Ductile Detailing of RC Frame Buildings
Training to LB technical staff on
Nepal National Building Code
Binay Shrestha
DETAILING OF RC MEMBERS
Detailing is often considered to be the preparation of
working drawings showing the size and location of the
reinforcement in a concrete structure.
Detailing involves the communication of the engineer’s
design to the contractors who build the structure. It
involves the translation of a good structural design
into the final structure.
Good detailing ensures that reinforcement and
concrete interact efficiently to provide satisfactory
behavior throughout the complete range of loading.
DETAILING OF RC MEMBERS
1. IS 456:2000 Indian Standard for Plane and
Reinforced Concrete - Code of Practice
(Fourth Revision)
2. IS 13920 Indian Standard for Ductile
Detailing of Reinforced Concrete
Structures Subjected to Seismic Forces -
Code of Practice
DUCTILE DETAILING
• Better behavior
• To improve ductility of building
Earthquake-resistant design is concerned
about ensuring that the damages in
buildings during earthquakes are of the
acceptable variety, and also that they
occur at the right places and in right
amounts.
MAKE BUILDING DUCTILE
The most common
construction material:
• Masonry.
• Concrete.
• Steel is used as
reinforcement.
DUCTILITY FOR GOOD SEISMIC PERFORMANCE
Brittle & Ductile BehaviourBrittle & Ductile Behaviour Chain Analogy for Ductile FailureChain Analogy for Ductile Failure
DETAILING
Our Practice for Detailing : Ignorance?
Our Practice for Detailing : Ignorance?
Our Practice for Detailing : Ignorance?
Our Practice for Detailing : Ignorance?
Our Practice for Detailing : Ignorance?
Our Practice for Detailing : Ignorance?
How do Beams resist forces
Long straight bars
(longitudinal bars)
placed along its length.
Closed loop of small diameter bars (stirrups)
placed vertical at regular interval along its
length.
Flexure (Bending) Failure:
ductile failure and hence is desirable.
a) Brittle failure
Relatively more steel is present on the tension face,
crushes in compression which is undesirable
b) Ductile failure
Relatively less steel is present on the tension face, steel
yield first and redistribution occurs in the beam until
eventually concrete crushes.
2 Basic Types of Failure in Beams
Shear Failure:
A beam may also fail due to shearing action.
Closed loop stirrups are provided to avoid such shearing
action. Shear damage occurs when the area of these
stirrups is insufficient.
Shear failure is brittle, and therefore, shear failure must
be avoided in the design of RC beams.
2 Basic Types of Failure in Beams
GENERAL REQUIREMENT IS13920-1993
• The factored axial stress on the member under earthquake
loading shall not exceed 0.1 fck.
• The member shall preferably have a width-to-depth ratio of
more than 0.3.
• The width of the member shall not be less than 200 mm.
• The depth D of the member shall preferably be not more
than 1/4 of the clear span.
BEAM
-Width, b ≥ 200mm
- Nominal Cover ≥ 25mm
-Width to effective depth ratio ≥ 0.3
-Steel percentage ≤ 2.5%
-minimum area of tension bar :
As/(bd) =0.85/(fy)
-minimum ratio = 0.24√(fck/fy)
-max. ratio = 0.025
-minimum shear bar
Asv/(b*Sv) ≥ 0.4/(0.87*Fy)
where ,Sv = stirrups spacing
Longitudinal Bars : are provided to resist flexure
Requires on both faces at the ends and on the bottom fa
ce at mid length
At least two bars go through the full length of the
beam at the top as well as at the bottom of the beam.
At the ends of the beams, the amount of steel
provided at the bottom is at least half of that at the
top.
Flexure
Stirrups help in three ways
Carry vertical shear force and resist diagonal crack.
Protect concrete from bulging outward due to flexure
Prevent buckling of compressed longitudinal bar due to
flexure
Shear
a)Diameter at least 6 mm but not less than 8 mm for
beam longer than 5 m.
b)135 hook at both end and 10 times diameter
extension.
c)Maximum spacing less than half the depth of beam.
d)Maximum spacing less than quarter the depth of
beam for twice the depth of beam from support.
At the location of the lap, the bars transfer large forces from
one to another
Laps of the longitudinal bars are:
a) Made away from the face of column.
b) Not made at locations where they are likely to stretch by large
amounts and yield (eg. Bottom bars at mid length of the beam)
At the location of laps, vertical stirrups should be provided at clos
er spacing
Calculation of Design Shear Force of
Beam : IS 13920
Column can sustain 2 types of damage:
a) Axial Flexural (Combined Compression
Bending) failure
b) Shear Failure (Brittle Damage) & must be
avoided by providing lateral ties
How do Column resist EQ
Design
-Width to Depth ratio ≥ 0.4
-0.8% ≤ Steel percent ≤ 4.0%
-Number of bars in rectangular section ≥ 4
-Longitudinal bar diameter (φ) ≥ 12mm
-Clear cover ≥ 40mm
-Minimum width of column = 300mm
Column
Closely spaced horizontal closed ties
help in three ways,
(i) they carry the horizontal shear
forces induced by earthquakes, and
thereby resist diagonal shear cracks,
(ii) they hold together the vertical
bars and prevent them from
excessively bending outwards, and
(iii) they contain the concrete in the
column within the closed loops. The
ends of the ties must be bent as 135°
hooks. Such hook ends prevent
opening of loops and consequently
buckling
Column
In column where spacing between the corner bar
exceeds 300 mm:
Additional links with 180 hook ends for ties to be
effective in holding the concrete in its place and to
prevent the buckling of vertical bars
Column
Height of Confinement Zone:
larger of D, hc /6 or 450 mm
Spacing of ties in CZ:
< D/4
but >75 mm and < 100 mm
Spacing of ties in Lap Zone:
< D/2 and < 150 mm
Spacing of ties in rest :
< D/2
Lap splices shall be provided only in the central half of the member
length. It should be proportioned as a tension splice. Hoops shall be
provided over the entire splice length at spacing not exceeding 150
mm centre to centre. Not more than 50 percent of the bars shall be
spliced at one section.
Longitudanal Reinforcement
Transverse Reinforcement
The design shear force for columns shall be the maximum of:
a) calculated factored shear force as per analysis, and
b) a factored shear force given by….
CALCULATION OF DESIGN SHEAR FORCE
IN COLUMN IS 13920
COLUMN AND JOINT DETAILING
PROVISION OF
SPECIAL CONFINING
REINFORCEMENT IN
FOOTINGS
AREA OF CROSS SECTION OF SPECIAL
CONFINING REINFORCEMENT
• Area of cross section, Ash of the bar forming rectangular
hoop, to be used as special confining reinforcement shall not
be less than
Ash=0.18*S*hk*fck/fy*(Ag-Ak-1)
Where hk=longer dimension of the rectangular
confining hoop measured to its outer face
S= Pitch
Detailing for Reducing Short
Column Effect:
Provide Special Confining
Reinforcement in the form of
closely spaced ties
throughout the height and
into the column above.
Columns supporting
reactions from discontinued
stiff members, such as walls,
shall be provided with special
confining reinforcement over
their full height.
This reinforcement shall also
be placed above the
discontinuity for at least the
development length of the
largest longitudinal bar in
the column.
Where the column is
supported on a wall, this
reinforcement shall be
provided over the full height
of the column; it shall also be
provided below the
discontinuity for the same
development length.
Ash = area of the bar cross section,
S = pitch of spiral or spacing of hoops,
Dk = diameter of core measured to the outside of the spiral or hoop,
fck = characteristic compressive strength of concrete cube,
fy = yield stress of steel (of circular hoop or spiral),
Ag = gross area of the column cross section, and
Ak = area of the concrete core =
h = longer dimension of the rectangular confining hoop measured to
its outer face
The area of cross section, Ash, of the bar forming circular hoops
or spiral, to be used as special confining reinforcement, shall
not be less than
Cover
Stirrup spacing
Deformability (ductility) of reinforced concrete members is a necessity. Note the obvious
differences of capability of concrete columns to take load after earthquake damage. The
reinforced column with more stirrups (ductile reinforcing) has an obvious capacity to
carry much more load than the column with less stirrups
Improper lapping of column bars
The pictures show damage concentration in the region of bar
lapping. Because of interaction between overlapped bars and
concrete for load transfer the overlapping section suffers higher
level of damage. This interaction is further coupled with lack of
stirrups which has led to buckling of bars, loss of concrete
BEAM COLUMN JOINT
In RC buildings, portions of columns that are common to
beams at their intersections are called beam-column
joints. Repairing damaged joints is difficult, and so
damage must be avoided.
Under earthquake moment,
the top & bottom beam bars
pull in opposite direction.
If size of joint is small or
concrete strength is low –
bar slips
Joint undergo geometric
distortion and if the size is
insufficient – diagonal crack
occur.
Can be controlled by –
providing large column size
– providing closed ties.
Column width – at least 20 times the diameter of largest
beam bar.
Closed loop steel ties in beam column joints confine the concrete in the
joint.
It also resist the shear force reducing the cracking & crushing of
concrete.
In Exterior Joint – beam bar
need to be anchored into
column to ensure proper
gripping.
In Interior Joint – beam
bars need to go through
the joint without any cut in
the joint region. Also, these
bars must be placed within
column bars and with no
bends.
External Beam-Column Joint
Development length
Development length is given by
= diameter of bar
= stress in bar
=design bond stress given by 26.2.1.1
Concrete M20 Concrete M25 Concrete M30
 415 500 415 500 415 500
12 47 564 57 680 40 484 49 583 38 451 49 544
16 47 752 57 906 40 645 49 777 38 602 49 725
20 47 940 57 1133 40 806 49 971 38 752 49 906
25 47 1175 57 1416 40 1007 49 1214 38 940 49 1133
28 47 1316 57 1586 40 1128 49 1359 38 1053 49 1269
32 47 1504 57 1813 40 1289 49 1554 38 1204 49 1450
Since slabs are not significantly affected by lateral loads,
provisions of IS 13920 do not apply in this case . Following are
relevant provisions of IS 456:2000
-Reinforcement percentage ≥ 0.12%
-Nominal cover ≥ 15 mm
-Main steel spacing ≤ minimum of (3d, 300mm)
-Distributor steel spacing ≤ minimum of (4d, 450mm)
Slab
Slab
Foundation
Stair
Thank You !!!

