Formwork
Presented by
aglaia
Formwork
• It is used as a mould for a structure in which fresh concrete is
poured only to harden subsequently.
• Types of concrete formwork construction depends on
formwork material and type of structural element.
• Formworks can also be named based on the type of structural
member construction such as slab formwork for use in slab,
beam formwork, column formwork for use in beams and
columns respectively etc.
• The construction of formwork takes time and involves
expenditure upto 20 to 25% of the cost of the structure or
even more.
• Design of these temporary structures are made to economic
expenditure.
• The operation of removing the formwork is known as stripping.
Stripped formwork can be reused.
• Reusable forms are known as panel forms and non-usable are
called stationary forms.
Requirements of a formwork
• It should be strong enough to withstand all types of dead and
live loads.
• It should be rigidly constructed and efficiently propped and
braced both horizontally and vertically, so as to retain its shape.
• The joints in the formwork should be tight against leakage of
cement grout.
• Construction of formwork should permit removal of various
parts in desired sequences without damage to the concrete.
• The material of the formwork should be cheap, easily available
and should be suitable for reuse.
• The formwork should be set accurately to the desired line and
levels should have plane surface.
• It should be as light as possible.
• The material of the formwork should not warp or get distorted
when exposed to the elements.
• It should rest on firm base.
Types of Formwork
1. Timber Formwork
2. Steel formwork
3. Plywood formwork
Timber Formwork
• It should be
1. well seasoned
2. light in weight
3. easily workable with nails without splitting
4. free from loose knots
• Timber used for shuttering for exposed concrete work
should have smooth and even surface on all faces which
come in contact with concrete.
Advantages
• Easy handling because it’s
light weight.
• Easy to disassemble.
• Damaged parts can be
replaced with new one.
• Very flexible.
Disadvantages
• Can’t be used for long.
• If the timber is dry, it will
absorb moisture from wet
concrete which could
weaken the resultant
concrete member.
• Timber with high moisture
content ,wet concrete will
shrink & cup leading to
open joints & leakage of
grout.
Plywood Formwork
• Resin bonded plywood sheets are attached to timber
frames to make up panels of required sizes.
• The cost of plywood formwork compares favourably with
that of timber shuttering and it may even prove cheaper in
certain cases in view of the following considerations:
• It is possible to have smooth finish in which case on cost in
surface finishing is there.
• By use of large size panels it is possible to effect saving in
the labour cost of fixing and dismantling.
• Number of reuses are more as compared with timber
shuttering. For estimation purpose, number of reuses can
be taken as 20 to 25.
Advantages
• Plywood can also be cut into
required size easily.
• Plywood Strong, durable and
light in weight.
• Provides smooth finish on the
surface.
• Very Large size plywood sheets
are available which makes the
construction of formwork
quicker and easier.
• Curved formworks can also be
prepared using plywood.
• When compared to timber, it
gives more number of reuses.
Disadvantages
• When compared to timber
it is costly.
• Thin plywood sheets cannot
sustain the weight of
concrete they may bow out
if proper thickness is not
provided.
Steel Formwork
• This consist of panels fabricated out of thin steel plates
stiffened along the edges by small steel angles.
• The panel units can be held together through the use of
suitable clamps or bolts and nuts.
• The panels can be fabricated in large number in any
desired modular shape or size.
• Steel forms are largely used in large projects or in situation
where large number reuses of the shuttering is possible.
• This type of shuttering is considered most suitable for
circular or curved structures.
Advantages
• Very strong and able to
carry heavy load.
• Easy to be fixed.
• Uniform size and surface.
• Can be used for a very long
time.
Disadvantages
• Limited size or shape.
• Excessive loss of heat.
• A very smooth surface will
be produced which would
give problems for finishing
process.
Steel forms compared with timber
formwork
• Steel forms are stronger, durable and have longer life than
timber formwork and their reuses are more in number.
• Steel forms can be installed and dismantled with greater
ease and speed.
• The quality of exposed concrete surface by using steel forms
is good and such surfaces need no further treatment.
• Steel formwork does not absorb moisture from concrete.
• Steel formwork does not shrink or warp.
Aluminum Formwork
• It is used often for pre-fabricated formworks.
• It is getting more popular because of its light weight and
good strength.
• It requires fewer supports and ties.
Advantages
• Easy to fix and easy to
dismantle.
• It can be handled easily
because of its light weight.
• It can be re-used for many
times.
• The walls and slabs of
structures can be casted
simultaneously.
• Monolithic crack free
structures can be built using
aluminum formwork.
Disadvantages
• When the load reaches its
maximum limit, the lighter
sections may deflect.
• Architectural modifications
are not possible when
aluminum formwork is
used.
Plastics Formwork
• Plastic is another type of formwork material which is used for
small concrete structures or for complex portions of the
structure.
• It is light in weight and durable for long periods. For
complicated concrete structures, Glass reinforced plastics (GRP)
and vacuum formed plastics are used.
Advantages
• Plastic is light in weight and
can be easily handled.
• Formwork for complex
shaped structures can be
prepared easily.
• Good resistant against
water.
• The damaged plastic sheets
can be recycled and useful
to make new sheets.
• Good quality plastic has
great re-usability.
Disadvantages
• Plastic is weak against heat.
• It is costly material.
• It does not take much load
when compared with
others.
Magnesium Formwork
• Magnesium is another metal element which is used for
formwork.
• Magnesium is not directly used for formwork and is used
with the combination of oxygen atoms which forms
magnesium oxide, usually called magnesia or MgO.
• Magnesium oxide boards or MgO boards are famous in
some countries because of their multiple applications.
• MgO boards are available in required sizes and grades.
Advantages
• Mgo boards are light in
weight and easy to handle.
• They are fire proof and
waterproof.
• Bio friendly boards cause no
harm to the environment.
• They are strong to resist
heavy loads.
Disadvantages
• When Mgo boards meet wet
concrete, the magnesium
chloride present in MgO
boards may dissolve and cause
corrosion to the
reinforcement.
• Skilled supervision is required
for installation.
• MgO boards cannot sustain in
humid conditions.
Fabric Formwork
• Fabric formwork is the modern technology in construction
sector.
• Fabric can be mold into any required shapes which makes
it more famous formwork for architectural purposes.
Order and Method of Removing
Formwork:
• The sequence of orders and method of removal of
formwork are as follows:
• Shuttering forming the vertical faces of walls, beams and
column sides should be removed first as they bear no load
but only retain the concrete.
• Shuttering forming soffit of slabs should be removed next.
• Shuttering forming soffit of beams, girders or other heavily
loaded shuttering should be removed in the end.
• Rapid hardening cement, warm weather and light loading
conditions allow early removal of formwork.
• The formwork should under no circumstances be allowed
to be removed until all the concrete reaches strength of at
least twice the stresses to which the concrete may be
subjected at the time of removal of formwork.
• All formworks should be eased gradually and carefully in
order to prevent the load being suddenly transferred to
concrete.
For more…. Mail to
aglaiaconnect2018@gmail.com
THANK YOU!!

