MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL
FLY LEVEL FIELD BOOK
SURVEY CAMP – 2017
Observer:- Suman Jyoti Date:- 2017-Dec-05
Booker:- Bishnu p. Bhandari Location:- NEA-Kharipati, Bhaktapur
Station Distance BS FS Rise Fall RL Remarks
BS FS Total T M B T M B
B.M 4.0 ------ -------- 0.280 0.300 0.320 ---------- --------- ---------- --------- --------- 1285.000 B.M
01 8.5 3.0 7.0 1.235 1.192 1.150 0.890 0.875 0.860 --------- 1.175 1283.825
02 8.8 7.6 16.1 1.370 1.326 1.282 0.462 1.424 1.386 --------- 0.232 1283.593
03 7.6 7.3 16.1 1.248 1.210 1.172 1.436 1.308 1.272 0.018 --------- 1283.611
04 5.7 8.4 16.0 1.302 1.273 1.245 1.106 1.064 1.022 0.146 -------- 1283.757
Setup A ---- 6.0 12.7 ---------- --------- ---------- 1.400 1.370 1.340 --------- 0.097 1283.660 Setup A
Setup A 5.3 ------ -------- 1.393 1.366 1.340 ---------- --------- ---------- ---------- --------- 1283.660 Setup A
01 8.5 5.9 11.2 1.499 1.456 1.414 1.340 1.310 1.281 0.056 --------- 1283.716
02 9.8 7.9 16.4 1.452 1.403 1.354 1.324 1.284 1.245 0.172 --------- 1283.888
03 9.4 9.2 19.0 0.818 0.771 0.724 1.197 1.151 1.105 0.252 --------- 1284.140
B.M ---- 8.3 17.7 ---------- --------- ---------- 0.416 0.457 0.499 1.228 --------- 1285.008 B.M
Now,
Total distance =131.12 m
Error = 0.008 m
Precision=25√k = 25√0.01312 = 9.05 mm
Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-
MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL
FLY LEVEL FIELD BOOK
SURVEY CAMP – 2017
Observer:- Suman Jyoti Date:- 2017-Dec-05
Booker:- Bishnu p. Bhandari Location:- NEA-Kharipati, Bhaktapur
Reciprocal Levelling Field Book
At Setup 1
Station A
Top = 1.134 m
Middle = 1.290 m
Bottom = 1.267 m
Mean readings(𝑀𝐴 ) =1.290 m
Station B
Top = 1.789 m
Middle = 1.6985 m
Bottom =1.608 m
Mean readings(𝑀 𝐵 )= 1.6985 m
𝒉 𝒂= 𝑴 𝑨 - 𝑴 𝑩 = -0.4085 m
At Setup 2
Station B
Top = 1.225 m
Middle = 1.145 m
Bottom = 1.065 m
Mean readings(𝑀𝐴 ) =1.145 m
Station A
Top = 1.566 m
Middle = 1.552 m
Bottom =1.538 m
Mean readings(𝑀 𝐵 )= 1.552 m
𝒉 𝒃= 𝑴 𝑩 - 𝑴 𝑨 = -0.407 m
Mean height difference (H) =
ℎ 𝑎+ℎ 𝑏
2
= −
0.4085+0.407
2
= −0.40775m
Thus, R.L of point B = R.L of A – H = 1283.66 – 0.40775 = 1283.252 m
Surveyed by:- Suman Jyoti
MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL
FLY LEVEL FIELD BOOK
SURVEY CAMP – 2017
Observer:- Suman Jyoti Date:- 2017-Dec-05
Booker:- Suman Jyoti Location:- NEA-Kharipati, Bhaktapur
1. R.L transfer from A to C
Station Distance BS FS Rise Fall RL Remarks
BS FS Total T M B T M B
A 3.6 ------- -------- 1.364 1.346 1.328 ---------- --------- ---------- --------- --------- 1283.660
C ---- 5.0 5.6 ---------- --------- ---------- 1.000 0.975 0.950 0.371 --------- 1284.031
1. R.L transfer from C to A
Station Distance BS FS Rise Fall RL Remarks
BS FS Total T M B T M B
C 4.3 ------- -------- 1.000 0.978 0.957 ---------- --------- ---------- --------- --------- 1284.031
A ---- 4.0 8.3 ---------- --------- ---------- 1.370 1.350 1.330 --------- 0.372 1283.659
R.L transfer from B to D
Station Distance BS FS Rise Fall RL Remarks
BS FS Total T M B T M B
B 3.4 ------- -------- 0.430 0.413 0.396 ---------- --------- ---------- --------- --------- 1283.252
D ---- 5.3 8.7 ---------- --------- ---------- 0.539 0.513 0.486 --------- 0.100 1283.152
1. R.L transfer from D to B
Station Distance BS FS Rise Fall RL Remarks
BS FS Total T M B T M B
D 4.8 ------- -------- 0.682 0.657 0.634 ---------- --------- ---------- --------- --------- 1283.152
B ---- 5.8 10.6 ---------- --------- ---------- 0.586 0.557 0.528 0.100 --------- 1283.252
Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-
MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL
Kageshwori Manahara, Kathmandu
Tachometric Surveying Field Book
SURVEY CAMP – 2017
Observer:- Suman Jyoti Date:- 2017-Dec-05
Booker:- Bishnu p. Bhandari
Instrument at:- A Height of Instrument: 1.953m
Location:- NEA-Kharipati, Bhaktapur
Zero set at:- C
Staff Point HCR VCR Stadia readings Horz.
Distance
Vertical
Distance
R.L Sketch
Top Mid Bot
From X-section of Bridge Alignment A - B
Road Edge 271°50'40'' 93°10'10'' 1.023 1.005 0.978 04.5 -0.248 1284.36 R.L of station A =1283.66m
Ground Level 102°00''10' 93°10''20' 1.797 1.789 1.782 01.5 -0.305
River Bank 103°28''30' 99°57''30' 2.927 2.916 2.906 02.1 -0.357
N.W.L 102°09''50' 99°57''10' 2.969 2.948 2.927 04.2 -0.714
Deepest Point 101°59''10' 99°57''10' 2.775 2.752 2.730 04.5 -0.776 1282.085
N.W.L 096°25''20' 97°48''00' 2.284 2.251 2.219 06.5 -0.874
River Bank 091°30''20' 97°11''00' 1.648 1.597 1.547 10.1 -1.253
Highest Point 092°57''10' 92°23''00' 1.340 1.275 1.210 13.0 -0.540
10 m upstream X- Section
Highest Point 197°53''00' 093°22''30' 0.750 0.699 0.648 10.2 -0.599
Road Edge 182°29''30' 094°15''00' 0.660 0.615 0.570 9.0 -0.665
River Bank 173°27''20' 094°21''40' 2.660 2.615 2.570 9.0 -0.682
Deepest Point 162°38''20' 094°21''50' 2.810 2.765 2.720 9.0 -0.682
River Bank 149°23''50' 093°15''40' 2.830 2.781 2.732 9.8 -0.556
Highest Point 128°50''50' 092°01''20' 1.450 1.385 1.320 13.0 -0.458
Highest Point 183°53''00' 091°47''50' 0.925 0.790 0.655 27.0 -0.846
BP 169°58''30' 094°45''40' 1.450 1.329 1.208 24.2 -2.001
Deepest Point 166°13''50' 094°46''00' 1.640 1.520 1.400 24.0 -1.987
R.B.P 162°38''30' 091°21''00' 2.940 2.823 2.706 23.4 -0.551
Highest Point 151°12''10' 091°23''40' 1.456 1.334 1.212 24.4 -0.593
Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-
MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL
Kageshwori Manahara, Kathmandu
Tachometric Surveying Field Book
SURVEY CAMP – 2017
Observer:- Suman Jyoti Date:- 2017-Dec-05
Booker:- Bishnu p. Bhandari
Instrument at:- Height of Instrument:
Location:- NEA-Kharipati, Bhaktapur
Zero set at:-
Staff Point HCR VCR Stadia readings Horz.
Distance
Vertical
Distance
Remarks Sketch
Top Mid Bot
10 m downstream X- Section
Road Edge 345°35''30' 088°55''40' 1.300 1.240 1.180 12.0 0.217
Bridge Corner 001°30''00' 088°30''50' 1.326 1.259 1.192 13.4 0.347
River Bank 033°09''30' 100°31''20' 1.900 1.850 1.800 10.0 -1.795
Deepest Point 038°39''10' 108°35''00' 1.640 1.584 1.528 11.2 -3.383
River Bank 050°01''50' 103°40''40' 0.870 0.805 0.740 13.0 -2.986
Highest Point 064°54''10' 084°15''10' 2.720 2.655 2.590 13.0 4.993 1287.951
Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-

More Related Content

What's hot

Juan pablo marsicano ingles
Juan pablo marsicano inglesJuan pablo marsicano ingles
Juan pablo marsicano ingles
juanpa91
 
BMW 740li report
BMW 740li reportBMW 740li report
BMW 740li report
Mariraja Ponraj
 
Anexo no. 02 lev topografico ok
Anexo no. 02 lev topografico okAnexo no. 02 lev topografico ok
Anexo no. 02 lev topografico ok
Byron Vargas
 
cable dimensions AWG and MM sizes
cable dimensions AWG and MM sizescable dimensions AWG and MM sizes
cable dimensions AWG and MM sizes
Joe Khan
 
Wire Strand Chart
Wire Strand ChartWire Strand Chart
Wire Strand Chart
MaryArmenta
 
Finite element analysis and experimental investigations on small size wind tu...
Finite element analysis and experimental investigations on small size wind tu...Finite element analysis and experimental investigations on small size wind tu...
Finite element analysis and experimental investigations on small size wind tu...
iaemedu
 
기말 Pt
기말 Pt기말 Pt
기말 Pt
jiiiy
 
Peramalan Data Time Series #2
Peramalan Data Time Series #2Peramalan Data Time Series #2
Peramalan Data Time Series #2
Adhitya Akbar
 
istatistik tablolar
istatistik tablolaristatistik tablolar
istatistik tablolar
Burak Kocak
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
Shen Sin
 
Fieldwork 1
Fieldwork 1 Fieldwork 1
Fieldwork 1
JamesMoy7
 
Fieldwork 1
Fieldwork 1Fieldwork 1
Fieldwork 1
Melvin Lim
 
Tabel chi
Tabel chiTabel chi
Tabel chi
Gigih Satrio
 
Handling Track Specifications Eng 18 09 08
Handling Track Specifications Eng 18 09 08Handling Track Specifications Eng 18 09 08
Handling Track Specifications Eng 18 09 08
guest549892
 
59 t 3-hig pressure
59 t 3-hig pressure59 t 3-hig pressure
59 t 3-hig pressure
Gnanago Abraham Olivier Totty
 
88 Gibraltar Pricelist Tower 2
88 Gibraltar Pricelist Tower 288 Gibraltar Pricelist Tower 2
88 Gibraltar Pricelist Tower 2
88gibraltar
 
Chi square table
Chi square tableChi square table
Chi square table
Denni Domingo
 

What's hot (17)

Juan pablo marsicano ingles
Juan pablo marsicano inglesJuan pablo marsicano ingles
Juan pablo marsicano ingles
 
BMW 740li report
BMW 740li reportBMW 740li report
BMW 740li report
 
Anexo no. 02 lev topografico ok
Anexo no. 02 lev topografico okAnexo no. 02 lev topografico ok
Anexo no. 02 lev topografico ok
 
cable dimensions AWG and MM sizes
cable dimensions AWG and MM sizescable dimensions AWG and MM sizes
cable dimensions AWG and MM sizes
 
Wire Strand Chart
Wire Strand ChartWire Strand Chart
Wire Strand Chart
 
Finite element analysis and experimental investigations on small size wind tu...
Finite element analysis and experimental investigations on small size wind tu...Finite element analysis and experimental investigations on small size wind tu...
Finite element analysis and experimental investigations on small size wind tu...
 
기말 Pt
기말 Pt기말 Pt
기말 Pt
 
Peramalan Data Time Series #2
Peramalan Data Time Series #2Peramalan Data Time Series #2
Peramalan Data Time Series #2
 
istatistik tablolar
istatistik tablolaristatistik tablolar
istatistik tablolar
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Fieldwork 1
Fieldwork 1 Fieldwork 1
Fieldwork 1
 
Fieldwork 1
Fieldwork 1Fieldwork 1
Fieldwork 1
 
Tabel chi
Tabel chiTabel chi
Tabel chi
 
Handling Track Specifications Eng 18 09 08
Handling Track Specifications Eng 18 09 08Handling Track Specifications Eng 18 09 08
Handling Track Specifications Eng 18 09 08
 
59 t 3-hig pressure
59 t 3-hig pressure59 t 3-hig pressure
59 t 3-hig pressure
 
88 Gibraltar Pricelist Tower 2
88 Gibraltar Pricelist Tower 288 Gibraltar Pricelist Tower 2
88 Gibraltar Pricelist Tower 2
 
Chi square table
Chi square tableChi square table
Chi square table
 

Similar to Bridge site survey 02

Topographic map level transfer to traverse
Topographic map level transfer to traverseTopographic map level transfer to traverse
Topographic map level transfer to traverse
Dhaka University of Engineering & Technology, Gazipur
 
REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf
REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdfREPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf
REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf
MuhammadMuazzam16
 
Topographic map fly levelling 1
Topographic map fly levelling 1Topographic map fly levelling 1
736.500Tunnel As.pdf
736.500Tunnel As.pdf736.500Tunnel As.pdf
736.500Tunnel As.pdf
SumanBiswas825463
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
ANANDA DS
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
Haziq1511
 
Csr922c Attain to 051.812.955.17 Sandro Suzart
Csr922c  Attain to 051.812.955.17 Sandro SuzartCsr922c  Attain to 051.812.955.17 Sandro Suzart
Csr922c Attain to 051.812.955.17 Sandro Suzart
Sandro Suzart
 
Road alignment survey 02
Road alignment survey 02Road alignment survey 02
AMW FIXTURES
AMW FIXTURESAMW FIXTURES
AMW FIXTURES
Maxpromotion
 
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
EQS -  EARTHWORK FOR ROADS AND CANALS.pdfEQS -  EARTHWORK FOR ROADS AND CANALS.pdf
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
GovindarajuluBadana
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Erik Ong
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
Sow Wei Henn
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Penny3688
 
Power to voltage
Power to voltagePower to voltage
Power to voltage
Yatindra Trivedi
 
DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...
DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...
DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...
Deltares
 
Resale and rent available units Allegria phase I & II
Resale and rent available units Allegria phase I & IIResale and rent available units Allegria phase I & II
Resale and rent available units Allegria phase I & II
Zayed Home
 
Punim fizika ndertimore
Punim fizika ndertimorePunim fizika ndertimore
Punim fizika ndertimore
Vedat Ramadani
 
Cross section in excel
 Cross section in excel Cross section in excel
Cross section in excel
Qaisar Ayub Malik
 
Site surveying
Site surveying Site surveying
Site surveying
Jäkê Čhŷį Śêrñ
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf

Similar to Bridge site survey 02 (20)

Topographic map level transfer to traverse
Topographic map level transfer to traverseTopographic map level transfer to traverse
Topographic map level transfer to traverse
 
REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf
REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdfREPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf
REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf
 
Topographic map fly levelling 1
Topographic map fly levelling 1Topographic map fly levelling 1
Topographic map fly levelling 1
 
736.500Tunnel As.pdf
736.500Tunnel As.pdf736.500Tunnel As.pdf
736.500Tunnel As.pdf
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Csr922c Attain to 051.812.955.17 Sandro Suzart
Csr922c  Attain to 051.812.955.17 Sandro SuzartCsr922c  Attain to 051.812.955.17 Sandro Suzart
Csr922c Attain to 051.812.955.17 Sandro Suzart
 
Road alignment survey 02
Road alignment survey 02Road alignment survey 02
Road alignment survey 02
 
AMW FIXTURES
AMW FIXTURESAMW FIXTURES
AMW FIXTURES
 
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
EQS -  EARTHWORK FOR ROADS AND CANALS.pdfEQS -  EARTHWORK FOR ROADS AND CANALS.pdf
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Power to voltage
Power to voltagePower to voltage
Power to voltage
 
DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...
DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...
DSD-NL 2014 - iMOD Symposium - 9. iPEST - iMOD parameter estimation, Peter Ve...
 
