Introduction
Types of Slip Forming
Structure Units Of Slip Forming
Structure Of Slip Forming
Advantages of Slip Forming
Introduction
Slip forming or slip form construction is a
construction method in which concrete is poured
into a continuously moving form.
Slip forming is used for tall structures (such as
bridges, towers, buildings, and dams), as well as
horizontal structures, such as roadways.
Concrete needs to be workable enough to be
placed into the form and consolidated (via
vibration), yet quick-setting enough to emerge
from the form with strength.
Types of Slip forming
1.Vertical Slip forming
In vertical slip forming the concrete form may
be surrounded by a platform on which workers
stand, placing steel reinforcing rods into the
concrete and ensuring a smooth pour.
Together, the concrete form and working
platform are raised by means of hydraulic jacks.
Construction of Silos , Chimneys.
2.Horizontal Slip Forming
In horizontal slip forming for pavement and
traffic separation walls concrete is laid down,
vibrated, worked, and settled in place while the
form itself slowly moves ahead.
This method was initially devised and utilized
in Highway construction.
Structural units of Slip
Formwork
• Slip formwork includes
• steel panels attached to frames,
• working platforms,
• hydraulic jacks,
• rods,
• pumps,
• distribution Centre and
• other connecting elements.
Structure of Slip Formwork
Slip formwork system is a system in which slip
forms are continuously raised by hydraulic
equipment. By this means the rising from 150 to
300 mm per hour depending on the concrete
hardening rate as the cast concrete can become
self-supporting very rapidly.
The system uses steel panels of special height,
which are fixed to working carcass consisting of
steel frames (yokes), trusses and fixing devices.
Carcass provide stability of the system design
and is a reliable base for the wooden flooring
used as a working platform for placement of
concrete, reinforcement and embedded parts for
doors and windows on its surface.
A hydraulic jack is placed on the top of each
frame. A high tensile steel jacking rod is passed
through the jack and is casted into the walls as it
rises. The jack consists of a cylinder and a pair of
upper and lower clamp mechanisms gripping the
rod and working in cycles.
The principle is that the jack works against the
lower clamp to lift the frame. When the pressure
is released upper clamp grips the rod and the
lower clamp is released and come up by spring
action.
Vertical reinforcement is retained in the correct
position using guides, which are fixed on the top
of the frames. Horizontal reinforcement is laid
under the frames and is bounded with the
vertical reinforcement.
Advantage of Slip formwork
 High speed of erection (works’ execution speed
increases) and as a result, rapid completion of
the project - considerable saving of time.
Minimal use of a crane, as formwork is lifted by
hydraulic jacks.
Uniformity of wall sections with the project
drawings, smooth wall surfaces are achieved by
the use of slip formwork.
Reduced labor costs due to the intensity of the
working process.
Slip formwork technique

More Related Content

What's hot

grouting and guniting
grouting and gunitinggrouting and guniting
grouting and guniting
Vipul Kerni
 
Underpinning
UnderpinningUnderpinning
Underpinning
Khuzema Olia
 
Prestress concrete
Prestress concretePrestress concrete
Prestress concrete
Dhrumil Pandya
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
HARITSEHRAWAT
 
Formwork
FormworkFormwork
Formwork
natesh0142
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structures
Umer Farooq
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
Rohit Ranjan
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
shubham paliwal
 
Well foundation
Well foundationWell foundation
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt
Akash Pandey
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
Seminar Links
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
Dar Hilal
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
Bhalchandra Tankkar
 
Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)
SSudhaVelan
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete road
pramodchavan32
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
Sagar Vekariya
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
GAURAV. H .TANDON
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
Boopathi Raja
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
Umer Farooq
 
Pile foundation
Pile foundationPile foundation
Pile foundation
Parth Desani
 

What's hot (20)

grouting and guniting
grouting and gunitinggrouting and guniting
grouting and guniting
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Prestress concrete
Prestress concretePrestress concrete
Prestress concrete
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Formwork
FormworkFormwork
Formwork
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structures
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 
Well foundation
Well foundationWell foundation
Well foundation
 
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete road
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 

Similar to Slip formwork technique

High rise building design
High rise building design High rise building design
High rise building design
Somesh Siddharth
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
Akshay Revekar
 
Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02
satwik345
 
high rise building
high rise buildinghigh rise building
high rise building
Aditya Sanyal
 
High rise structure
High rise structureHigh rise structure
High rise structure
Anuj Singhal
 
Bridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdfBridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdf
PranotiHunungare
 
Speed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial DataSpeed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial Data
drk357111
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
LokeswarSaha1
 
Bridge-SIT-01.pptx
Bridge-SIT-01.pptxBridge-SIT-01.pptx
Bridge-SIT-01.pptx
PranotiHunungare
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
Vinayak247538
 
Slip form
Slip formSlip form
Slip form
Aglaia Connect
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
jisunfoo
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
Prasad Thanthratey
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
Hajee Mohammad Danesh Science & Technology University, Dinajpur
 
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
toddr4
 
loadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdfloadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdf
nileshsurti
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
Bee Key Verma
 
KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5
Bennet Kuriakose, PhD
 
Horseshoe Casino Construction
Horseshoe Casino ConstructionHorseshoe Casino Construction
Horseshoe Casino Construction
RedBuilt LLC
 
Building construction report
Building construction  reportBuilding construction  report
Building construction report
Aprajeeta Singh
 

Similar to Slip formwork technique (20)

High rise building design
High rise building design High rise building design
High rise building design
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02
 
high rise building
high rise buildinghigh rise building
high rise building
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Bridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdfBridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdf
 
Speed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial DataSpeed Floor Melbourne Engineers Presentation & Techinicial Data
Speed Floor Melbourne Engineers Presentation & Techinicial Data
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
Bridge-SIT-01.pptx
Bridge-SIT-01.pptxBridge-SIT-01.pptx
Bridge-SIT-01.pptx
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
Slip form
Slip formSlip form
Slip form
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
 
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
 
loadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdfloadanalysisandstructuralconsideration-190126210125-1.pdf
loadanalysisandstructuralconsideration-190126210125-1.pdf
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
 
KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5
 
Horseshoe Casino Construction
Horseshoe Casino ConstructionHorseshoe Casino Construction
Horseshoe Casino Construction
 
Building construction report
Building construction  reportBuilding construction  report
Building construction report
 

More from Ghanashyam Prajapati

Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
Ghanashyam Prajapati
 
Limit state method
Limit state methodLimit state method
Limit state method
Ghanashyam Prajapati
 
Gravity dam
Gravity damGravity dam
Depreciation & obsolescence
Depreciation & obsolescenceDepreciation & obsolescence
Depreciation & obsolescence
Ghanashyam Prajapati
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
Ghanashyam Prajapati
 
Dry weather flow
Dry weather flowDry weather flow
Dry weather flow
Ghanashyam Prajapati
 
Types of slope failures
Types of slope failuresTypes of slope failures
Types of slope failures
Ghanashyam Prajapati
 
Stucture of atmoshere
Stucture of atmoshereStucture of atmoshere
Stucture of atmoshere
Ghanashyam Prajapati
 
Parking study
Parking studyParking study
Parking study
Ghanashyam Prajapati
 
Slums
SlumsSlums
Cross section of road
Cross section of roadCross section of road
Cross section of road
Ghanashyam Prajapati
 
Roads and railways
Roads and railwaysRoads and railways
Roads and railways
Ghanashyam Prajapati
 
Ordinary portland cement (opc) & Rapid hardening cement
Ordinary portland cement (opc)  & Rapid hardening cementOrdinary portland cement (opc)  & Rapid hardening cement
Ordinary portland cement (opc) & Rapid hardening cement
Ghanashyam Prajapati
 
Moment generating function & bernoulli experiment
Moment generating function & bernoulli experimentMoment generating function & bernoulli experiment
Moment generating function & bernoulli experiment
Ghanashyam Prajapati
 
Ground granulated blast furnace slag
Ground granulated blast furnace slagGround granulated blast furnace slag
Ground granulated blast furnace slag
Ghanashyam Prajapati
 
Engineering economics and management
Engineering economics  and managementEngineering economics  and management
Engineering economics and management
Ghanashyam Prajapati
 

More from Ghanashyam Prajapati (16)

Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Limit state method
Limit state methodLimit state method
Limit state method
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Depreciation & obsolescence
Depreciation & obsolescenceDepreciation & obsolescence
Depreciation & obsolescence
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Dry weather flow
Dry weather flowDry weather flow
Dry weather flow
 
Types of slope failures
Types of slope failuresTypes of slope failures
Types of slope failures
 
Stucture of atmoshere
Stucture of atmoshereStucture of atmoshere
Stucture of atmoshere
 
Parking study
Parking studyParking study
Parking study
 
Slums
SlumsSlums
Slums
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
 
Roads and railways
Roads and railwaysRoads and railways
Roads and railways
 
Ordinary portland cement (opc) & Rapid hardening cement
Ordinary portland cement (opc)  & Rapid hardening cementOrdinary portland cement (opc)  & Rapid hardening cement
Ordinary portland cement (opc) & Rapid hardening cement
 
Moment generating function & bernoulli experiment
Moment generating function & bernoulli experimentMoment generating function & bernoulli experiment
Moment generating function & bernoulli experiment
 
Ground granulated blast furnace slag
Ground granulated blast furnace slagGround granulated blast furnace slag
Ground granulated blast furnace slag
 
Engineering economics and management
Engineering economics  and managementEngineering economics  and management
Engineering economics and management
 

Recently uploaded

Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
christinelarrosa
 
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdfLee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
leebarnesutopia
 
Essentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation ParametersEssentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation Parameters
Safe Software
 
Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!
Tobias Schneck
 
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptxPRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
christinelarrosa
 
Discover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched ContentDiscover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched Content
ScyllaDB
 
From NCSA to the National Research Platform
From NCSA to the National Research PlatformFrom NCSA to the National Research Platform
From NCSA to the National Research Platform
Larry Smarr
 
Session 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdfSession 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdf
UiPathCommunity
 
An Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise IntegrationAn Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise Integration
Safe Software
 
Introduction to ThousandEyes AMER Webinar
Introduction  to ThousandEyes AMER WebinarIntroduction  to ThousandEyes AMER Webinar
Introduction to ThousandEyes AMER Webinar
ThousandEyes
 
A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
ScyllaDB
 
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
AlexanderRichford
 
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google CloudRadically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
ScyllaDB
 
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
manji sharman06
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
christinelarrosa
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
ScyllaDB
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
Pablo Gómez Abajo
 
Getting the Most Out of ScyllaDB Monitoring: ShareChat's Tips
Getting the Most Out of ScyllaDB Monitoring: ShareChat's TipsGetting the Most Out of ScyllaDB Monitoring: ShareChat's Tips
Getting the Most Out of ScyllaDB Monitoring: ShareChat's Tips
ScyllaDB
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
UiPathCommunity
 

Recently uploaded (20)

Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
 
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdfLee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
 
Essentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation ParametersEssentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation Parameters
 
Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!
 
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptxPRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
 
Discover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched ContentDiscover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched Content
 
From NCSA to the National Research Platform
From NCSA to the National Research PlatformFrom NCSA to the National Research Platform
From NCSA to the National Research Platform
 
Session 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdfSession 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdf
 
An Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise IntegrationAn Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise Integration
 
Introduction to ThousandEyes AMER Webinar
Introduction  to ThousandEyes AMER WebinarIntroduction  to ThousandEyes AMER Webinar
Introduction to ThousandEyes AMER Webinar
 
A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
 
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
 
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google CloudRadically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
 
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
 
Getting the Most Out of ScyllaDB Monitoring: ShareChat's Tips
Getting the Most Out of ScyllaDB Monitoring: ShareChat's TipsGetting the Most Out of ScyllaDB Monitoring: ShareChat's Tips
Getting the Most Out of ScyllaDB Monitoring: ShareChat's Tips
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
 

Slip formwork technique

  • 1. Slip formwork Technique Concrete Technology Prepared by: Ghanashyam prajapati (13CV088)
  • 2. Content Introduction Types of Slip Forming Structure Units Of Slip Forming Structure Of Slip Forming Advantages of Slip Forming
  • 3. Introduction Slip forming or slip form construction is a construction method in which concrete is poured into a continuously moving form. Slip forming is used for tall structures (such as bridges, towers, buildings, and dams), as well as horizontal structures, such as roadways. Concrete needs to be workable enough to be placed into the form and consolidated (via vibration), yet quick-setting enough to emerge from the form with strength.
  • 4. Types of Slip forming 1.Vertical Slip forming In vertical slip forming the concrete form may be surrounded by a platform on which workers stand, placing steel reinforcing rods into the concrete and ensuring a smooth pour. Together, the concrete form and working platform are raised by means of hydraulic jacks. Construction of Silos , Chimneys.
  • 5.
  • 6. 2.Horizontal Slip Forming In horizontal slip forming for pavement and traffic separation walls concrete is laid down, vibrated, worked, and settled in place while the form itself slowly moves ahead. This method was initially devised and utilized in Highway construction.
  • 7.
  • 8. Structural units of Slip Formwork • Slip formwork includes • steel panels attached to frames, • working platforms, • hydraulic jacks, • rods, • pumps, • distribution Centre and • other connecting elements.
  • 9. Structure of Slip Formwork Slip formwork system is a system in which slip forms are continuously raised by hydraulic equipment. By this means the rising from 150 to 300 mm per hour depending on the concrete hardening rate as the cast concrete can become self-supporting very rapidly. The system uses steel panels of special height, which are fixed to working carcass consisting of steel frames (yokes), trusses and fixing devices.
  • 10. Carcass provide stability of the system design and is a reliable base for the wooden flooring used as a working platform for placement of concrete, reinforcement and embedded parts for doors and windows on its surface. A hydraulic jack is placed on the top of each frame. A high tensile steel jacking rod is passed through the jack and is casted into the walls as it rises. The jack consists of a cylinder and a pair of upper and lower clamp mechanisms gripping the rod and working in cycles.
  • 11. The principle is that the jack works against the lower clamp to lift the frame. When the pressure is released upper clamp grips the rod and the lower clamp is released and come up by spring action. Vertical reinforcement is retained in the correct position using guides, which are fixed on the top of the frames. Horizontal reinforcement is laid under the frames and is bounded with the vertical reinforcement.
  • 12. Advantage of Slip formwork  High speed of erection (works’ execution speed increases) and as a result, rapid completion of the project - considerable saving of time. Minimal use of a crane, as formwork is lifted by hydraulic jacks. Uniformity of wall sections with the project drawings, smooth wall surfaces are achieved by the use of slip formwork. Reduced labor costs due to the intensity of the working process.