DEFINITION OF FORMWORK
Formwork is amould or open box, like container into
which fresh concrete is poured and compacted.
When the concrete is set, the formwork is removed and a
solid mass is produced in the shape of the inner face of
the formwork.
It should be capable of carrying all imposed dead and
live loads apart from its own weight.
REQUIREMENTS OF AGOOD FORMWORK
Materials should be cheap and reusable.
Swelling and shrinkage should be minimum.
Surface should be smooth, and afford easystripping.
Light in weight , so that easy to transfer.
It should be practically water proof , so that it should not absorb
water from concrete.
The material of formwork should not warp or get distorted when
exposed to the elements.
The joints in the formwork should be tight against leakage of
cement grout.
 Deflection should be minimum.
CATEGORIES OF FORMWORK
CONVENTIONAL: The formwork is built on site out of timber or moisture -
resistant particle board. It is easy to produce but time -consuming for larger
structures, and the plywood facing has a relatively short lifespan. It is still used
extensively where the labour costs are lower than the costs for procuring
reusable formwork.
M ODERN-DAY FORMWORK :This formwork system are
mostly modular, which are designed for speed and
efficiency. The main types of formwork systems in used
now are
 Table form/flying formwork
 System column formwork
 Slip formwork
 Tunnel formwork
ENGINEERED/PRE-FABRICATED FORMWORK: This formwork is
built out of prefabricated modules with a metal frame (usually steel
or aluminium) and covered on the application (concrete) side with
material having the wanted surface structure (steel, aluminium,
timber, etc.).
Major objectives considered in formwork
 Quality
 Safety
 Economy
Quality:
Forms must be designed and built with sufficient
stiffness and accuracy so that the size, shape, position, and
finish of the cast concrete are maintained .
Safety:
Forms must be built sufficient strength and factor of
safety so that they have the capable of all supporting
loads .
Economy:
Forms must be built efficiently, minimizing time and
cost.
TYPESOF FORMWORK MATERIALS
TIMBER
STEEL
PLASTIC
ALUMINIUM
TIMBER FORMWORK:
Most common material used for
bracing the member, hence called
as the traditional formwork.
Can easily be cut to size on site.
ADVANTAGES OF TIMBERFORMWORK:
 Easy handling because its light weight.
 Easy to disassemble.
 Damaged parts can be replaced with new one.
 It has good thermal insulation which makes it
useful to be used in colder regions.
 Reduced site labour.
 Can be built to exceed 60 year design life.
DISADVANTAGES OF TIMBERFORMWORK:
 Can’t be used for long, have limited reuse.
 If timber is dry, it will absorb moisture from wet
concrete which could weaken the resultant concrete
member.
 Timber with high moisture content (more than
20% moisture content), wet concrete will
shrink & cup
leading to open joints & leakage of grout.
STEEL FORMWORK:
Steel forms are stronger,
durable and have longer life
than timber formwork and
their reuses are more in
number.
Steel forms can be installed
and dismantled with
greater ease and speed.
ADVANTAGES OF STEELFORMWORK:
 Very strong and able to carry loads
 Easy to be fixed.
 Uniform size and surface.
 Can be used for more number of times.
 More durable than timber formwork.
 No shrinkage of formwork occurs.
DISADVANTAGES OF STEELFORMWORK:
 More expensive than wood.
 Due to high weight handlingis difficult.
 Excessive lossof heat.
 Limited size and shape.
PLASTICFORMWORK:
ADVANTAGES OF PLASTICFORMWORK:
 Light weight.
 Reusable.
 Chemical resistant.
 Fungus and termites resistant.
 Can be easily cut and nail by using wood working.
 Damages on the formwork can be easily removed.
 Very useful for complex shaped and special features.
DISADVANTAGES OF PLASTICFORMWORK:
 Expensive at first.
 Load carrying capacity low.
 Damage the plastic by the heat.
ALUMINIUM FORMWORK:
Aluminium is strong and light,
and consequently fewer,
supports and ties are required.
ADVANTAGES OF ALUMINIUM FORMWORK:
 Monolithic crack free structures.
 Doesn’t require timber or plywood for construction
activities.
 Casting of walls and slabs possible simultaneously.
 Doesn’t required skilled labour.
DISADVANTAGES OF ALUMINIUM FORMWORK:
 Architectural changes are not possible on the structure.
 Due to the tremendous speed of construction, working
capital finance needs to the planned in advance.
PROCESS OF FORMWORK
CONSTRUCTION
FORMWORK FOR VARIOUS STRUCTURAL MEMBERS
FORMWORKFOR WALL
It consists of
-Timber sheeting
-Vertical posts
-Horizontal member
-Rackers
-Stakes
-Wedges
Wall formwork and its components
FORMWORK FOR COLUMN
Itconsistsof
-Side and end planks
-Yoke
-Nuts and bolts
Two end and two side planks are joined by
the yokes and bolts.
Erection s equence for a column:
cleared fPrior to positioning column formwork check that steel for the columnhas been inspected and
or casting.
- Position formwork for the column from predeterminedgrids.
- Plumb formwork both ways and securely support using adjustable steel props.
- The propping angle should be 45° to the floor.
- Ensure the steel props are safely secured to the column formwork and
the floor, and that adjustment for pushing and pulling isoperational.
- Set out the positions of column clamps from a storeyrod.
- Transfer the column clamp positions from the storey rod onto columnformwork.
- Use nails to support the arms of column clamps while wedging.
- Position and wedge the bottom, middle and top clampssets.
- Check the formwork at the top for square.
- Position and wedge the remainder of the columnclamps.
- Using a plumb bob suspended from a gauge block plumb the column
 When all the column formwork is securely propped a final check must be ma
de for plumb and column alignment before and immediately after the
concrete has been poured and vibrated.
Formwork for staircase
 Points to consider when designing
staircase formwork:
Stair formwork must support the weight
of concrete.
Because of the slope of the stair, some of
the force is transmitted to the sideways. All
formwork must be well tied together to
prevent sideway movement.
Erection sequence for a beam:
 Marking out and setting height for formwork
 Assemble and position props, adjustable head jacks, formworks,
bearers and spreaders.
 Construct and erect sidewalls and beam soffit.
 Position of sole plates.
DESHUTTERING
“DESHUTTERING” means the process of removing the shuttering.
Order and method of removing formwork:
Shutte ri ng formi ng verti cal fac es of wal ls, beams
and colum ns sho ul d be re moved firs t. Shutte ri ng
form ing soffit to slab sho ul d be re moved ne xt.
Shutte ri ng formi ng soffit to beams or othe r
he avy loade d members sho ul d be re moved in the
end.
Time of removal of formwork:
Sl
.
N
o
Structural Member
OPC
(Ordinary Portland
Cement)
Rapid
Hardening
Cement
1 Beam sides, walls & Columns 2-3 Days 2 Days
2 Slab (Vertical Supports remains intact) 4 Days 3 Days
3 Slab (Complete Formwork removal) 10 Days 5 Days
4 Beams (Removal of Sheeting,
Props remains intact)
8 Days 5 Days
5 Beams & Arches (Complete formwork
removal) (up to 6 m span)
14 Days 5-8 Days
6 Beams & Arches (Complete
formwork removal) (more than 6 m
span)
21 Days 8-10 Days
Cost of formwork:
For normal works formwork costs about 30 -40% of
the concrete cost.
Failure of formwork
 Generally someunexpectedeventcausesone member
tofail,thenothersbecomeoverloaded ormisaligneda
ndtheentireformwork
structurecollapses.
 Vibration.
 Inadequatebracing.
 Unstablesoilunderfoundations.
 Inadequatecontrolofconcrete placement.
 Lackofattentionofformworkdetails.
 Inadequatecrossbracingandhorizontal
bracingofshores.
 Passingtraffic.
 Movementof workers andequipmenton the
formwork.
SAFETY PRECAUTION
 Mate ri al us ed for the construc tion of form wo rk must ful fill the
specificati on.
 Formwo rk is fixed firml y and pro perl y.
 Construc tion are a must be pro tected to pre vent vandal ism of
form wo rk .
 Warni ng sign must be put up at the are a whe re the form wo rk
is fixed to pre vent entranc e of people that may dam ag e the
form wo rk .
 The form wo rk must be inspected before the conc re te is po ure d.
Reference- N. Natesh

More Related Content

What's hot

Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and construction
EyobAlene1
 
Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in construction
sandeepasandaruwan1
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
Wilden How
 
Formwork
FormworkFormwork
Formwork
Shakil Ahmmad
 
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
gayathrysatheesan1
 
Types of roof
Types of roofTypes of roof
Types of roof
Aamir Farhan Sheikh
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
SAGAR RAUT
 
Scaffoldings
ScaffoldingsScaffoldings
Scaffoldings
Aglaia Connect
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
purvi golecha
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
Aglaia Connect
 
Steel structures
Steel structuresSteel structures
Steel structures
Sukhdarshan Singh
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
toshi gupta
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
Structural steel
Structural steelStructural steel
Structural steel
vinod singh
 
Roof structures and Types of roofs
Roof structures and Types of roofsRoof structures and Types of roofs
Roof structures and Types of roofs
Abhishek kumar
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
Est chua
 
Water proofing-membrane
Water proofing-membraneWater proofing-membrane
Water proofing-membrane
primary information services
 
STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.
Mehul Gohil
 
Fabric - Building construction material
Fabric - Building construction materialFabric - Building construction material
Fabric - Building construction material
Denis Patel
 
building defects & remidies
building  defects & remidiesbuilding  defects & remidies
building defects & remidies
Kirtika Gupta
 

What's hot (20)

Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and construction
 
Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in construction
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Formwork
FormworkFormwork
Formwork
 
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
 
Types of roof
Types of roofTypes of roof
Types of roof
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 
Scaffoldings
ScaffoldingsScaffoldings
Scaffoldings
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Steel structures
Steel structuresSteel structures
Steel structures
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Structural steel
Structural steelStructural steel
Structural steel
 
Roof structures and Types of roofs
Roof structures and Types of roofsRoof structures and Types of roofs
Roof structures and Types of roofs
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Water proofing-membrane
Water proofing-membraneWater proofing-membrane
Water proofing-membrane
 
STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.
 
Fabric - Building construction material
Fabric - Building construction materialFabric - Building construction material
Fabric - Building construction material
 
building defects & remidies
building  defects & remidiesbuilding  defects & remidies
building defects & remidies
 

Similar to Farmwork shuttering

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 
Formwork
FormworkFormwork
Formwork
kajol panchal
 
Formwork
FormworkFormwork
Formwork
snehakaira
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
I'mMiss Lily
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
ErankajKumar
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
santoshkumar gurme
 
Formwork
FormworkFormwork
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
KHUSHBU SHAH
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
UjasPandya2
 
Shuttering PPT.pptx
Shuttering PPT.pptxShuttering PPT.pptx
Shuttering PPT.pptx
wwwuditmeghwal2000
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
Mr Amol Ghogare
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
Anoop Banshiwal
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
ReigerRoyal
 
Formwork
FormworkFormwork
Formwork
rmeena99
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
LiesaStone
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
Form Work
Form Work Form Work
Form Work
Kezar Ali. Shah
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
Mr Amol Ghogare
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
Pradumn Suryakar
 

Similar to Farmwork shuttering (20)

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
Formwork
FormworkFormwork
Formwork
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
Shuttering PPT.pptx
Shuttering PPT.pptxShuttering PPT.pptx
Shuttering PPT.pptx
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
 
Formwork
FormworkFormwork
Formwork
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Formwork
FormworkFormwork
Formwork
 
Form Work
Form Work Form Work
Form Work
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 

More from Kishor Ade

Motivation
MotivationMotivation
Motivation
Kishor Ade
 
Contouring
ContouringContouring
Contouring
Kishor Ade
 
Balbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavitaBalbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavita
Kishor Ade
 
THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]
Kishor Ade
 
First lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college PuneFirst lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college Pune
Kishor Ade
 
Demolition work of existing building
Demolition work of existing buildingDemolition work of existing building
Demolition work of existing building
Kishor Ade
 
Levelling
LevellingLevelling
Levelling
Kishor Ade
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
Kishor Ade
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Kishor Ade
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
Kishor Ade
 
Compass surveying
Compass surveying Compass surveying
Compass surveying
Kishor Ade
 
Natural Beauty of India...............!
Natural Beauty of India...............!Natural Beauty of India...............!
Natural Beauty of India...............!
Kishor Ade
 
Life will be never ending..........!
Life will be never ending..........!Life will be never ending..........!
Life will be never ending..........!
Kishor Ade
 
Structures-V
Structures-VStructures-V
Structures-V
Kishor Ade
 
Specification Writing-I
Specification Writing-I Specification Writing-I
Specification Writing-I
Kishor Ade
 
Research Methodology Module-08
Research Methodology Module-08Research Methodology Module-08
Research Methodology Module-08
Kishor Ade
 
Research Methodology Module-07
Research Methodology Module-07Research Methodology Module-07
Research Methodology Module-07
Kishor Ade
 