Resale and rent available units Allegria phase I & II
Resale and rent available units Allegria phase I & IIResale and rent available units Allegria phase I & II
Resale and rent available units Allegria phase I & II
 
Punim fizika ndertimore
Punim fizika ndertimorePunim fizika ndertimore
Punim fizika ndertimore
 
Cross section in excel
 Cross section in excel Cross section in excel
Cross section in excel
 
Site surveying
Site surveying Site surveying
Site surveying
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
LBA-1.pdf
 

More from Dhaka University of Engineering & Technology, Gazipur

Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
Dhaka University of Engineering & Technology, Gazipur
 
विकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdf
विकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdfविकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdf
विकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdf
Dhaka University of Engineering & Technology, Gazipur
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Dhaka University of Engineering & Technology, Gazipur
 
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
Dhaka University of Engineering & Technology, Gazipur
 
A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...
Dhaka University of Engineering & Technology, Gazipur
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Dhaka University of Engineering & Technology, Gazipur
 
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pagesSurvey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Dhaka University of Engineering & Technology, Gazipur
 
Engineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 reportEngineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 report
Dhaka University of Engineering & Technology, Gazipur
 
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Dhaka University of Engineering & Technology, Gazipur
 
Aggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman JyotiAggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Dhaka University of Engineering & Technology, Gazipur
 
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Dhaka University of Engineering & Technology, Gazipur
 
Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021
Dhaka University of Engineering & Technology, Gazipur
 
Topographic map distance and angular measurement 0
Topographic map  distance and angular measurement  0Topographic map  distance and angular measurement  0
Topographic map distance and angular measurement 0
Dhaka University of Engineering & Technology, Gazipur
 
Road alignment survey 01
Road alignment survey 01Road alignment survey 01
Bridge site survey 01
Bridge site survey 01Bridge site survey 01
Theory of theodolite traversing
Theory of theodolite traversingTheory of theodolite traversing
Theory of linear measurement
Theory of linear measurementTheory of linear measurement
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyotiSurvey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Dhaka University of Engineering & Technology, Gazipur
 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing

More from Dhaka University of Engineering & Technology, Gazipur (19)

Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
विकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdf
विकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdfविकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdf
विकास निर्माण कार्यमा महिलाहरुको सहभागिता.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
 
A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
 
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pagesSurvey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
 
Engineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 reportEngineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 report
 
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
 
Aggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman JyotiAggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
 
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
 
Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021
 
Topographic map distance and angular measurement 0
Topographic map  distance and angular measurement  0Topographic map  distance and angular measurement  0
Topographic map distance and angular measurement 0
 
Road alignment survey 01
Road alignment survey 01Road alignment survey 01
Road alignment survey 01
 
Bridge site survey 01
Bridge site survey 01Bridge site survey 01
Bridge site survey 01
 
Theory of theodolite traversing
Theory of theodolite traversingTheory of theodolite traversing
Theory of theodolite traversing
 
Theory of linear measurement
Theory of linear measurementTheory of linear measurement
Theory of linear measurement
 
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyotiSurvey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing
Tacheometry survey of detailing
 

Recently uploaded

Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
SMT process how to making and defects finding
SMT process how to making and defects findingSMT process how to making and defects finding
SMT process how to making and defects finding
rameshqapcba
 
Flow Through Pipe: the analysis of fluid flow within pipes
Flow Through Pipe:  the analysis of fluid flow within pipesFlow Through Pipe:  the analysis of fluid flow within pipes
Flow Through Pipe: the analysis of fluid flow within pipes
Indrajeet sahu
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
Lubi Valves
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
PreethaV16
 

Recently uploaded (20)

Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
SMT process how to making and defects finding
SMT process how to making and defects findingSMT process how to making and defects finding
SMT process how to making and defects finding
 
Flow Through Pipe: the analysis of fluid flow within pipes
Flow Through Pipe:  the analysis of fluid flow within pipesFlow Through Pipe:  the analysis of fluid flow within pipes
Flow Through Pipe: the analysis of fluid flow within pipes
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
 

Bridge site survey 02

  • 1. MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL FLY LEVEL FIELD BOOK SURVEY CAMP – 2017 Observer:- Suman Jyoti Date:- 2017-Dec-05 Booker:- Bishnu p. Bhandari Location:- NEA-Kharipati, Bhaktapur Station Distance BS FS Rise Fall RL Remarks BS FS Total T M B T M B B.M 4.0 ------ -------- 0.280 0.300 0.320 ---------- --------- ---------- --------- --------- 1285.000 B.M 01 8.5 3.0 7.0 1.235 1.192 1.150 0.890 0.875 0.860 --------- 1.175 1283.825 02 8.8 7.6 16.1 1.370 1.326 1.282 0.462 1.424 1.386 --------- 0.232 1283.593 03 7.6 7.3 16.1 1.248 1.210 1.172 1.436 1.308 1.272 0.018 --------- 1283.611 04 5.7 8.4 16.0 1.302 1.273 1.245 1.106 1.064 1.022 0.146 -------- 1283.757 Setup A ---- 6.0 12.7 ---------- --------- ---------- 1.400 1.370 1.340 --------- 0.097 1283.660 Setup A Setup A 5.3 ------ -------- 1.393 1.366 1.340 ---------- --------- ---------- ---------- --------- 1283.660 Setup A 01 8.5 5.9 11.2 1.499 1.456 1.414 1.340 1.310 1.281 0.056 --------- 1283.716 02 9.8 7.9 16.4 1.452 1.403 1.354 1.324 1.284 1.245 0.172 --------- 1283.888 03 9.4 9.2 19.0 0.818 0.771 0.724 1.197 1.151 1.105 0.252 --------- 1284.140 B.M ---- 8.3 17.7 ---------- --------- ---------- 0.416 0.457 0.499 1.228 --------- 1285.008 B.M Now, Total distance =131.12 m Error = 0.008 m Precision=25√k = 25√0.01312 = 9.05 mm Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-
  • 2. MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL FLY LEVEL FIELD BOOK SURVEY CAMP – 2017 Observer:- Suman Jyoti Date:- 2017-Dec-05 Booker:- Bishnu p. Bhandari Location:- NEA-Kharipati, Bhaktapur Reciprocal Levelling Field Book At Setup 1 Station A Top = 1.134 m Middle = 1.290 m Bottom = 1.267 m Mean readings(𝑀𝐴 ) =1.290 m Station B Top = 1.789 m Middle = 1.6985 m Bottom =1.608 m Mean readings(𝑀 𝐵 )= 1.6985 m 𝒉 𝒂= 𝑴 𝑨 - 𝑴 𝑩 = -0.4085 m At Setup 2 Station B Top = 1.225 m Middle = 1.145 m Bottom = 1.065 m Mean readings(𝑀𝐴 ) =1.145 m Station A Top = 1.566 m Middle = 1.552 m Bottom =1.538 m Mean readings(𝑀 𝐵 )= 1.552 m 𝒉 𝒃= 𝑴 𝑩 - 𝑴 𝑨 = -0.407 m Mean height difference (H) = ℎ 𝑎+ℎ 𝑏 2 = − 0.4085+0.407 2 = −0.40775m Thus, R.L of point B = R.L of A – H = 1283.66 – 0.40775 = 1283.252 m Surveyed by:- Suman Jyoti
  • 3. MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL FLY LEVEL FIELD BOOK SURVEY CAMP – 2017 Observer:- Suman Jyoti Date:- 2017-Dec-05 Booker:- Suman Jyoti Location:- NEA-Kharipati, Bhaktapur 1. R.L transfer from A to C Station Distance BS FS Rise Fall RL Remarks BS FS Total T M B T M B A 3.6 ------- -------- 1.364 1.346 1.328 ---------- --------- ---------- --------- --------- 1283.660 C ---- 5.0 5.6 ---------- --------- ---------- 1.000 0.975 0.950 0.371 --------- 1284.031 1. R.L transfer from C to A Station Distance BS FS Rise Fall RL Remarks BS FS Total T M B T M B C 4.3 ------- -------- 1.000 0.978 0.957 ---------- --------- ---------- --------- --------- 1284.031 A ---- 4.0 8.3 ---------- --------- ---------- 1.370 1.350 1.330 --------- 0.372 1283.659 R.L transfer from B to D Station Distance BS FS Rise Fall RL Remarks BS FS Total T M B T M B B 3.4 ------- -------- 0.430 0.413 0.396 ---------- --------- ---------- --------- --------- 1283.252 D ---- 5.3 8.7 ---------- --------- ---------- 0.539 0.513 0.486 --------- 0.100 1283.152 1. R.L transfer from D to B Station Distance BS FS Rise Fall RL Remarks BS FS Total T M B T M B D 4.8 ------- -------- 0.682 0.657 0.634 ---------- --------- ---------- --------- --------- 1283.152 B ---- 5.8 10.6 ---------- --------- ---------- 0.586 0.557 0.528 0.100 --------- 1283.252 Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-
  • 4. MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL Kageshwori Manahara, Kathmandu Tachometric Surveying Field Book SURVEY CAMP – 2017 Observer:- Suman Jyoti Date:- 2017-Dec-05 Booker:- Bishnu p. Bhandari Instrument at:- A Height of Instrument: 1.953m Location:- NEA-Kharipati, Bhaktapur Zero set at:- C Staff Point HCR VCR Stadia readings Horz. Distance Vertical Distance R.L Sketch Top Mid Bot From X-section of Bridge Alignment A - B Road Edge 271°50'40'' 93°10'10'' 1.023 1.005 0.978 04.5 -0.248 1284.36 R.L of station A =1283.66m Ground Level 102°00''10' 93°10''20' 1.797 1.789 1.782 01.5 -0.305 River Bank 103°28''30' 99°57''30' 2.927 2.916 2.906 02.1 -0.357 N.W.L 102°09''50' 99°57''10' 2.969 2.948 2.927 04.2 -0.714 Deepest Point 101°59''10' 99°57''10' 2.775 2.752 2.730 04.5 -0.776 1282.085 N.W.L 096°25''20' 97°48''00' 2.284 2.251 2.219 06.5 -0.874 River Bank 091°30''20' 97°11''00' 1.648 1.597 1.547 10.1 -1.253 Highest Point 092°57''10' 92°23''00' 1.340 1.275 1.210 13.0 -0.540 10 m upstream X- Section Highest Point 197°53''00' 093°22''30' 0.750 0.699 0.648 10.2 -0.599 Road Edge 182°29''30' 094°15''00' 0.660 0.615 0.570 9.0 -0.665 River Bank 173°27''20' 094°21''40' 2.660 2.615 2.570 9.0 -0.682 Deepest Point 162°38''20' 094°21''50' 2.810 2.765 2.720 9.0 -0.682 River Bank 149°23''50' 093°15''40' 2.830 2.781 2.732 9.8 -0.556 Highest Point 128°50''50' 092°01''20' 1.450 1.385 1.320 13.0 -0.458 Highest Point 183°53''00' 091°47''50' 0.925 0.790 0.655 27.0 -0.846 BP 169°58''30' 094°45''40' 1.450 1.329 1.208 24.2 -2.001 Deepest Point 166°13''50' 094°46''00' 1.640 1.520 1.400 24.0 -1.987 R.B.P 162°38''30' 091°21''00' 2.940 2.823 2.706 23.4 -0.551 Highest Point 151°12''10' 091°23''40' 1.456 1.334 1.212 24.4 -0.593 Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-
  • 5. MADAN ASHRIT MEMORIAL TECHNICAL SCHOOL Kageshwori Manahara, Kathmandu Tachometric Surveying Field Book SURVEY CAMP – 2017 Observer:- Suman Jyoti Date:- 2017-Dec-05 Booker:- Bishnu p. Bhandari Instrument at:- Height of Instrument: Location:- NEA-Kharipati, Bhaktapur Zero set at:- Staff Point HCR VCR Stadia readings Horz. Distance Vertical Distance Remarks Sketch Top Mid Bot 10 m downstream X- Section Road Edge 345°35''30' 088°55''40' 1.300 1.240 1.180 12.0 0.217 Bridge Corner 001°30''00' 088°30''50' 1.326 1.259 1.192 13.4 0.347 River Bank 033°09''30' 100°31''20' 1.900 1.850 1.800 10.0 -1.795 Deepest Point 038°39''10' 108°35''00' 1.640 1.584 1.528 11.2 -3.383 River Bank 050°01''50' 103°40''40' 0.870 0.805 0.740 13.0 -2.986 Highest Point 064°54''10' 084°15''10' 2.720 2.655 2.590 13.0 4.993 1287.951 Surveyed by:- Suman Jyoti Computed by:- Suman Jyoti Checked By:-
  翻译: