Prepared By :
Prof. Karm Balar
CED,SSASIT, SURAT
FORMWORK
1
OUTLINE OF PRESENTATION
• Definition
• Classification of formwork
• Quality of formwork
• Requirements of formwork
• Formwork for building components
• Removal of formworks
• Cost of formworks
• General formwork systems
• Critical formwork systems
• Advanced formwork systems
• Case study
• References
2
3
Some temporary nature supports and structures are required like
 Formwork (Supporting Structure)
 Scaffoldings (arrangement for working plate forms)
 Shoring (supporting method for unsafe structure)
 Underpinning (Method of strengthening an existing structure’s footing)
What is formwork?
• It should be capable of carrying all imposed dead and live loads
apart from its own weight.
• Formwork is a mould including all supporting structures, used
to shape and support the concrete until it attains sufficient
strength to carry its own weight.
Classification of formwork
1. Classification according to sizes
2. Classification according to material
3. Classification according to nature of operation
5
• Classification according to sizes
 Small-sized formwork
-Operation by workers manually.
-Speedy work and easy operating.
-Timber and plastic
Large-sized formwork
-Crane facilities are required in the
operation.
-Reduce the number of jointing and
to minimize the number of lift.
-Steel and aluminum
6
• Classification according to material
a) Timber
-Most popular formwork material
-Low initial cost
-High adaptability to complicated shape
-Labor intensive and environmental unfriendly
7
8
b) Steel
-Initial cost is high
-Formed sections
-Heavy weight
-Suitable for large-sized panels
9
c) Aluminum
-High quality finish.
-unskilled labour can also erect.
-Pure aluminum chemically attacked by wet Concrete
-High reuse value
10
d) Plastic
-Unusual textures and designs can be molded into the form.
-Damages on the formwork can be easily be repaired.
-Easy to disassemble.
-Light.
11
• Classification According to Nature of
Operation
-Manually operated formwork
-Crane lifted formwork
-Gantry, traveling and tunnel type formwork system
12
Conventional ( Traditional ) Formwork system:
In concrete construction, formwork is commonly provided for the
following structural members.
• Foundations
• Wall
• Column
• Slabs & Beams
• Stairs
13
Formwork for
foundation
Wall foundations
It consists of
- Plywood Sheeting
- Struts
Column Foundations
It consists of
- Side Supports
- Side Planks
- Cleats
14
Cleat
Side Planks
Side Support
Formwork for Column :
Fig-6.1.3 Formwork for Column
•It consists of : Side & End Planks, Yokes, & Nut-Bolts
•Two end & two side planks are joined by the yokes and bolts.
• Yokes are the horizontal member which gives support to the side & end planks.
• Yokes are connected to each other by the help of nut & bolts.
15
STUB COLUMN
STEEL BEAM
SIDE SUPPORT,
PROP
FOUNDATION FORMWORK
COLUMN FORMWORK
STEEL SHUTTER PLATES
18 MM PLY INSIDE
COLUMN / WALL FORMWORK
Formwork for Wall
 It consists of
 Timber sheeting
 Vertical posts
 Horizontal members
 Rackers
 Stakes
 Wedges
 After completing one
side of formwork
reinforcement is
provided at the place
then the second side
formwork is provided.
Vertical Posts
Struts
Formwork for wall 24
6.1.4 Formwork for Slabs & beams
It consists of
• Sole plates
• Wedges
• Props
• Head tree
• Planks
• Batten
• Ledgers
• Beam formwork rests on head tree
• Slab form work rests on battens and joists
25
Lintel or Beam Formwork
SLAB FORMWORK
3. ADJUSTABLE BEAM SIDE EXTN.
1. BEAM FORMING SUPPORT
2. BEAM FORMING SUPPORT EXTN.
AVAILABILITY
600,800, 1000,1200
1
2
BEAM SIDE SUPPORTS
6.1.5 Formwork for Stairs
It consists of
•Vertical & inclined posts
•Inclined members
•Wooden Planks or sheeting
•Stringer
•Riser Planks
31
STAIRCASE FORMWORK
35
Requirements of formwork:
 Material should be cheap and reusable,
 It should be practically water proof, so that it should not
absorb water from concrete,
 Shrinkage should be minimum,
 Strong enough to with stand all external loads,
 Deflection should be minimum,
 Surface should be smooth, and afford easy striping,
 Light in weight, so that easy to transfer,
 Joints should be stiff, so that lateral deformation and leak is
minimum . 36
Time of Removal of formwork:
37
Sr.
No
Structural Member OPC* RHC**
1 Beam sides, walls & Columns 2-3 D 2 D
2 Slab (Vertical Supports remains intact) 4 D 3 D
3 Slab (Complete Formwork removal) 10 D 5 D
4 Beams (Removal of Sheeting, Props remains intact) 8 D 5 D
5
Beams & Arches (Complete formwork removal)
(up to 6 m span)
14 D 5-8 D
6
Beams & Arches (Complete formwork removal)
(more than 6 m span)
21 D 8-10 D
*(Ordinary Portland Cement, **Rapid Hardening Cement)
• Cost of formwork
 For normal works cost of formwork is about 30%-40% of the
concrete cost.
 For special works cost of formwork is about 50%-60% of the
concrete cost.
 Formwork cost is controlled by the following factors
• Formwork Material cost
• Formwork erecting cost
• Formwork removal cost
• Formwork jointing cost (Nails and Cables)
• Labor charges.
38
REVOLA - FRAMED WALL FORM
SYSTEM
• MESA-Revola Wall Form System is designed and manufactured for
concreting of load bearing walls and columns.
• REVOLA System is crane-dependent but admits very high concrete
pressure up to 88 kN/m2 when using suitable tie-rods of diameter
20mm.
39
• Types of REVOLA System and Surface Material:
• Concrete facing materials differs according to demands of the
construction sites.
• REVOLA-S with Steel Plate having 4 mm thickness,
• REVOLA-P Plywood having 21 mm thickness
• REVOLA-L Composite Polypropylene Plate having 20 mm thickness
40
41
• LOGICA - FRAMED WALL FORM SYSTEM
• MESA-Logica Wall Form System is crane-dependent as well as it
could be used without crane due to decreased weights of panels
having 1200 and 1500 mm height. Without taking into account of
rate of displacement of concrete, maximum 2,700 mm height of
concrete could be cast by Logica Wall Form when using tie-rods of
diameter 15mm.
• System also shortens the concreting time due to such a high resistance
to concrete pressure which reaches up to 60 kN/m2.
42
• Types of LOGICA System and Surface Material:
• Available concrete facing materials could be two types;
• LOGICA - P with 15 mm thick Plywood
• LOGICA - L with 15 mm thick Composite Polypropylene Plate
43
44
Thank you
THANK YOU45