More Related Content

What's hot

Joints in concrete
Joints in concreteJoints in concrete
Joints in concrete
Aglaia Connect
 
Shear wall
Shear wallShear wall
Compression member
Compression memberCompression member
Compression member
kamariya keyur
 
Design of columns axial load as per IS 456-2000
Design of columns  axial load as per IS 456-2000Design of columns  axial load as per IS 456-2000
Design of columns axial load as per IS 456-2000
PraveenKumar Shanmugam
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
PraveenKumar Shanmugam
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
Jayvant Choudhary
 
Introduction to prestressed concrete structures
Introduction to prestressed concrete structuresIntroduction to prestressed concrete structures
Introduction to prestressed concrete structures
PraveenKumar Shanmugam
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
kamariya keyur
 
Staircase design
Staircase designStaircase design
Staircase design
Pritesh Parmar
 
Advantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteAdvantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concrete
Baruti Balinda Jonathan
 
Foundations
FoundationsFoundations
Foundations
Shanik Aromgottil
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
Yash Patel
 
Beam design
Beam designBeam design
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
Saleem Malik
 
Design of beam
Design of beamDesign of beam
Design of beam
raunak khurana
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
Muhammad Zain Ul abdin
 
Pile foundation
Pile foundationPile foundation
Pile foundation
Parth Desani
 
Columns
ColumnsColumns
Columns
Abdul Mateen
 
Raft foundations
Raft foundationsRaft foundations
Raft foundations
hatim ahmed
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
Ravi Savani
 

What's hot (20)

Joints in concrete
Joints in concreteJoints in concrete
Joints in concrete
 
Shear wall
Shear wallShear wall
Shear wall
 
Compression member
Compression memberCompression member
Compression member
 
Design of columns axial load as per IS 456-2000
Design of columns  axial load as per IS 456-2000Design of columns  axial load as per IS 456-2000
Design of columns axial load as per IS 456-2000
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Introduction to prestressed concrete structures
Introduction to prestressed concrete structuresIntroduction to prestressed concrete structures
Introduction to prestressed concrete structures
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Staircase design
Staircase designStaircase design
Staircase design
 
Advantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteAdvantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concrete
 
Foundations
FoundationsFoundations
Foundations
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Beam design
Beam designBeam design
Beam design
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
 
Design of beam
Design of beamDesign of beam
Design of beam
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Columns
ColumnsColumns
Columns
 
Raft foundations
Raft foundationsRaft foundations
Raft foundations
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 

Similar to Ductile detailing

Jsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsns
JsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsnsJsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsns
Jsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsns
HiteshVasava8
 
Details of REINFORCEMENT Summary
Details of REINFORCEMENT SummaryDetails of REINFORCEMENT Summary
Details of REINFORCEMENT Summary
Muhammad Yousif Nazar
 
Ductile deatailing
Ductile deatailingDuctile deatailing
Ductile deatailing
AniketChavan72
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
HARITHASIVAGURU
 
rcc design tips for beams and footing.pptxa
rcc design tips for beams and footing.pptxarcc design tips for beams and footing.pptxa
rcc design tips for beams and footing.pptxa
nlnmurthy28
 
BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
Rishi Nath
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
Prabhat chhirolya
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
naveen kumar
 
07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdf07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdf
kksingh1010195
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
Dhaka University of Engineering & Technology, Gazipur
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
Zeinab Awada
 
Seismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointSeismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column Joint
Shoaib Wani
 
Design of reinforced concrete beam
Design of reinforced concrete beamDesign of reinforced concrete beam
Design of reinforced concrete beam
civilengineeringfreedownload
 
Lecture note on column design
Lecture note on column designLecture note on column design
Lecture note on column design
Niyogakiza Philemon
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
IRJET Journal
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
Mohamed Azeem Nijamdeen
 
Reinforced concrete column
Reinforced concrete columnReinforced concrete column
Reinforced concrete column
civilengineeringfreedownload
 
seismic behaviour of beam column joint
seismic behaviour of beam column jointseismic behaviour of beam column joint
seismic behaviour of beam column joint
saurabh gehlod
 
Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building Project
MD AFROZ ALAM
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
ahsanrabbani
 

Similar to Ductile detailing (20)

Jsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsns
JsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsnsJsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsns
Jsjdjsjsjjeksksksksmsmmsmsmsmsmsmksksmmsnsns
 
Details of REINFORCEMENT Summary
Details of REINFORCEMENT SummaryDetails of REINFORCEMENT Summary
Details of REINFORCEMENT Summary
 
Ductile deatailing
Ductile deatailingDuctile deatailing
Ductile deatailing
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
rcc design tips for beams and footing.pptxa
rcc design tips for beams and footing.pptxarcc design tips for beams and footing.pptxa
rcc design tips for beams and footing.pptxa
 
BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
 
07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdf07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdf
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
Seismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointSeismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column Joint
 
Design of reinforced concrete beam
Design of reinforced concrete beamDesign of reinforced concrete beam
Design of reinforced concrete beam
 
Lecture note on column design
Lecture note on column designLecture note on column design
Lecture note on column design
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 
Reinforced concrete column
Reinforced concrete columnReinforced concrete column
Reinforced concrete column
 
seismic behaviour of beam column joint
seismic behaviour of beam column jointseismic behaviour of beam column joint
seismic behaviour of beam column joint
 
Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building Project
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
 

More from Binay Shrestha

Post damage assessment
Post damage assessmentPost damage assessment
Post damage assessment
Binay Shrestha
 
Behavior of rc structure under earthquake loading
Behavior of rc structure under earthquake loadingBehavior of rc structure under earthquake loading
Behavior of rc structure under earthquake loading
Binay Shrestha
 
Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893
Binay Shrestha
 
Code approaches to seismic design of masonry infiled rc frames
Code approaches to seismic design of masonry infiled rc framesCode approaches to seismic design of masonry infiled rc frames
Code approaches to seismic design of masonry infiled rc frames
Binay Shrestha
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
Binay Shrestha
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
Binay Shrestha
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
Binay Shrestha
 
Sept11 2011 earthquake damage assessment
Sept11 2011 earthquake damage assessmentSept11 2011 earthquake damage assessment
Sept11 2011 earthquake damage assessment
Binay Shrestha
 

More from Binay Shrestha (8)

Post damage assessment
Post damage assessmentPost damage assessment
Post damage assessment
 
Behavior of rc structure under earthquake loading
Behavior of rc structure under earthquake loadingBehavior of rc structure under earthquake loading
Behavior of rc structure under earthquake loading
 
Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893
 
Code approaches to seismic design of masonry infiled rc frames
Code approaches to seismic design of masonry infiled rc framesCode approaches to seismic design of masonry infiled rc frames
Code approaches to seismic design of masonry infiled rc frames
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
 
Sept11 2011 earthquake damage assessment
Sept11 2011 earthquake damage assessmentSept11 2011 earthquake damage assessment
Sept11 2011 earthquake damage assessment
 

Recently uploaded

Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
GiselleginaGloria
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 

Recently uploaded (20)

Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 

Ductile detailing

  • 1. Ductile Detailing of RC Frame Buildings Training to LB technical staff on Nepal National Building Code Binay Shrestha
  • 2. DETAILING OF RC MEMBERS Detailing is often considered to be the preparation of working drawings showing the size and location of the reinforcement in a concrete structure. Detailing involves the communication of the engineer’s design to the contractors who build the structure. It involves the translation of a good structural design into the final structure. Good detailing ensures that reinforcement and concrete interact efficiently to provide satisfactory behavior throughout the complete range of loading.
  • 3. DETAILING OF RC MEMBERS 1. IS 456:2000 Indian Standard for Plane and Reinforced Concrete - Code of Practice (Fourth Revision) 2. IS 13920 Indian Standard for Ductile Detailing of Reinforced Concrete Structures Subjected to Seismic Forces - Code of Practice
  • 4. DUCTILE DETAILING • Better behavior • To improve ductility of building Earthquake-resistant design is concerned about ensuring that the damages in buildings during earthquakes are of the acceptable variety, and also that they occur at the right places and in right amounts.
  • 5. MAKE BUILDING DUCTILE The most common construction material: • Masonry. • Concrete. • Steel is used as reinforcement.
  • 6. DUCTILITY FOR GOOD SEISMIC PERFORMANCE Brittle & Ductile BehaviourBrittle & Ductile Behaviour Chain Analogy for Ductile FailureChain Analogy for Ductile Failure
  • 8. Our Practice for Detailing : Ignorance?
  • 9. Our Practice for Detailing : Ignorance?
  • 10. Our Practice for Detailing : Ignorance?
  • 11. Our Practice for Detailing : Ignorance?
  • 12. Our Practice for Detailing : Ignorance?
  • 13. Our Practice for Detailing : Ignorance?
  • 14. How do Beams resist forces Long straight bars (longitudinal bars) placed along its length. Closed loop of small diameter bars (stirrups) placed vertical at regular interval along its length.
  • 15. Flexure (Bending) Failure: ductile failure and hence is desirable. a) Brittle failure Relatively more steel is present on the tension face, crushes in compression which is undesirable b) Ductile failure Relatively less steel is present on the tension face, steel yield first and redistribution occurs in the beam until eventually concrete crushes. 2 Basic Types of Failure in Beams
  • 16. Shear Failure: A beam may also fail due to shearing action. Closed loop stirrups are provided to avoid such shearing action. Shear damage occurs when the area of these stirrups is insufficient. Shear failure is brittle, and therefore, shear failure must be avoided in the design of RC beams. 2 Basic Types of Failure in Beams
  • 17. GENERAL REQUIREMENT IS13920-1993 • The factored axial stress on the member under earthquake loading shall not exceed 0.1 fck. • The member shall preferably have a width-to-depth ratio of more than 0.3. • The width of the member shall not be less than 200 mm. • The depth D of the member shall preferably be not more than 1/4 of the clear span.
  • 18. BEAM -Width, b ≥ 200mm - Nominal Cover ≥ 25mm -Width to effective depth ratio ≥ 0.3 -Steel percentage ≤ 2.5% -minimum area of tension bar : As/(bd) =0.85/(fy) -minimum ratio = 0.24√(fck/fy) -max. ratio = 0.025 -minimum shear bar Asv/(b*Sv) ≥ 0.4/(0.87*Fy) where ,Sv = stirrups spacing
  • 19. Longitudinal Bars : are provided to resist flexure Requires on both faces at the ends and on the bottom fa ce at mid length At least two bars go through the full length of the beam at the top as well as at the bottom of the beam. At the ends of the beams, the amount of steel provided at the bottom is at least half of that at the top. Flexure
  • 20. Stirrups help in three ways Carry vertical shear force and resist diagonal crack. Protect concrete from bulging outward due to flexure Prevent buckling of compressed longitudinal bar due to flexure Shear
  • 21. a)Diameter at least 6 mm but not less than 8 mm for beam longer than 5 m. b)135 hook at both end and 10 times diameter extension. c)Maximum spacing less than half the depth of beam. d)Maximum spacing less than quarter the depth of beam for twice the depth of beam from support.
  • 22. At the location of the lap, the bars transfer large forces from one to another Laps of the longitudinal bars are: a) Made away from the face of column. b) Not made at locations where they are likely to stretch by large amounts and yield (eg. Bottom bars at mid length of the beam) At the location of laps, vertical stirrups should be provided at clos er spacing
  • 23. Calculation of Design Shear Force of Beam : IS 13920
  • 24. Column can sustain 2 types of damage: a) Axial Flexural (Combined Compression Bending) failure b) Shear Failure (Brittle Damage) & must be avoided by providing lateral ties How do Column resist EQ
  • 25. Design -Width to Depth ratio ≥ 0.4 -0.8% ≤ Steel percent ≤ 4.0% -Number of bars in rectangular section ≥ 4 -Longitudinal bar diameter (φ) ≥ 12mm -Clear cover ≥ 40mm -Minimum width of column = 300mm Column
  • 26. Closely spaced horizontal closed ties help in three ways, (i) they carry the horizontal shear forces induced by earthquakes, and thereby resist diagonal shear cracks, (ii) they hold together the vertical bars and prevent them from excessively bending outwards, and (iii) they contain the concrete in the column within the closed loops. The ends of the ties must be bent as 135° hooks. Such hook ends prevent opening of loops and consequently buckling Column
  • 27. In column where spacing between the corner bar exceeds 300 mm: Additional links with 180 hook ends for ties to be effective in holding the concrete in its place and to prevent the buckling of vertical bars Column
  • 28. Height of Confinement Zone: larger of D, hc /6 or 450 mm Spacing of ties in CZ: < D/4 but >75 mm and < 100 mm Spacing of ties in Lap Zone: < D/2 and < 150 mm Spacing of ties in rest : < D/2
  • 29. Lap splices shall be provided only in the central half of the member length. It should be proportioned as a tension splice. Hoops shall be provided over the entire splice length at spacing not exceeding 150 mm centre to centre. Not more than 50 percent of the bars shall be spliced at one section. Longitudanal Reinforcement Transverse Reinforcement The design shear force for columns shall be the maximum of: a) calculated factored shear force as per analysis, and b) a factored shear force given by….
  • 30. CALCULATION OF DESIGN SHEAR FORCE IN COLUMN IS 13920
  • 31. COLUMN AND JOINT DETAILING PROVISION OF SPECIAL CONFINING REINFORCEMENT IN FOOTINGS
  • 32. AREA OF CROSS SECTION OF SPECIAL CONFINING REINFORCEMENT • Area of cross section, Ash of the bar forming rectangular hoop, to be used as special confining reinforcement shall not be less than Ash=0.18*S*hk*fck/fy*(Ag-Ak-1) Where hk=longer dimension of the rectangular confining hoop measured to its outer face S= Pitch
  • 33. Detailing for Reducing Short Column Effect: Provide Special Confining Reinforcement in the form of closely spaced ties throughout the height and into the column above.
  • 34. Columns supporting reactions from discontinued stiff members, such as walls, shall be provided with special confining reinforcement over their full height. This reinforcement shall also be placed above the discontinuity for at least the development length of the largest longitudinal bar in the column. Where the column is supported on a wall, this reinforcement shall be provided over the full height of the column; it shall also be provided below the discontinuity for the same development length.
  • 35. Ash = area of the bar cross section, S = pitch of spiral or spacing of hoops, Dk = diameter of core measured to the outside of the spiral or hoop, fck = characteristic compressive strength of concrete cube, fy = yield stress of steel (of circular hoop or spiral), Ag = gross area of the column cross section, and Ak = area of the concrete core = h = longer dimension of the rectangular confining hoop measured to its outer face The area of cross section, Ash, of the bar forming circular hoops or spiral, to be used as special confining reinforcement, shall not be less than
  • 37. Deformability (ductility) of reinforced concrete members is a necessity. Note the obvious differences of capability of concrete columns to take load after earthquake damage. The reinforced column with more stirrups (ductile reinforcing) has an obvious capacity to carry much more load than the column with less stirrups
  • 38. Improper lapping of column bars The pictures show damage concentration in the region of bar lapping. Because of interaction between overlapped bars and concrete for load transfer the overlapping section suffers higher level of damage. This interaction is further coupled with lack of stirrups which has led to buckling of bars, loss of concrete
  • 39. BEAM COLUMN JOINT In RC buildings, portions of columns that are common to beams at their intersections are called beam-column joints. Repairing damaged joints is difficult, and so damage must be avoided.
  • 40. Under earthquake moment, the top & bottom beam bars pull in opposite direction. If size of joint is small or concrete strength is low – bar slips Joint undergo geometric distortion and if the size is insufficient – diagonal crack occur. Can be controlled by – providing large column size – providing closed ties.
  • 41. Column width – at least 20 times the diameter of largest beam bar. Closed loop steel ties in beam column joints confine the concrete in the joint. It also resist the shear force reducing the cracking & crushing of concrete.
  • 42.
  • 43. In Exterior Joint – beam bar need to be anchored into column to ensure proper gripping. In Interior Joint – beam bars need to go through the joint without any cut in the joint region. Also, these bars must be placed within column bars and with no bends.
  • 44.
  • 46. Development length Development length is given by = diameter of bar = stress in bar =design bond stress given by 26.2.1.1
  • 47. Concrete M20 Concrete M25 Concrete M30  415 500 415 500 415 500 12 47 564 57 680 40 484 49 583 38 451 49 544 16 47 752 57 906 40 645 49 777 38 602 49 725 20 47 940 57 1133 40 806 49 971 38 752 49 906 25 47 1175 57 1416 40 1007 49 1214 38 940 49 1133 28 47 1316 57 1586 40 1128 49 1359 38 1053 49 1269 32 47 1504 57 1813 40 1289 49 1554 38 1204 49 1450
  • 48. Since slabs are not significantly affected by lateral loads, provisions of IS 13920 do not apply in this case . Following are relevant provisions of IS 456:2000 -Reinforcement percentage ≥ 0.12% -Nominal cover ≥ 15 mm -Main steel spacing ≤ minimum of (3d, 300mm) -Distributor steel spacing ≤ minimum of (4d, 450mm) Slab
  • 49. Slab
  • 51. Stair