More Related Content

What's hot

Industrial building
Industrial buildingIndustrial building
Industrial building
tausif_k
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
Rimpi Baro
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
purvi golecha
 
Jacketing
JacketingJacketing
Jacketing
SHAIKH ARSHAD
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
Kezar Ali. Shah
 
Underpinning
UnderpinningUnderpinning
Underpinning
Khuzema Olia
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
KHUSHBU SHAH
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
lalitha moorthy
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
Divya Vishnoi
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Rajesh Burde
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
Construction Tech. and Mgmt., VNIT Nagpur
 
footing
footingfooting
footing
illpa
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
GAURAV. H .TANDON
 
Building Components
Building ComponentsBuilding Components
Building Components
GAURAV. H .TANDON
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
Surhan Fatima
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
Simran Aggarwal
 
Mivan shuttering
Mivan shutteringMivan shuttering
Mivan shuttering
Tharun Chowdary Mannava
 
Concrete
ConcreteConcrete
Concrete
Sameer Nawab
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
Puneet Chhonker
 

What's hot (20)

Industrial building
Industrial buildingIndustrial building
Industrial building
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Jacketing
JacketingJacketing
Jacketing
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
footing
footingfooting
footing
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
Building Components
Building ComponentsBuilding Components
Building Components
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
Mivan shuttering
Mivan shutteringMivan shuttering
Mivan shuttering
 
Concrete
ConcreteConcrete
Concrete
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 

Similar to Types of formwork

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
I'mMiss Lily
 
Formwork
FormworkFormwork
Formwork
Shakil Ahmmad
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
Anoop Banshiwal
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
santoshkumar gurme
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
Ankit Singhai
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
Musahiddin Md Zainal
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdf
Nithyashree594058
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
Kishor Ade
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
UjasPandya2
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
ErankajKumar
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
Pradumn Suryakar
 
Concrete structure presentation
Concrete structure presentation Concrete structure presentation
Concrete structure presentation
EmHetchMaidabino
 
Bubble deck slab ppt
Bubble deck slab pptBubble deck slab ppt
Bubble deck slab ppt
prashanth prashu
 
Bubbleds 170408171346
Bubbleds 170408171346Bubbleds 170408171346
Bubbleds 170408171346
1212140039
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
jagrutib22
 
Formwork
FormworkFormwork
Formwork
kajol panchal
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
adarshkaushik6
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slab
DC Graphics
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
SAGAR RAUT
 

Similar to Types of formwork (20)

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Formwork
FormworkFormwork
Formwork
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdf
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
Concrete structure presentation
Concrete structure presentation Concrete structure presentation
Concrete structure presentation
 
Bubble deck slab ppt
Bubble deck slab pptBubble deck slab ppt
Bubble deck slab ppt
 
Bubbleds 170408171346
Bubbleds 170408171346Bubbleds 170408171346
Bubbleds 170408171346
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
Formwork
FormworkFormwork
Formwork
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slab
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 

More from Aglaia Connect

Underground construction
Underground constructionUnderground construction
Underground construction
Aglaia Connect
 
Self curing-concrete-
Self curing-concrete-Self curing-concrete-
Self curing-concrete-
Aglaia Connect
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
Aglaia Connect
 
Reactive powder-concrete
Reactive powder-concreteReactive powder-concrete
Reactive powder-concrete
Aglaia Connect
 
Stress ribbon-bridges
Stress ribbon-bridgesStress ribbon-bridges
Stress ribbon-bridges
Aglaia Connect
 
Self healing-material-bacterial-concrete
Self healing-material-bacterial-concreteSelf healing-material-bacterial-concrete
Self healing-material-bacterial-concrete
Aglaia Connect
 
Structural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteStructural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concrete
Aglaia Connect
 
Aerated autoclaved-concrete
Aerated autoclaved-concreteAerated autoclaved-concrete
Aerated autoclaved-concrete
Aglaia Connect
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
Aglaia Connect
 
Tube structures
Tube structuresTube structures
Tube structures
Aglaia Connect
 
Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete
Aglaia Connect
 
Computer ethics
Computer ethics Computer ethics
Computer ethics
Aglaia Connect
 
Plastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis processPlastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis process
Aglaia Connect
 
Geotextile for soil stabilization
Geotextile for soil stabilizationGeotextile for soil stabilization
Geotextile for soil stabilization
Aglaia Connect
 
Corrosion control of underwater piles
Corrosion control of underwater pilesCorrosion control of underwater piles
Corrosion control of underwater piles
Aglaia Connect
 
Constucted wetlands for waste water treatment
Constucted wetlands for waste water treatmentConstucted wetlands for waste water treatment
Constucted wetlands for waste water treatment
Aglaia Connect
 
Coconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteCoconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concrete
Aglaia Connect
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavement
Aglaia Connect
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Aglaia Connect
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavement
Aglaia Connect
 

More from Aglaia Connect (20)

Underground construction
Underground constructionUnderground construction
Underground construction
 
Self curing-concrete-
Self curing-concrete-Self curing-concrete-
Self curing-concrete-
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Reactive powder-concrete
Reactive powder-concreteReactive powder-concrete
Reactive powder-concrete
 
Stress ribbon-bridges
Stress ribbon-bridgesStress ribbon-bridges
Stress ribbon-bridges
 
Self healing-material-bacterial-concrete
Self healing-material-bacterial-concreteSelf healing-material-bacterial-concrete
Self healing-material-bacterial-concrete
 
Structural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteStructural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concrete
 
Aerated autoclaved-concrete
Aerated autoclaved-concreteAerated autoclaved-concrete
Aerated autoclaved-concrete
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
Tube structures
Tube structuresTube structures
Tube structures
 
Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete
 
Computer ethics
Computer ethics Computer ethics
Computer ethics
 
Plastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis processPlastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis process
 
Geotextile for soil stabilization
Geotextile for soil stabilizationGeotextile for soil stabilization
Geotextile for soil stabilization
 
Corrosion control of underwater piles
Corrosion control of underwater pilesCorrosion control of underwater piles
Corrosion control of underwater piles
 
Constucted wetlands for waste water treatment
Constucted wetlands for waste water treatmentConstucted wetlands for waste water treatment
Constucted wetlands for waste water treatment
 
Coconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteCoconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concrete
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavement
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavement
 

Recently uploaded

❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
Geoffrey Wardle. MSc. MSc. Snr.MAIAA
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
supriyaDicholkar1
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
aarusi sexy model
 

Recently uploaded (20)

❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
 

Types of formwork

  • 2. Formwork • It is used as a mould for a structure in which fresh concrete is poured only to harden subsequently. • Types of concrete formwork construction depends on formwork material and type of structural element. • Formworks can also be named based on the type of structural member construction such as slab formwork for use in slab, beam formwork, column formwork for use in beams and columns respectively etc. • The construction of formwork takes time and involves expenditure upto 20 to 25% of the cost of the structure or even more.
  • 3. • Design of these temporary structures are made to economic expenditure. • The operation of removing the formwork is known as stripping. Stripped formwork can be reused. • Reusable forms are known as panel forms and non-usable are called stationary forms.
  • 4. Requirements of a formwork • It should be strong enough to withstand all types of dead and live loads. • It should be rigidly constructed and efficiently propped and braced both horizontally and vertically, so as to retain its shape. • The joints in the formwork should be tight against leakage of cement grout. • Construction of formwork should permit removal of various parts in desired sequences without damage to the concrete. • The material of the formwork should be cheap, easily available and should be suitable for reuse.
  • 5. • The formwork should be set accurately to the desired line and levels should have plane surface. • It should be as light as possible. • The material of the formwork should not warp or get distorted when exposed to the elements. • It should rest on firm base.
  • 6. Types of Formwork 1. Timber Formwork 2. Steel formwork 3. Plywood formwork
  • 7. Timber Formwork • It should be 1. well seasoned 2. light in weight 3. easily workable with nails without splitting 4. free from loose knots • Timber used for shuttering for exposed concrete work should have smooth and even surface on all faces which come in contact with concrete.
  • 8.
  • 9. Advantages • Easy handling because it’s light weight. • Easy to disassemble. • Damaged parts can be replaced with new one. • Very flexible. Disadvantages • Can’t be used for long. • If the timber is dry, it will absorb moisture from wet concrete which could weaken the resultant concrete member. • Timber with high moisture content ,wet concrete will shrink & cup leading to open joints & leakage of grout.
  • 10. Plywood Formwork • Resin bonded plywood sheets are attached to timber frames to make up panels of required sizes. • The cost of plywood formwork compares favourably with that of timber shuttering and it may even prove cheaper in certain cases in view of the following considerations: • It is possible to have smooth finish in which case on cost in surface finishing is there. • By use of large size panels it is possible to effect saving in the labour cost of fixing and dismantling. • Number of reuses are more as compared with timber shuttering. For estimation purpose, number of reuses can be taken as 20 to 25.
  • 11. Advantages • Plywood can also be cut into required size easily. • Plywood Strong, durable and light in weight. • Provides smooth finish on the surface. • Very Large size plywood sheets are available which makes the construction of formwork quicker and easier. • Curved formworks can also be prepared using plywood. • When compared to timber, it gives more number of reuses. Disadvantages • When compared to timber it is costly. • Thin plywood sheets cannot sustain the weight of concrete they may bow out if proper thickness is not provided.
  • 12.
  • 13. Steel Formwork • This consist of panels fabricated out of thin steel plates stiffened along the edges by small steel angles. • The panel units can be held together through the use of suitable clamps or bolts and nuts. • The panels can be fabricated in large number in any desired modular shape or size. • Steel forms are largely used in large projects or in situation where large number reuses of the shuttering is possible. • This type of shuttering is considered most suitable for circular or curved structures.
  • 14. Advantages • Very strong and able to carry heavy load. • Easy to be fixed. • Uniform size and surface. • Can be used for a very long time. Disadvantages • Limited size or shape. • Excessive loss of heat. • A very smooth surface will be produced which would give problems for finishing process.
  • 15.
  • 16. Steel forms compared with timber formwork • Steel forms are stronger, durable and have longer life than timber formwork and their reuses are more in number. • Steel forms can be installed and dismantled with greater ease and speed. • The quality of exposed concrete surface by using steel forms is good and such surfaces need no further treatment. • Steel formwork does not absorb moisture from concrete. • Steel formwork does not shrink or warp.
  • 17. Aluminum Formwork • It is used often for pre-fabricated formworks. • It is getting more popular because of its light weight and good strength. • It requires fewer supports and ties.
  • 18. Advantages • Easy to fix and easy to dismantle. • It can be handled easily because of its light weight. • It can be re-used for many times. • The walls and slabs of structures can be casted simultaneously. • Monolithic crack free structures can be built using aluminum formwork. Disadvantages • When the load reaches its maximum limit, the lighter sections may deflect. • Architectural modifications are not possible when aluminum formwork is used.
  • 19. Plastics Formwork • Plastic is another type of formwork material which is used for small concrete structures or for complex portions of the structure. • It is light in weight and durable for long periods. For complicated concrete structures, Glass reinforced plastics (GRP) and vacuum formed plastics are used.
  • 20. Advantages • Plastic is light in weight and can be easily handled. • Formwork for complex shaped structures can be prepared easily. • Good resistant against water. • The damaged plastic sheets can be recycled and useful to make new sheets. • Good quality plastic has great re-usability. Disadvantages • Plastic is weak against heat. • It is costly material. • It does not take much load when compared with others.
  • 21. Magnesium Formwork • Magnesium is another metal element which is used for formwork. • Magnesium is not directly used for formwork and is used with the combination of oxygen atoms which forms magnesium oxide, usually called magnesia or MgO. • Magnesium oxide boards or MgO boards are famous in some countries because of their multiple applications. • MgO boards are available in required sizes and grades.
  • 22. Advantages • Mgo boards are light in weight and easy to handle. • They are fire proof and waterproof. • Bio friendly boards cause no harm to the environment. • They are strong to resist heavy loads. Disadvantages • When Mgo boards meet wet concrete, the magnesium chloride present in MgO boards may dissolve and cause corrosion to the reinforcement. • Skilled supervision is required for installation. • MgO boards cannot sustain in humid conditions.
  • 23.
  • 24. Fabric Formwork • Fabric formwork is the modern technology in construction sector. • Fabric can be mold into any required shapes which makes it more famous formwork for architectural purposes.
  • 25. Order and Method of Removing Formwork: • The sequence of orders and method of removal of formwork are as follows: • Shuttering forming the vertical faces of walls, beams and column sides should be removed first as they bear no load but only retain the concrete. • Shuttering forming soffit of slabs should be removed next. • Shuttering forming soffit of beams, girders or other heavily loaded shuttering should be removed in the end. • Rapid hardening cement, warm weather and light loading conditions allow early removal of formwork.
  • 26. • The formwork should under no circumstances be allowed to be removed until all the concrete reaches strength of at least twice the stresses to which the concrete may be subjected at the time of removal of formwork. • All formworks should be eased gradually and carefully in order to prevent the load being suddenly transferred to concrete.