Research Methodology Module-06
Research Methodology Module-06Research Methodology Module-06
Research Methodology Module-06
Kishor Ade
 
Research Methodology Module-05
Research Methodology Module-05Research Methodology Module-05
Research Methodology Module-05
Kishor Ade
 
Research Methodology Module-04
Research Methodology Module-04Research Methodology Module-04
Research Methodology Module-04
Kishor Ade
 

More from Kishor Ade (20)

Motivation
MotivationMotivation
Motivation
 
Contouring
ContouringContouring
Contouring
 
Balbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavitaBalbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavita
 
THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]
 
First lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college PuneFirst lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college Pune
 
Demolition work of existing building
Demolition work of existing buildingDemolition work of existing building
Demolition work of existing building
 
Levelling
LevellingLevelling
Levelling
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass surveying
Compass surveying Compass surveying
Compass surveying
 
Natural Beauty of India...............!
Natural Beauty of India...............!Natural Beauty of India...............!
Natural Beauty of India...............!
 
Life will be never ending..........!
Life will be never ending..........!Life will be never ending..........!
Life will be never ending..........!
 
Structures-V
Structures-VStructures-V
Structures-V
 
Specification Writing-I
Specification Writing-I Specification Writing-I
Specification Writing-I
 
Research Methodology Module-08
Research Methodology Module-08Research Methodology Module-08
Research Methodology Module-08
 
Research Methodology Module-07
Research Methodology Module-07Research Methodology Module-07
Research Methodology Module-07
 
Research Methodology Module-06
Research Methodology Module-06Research Methodology Module-06
Research Methodology Module-06
 
Research Methodology Module-05
Research Methodology Module-05Research Methodology Module-05
Research Methodology Module-05
 
Research Methodology Module-04
Research Methodology Module-04Research Methodology Module-04
Research Methodology Module-04
 

Recently uploaded

adjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammaradjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammar
7DFarhanaMohammed
 
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
220711130083 SUBHASHREE RAKSHIT  Internet resources for social science220711130083 SUBHASHREE RAKSHIT  Internet resources for social science
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
Kalna College
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
chaudharyreet2244
 
Accounting for Restricted Grants When and How To Record Properly
Accounting for Restricted Grants  When and How To Record ProperlyAccounting for Restricted Grants  When and How To Record Properly
Accounting for Restricted Grants When and How To Record Properly
TechSoup
 
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
Nguyen Thanh Tu Collection
 
Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
whatchangedhowreflec
 
Post init hook in the odoo 17 ERP Module
Post init hook in the  odoo 17 ERP ModulePost init hook in the  odoo 17 ERP Module
Post init hook in the odoo 17 ERP Module
Celine George
 
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
ShwetaGawande8
 
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
family welfare programme-pptx details welfare
family welfare programme-pptx details welfarefamily welfare programme-pptx details welfare
family welfare programme-pptx details welfare
AnushreeBhunia
 
How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17
Celine George
 
CapTechTalks Webinar Slides June 2024 Donovan Wright.pptx
CapTechTalks Webinar Slides June 2024 Donovan Wright.pptxCapTechTalks Webinar Slides June 2024 Donovan Wright.pptx
CapTechTalks Webinar Slides June 2024 Donovan Wright.pptx
CapitolTechU
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
Derek Wenmoth
 
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
biruktesfaye27
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
Kalna College
 
Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17
Celine George
 
220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx
Kalna College
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
khabri85
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
OH TEIK BIN
 
220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology
Kalna College
 

Recently uploaded (20)

adjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammaradjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammar
 
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
220711130083 SUBHASHREE RAKSHIT  Internet resources for social science220711130083 SUBHASHREE RAKSHIT  Internet resources for social science
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
 
Accounting for Restricted Grants When and How To Record Properly
Accounting for Restricted Grants  When and How To Record ProperlyAccounting for Restricted Grants  When and How To Record Properly
Accounting for Restricted Grants When and How To Record Properly
 
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
 
Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
 
Post init hook in the odoo 17 ERP Module
Post init hook in the  odoo 17 ERP ModulePost init hook in the  odoo 17 ERP Module
Post init hook in the odoo 17 ERP Module
 
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
 
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
 
family welfare programme-pptx details welfare
family welfare programme-pptx details welfarefamily welfare programme-pptx details welfare
family welfare programme-pptx details welfare
 
How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17
 
CapTechTalks Webinar Slides June 2024 Donovan Wright.pptx
CapTechTalks Webinar Slides June 2024 Donovan Wright.pptxCapTechTalks Webinar Slides June 2024 Donovan Wright.pptx
CapTechTalks Webinar Slides June 2024 Donovan Wright.pptx
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
 
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
 
Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17
 
220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
 
220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology
 

Farmwork shuttering

  • 2. CONTENTS • DEFINITION OFFORMWORK • REQUIREMENTS OFA GOOD FORMWORK • CATEGORIES OF FORMWORK • TYPES OFFORMWORK • PROCESS OFFORM WORKCONSTRUCTION • DESHUTTERING • FAILURE OF FORMWORK • SAFETY PRECAUTION
  • 3. DEFINITION OF FORMWORK Formwork is amould or open box, like container into which fresh concrete is poured and compacted. When the concrete is set, the formwork is removed and a solid mass is produced in the shape of the inner face of the formwork. It should be capable of carrying all imposed dead and live loads apart from its own weight.
  • 4.
  • 5. REQUIREMENTS OF AGOOD FORMWORK Materials should be cheap and reusable. Swelling and shrinkage should be minimum. Surface should be smooth, and afford easystripping. Light in weight , so that easy to transfer. It should be practically water proof , so that it should not absorb water from concrete. The material of formwork should not warp or get distorted when exposed to the elements. The joints in the formwork should be tight against leakage of cement grout.  Deflection should be minimum.
  • 6. CATEGORIES OF FORMWORK CONVENTIONAL: The formwork is built on site out of timber or moisture - resistant particle board. It is easy to produce but time -consuming for larger structures, and the plywood facing has a relatively short lifespan. It is still used extensively where the labour costs are lower than the costs for procuring reusable formwork.
  • 7. M ODERN-DAY FORMWORK :This formwork system are mostly modular, which are designed for speed and efficiency. The main types of formwork systems in used now are  Table form/flying formwork  System column formwork  Slip formwork  Tunnel formwork
  • 8.
  • 9.
  • 10. ENGINEERED/PRE-FABRICATED FORMWORK: This formwork is built out of prefabricated modules with a metal frame (usually steel or aluminium) and covered on the application (concrete) side with material having the wanted surface structure (steel, aluminium, timber, etc.).
  • 11. Major objectives considered in formwork  Quality  Safety  Economy
  • 12. Quality: Forms must be designed and built with sufficient stiffness and accuracy so that the size, shape, position, and finish of the cast concrete are maintained . Safety: Forms must be built sufficient strength and factor of safety so that they have the capable of all supporting loads . Economy: Forms must be built efficiently, minimizing time and cost.
  • 14. TIMBER FORMWORK: Most common material used for bracing the member, hence called as the traditional formwork. Can easily be cut to size on site.
  • 15.
  • 16. ADVANTAGES OF TIMBERFORMWORK:  Easy handling because its light weight.  Easy to disassemble.  Damaged parts can be replaced with new one.  It has good thermal insulation which makes it useful to be used in colder regions.  Reduced site labour.  Can be built to exceed 60 year design life.
  • 17. DISADVANTAGES OF TIMBERFORMWORK:  Can’t be used for long, have limited reuse.  If timber is dry, it will absorb moisture from wet concrete which could weaken the resultant concrete member.  Timber with high moisture content (more than 20% moisture content), wet concrete will shrink & cup leading to open joints & leakage of grout.
  • 18. STEEL FORMWORK: Steel forms are stronger, durable and have longer life than timber formwork and their reuses are more in number. Steel forms can be installed and dismantled with greater ease and speed.
  • 19.
  • 20. ADVANTAGES OF STEELFORMWORK:  Very strong and able to carry loads  Easy to be fixed.  Uniform size and surface.  Can be used for more number of times.  More durable than timber formwork.  No shrinkage of formwork occurs.
  • 21. DISADVANTAGES OF STEELFORMWORK:  More expensive than wood.  Due to high weight handlingis difficult.  Excessive lossof heat.  Limited size and shape.
  • 23.
  • 24. ADVANTAGES OF PLASTICFORMWORK:  Light weight.  Reusable.  Chemical resistant.  Fungus and termites resistant.  Can be easily cut and nail by using wood working.  Damages on the formwork can be easily removed.  Very useful for complex shaped and special features.
  • 25. DISADVANTAGES OF PLASTICFORMWORK:  Expensive at first.  Load carrying capacity low.  Damage the plastic by the heat.
  • 26. ALUMINIUM FORMWORK: Aluminium is strong and light, and consequently fewer, supports and ties are required.
  • 27.
  • 28. ADVANTAGES OF ALUMINIUM FORMWORK:  Monolithic crack free structures.  Doesn’t require timber or plywood for construction activities.  Casting of walls and slabs possible simultaneously.  Doesn’t required skilled labour.
  • 29. DISADVANTAGES OF ALUMINIUM FORMWORK:  Architectural changes are not possible on the structure.  Due to the tremendous speed of construction, working capital finance needs to the planned in advance.
  • 30. PROCESS OF FORMWORK CONSTRUCTION FORMWORK FOR VARIOUS STRUCTURAL MEMBERS
  • 31. FORMWORKFOR WALL It consists of -Timber sheeting -Vertical posts -Horizontal member -Rackers -Stakes -Wedges
  • 32. Wall formwork and its components
  • 33. FORMWORK FOR COLUMN Itconsistsof -Side and end planks -Yoke -Nuts and bolts Two end and two side planks are joined by the yokes and bolts.
  • 34. Erection s equence for a column: cleared fPrior to positioning column formwork check that steel for the columnhas been inspected and or casting. - Position formwork for the column from predeterminedgrids. - Plumb formwork both ways and securely support using adjustable steel props. - The propping angle should be 45° to the floor. - Ensure the steel props are safely secured to the column formwork and the floor, and that adjustment for pushing and pulling isoperational. - Set out the positions of column clamps from a storeyrod. - Transfer the column clamp positions from the storey rod onto columnformwork. - Use nails to support the arms of column clamps while wedging. - Position and wedge the bottom, middle and top clampssets. - Check the formwork at the top for square. - Position and wedge the remainder of the columnclamps. - Using a plumb bob suspended from a gauge block plumb the column  When all the column formwork is securely propped a final check must be ma de for plumb and column alignment before and immediately after the concrete has been poured and vibrated.
  • 35. Formwork for staircase  Points to consider when designing staircase formwork: Stair formwork must support the weight of concrete. Because of the slope of the stair, some of the force is transmitted to the sideways. All formwork must be well tied together to prevent sideway movement.
  • 36.
  • 37. Erection sequence for a beam:  Marking out and setting height for formwork  Assemble and position props, adjustable head jacks, formworks, bearers and spreaders.  Construct and erect sidewalls and beam soffit.  Position of sole plates.
  • 38. DESHUTTERING “DESHUTTERING” means the process of removing the shuttering. Order and method of removing formwork: Shutte ri ng formi ng verti cal fac es of wal ls, beams and colum ns sho ul d be re moved firs t. Shutte ri ng form ing soffit to slab sho ul d be re moved ne xt. Shutte ri ng formi ng soffit to beams or othe r he avy loade d members sho ul d be re moved in the end.
  • 39. Time of removal of formwork: Sl . N o Structural Member OPC (Ordinary Portland Cement) Rapid Hardening Cement 1 Beam sides, walls & Columns 2-3 Days 2 Days 2 Slab (Vertical Supports remains intact) 4 Days 3 Days 3 Slab (Complete Formwork removal) 10 Days 5 Days 4 Beams (Removal of Sheeting, Props remains intact) 8 Days 5 Days 5 Beams & Arches (Complete formwork removal) (up to 6 m span) 14 Days 5-8 Days 6 Beams & Arches (Complete formwork removal) (more than 6 m span) 21 Days 8-10 Days
  • 40. Cost of formwork: For normal works formwork costs about 30 -40% of the concrete cost.
  • 42.  Generally someunexpectedeventcausesone member tofail,thenothersbecomeoverloaded ormisaligneda ndtheentireformwork structurecollapses.  Vibration.  Inadequatebracing.  Unstablesoilunderfoundations.  Inadequatecontrolofconcrete placement.  Lackofattentionofformworkdetails.  Inadequatecrossbracingandhorizontal bracingofshores.  Passingtraffic.  Movementof workers andequipmenton the formwork.
  • 43. SAFETY PRECAUTION  Mate ri al us ed for the construc tion of form wo rk must ful fill the specificati on.  Formwo rk is fixed firml y and pro perl y.  Construc tion are a must be pro tected to pre vent vandal ism of form wo rk .  Warni ng sign must be put up at the are a whe re the form wo rk is fixed to pre vent entranc e of people that may dam ag e the form wo rk .  The form wo rk must be inspected before the conc re te is po ure d.