More Related Content

What's hot

Cracks in structure/buildings
Cracks in structure/buildingsCracks in structure/buildings
Cracks in structure/buildings
Mohanakrishna31
 
Prestressing ppt
Prestressing pptPrestressing ppt
Prestressing ppt
Sudhan Sathe
 
Composite deck bridge systems
Composite deck bridge systemsComposite deck bridge systems
Composite deck bridge systems
Venkat Ramana Littu
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
SonaSaravanan2
 
Self curing concrete
Self curing concreteSelf curing concrete
Self curing concrete
Ranjan Kumar Lal
 
Self compacting concrete
Self compacting concrete Self compacting concrete
Self compacting concrete
ARIVU SUDAR
 
U BOOT BETON TECHNOLOGY SEMINAR REPORT
U BOOT BETON TECHNOLOGY SEMINAR REPORTU BOOT BETON TECHNOLOGY SEMINAR REPORT
U BOOT BETON TECHNOLOGY SEMINAR REPORT
BaharAnjum
 
Fiber reinforced self compacting concrete
Fiber reinforced self compacting concreteFiber reinforced self compacting concrete
Fiber reinforced self compacting concrete
ARTHIKSURAJRATHODRAM
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
Dhaval Jadhav
 
Formwork
FormworkFormwork
Formwork
rmeena99
 
Bubble deck slab ppt
Bubble deck slab pptBubble deck slab ppt
Bubble deck slab ppt
prashanth prashu
 
Concrete filled steel tubes
Concrete filled steel tubesConcrete filled steel tubes
Concrete filled steel tubes
Harikrishna M.S
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
jagrutib22
 
Polymer concrete
Polymer concretePolymer concrete
Polymer concrete
Ravikiran Kattoli
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Deepak Verma
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING
Vikas Sukhwal
 
Joints ppt devesh
Joints ppt deveshJoints ppt devesh
Joints ppt devesh
Devesh Tripathi
 
Fiber reinforced concrete
Fiber reinforced concreteFiber reinforced concrete
Fiber reinforced concrete
Abhik Adak
 
Construction practices
Construction practicesConstruction practices
Construction practices
Arun Kurali
 
Ct formwork presentation
Ct formwork presentationCt formwork presentation
Ct formwork presentation
bee_by
 

What's hot (20)

Cracks in structure/buildings
Cracks in structure/buildingsCracks in structure/buildings
Cracks in structure/buildings
 
Prestressing ppt
Prestressing pptPrestressing ppt
Prestressing ppt
 
Composite deck bridge systems
Composite deck bridge systemsComposite deck bridge systems
Composite deck bridge systems
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
 
Self curing concrete
Self curing concreteSelf curing concrete
Self curing concrete
 
Self compacting concrete
Self compacting concrete Self compacting concrete
Self compacting concrete
 
U BOOT BETON TECHNOLOGY SEMINAR REPORT
U BOOT BETON TECHNOLOGY SEMINAR REPORTU BOOT BETON TECHNOLOGY SEMINAR REPORT
U BOOT BETON TECHNOLOGY SEMINAR REPORT
 
Fiber reinforced self compacting concrete
Fiber reinforced self compacting concreteFiber reinforced self compacting concrete
Fiber reinforced self compacting concrete
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
Formwork
FormworkFormwork
Formwork
 
Bubble deck slab ppt
Bubble deck slab pptBubble deck slab ppt
Bubble deck slab ppt
 
Concrete filled steel tubes
Concrete filled steel tubesConcrete filled steel tubes
Concrete filled steel tubes
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
Polymer concrete
Polymer concretePolymer concrete
Polymer concrete
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING
 
Joints ppt devesh
Joints ppt deveshJoints ppt devesh
Joints ppt devesh
 
Fiber reinforced concrete
Fiber reinforced concreteFiber reinforced concrete
Fiber reinforced concrete
 
Construction practices
Construction practicesConstruction practices
Construction practices
 
Ct formwork presentation
Ct formwork presentationCt formwork presentation
Ct formwork presentation
 

Similar to CHE :- 6 form work (MODULE 3)

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
purvi golecha
 
Form-woks-additional.pptx
Form-woks-additional.pptxForm-woks-additional.pptx
Form-woks-additional.pptx
ssuserc0bf9b
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
UjasPandya2
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
ErankajKumar
 
Formwork
FormworkFormwork
Formwork
natesh0142
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
SAGAR RAUT
 
Formwork
FormworkFormwork
Formwork
kajol panchal
 
Formwork
FormworkFormwork
Formwork
Sneha Kaira
 
Formwork
FormworkFormwork
Formwork
snehakaira
 
national building code
national building codenational building code
national building code
Ruhiya Garg
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
Kishor Ade
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
Est chua
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
I'mMiss Lily
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
Formwork
FormworkFormwork
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
Akshay Gawade
 
building structures of architectural students.pptx
building structures of architectural students.pptxbuilding structures of architectural students.pptx
building structures of architectural students.pptx
kifottoti
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
ssuserc0bf9b
 
Site report
Site reportSite report
Site report
Tee Joanne
 

Similar to CHE :- 6 form work (MODULE 3) (20)

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Form-woks-additional.pptx
Form-woks-additional.pptxForm-woks-additional.pptx
Form-woks-additional.pptx
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Formwork
FormworkFormwork
Formwork
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
national building code
national building codenational building code
national building code
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Formwork
FormworkFormwork
Formwork
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
building structures of architectural students.pptx
building structures of architectural students.pptxbuilding structures of architectural students.pptx
building structures of architectural students.pptx
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Site report
Site reportSite report
Site report
 

More from Shree Swami atmanand saraswati inst. of technology, surat

INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart citiesINFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
Shree Swami atmanand saraswati inst. of technology, surat
 
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systemsINFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
Shree Swami atmanand saraswati inst. of technology, surat
 
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Shree Swami atmanand saraswati inst. of technology, surat
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
Shree Swami atmanand saraswati inst. of technology, surat
 
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
Shree Swami atmanand saraswati inst. of technology, surat
 
MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)
Shree Swami atmanand saraswati inst. of technology, surat
 
BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)BCT- Module 5 a coffer-dam (Part_2)
BCT - Module 5 special work
BCT - Module 5 special workBCT - Module 5 special work
Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)Module :- 8 Job layout (PART 2)
Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levellingModule :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levelling
Shree Swami atmanand saraswati inst. of technology, surat
 
Mod 3 construction economics
Mod 3 construction economicsMod 3 construction economics
MODULE 2 project organization
MODULE 2 project organizationMODULE 2 project organization
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
Shree Swami atmanand saraswati inst. of technology, surat
 
Che 10 engineering fundamental
Che  10 engineering fundamentalChe  10 engineering fundamental
Chapter 9 introduction to construction equipments
Chapter  9 introduction to construction equipmentsChapter  9 introduction to construction equipments
Chapter 9 introduction to construction equipments
Shree Swami atmanand saraswati inst. of technology, surat
 
Che 1 pile foundation
Che 1 pile foundationChe 1 pile foundation
Ch 5 b remote sensing
Ch 5 b remote sensingCh 5 b remote sensing
Ch 5 a gps
Ch 5 a gpsCh 5 a gps
Ch 5 levelling
Ch 5 levellingCh 5 levelling

More from Shree Swami atmanand saraswati inst. of technology, surat (20)

INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart citiesINFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
 
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systemsINFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
 
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
 
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
 
MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)
 
BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)
 
BCT - Module 5 special work
BCT - Module 5 special workBCT - Module 5 special work
BCT - Module 5 special work
 
Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)
 
Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :- 8 material management
 
Module :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levellingModule :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levelling
 
Mod 3 construction economics
Mod 3 construction economicsMod 3 construction economics
Mod 3 construction economics
 
MODULE 2 project organization
MODULE 2 project organizationMODULE 2 project organization
MODULE 2 project organization
 
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
 
Che 10 engineering fundamental
Che  10 engineering fundamentalChe  10 engineering fundamental
Che 10 engineering fundamental
 
Chapter 9 introduction to construction equipments
Chapter  9 introduction to construction equipmentsChapter  9 introduction to construction equipments
Chapter 9 introduction to construction equipments
 
Che 1 pile foundation
Che 1 pile foundationChe 1 pile foundation
Che 1 pile foundation
 
Ch 5 b remote sensing
Ch 5 b remote sensingCh 5 b remote sensing
Ch 5 b remote sensing
 
Ch 5 a gps
Ch 5 a gpsCh 5 a gps
Ch 5 a gps
 
Ch 5 levelling
Ch 5 levellingCh 5 levelling
Ch 5 levelling
 

Recently uploaded

Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
whatchangedhowreflec
 
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
biruktesfaye27
 
Slides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptxSlides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptx
shabeluno
 
IoT (Internet of Things) introduction Notes.pdf
IoT (Internet of Things) introduction Notes.pdfIoT (Internet of Things) introduction Notes.pdf
IoT (Internet of Things) introduction Notes.pdf
roshanranjit222
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
Derek Wenmoth
 
Non-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech ProfessionalsNon-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech Professionals
MattVassar1
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
Ben Aldrich
 
bryophytes.pptx bsc botany honours second semester
bryophytes.pptx bsc botany honours  second semesterbryophytes.pptx bsc botany honours  second semester
bryophytes.pptx bsc botany honours second semester
Sarojini38
 
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...
Nguyen Thanh Tu Collection
 
Creativity for Innovation and Speechmaking
Creativity for Innovation and SpeechmakingCreativity for Innovation and Speechmaking
Creativity for Innovation and Speechmaking
MattVassar1
 
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptxScience-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Catherine Dela Cruz
 
Keynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse CityKeynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse City
PJ Caposey
 
pol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdfpol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdf
BiplabHalder13
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
khabri85
 
What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17
Celine George
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
Celine George
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
Kalna College
 
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
Kalna College
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
chaudharyreet2244
 
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptxAngle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
siddhimeena3
 

Recently uploaded (20)

Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
 
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
 
Slides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptxSlides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptx
 
IoT (Internet of Things) introduction Notes.pdf
IoT (Internet of Things) introduction Notes.pdfIoT (Internet of Things) introduction Notes.pdf
IoT (Internet of Things) introduction Notes.pdf
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
 
Non-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech ProfessionalsNon-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech Professionals
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
 
bryophytes.pptx bsc botany honours second semester
bryophytes.pptx bsc botany honours  second semesterbryophytes.pptx bsc botany honours  second semester
bryophytes.pptx bsc botany honours second semester
 
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH LỚP 9 - GLOBAL SUCCESS - FORM MỚI 2025 - C...
 
Creativity for Innovation and Speechmaking
Creativity for Innovation and SpeechmakingCreativity for Innovation and Speechmaking
Creativity for Innovation and Speechmaking
 
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptxScience-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
 
Keynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse CityKeynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse City
 
pol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdfpol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdf
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
 
What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
 
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
 
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptxAngle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
 

CHE :- 6 form work (MODULE 3)

  • 1. Prepared By : Prof. Karm Balar CED,SSASIT, SURAT FORMWORK 1
  • 2. OUTLINE OF PRESENTATION • Definition • Classification of formwork • Quality of formwork • Requirements of formwork • Formwork for building components • Removal of formworks • Cost of formworks • General formwork systems • Critical formwork systems • Advanced formwork systems • Case study • References 2
  • 3. 3 Some temporary nature supports and structures are required like  Formwork (Supporting Structure)  Scaffoldings (arrangement for working plate forms)  Shoring (supporting method for unsafe structure)  Underpinning (Method of strengthening an existing structure’s footing)
  • 4. What is formwork? • It should be capable of carrying all imposed dead and live loads apart from its own weight. • Formwork is a mould including all supporting structures, used to shape and support the concrete until it attains sufficient strength to carry its own weight.
  • 5. Classification of formwork 1. Classification according to sizes 2. Classification according to material 3. Classification according to nature of operation 5
  • 6. • Classification according to sizes  Small-sized formwork -Operation by workers manually. -Speedy work and easy operating. -Timber and plastic Large-sized formwork -Crane facilities are required in the operation. -Reduce the number of jointing and to minimize the number of lift. -Steel and aluminum 6
  • 7. • Classification according to material a) Timber -Most popular formwork material -Low initial cost -High adaptability to complicated shape -Labor intensive and environmental unfriendly 7
  • 8. 8
  • 9. b) Steel -Initial cost is high -Formed sections -Heavy weight -Suitable for large-sized panels 9
  • 10. c) Aluminum -High quality finish. -unskilled labour can also erect. -Pure aluminum chemically attacked by wet Concrete -High reuse value 10
  • 11. d) Plastic -Unusual textures and designs can be molded into the form. -Damages on the formwork can be easily be repaired. -Easy to disassemble. -Light. 11
  • 12. • Classification According to Nature of Operation -Manually operated formwork -Crane lifted formwork -Gantry, traveling and tunnel type formwork system 12
  • 13. Conventional ( Traditional ) Formwork system: In concrete construction, formwork is commonly provided for the following structural members. • Foundations • Wall • Column • Slabs & Beams • Stairs 13
  • 14. Formwork for foundation Wall foundations It consists of - Plywood Sheeting - Struts Column Foundations It consists of - Side Supports - Side Planks - Cleats 14 Cleat Side Planks Side Support
  • 15. Formwork for Column : Fig-6.1.3 Formwork for Column •It consists of : Side & End Planks, Yokes, & Nut-Bolts •Two end & two side planks are joined by the yokes and bolts. • Yokes are the horizontal member which gives support to the side & end planks. • Yokes are connected to each other by the help of nut & bolts. 15
  • 16.
  • 17.
  • 20. COLUMN FORMWORK STEEL SHUTTER PLATES 18 MM PLY INSIDE
  • 21. COLUMN / WALL FORMWORK
  • 22.
  • 23. Formwork for Wall  It consists of  Timber sheeting  Vertical posts  Horizontal members  Rackers  Stakes  Wedges  After completing one side of formwork reinforcement is provided at the place then the second side formwork is provided. Vertical Posts Struts
  • 25. 6.1.4 Formwork for Slabs & beams It consists of • Sole plates • Wedges • Props • Head tree • Planks • Batten • Ledgers • Beam formwork rests on head tree • Slab form work rests on battens and joists 25
  • 26. Lintel or Beam Formwork
  • 28.
  • 29. 3. ADJUSTABLE BEAM SIDE EXTN. 1. BEAM FORMING SUPPORT 2. BEAM FORMING SUPPORT EXTN. AVAILABILITY 600,800, 1000,1200 1 2
  • 31. 6.1.5 Formwork for Stairs It consists of •Vertical & inclined posts •Inclined members •Wooden Planks or sheeting •Stringer •Riser Planks 31
  • 33.
  • 34.
  • 35. 35
  • 36. Requirements of formwork:  Material should be cheap and reusable,  It should be practically water proof, so that it should not absorb water from concrete,  Shrinkage should be minimum,  Strong enough to with stand all external loads,  Deflection should be minimum,  Surface should be smooth, and afford easy striping,  Light in weight, so that easy to transfer,  Joints should be stiff, so that lateral deformation and leak is minimum . 36
  • 37. Time of Removal of formwork: 37 Sr. No Structural Member OPC* RHC** 1 Beam sides, walls & Columns 2-3 D 2 D 2 Slab (Vertical Supports remains intact) 4 D 3 D 3 Slab (Complete Formwork removal) 10 D 5 D 4 Beams (Removal of Sheeting, Props remains intact) 8 D 5 D 5 Beams & Arches (Complete formwork removal) (up to 6 m span) 14 D 5-8 D 6 Beams & Arches (Complete formwork removal) (more than 6 m span) 21 D 8-10 D *(Ordinary Portland Cement, **Rapid Hardening Cement)
  • 38. • Cost of formwork  For normal works cost of formwork is about 30%-40% of the concrete cost.  For special works cost of formwork is about 50%-60% of the concrete cost.  Formwork cost is controlled by the following factors • Formwork Material cost • Formwork erecting cost • Formwork removal cost • Formwork jointing cost (Nails and Cables) • Labor charges. 38
  • 39. REVOLA - FRAMED WALL FORM SYSTEM • MESA-Revola Wall Form System is designed and manufactured for concreting of load bearing walls and columns. • REVOLA System is crane-dependent but admits very high concrete pressure up to 88 kN/m2 when using suitable tie-rods of diameter 20mm. 39
  • 40. • Types of REVOLA System and Surface Material: • Concrete facing materials differs according to demands of the construction sites. • REVOLA-S with Steel Plate having 4 mm thickness, • REVOLA-P Plywood having 21 mm thickness • REVOLA-L Composite Polypropylene Plate having 20 mm thickness 40
  • 41. 41
  • 42. • LOGICA - FRAMED WALL FORM SYSTEM • MESA-Logica Wall Form System is crane-dependent as well as it could be used without crane due to decreased weights of panels having 1200 and 1500 mm height. Without taking into account of rate of displacement of concrete, maximum 2,700 mm height of concrete could be cast by Logica Wall Form when using tie-rods of diameter 15mm. • System also shortens the concreting time due to such a high resistance to concrete pressure which reaches up to 60 kN/m2. 42
  • 43. • Types of LOGICA System and Surface Material: • Available concrete facing materials could be two types; • LOGICA - P with 15 mm thick Plywood • LOGICA - L with 15 mm thick Composite Polypropylene Plate 43
  • 44. 44
  翻译: