尊敬的 微信汇率:1円 ≈ 0.046239 元 支付宝汇率:1円 ≈ 0.04633元 [退出登录]
SlideShare a Scribd company logo
1
 INTRODUCTION.
 PREFABRIC CONCEPT.
 PREFABRICATION.
 PREFABRIC COMPONENTS.
 ADVANTAGES AND DISADVANTAGES.
 CONCLUSIONS.
2
3
What is prefabrication?
 Prefabrication is the practice of assembling components
of a structure in a factory or other manufacturing site,
and transporting complete assemblies or sub-assemblies to
the construction site where the structure is to be located.
 It is combination of good design with modern high
performance components and quality controlled
manufacturing procedures.
 This work is carried out in two stages, manufacturing of
components in a place other than final location and their
erection in position.
4
 Prefabricated sections are produced in large quantities in a
factory and then shipped to various construction sites.
 This procedure may allow work to continue despite poor
weather conditions and should reduce any waste in time
and material at the site.
 Precast concrete units are cast and hardened before being
used for construction
 Sometimes builders cast components at the building site
and hoist them into place after they harden.
 This technique permits the speedy erection of structures.
5
 The Prefabrication as defined will be done in two stages
Manufacturing at factory condition and erection of
components at the required location.
 This requires certain stages of preparation. They are
 Casting.
 Curing.
 Transportation and erection.
 Casting: - Precast components are casted with controlled
cement concrete in moulds of required shape and sizes.
The vibrator is used to vibrate concrete and this removes
any honeycombing inside the components.
6
7
 Curing: - After 24 hours of casting, the casted
components are released from the mould and transported
to curing tanks. Certain special components like railway
sleepers where high strength is required are steam cured.
8
9
 Transportation and erection: - After complete curing is
done the components are transported to the site with
heavy trucks and erection will be done using cranes with
skilled labour force.
10
11
For Indian conditions partial prefabrication is well
suited.
12
13
Some of the prefabricated components are as explained
below
 Columns: - A column is a vertical member carrying the
beam and floor loadings to the foundation.
 It is a compression member and therefore the column
connection is required to be proper.
 The main principle involved in making column
connections is to ensure continuity and this can be
achieved by a variety of methods.
14
15
Column to Column Connection
 Beams: - Beams can vary in their complexity of design and
reinforcement from the very simple beam formed over an
isolated opening to the more common encountered in
frames where the beams transfer their loadings to the
column.
Methods of connecting beams and columns are
A precasting concrete haunch is cast on to the column
with a locating dowel or stud bolt to fix the beam.
A projecting metal corbel is fixed to the column and the
beam is bolted to the corbel.
Column and beam reinforcement, generally in the form
of hooks, are left exposed. The two members are
hooked together and covered with insitu concrete to
complete the joint.
This is as shown in the figure.
16
17
 Waffle unit for flooring / roofing: - These are suitable for
roofs / floors spanning in two directions.
 They are laid in a grid pattern.
 These units are cast in moulds.
 The saving achieved is not much. Also Shuttering are
complicated and costly.
 Time consumption for construction is less
18
19
20
SLAB TO BEAM CONNECTION
21
GLANCE AT BUILDING PROCESS
22
Advantages:
 Saving in cost, material, time & manpower.
 Shuttering and scaffolding is not necessary.
 Installation of building services and finishes can be done
immediately.
 Independent of weather condition.
 Components produced at close supervision .so quality is
good
23
Advantages:
 Clean and dry work at site.
 Possibility of alterations and reuse
 Correct shape and dimensions and sharp edges are
maintained.
 Very thin sections can be entirely precast with precision.
24
Disadvantages:
 Handling and transportation may cause breakages of
members during the transit and extra provision is to be
made.
 Difficulty in connecting precast units so as to produce
same effect as monolithic. This leads to non-monolithic
construction.
 They are to be exactly placed in position, otherwise the
loads coming on them are likely to get changed and the
member may be affected.
25
Disadvantages:
 High transport cost
 Need of erection equipment
 Skilled labour and supervision is required.
26
 The prefab components and prefab structures eliminate
space and time over conventional constructions.
 Although prefabrication is employed to a large extent in
a wide variety of countries, in India, construction
industry, in spite of its expansion continues to adopt
same conventional methods.
 The root of the economic problem is the fact that the
majority of the households do not have the confidence
needed to construct prefab houses.
 These structures are easy to erect as it is light material.
This type of prefab buildings were constructed in
earthquake prone areas of Lature and Gujarat.
27
 Google.com
 Britanica.com
 www.dictionaryofconstruction.com
 bkaviani.wordpress.com
 www.concrete.org.uk
 IE (I) Journal—AR
28
29

More Related Content

What's hot

Steel trusses
Steel trussesSteel trusses
Steel trusses
Roopa Chikkalgi
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
Eyad Reda
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
Kush Agarwal
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
Aishwarya Deopujari
 
Industrial building
Industrial buildingIndustrial building
Industrial building
tausif_k
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
JenilPatel22
 
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
nancy debora
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
Boopathi Raja
 
modular coordination
modular coordinationmodular coordination
modular coordination
Shailja km
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
shubham jain
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
Puneet Chhonker
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
Charlie Gupta
 
Flat slab
Flat slabFlat slab
Flat slab
Tarun kumar
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
9833356555
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
Ravi Savani
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation process
Udayram Patil
 
Joints in concrete
Joints in concreteJoints in concrete
Joints in concrete
Aglaia Connect
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Udisha15
 
Modular cordination
Modular cordinationModular cordination
Modular cordination
Shivangi Saini
 

What's hot (20)

Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Industrial building
Industrial buildingIndustrial building
Industrial building
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Flat slab
Flat slabFlat slab
Flat slab
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation process
 
Joints in concrete
Joints in concreteJoints in concrete
Joints in concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Modular cordination
Modular cordinationModular cordination
Modular cordination
 

Similar to Prefabrication construction

study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
Manisha Singh
 
Lecture 3 - Prefabrication and Prefabricated Structures.pptx
Lecture 3 - Prefabrication and Prefabricated Structures.pptxLecture 3 - Prefabrication and Prefabricated Structures.pptx
Lecture 3 - Prefabrication and Prefabricated Structures.pptx
behailuzerihun1
 
Precast
PrecastPrecast
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
Anees Khan
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
sathish sak
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
varun km
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
jamali husain
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdf
BiswaKeshanPanda1
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
ijsrd.com
 
Precast structure
Precast structurePrecast structure
Precast structure
piyush9392
 
Construction using Precast technology
Construction using Precast technologyConstruction using Precast technology
Construction using Precast technology
Shubham Arora
 
Modular High Rise Construction.pptx
Modular High Rise Construction.pptxModular High Rise Construction.pptx
Modular High Rise Construction.pptx
GeethikaSV
 
Super Structure Construction.pptx
Super Structure Construction.pptxSuper Structure Construction.pptx
Super Structure Construction.pptx
Ananthakumar75
 
Concrete repair
Concrete repairConcrete repair
Concrete repair
Hoda Yahyaei
 
Metroppt
MetropptMetroppt
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
ssusera0ac221
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
Yamini K
 
Building construction report
Building construction  reportBuilding construction  report
Building construction report
Aprajeeta Singh
 
Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptx
Ananthakumar75
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
Minh Bui Si
 

Similar to Prefabrication construction (20)

study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 
Lecture 3 - Prefabrication and Prefabricated Structures.pptx
Lecture 3 - Prefabrication and Prefabricated Structures.pptxLecture 3 - Prefabrication and Prefabricated Structures.pptx
Lecture 3 - Prefabrication and Prefabricated Structures.pptx
 
Precast
PrecastPrecast
Precast
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdf
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
 
Precast structure
Precast structurePrecast structure
Precast structure
 
Construction using Precast technology
Construction using Precast technologyConstruction using Precast technology
Construction using Precast technology
 
Modular High Rise Construction.pptx
Modular High Rise Construction.pptxModular High Rise Construction.pptx
Modular High Rise Construction.pptx
 
Super Structure Construction.pptx
Super Structure Construction.pptxSuper Structure Construction.pptx
Super Structure Construction.pptx
 
Concrete repair
Concrete repairConcrete repair
Concrete repair
 
Metroppt
MetropptMetroppt
Metroppt
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
 
Building construction report
Building construction  reportBuilding construction  report
Building construction report
 
Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptx
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 

More from Divya Vishnoi

Understanding of Disasters
Understanding of DisastersUnderstanding of Disasters
Understanding of Disasters
Divya Vishnoi
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
Divya Vishnoi
 
Hydropower
HydropowerHydropower
Hydropower
Divya Vishnoi
 
Spillways
SpillwaysSpillways
Spillways
Divya Vishnoi
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
Divya Vishnoi
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity dam
Divya Vishnoi
 
Gravity dam stability analysis
Gravity dam stability analysisGravity dam stability analysis
Gravity dam stability analysis
Divya Vishnoi
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floor
Divya Vishnoi
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
Divya Vishnoi
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
Divya Vishnoi
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
Divya Vishnoi
 
Building foundation
Building foundationBuilding foundation
Building foundation
Divya Vishnoi
 
Temporary structures
Temporary structuresTemporary structures
Temporary structures
Divya Vishnoi
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
Divya Vishnoi
 
Roof and roof covering
Roof and roof coveringRoof and roof covering
Roof and roof covering
Divya Vishnoi
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floor
Divya Vishnoi
 
Mortar plaster pointing
Mortar plaster pointingMortar plaster pointing
Mortar plaster pointing
Divya Vishnoi
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonry
Divya Vishnoi
 
Tension coefficient method
Tension coefficient methodTension coefficient method
Tension coefficient method
Divya Vishnoi
 
IS 13827
IS 13827IS 13827
IS 13827
Divya Vishnoi
 

More from Divya Vishnoi (20)

Understanding of Disasters
Understanding of DisastersUnderstanding of Disasters
Understanding of Disasters
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
 
Hydropower
HydropowerHydropower
Hydropower
 
Spillways
SpillwaysSpillways
Spillways
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity dam
 
Gravity dam stability analysis
Gravity dam stability analysisGravity dam stability analysis
Gravity dam stability analysis
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floor
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
Building foundation
Building foundationBuilding foundation
Building foundation
 
Temporary structures
Temporary structuresTemporary structures
Temporary structures
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Roof and roof covering
Roof and roof coveringRoof and roof covering
Roof and roof covering
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floor
 
Mortar plaster pointing
Mortar plaster pointingMortar plaster pointing
Mortar plaster pointing
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonry
 
Tension coefficient method
Tension coefficient methodTension coefficient method
Tension coefficient method
 
IS 13827
IS 13827IS 13827
IS 13827
 

Recently uploaded

Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
supriyaDicholkar1
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
dulbh kashyap
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
DharmaBanothu
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
aarusi sexy model
 

Recently uploaded (20)

Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
 

Prefabrication construction

  • 1. 1
  • 2.  INTRODUCTION.  PREFABRIC CONCEPT.  PREFABRICATION.  PREFABRIC COMPONENTS.  ADVANTAGES AND DISADVANTAGES.  CONCLUSIONS. 2
  • 3. 3
  • 4. What is prefabrication?  Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located.  It is combination of good design with modern high performance components and quality controlled manufacturing procedures.  This work is carried out in two stages, manufacturing of components in a place other than final location and their erection in position. 4
  • 5.  Prefabricated sections are produced in large quantities in a factory and then shipped to various construction sites.  This procedure may allow work to continue despite poor weather conditions and should reduce any waste in time and material at the site.  Precast concrete units are cast and hardened before being used for construction  Sometimes builders cast components at the building site and hoist them into place after they harden.  This technique permits the speedy erection of structures. 5
  • 6.  The Prefabrication as defined will be done in two stages Manufacturing at factory condition and erection of components at the required location.  This requires certain stages of preparation. They are  Casting.  Curing.  Transportation and erection.  Casting: - Precast components are casted with controlled cement concrete in moulds of required shape and sizes. The vibrator is used to vibrate concrete and this removes any honeycombing inside the components. 6
  • 7. 7
  • 8.  Curing: - After 24 hours of casting, the casted components are released from the mould and transported to curing tanks. Certain special components like railway sleepers where high strength is required are steam cured. 8
  • 9. 9
  • 10.  Transportation and erection: - After complete curing is done the components are transported to the site with heavy trucks and erection will be done using cranes with skilled labour force. 10
  • 11. 11
  • 12. For Indian conditions partial prefabrication is well suited. 12
  • 13. 13
  • 14. Some of the prefabricated components are as explained below  Columns: - A column is a vertical member carrying the beam and floor loadings to the foundation.  It is a compression member and therefore the column connection is required to be proper.  The main principle involved in making column connections is to ensure continuity and this can be achieved by a variety of methods. 14
  • 15. 15 Column to Column Connection
  • 16.  Beams: - Beams can vary in their complexity of design and reinforcement from the very simple beam formed over an isolated opening to the more common encountered in frames where the beams transfer their loadings to the column. Methods of connecting beams and columns are A precasting concrete haunch is cast on to the column with a locating dowel or stud bolt to fix the beam. A projecting metal corbel is fixed to the column and the beam is bolted to the corbel. Column and beam reinforcement, generally in the form of hooks, are left exposed. The two members are hooked together and covered with insitu concrete to complete the joint. This is as shown in the figure. 16
  • 17. 17
  • 18.  Waffle unit for flooring / roofing: - These are suitable for roofs / floors spanning in two directions.  They are laid in a grid pattern.  These units are cast in moulds.  The saving achieved is not much. Also Shuttering are complicated and costly.  Time consumption for construction is less 18
  • 19. 19
  • 20. 20 SLAB TO BEAM CONNECTION
  • 22. 22
  • 23. Advantages:  Saving in cost, material, time & manpower.  Shuttering and scaffolding is not necessary.  Installation of building services and finishes can be done immediately.  Independent of weather condition.  Components produced at close supervision .so quality is good 23
  • 24. Advantages:  Clean and dry work at site.  Possibility of alterations and reuse  Correct shape and dimensions and sharp edges are maintained.  Very thin sections can be entirely precast with precision. 24
  • 25. Disadvantages:  Handling and transportation may cause breakages of members during the transit and extra provision is to be made.  Difficulty in connecting precast units so as to produce same effect as monolithic. This leads to non-monolithic construction.  They are to be exactly placed in position, otherwise the loads coming on them are likely to get changed and the member may be affected. 25
  • 26. Disadvantages:  High transport cost  Need of erection equipment  Skilled labour and supervision is required. 26
  • 27.  The prefab components and prefab structures eliminate space and time over conventional constructions.  Although prefabrication is employed to a large extent in a wide variety of countries, in India, construction industry, in spite of its expansion continues to adopt same conventional methods.  The root of the economic problem is the fact that the majority of the households do not have the confidence needed to construct prefab houses.  These structures are easy to erect as it is light material. This type of prefab buildings were constructed in earthquake prone areas of Lature and Gujarat. 27
  • 28.  Google.com  Britanica.com  www.dictionaryofconstruction.com  bkaviani.wordpress.com  www.concrete.org.uk  IE (I) Journal—AR 28
  • 29. 29