number of times.  More durable than timber formwork.  No shrinkage of formwork occurs.
  • 22. DISADVANTAGES OF STEEL FORMWORK:  More expensive than wood.  Due to high weight handling is difficult.  Excessive loss of heat.  Limited size and shape.
  • 24.
  • 25. ADVANTAGES OF PLASTIC FORMWORK:  Light weight.  Reusable.  Chemical resistant.  Fungus and termites resistant.  Can be easily cut and nail by using wood working.  Damages on the formwork can be easily removed.  Very useful for complex shaped and special features.
  • 26. DISADVANTAGES OF PLASTIC FORMWORK:  Expensive at first.  Load carrying capacity low.  Damage the plastic by the heat.
  • 27. ALUMINIUM FORMWORK:  Aluminium is strong and light, and consequently fewer, supports and ties are required.
  • 28.
  • 29. ADVANTAGES OF ALUMINIUM FORMWORK:  Monolithic crack free structures.  Doesn’t require timber or plywood for construction activities.  Casting of walls and slabs possible simultaneously.  Doesn’t required skilled labour.
  • 30. DISADVANTAGES OF ALUMINIUM FORMWORK:  Architectural changes are not possible on the structure.  Due to the tremendous speed of construction, working capital finance needs to the planned in advance.
  • 31. PROCESS OF FORMWORK CONSTRUCTION FORMWORK FOR VARIOUS STRUCTURAL MEMBERS
  • 32. FORMWORK FOR WALL It consists of -Timber sheeting -Vertical posts -Horizontal member -Rackers -Stakes -Wedges
  • 33. Wall formwork and its components
  • 35. FORMWORK FOR COLUMN  It consists of -Side and end planks -Yoke -Nuts and bolts  Two end and two side planks are joined by the yokes and bolts.
  • 36. Erection sequence for a column: Prior to positioning column formwork check that steel for the column has been inspected and cleared f or casting. - Position formwork for the column from predetermined grids. - Plumb formwork both ways and securely support using adjustable steel props. - The propping angle should be 45° to the floor. - Ensure the steel props are safely secured to the column formwork and the floor, and that adjustment for pushing and pulling is operational. - Set out the positions of column clamps from a storey rod. - Transfer the column clamp positions from the storey rod onto column formwork. - Use nails to support the arms of column clamps while wedging. - Position and wedge the bottom, middle and top clamps sets. - Check the formwork at the top for square. - Position and wedge the remainder of the column clamps. - Using a plumb bob suspended from a gauge block plumb the column  When all the column formwork is securely propped a final check must be ma de for plumb and column alignment before and immediately after the concrete has been poured and vibrated.
  • 37. Formwork for staircase  Points to consider when designing staircase formwork: Stair formwork must support the weight of concrete. Because of the slope of the stair, some of the force is transmitted to the sideways. All formwork must be well tied together to prevent sideway movement.
  • 38.
  • 39. Erection sequence for a beam:  Marking out and setting height for formwork  Assemble and position props, adjustable head jacks, formworks, bearers and spreaders.  Construct and erect sidewalls and beam soffit.  Position of sole plates.
  • 40. DESHUTTERING  “DESHUTTERING” means the process of removing the shuttering. Order and method of removing formwork:  Shuttering forming vertical faces of walls, beams and columns should be removed first. Shuttering forming soffit to slab should be removed next.  Shuttering forming soffit to beams or other heavy loaded members should be removed in the end.
  • 41. Time of removal of formwork: Sl. No Structural Member OPC (Ordinary Portland Cement) Rapid Hardening Cement 1 Beam sides, walls & Columns 2-3 Days 2 Days 2 Slab (Vertical Supports remains intact) 4 Days 3 Days 3 Slab (Complete Formwork removal) 10 Days 5 Days 4 Beams (Removal of Sheeting, Props remains intact) 8 Days 5 Days 5 Beams & Arches (Complete formwork removal) (up to 6 m span) 14 Days 5-8 Days 6 Beams & Arches (Complete formwork removal) (more than 6 m span) 21 Days 8-10 Days
  • 42. Cost of formwork: For normal works formwork costs about 30-40% of the concrete cost.
  • 44.  Generally some unexpected event causes one member to fail, then others become overloaded or misaligned and the entire formwork structure collapses.  Vibration.  Inadequate bracing.  Unstable soil under foundations.  Inadequate control of concrete placement.  Lack of attention of formwork details.  Inadequate cross bracing and horizontal bracing of shores.  Passing traffic.  Movement of workers and equipment on the formwork.
  • 45. SAFETY PRECAUTION  Material used for the construction of formwork must fulfill the specification.  Formwork is fixed firmly and properly.  Construction area must be protected to prevent vandalism of formwork.  Warning sign must be put up at the area where the formwork is fixed to prevent entrance of people that may damage the formwork.  The formwork must be inspected before the concrete is poured.