What is Formwork?
o It should be capable of carrying all imposed dead and live loads
apart from its own weight.
o Formwork is a mould including all supporting structures, used to
shape and support the concrete until it attains sufficient strength to
carry its own weight.
Formwork is commonly made of
o Steel
o Timber
TIMBER FORMWORK
STEEL FORMWORK
 Formwork has been in use since the beginning of concrete
construction.
 New materials such as steel, plastics and fibreglass are used in
formwork.
 Greater attention is being given to the design, fabrication,
erection and dismantling of formwork
 Formwork is designed according to The ACI document SP-4.
Qualities of Formwork
 It should be water tight.
 It should be strong.
 It can be reusable.
 Its contact surface should be uniform.
 It should be according to the size of member.
 In order to successfully carry out its function,
formwork must achieve a balance of following
requirements:
• Containment
• Strength
• Resistance To Leakage
• Accuracy
• Ease Of Handling
• Finish And Reuse Potential
• Access For Concrete
• Economy
 Containment: formwork must be capable of shaping and
supporting the fluid concrete until it cures.
 Strength: formwork must be capable of safely withstanding
without distortion or danger the dead weight of the fluid
concrete is placed on it, labour weight, equipment weight and
any environmental loadings.
 Ease of Handling: form panels and units should be designed so
that their maximum size does not exceed that which can be easily
handled by hand or mechanical means.
 In addition all formwork must also be designed and constructed
to include facilities for adjustments, levelling, easing and
striking without damage to the form work or concrete.
 Economy: all the formwork is very expensive. On average about 35% of
the total cost of any finished concrete unit or element can be attributed to
its formwork; of this just over 40% can be taken for material for
formwork and 60% for labour.
 The formwork designer must therefore not only consider the
maximum number of times that any form can be reused, but also
produce a design that will minimize the time taken for erection and
striking.
Major objectives considered in
formwork:
 Quality
 Safety
 Economy
 Quality:
Forms must be designed and built with sufficient stiffness
and accuracy so that the size, shape, position, and finish of the
cast concrete are maintained.
Safety:
Forms must be built sufficient strength and factor of safety so
that they have the capable of all supporting loads.
 Economy:
Forms must be built efficiently, minimizing time and cost.
Requirements of formwork:
 Material should be cheap and re usable,
 It should be practically water proof, so that it should not absorb water
from concrete,
 Swelling and shrinkage should be minimum,
 Strong enough to with stand all external loads,
 Deflection should be minimum,
 Surface should be smooth, and afford easy striping,
 Light in weight, so that easy to transfer,
 Joints should be stiff, so that lateral deformation and leak is minimum .
a) Assembly and erection .
b) Concrete placement.
c) Stripping and dismantling.
Three stages in the process :
 Formwork detail for different
structural members
In concrete construction formwork is commonly
provided for the following structural members.
o Wall
o Column
o Slabs & Beams
o Stairs
o Chimneys
o Water tanks
o Cooling Towers
It consists of
Timber sheeting
Vertical posts
Horizontal members
Stakes
Wedges
After completing one
side of formwork
reinforcement is provided
at the place then the
second side formwork is
provided.
FORMWORK FOR WALL
 Formwork for Column
• It consists of the following
– Side & End Planks
– Yoke
– Nut & Bolts
• Two end & two side planks
are joined by the yokes and
bolts.
 Formwork for columns
 Formwork for Slabs & beams:
• It consists of
– Sole plates
– Wedges
– Props
– Head tree
– Planks
– Batten
– Ledgers
• Beam formwork
rests on head tree
• Slab form work
rests on battens
and joists
• If prop height are
more than 8’
provide horizontal
braces.
 Lintel or Beam Formwork:
 FORMWORK FOR SLAB:
 FORMWORK FOR STAIRS:
• It consists of
– Vertical & inclined
posts
– Inclined members
-- Wooden Planks or
sheeting
– Stringer
– Riser Planks
 FORMWORK FOR STAIRS:
 FORMWORK FOR CHIMNEYS:
For tall chimneys two types of forms
techniques are in generally use in our country
a) Jump form
b) Slip form
 Removal of formwork:
 Time of formwork removal depends on the following factors
1. Type of Cement
1. Rapid hardening cements require lesser time as compared to OPC
(Ordinary Portland Cement)
2. Ratio of concrete mix
1. Rich ratio concrete gain strength earlier as compared to weak ratio
concrete.
3. Weather condition
1. Hydration process accelerates in hot weather conditions as compared to
cold and humid weather conditions.
Time of Removal of formwork:
• First free end's support
should be removed.
• And then from right to
left it should be proceed.
• If we are removing from
the mid span then it will
act as a prop cantilever.
Cantilever slab
• In simply supported we
have to remove the
support from the mid
span to the ends.
 To meet the design
behavior.
Simply supported slab
 Maintenance of formwork:
• Due to continuous use wooden planks & steel plates
surfaces become uneven and require maintenance.
• For wooden formwork use cardboard or plastic fiber
board. Bolt hole places must also be repaired.
• For steel formwork plates must be leveled by mallet
and loose corners must be welded.
 Cost of formwork
 For normal works cost of formwork is about 30%-40% of the concrete cost.
 For special works cost of formwork is about 50%-60% of the concrete cost.
 Formwork cost is controlled by the following factors
• Formwork Material cost
• Formwork erecting cost
• Formwork removal cost
• Formwork jointing cost (Nails and Cables)
• Labor charges.
 Advantages of steel form work:
 It can be used for a no. of times.
 It is non absorbent.
 Smooth finish surface obtained.
 No shrinkage of formwork occurs.
 Easy to use.
 Its volume is less
 Its strength is more.
 LOADS ON FORMWORK:
• Dead load
 Self weight of formwork
 Pressure and loads from fresh concrete
 Reinforcement
• Imposed load
 Construction workers
 Stacking of materials
• Horizontal loads
• Environmental loads
 Accidental loads
 Wind loads
Thank you
THANK YOU

More Related Content

What's hot

Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
মু সা
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
Seminar Links
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
Esri India
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
Abhishek Gupta
 
Framed structures
Framed structures Framed structures
Framed structures
Shivangi Saini
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
KHUSHBU SHAH
 
shotcreting and guniting ppt
shotcreting and guniting pptshotcreting and guniting ppt
shotcreting and guniting ppt
Punit Sharnagat
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
Surhan Fatima
 
4 Cracks in Concrete.pptx
4 Cracks in Concrete.pptx4 Cracks in Concrete.pptx
4 Cracks in Concrete.pptx
JamilaTrinidad
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
PraveenKumar Shanmugam
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildings
SUPREETH Suppi
 
Formwork
Formwork Formwork
Formwork
Dinesh Jain
 
Introduction to prestressed concrete structures
Introduction to prestressed concrete structuresIntroduction to prestressed concrete structures
Introduction to prestressed concrete structures
PraveenKumar Shanmugam
 
types of cracks in building
types of cracks in buildingtypes of cracks in building
types of cracks in building
Muhammad Sultan
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
GAURAV. H .TANDON
 
L3 Vertical Structure Pt1 1
L3  Vertical  Structure  Pt1 1L3  Vertical  Structure  Pt1 1
L3 Vertical Structure Pt1 1
chuhonsan
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
Steel structures
Steel structuresSteel structures
Steel structures
Sukhdarshan Singh
 
SPECIAL TYPES OF CONCRETE under subject CONCRETE TECHNOLOGY
SPECIAL TYPES OF CONCRETE under subject CONCRETE  TECHNOLOGYSPECIAL TYPES OF CONCRETE under subject CONCRETE  TECHNOLOGY
SPECIAL TYPES OF CONCRETE under subject CONCRETE TECHNOLOGY
piyush andani
 
Fahad types and causes of cracks in concrete structures
Fahad types and causes of cracks in concrete structuresFahad types and causes of cracks in concrete structures
Fahad types and causes of cracks in concrete structures
FAHAD ALI KHAN
 

What's hot (20)

Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
 
Framed structures
Framed structures Framed structures
Framed structures
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
shotcreting and guniting ppt
shotcreting and guniting pptshotcreting and guniting ppt
shotcreting and guniting ppt
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
 
4 Cracks in Concrete.pptx
4 Cracks in Concrete.pptx4 Cracks in Concrete.pptx
4 Cracks in Concrete.pptx
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildings
 
Formwork
Formwork Formwork
Formwork
 
Introduction to prestressed concrete structures
Introduction to prestressed concrete structuresIntroduction to prestressed concrete structures
Introduction to prestressed concrete structures
 
types of cracks in building
types of cracks in buildingtypes of cracks in building
types of cracks in building
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
L3 Vertical Structure Pt1 1
L3  Vertical  Structure  Pt1 1L3  Vertical  Structure  Pt1 1
L3 Vertical Structure Pt1 1
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Steel structures
Steel structuresSteel structures
Steel structures
 
SPECIAL TYPES OF CONCRETE under subject CONCRETE TECHNOLOGY
SPECIAL TYPES OF CONCRETE under subject CONCRETE  TECHNOLOGYSPECIAL TYPES OF CONCRETE under subject CONCRETE  TECHNOLOGY
SPECIAL TYPES OF CONCRETE under subject CONCRETE TECHNOLOGY
 
Fahad types and causes of cracks in concrete structures
Fahad types and causes of cracks in concrete structuresFahad types and causes of cracks in concrete structures
Fahad types and causes of cracks in concrete structures
 

Similar to Formwork

Formwork
FormworkFormwork
Formwork
snehakaira
 
Formwork
FormworkFormwork
Formwork
Sneha Kaira
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
SAGAR RAUT
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
ErankajKumar
 
Formwork
FormworkFormwork
FormWork
FormWork FormWork
FormWork
Abhishek Kansara
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
Kishor Ade
 
Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
santoshkumar gurme
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
I'mMiss Lily
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
UjasPandya2
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
Ankit Singhai
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
FaizanSolanki
 
Form Work
Form Work Form Work
Form Work
Kezar Ali. Shah
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
LiesaStone
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
ReigerRoyal
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
Pradumn Suryakar
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
Musahiddin Md Zainal
 

Similar to Formwork (20)

Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Formwork
FormworkFormwork
Formwork
 
FormWork
FormWork FormWork
FormWork
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Formwork
FormworkFormwork
Formwork
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
 
Form Work
Form Work Form Work
Form Work
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 

More from kajol panchal

Heat transfer
Heat transferHeat transfer
Heat transfer
kajol panchal
 
Basics of civil engineering Induction Type
Basics of civil engineering Induction TypeBasics of civil engineering Induction Type
Basics of civil engineering Induction Type
kajol panchal
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineering
kajol panchal
 
Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering
kajol panchal
 
Surveying
SurveyingSurveying
Surveying
kajol panchal
 
Component of building
Component of buildingComponent of building
Component of building
kajol panchal
 
Introduction of various civil engineering structures
Introduction of various civil engineering structuresIntroduction of various civil engineering structures
Introduction of various civil engineering structures
kajol panchal
 
Guntry girder
Guntry girderGuntry girder
Guntry girder
kajol panchal
 
Lintel and arches
Lintel and archesLintel and arches
Lintel and arches
kajol panchal
 
Water resourcs engineering
Water resourcs engineeringWater resourcs engineering
Water resourcs engineering
kajol panchal
 
Valuation
ValuationValuation
Valuation
kajol panchal
 
Hydrlelectric power
Hydrlelectric powerHydrlelectric power
Hydrlelectric power
kajol panchal
 

More from kajol panchal (12)

Heat transfer
Heat transferHeat transfer
Heat transfer
 
Basics of civil engineering Induction Type
Basics of civil engineering Induction TypeBasics of civil engineering Induction Type
Basics of civil engineering Induction Type
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineering
 
Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering Basics of Water supply and sanitation Engineering
Basics of Water supply and sanitation Engineering
 
Surveying
SurveyingSurveying
Surveying
 
Component of building
Component of buildingComponent of building
Component of building
 
Introduction of various civil engineering structures
Introduction of various civil engineering structuresIntroduction of various civil engineering structures
Introduction of various civil engineering structures
 
Guntry girder
Guntry girderGuntry girder
Guntry girder
 
Lintel and arches
Lintel and archesLintel and arches
Lintel and arches
 
Water resourcs engineering
Water resourcs engineeringWater resourcs engineering
Water resourcs engineering
 
Valuation
ValuationValuation
Valuation
 
Hydrlelectric power
Hydrlelectric powerHydrlelectric power
Hydrlelectric power
 

Recently uploaded

INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
Lubi Valves
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
tanujaharish2
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEERDELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
EMERSON EDUARDO RODRIGUES
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 

Recently uploaded (20)

INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEERDELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 

Formwork

  • 2. What is Formwork? o It should be capable of carrying all imposed dead and live loads apart from its own weight. o Formwork is a mould including all supporting structures, used to shape and support the concrete until it attains sufficient strength to carry its own weight. Formwork is commonly made of o Steel o Timber
  • 5.  Formwork has been in use since the beginning of concrete construction.  New materials such as steel, plastics and fibreglass are used in formwork.  Greater attention is being given to the design, fabrication, erection and dismantling of formwork  Formwork is designed according to The ACI document SP-4.
  • 6. Qualities of Formwork  It should be water tight.  It should be strong.  It can be reusable.  Its contact surface should be uniform.  It should be according to the size of member.
  • 7.  In order to successfully carry out its function, formwork must achieve a balance of following requirements: • Containment • Strength • Resistance To Leakage • Accuracy • Ease Of Handling • Finish And Reuse Potential • Access For Concrete • Economy
  • 8.  Containment: formwork must be capable of shaping and supporting the fluid concrete until it cures.  Strength: formwork must be capable of safely withstanding without distortion or danger the dead weight of the fluid concrete is placed on it, labour weight, equipment weight and any environmental loadings.
  • 9.  Ease of Handling: form panels and units should be designed so that their maximum size does not exceed that which can be easily handled by hand or mechanical means.  In addition all formwork must also be designed and constructed to include facilities for adjustments, levelling, easing and striking without damage to the form work or concrete.
  • 10.  Economy: all the formwork is very expensive. On average about 35% of the total cost of any finished concrete unit or element can be attributed to its formwork; of this just over 40% can be taken for material for formwork and 60% for labour.  The formwork designer must therefore not only consider the maximum number of times that any form can be reused, but also produce a design that will minimize the time taken for erection and striking.
  • 11. Major objectives considered in formwork:  Quality  Safety  Economy
  • 12.  Quality: Forms must be designed and built with sufficient stiffness and accuracy so that the size, shape, position, and finish of the cast concrete are maintained. Safety: Forms must be built sufficient strength and factor of safety so that they have the capable of all supporting loads.  Economy: Forms must be built efficiently, minimizing time and cost.
  • 13. Requirements of formwork:  Material should be cheap and re usable,  It should be practically water proof, so that it should not absorb water from concrete,  Swelling and shrinkage should be minimum,  Strong enough to with stand all external loads,  Deflection should be minimum,  Surface should be smooth, and afford easy striping,  Light in weight, so that easy to transfer,  Joints should be stiff, so that lateral deformation and leak is minimum .
  • 14. a) Assembly and erection . b) Concrete placement. c) Stripping and dismantling. Three stages in the process :
  • 15.  Formwork detail for different structural members In concrete construction formwork is commonly provided for the following structural members. o Wall o Column o Slabs & Beams o Stairs o Chimneys o Water tanks o Cooling Towers
  • 16. It consists of Timber sheeting Vertical posts Horizontal members Stakes Wedges After completing one side of formwork reinforcement is provided at the place then the second side formwork is provided. FORMWORK FOR WALL
  • 17.  Formwork for Column • It consists of the following – Side & End Planks – Yoke – Nut & Bolts • Two end & two side planks are joined by the yokes and bolts.
  • 18.  Formwork for columns
  • 19.  Formwork for Slabs & beams: • It consists of – Sole plates – Wedges – Props – Head tree – Planks – Batten – Ledgers • Beam formwork rests on head tree • Slab form work rests on battens and joists • If prop height are more than 8’ provide horizontal braces.
  • 20.  Lintel or Beam Formwork:
  • 22.  FORMWORK FOR STAIRS: • It consists of – Vertical & inclined posts – Inclined members -- Wooden Planks or sheeting – Stringer – Riser Planks
  • 23.  FORMWORK FOR STAIRS:
  • 24.  FORMWORK FOR CHIMNEYS: For tall chimneys two types of forms techniques are in generally use in our country a) Jump form b) Slip form
  • 25.  Removal of formwork:  Time of formwork removal depends on the following factors 1. Type of Cement 1. Rapid hardening cements require lesser time as compared to OPC (Ordinary Portland Cement) 2. Ratio of concrete mix 1. Rich ratio concrete gain strength earlier as compared to weak ratio concrete. 3. Weather condition 1. Hydration process accelerates in hot weather conditions as compared to cold and humid weather conditions.
  • 26. Time of Removal of formwork:
  • 27. • First free end's support should be removed. • And then from right to left it should be proceed. • If we are removing from the mid span then it will act as a prop cantilever. Cantilever slab
  • 28. • In simply supported we have to remove the support from the mid span to the ends.  To meet the design behavior. Simply supported slab
  • 29.  Maintenance of formwork: • Due to continuous use wooden planks & steel plates surfaces become uneven and require maintenance. • For wooden formwork use cardboard or plastic fiber board. Bolt hole places must also be repaired. • For steel formwork plates must be leveled by mallet and loose corners must be welded.
  • 30.  Cost of formwork  For normal works cost of formwork is about 30%-40% of the concrete cost.  For special works cost of formwork is about 50%-60% of the concrete cost.  Formwork cost is controlled by the following factors • Formwork Material cost • Formwork erecting cost • Formwork removal cost • Formwork jointing cost (Nails and Cables) • Labor charges.
  • 31.  Advantages of steel form work:  It can be used for a no. of times.  It is non absorbent.  Smooth finish surface obtained.  No shrinkage of formwork occurs.  Easy to use.  Its volume is less  Its strength is more.
  • 32.  LOADS ON FORMWORK: • Dead load  Self weight of formwork  Pressure and loads from fresh concrete  Reinforcement • Imposed load  Construction workers  Stacking of materials • Horizontal loads • Environmental loads  Accidental loads  Wind loads
  翻译: