CIVIL ENGINEERING DEPARTMENT
DCC 20063
ENGINEERING SURVEY
FIELD WORK REPORT
FIELD WORK TITLE
LEVELLING
NAME MUHAMMAD MUAZZAM BIN MAZLAN
REG NUMBER 03DKA21F2013
MEMBER OF GROUP
MOHAMMAD FARHAT BIN SUHAIMI CRITERIA MARK
MUHAMAD SUFYAN IZZUDINBIN MUHAMAD SUHAIMI INTRODUCTION
/5
MATERIALS AND METHODS
/5
DATA
/5
PLOTTING
/5
ANALYSIS
/5
DISCUSSION
/5
CONCLUSION
/5
COURSE/SESSION
DKA SESSION 1 2022/2023
TOTAL MARK
LECTERUR SAMSUL NIZAN BIN MOHD EHSAN COMMENT:
LABSHEET 1: SERIES LEVELLING
INTRODUCTION
Levelling is a part of reviewing, the object of which is to lay out or
confirm or quantify the level of determined guides relative toward a
datum. It is generally utilized in geodesy and map making to gauge
vertical situation concerning an upward datum, and in development to
quantify level contrasts of development relics.
It is the most generally utilized strategy for evening out. In this
technique, estimations are noticed straightforwardly from evening out
instrument. In view of the perception focuses and instrument positions
direct evening out is separated into various sorts as follows simple
leveling, differential leveling, fly leveling, profile leveling, precise
leveling and reciprocal leveling.
Following that, levelling overviews are utilized to design expressways,
rail lines, trenches, sewers, and water supply frameworks, as well as
decide the volume of earthworks, orchestrate development projects as
indicated by expected heights, and break down waste qualities. Beside
that, the most critical thing for staff to comprehend is the hypothesis as
well as the common sense. This is on the grounds that evening out
exactness is basic in site arrangement, establishment, and consequently
quality affirmation.
MATERIALS
AUTOMATIC LEVEL TRIPOD
STAFF STAFF BUBBLES PEG
MEASUREMENT TAPE RANGING POLE
RISE AND FALL METHOD WITH EXAMPLES
Rise and fall is the strategy for studying to settle the evening out to figure out the
distinction in height and rise of two places. In this strategy like we want to
ascertain the distinction in rise of the staff of two places. The two stations places
where the staff readings are taken, we know the RL of ground of one station and
we need to track down the RL of another.
BS IS FS RISE FALL RL ADJ ADJ RL REMARKS
1.230 - 13.922 - 13.922 TBM
1.258 1.345 0.115 13.807 -0.1315 13.675 1
1.312 1.315 0.057 13.750 -0.2630 13.487 2
1.293 1.308 0.004 13.754 -0.3945 13.359 3
1.310 1.310 0.017 13.737 -0.5260 13.211 4
1.361 1.414 0.104 13.633 -0.6575 12.976 5
1.391 1.312 0.049 13.682 -0.7890 12.893 6
PRACTICAL : SERIES LEVELLING
PROCEDURE
a) Let A and B be the two point and the level is set up between A and B
anywhere in the ground. A is a point of known elevation, TBM1 =
13.922 m.
b) The telescope is directed towards A and reading vertically held staff
at point A. This is B.S reading = 1.230 m.
c) The telescope is directed on the staff at point B. The F.S reading is
1.345 m.
d) Then move level at any stable ground between next point B and C.
e) Repeat the procedure b) and c). Also take reading for B.S and F.S.
f) Repeat the procedure until the unknown point. Then close the
reading to TBM1.
DATA SERIES LEVELLING (RISE AND FALL)
BS IS FS RISE FALL RL ADJ ADJ RL REMARKS
1.230 13.922 - 13.922 TBM
1.258 1.345 0.115 13.807 -0.1315 13.675 1
1.312 1.315 0.057 13.750 -0.2630 13.487 2
1.293 1.308 0.004 13.754 -0.3945 13.359 3
1.310 1.310 0.017 13.737 -0.5260 13.211 4
1.361 1.414 0.104 13.633 -0.6575 12.976 5
1.391 1.312 0.049 13.682 -0.7890 12.893 6
1.908 1.420 0.029 13.653 -0.9205 12.733 7
2.298 1.937 0.029 13.624 -1.052 12.572 8
1.335 1.314 0.984 14.608 -1.1835 13.425 9
1.328 1.360 0.025 14.583 -1.3150 13.268 10
2.315 1.355 0.027 14.556 -1.4465 13.109 11
1.370 0.945 15.501 -1.579 13.922 TBM
∑BS =
18.339
∑FS =
16.760
∑R =
1.982
∑F =
0.403
ANALYSIS DATA
• Give the formula for calculation of arithmetic checking and use the
collection data calculates arithmetic checking.
• Show step for calculate the correction of reduce level.
ARITHMETIC CHECKING
∑BS - ∑FS = ∑R - ∑F = URL – IRL
18.339 m – 16.760 m = 1.982 m – 0.403 m = 15.501 m – 13.922 m
1.579 m = 1.579 m = 1.579 m
MISCLOSURE
15.501 m – 13.922 m = + 1.579 m
MISCLOSURE LIMIT
(± 5 √𝑛) mm , n = bilangan kedudukan alat
= 5 √12
= ±17.321 mm -17.321 < 1579.000 < + 17.321
CORRECTION
- 1.579/n = - 1.579/12 = - 0.1315 m (ADJ)
-0.1315 × 2 = - 0.2630 m (ADJ BACAAN KE-2)
PRACTICAL : LONG SECTION AND CROSS SECTION
SURVEY
PROCEDURE
a) Set up center line with given points@ equal distance as
known as longitudinal section.
b) Set up the points at right angles on either side of the center
line of the proposed center line.
c) Set up instrument at any suitable points, a number of change
points, CP along with intermediate sights, IS may be required.
d) The intermediate sights, IS are taken on stations, at breaks in
the ground surface, at points of change of slope and other
critical points.
DATA LONG SECTION AND CROSS SECTION (RISE AND FALL)
Σ BS = 5.755 Σ FS = 5.761
BS IS FS RISE FALL RL ADJ ADJ-RL REMARKS
1.230 15.152 13.922 - 13.922 TBM
2.085 13.067 -0.0105 13.057 1
2.068 13.084 -0.021 13.063 2
1.492 13.660 -0.0315 13.629 3
1.364 13.788 -0.0420 13.746 4
1.345 13.807 -0.0525 13.755 5
1.322 13.830 -0.0630 13.767 6
1.380 13.772 -0.0735 13.699 7
1.369 13.783 -0.0840 13.699 8
1.382 13.770 -0.0945 13.676 9
1.342 13.810 -0.1050 13.705 10
1.302 1.313 15.192 13.890 -0.1155 13.775 11
1.552 13.640 -0.1260 13.514 12
1.558 13.634 -0.1365 13.498 13
1.605 13.587 -0.1470 13.440 14
1.572 13.620 -0.1575 13.463 15
1.538 13.604 -0.1168 13.436 16
1.600 13.592 -0.1785 13.414 17
1.565 13.627 -0.1890 13.438 18
1.599 13.593 -0.1995 13.394 19
1.612 13.580 -0.2100 13.370 20
1.739 13.453 -0.2205 13.233 21
1.911 1.962 15.141 13.230 -0.2310 12.999 22
2.198 12.943 -0.2415 12.702 23
2.048 13.093 -0.2520 12.841 24
1.282 13.859 -0.2625 13.597 25
1.265 13.876 -0.2730 13.603 26
1.245 13.896 -0.2835 13.613 27
1.620 13.521 -0.2940 13.227 28
1.254 13.887 -0.3045 13.583 29
1.320 13.839 -0.3150 13.524 30
1.328 13.813 -0.3255 13.488 31
1.325 13.816 -0.3360 13.480 32
1.312 1.309 13.832 -0.3465 13.486 33
1..177 13.964 -0.3570 13.607 TBM
ANALYSIS DATA
• Give the formula for calculation of arithmetic checking and use the
collection data calculates arithmetic checking.
• Show step for calculate the correction of reduce level.
ARITHMETIC CHECKING
∑BS - ∑FS = URL - IRL
5.755 m – 5.761 m = 13.964 m – 13.922 m
-0.006 m = 0.042 m
MISELOSURE
13.964 m – 13.922 m = +0.042 m
MISELOSURE LIMIT
(± 5 √𝑛 ) 𝑚𝑚, 𝑛 = 𝑏𝑖𝑙𝑎𝑛𝑔𝑎𝑛 𝑘𝑒𝑑𝑢𝑑𝑢𝑘𝑎𝑛 𝑎𝑙𝑎𝑡
= ± 5 √4
= ± 10 mm
CORRECTION
−0.042
𝑛
=
−0.042
4
= -0.0105 m
PRACTICAL : CONTOUR
PROCEDURE
a) Make a grid line 3 m x 3 m with ranging pole and
measurement tape.
b) Mark each point (eg: A, B, C, D and).
c) Start back-sight reading at given TBM = 1.230 m.
d) Intermediate sight reading at marking point.
e) Then close the reading to TBM.
A B C D
E F G H
I J K L
DATA CONTOUR (RISE AND FALL)
Σ BS = 5.755 Σ FS = 5.761
BS IS FS RISE FALL RL ADJ ADJ-RL REMARKS
1.230 15.152 13.922 - 13.922 TBM
2.085 13.067 -0.0105 13.057 1
2.068 13.084 -0.021 13.063 2
1.492 13.660 -0.0315 13.629 3
1.364 13.788 -0.0420 13.746 4
1.345 13.807 -0.0525 13.755 5
1.322 13.830 -0.0630 13.767 6
1.380 13.772 -0.0735 13.699 7
1.369 13.783 -0.0840 13.699 8
1.382 13.770 -0.0945 13.676 9
1.342 13.810 -0.1050 13.705 10
1.302 1.313 15.192 13.890 -0.1155 13.775 11
1.552 13.640 -0.1260 13.514 12
1.558 13.634 -0.1365 13.498 13
1.605 13.587 -0.1470 13.440 14
1.572 13.620 -0.1575 13.463 15
1.538 13.604 -0.1168 13.436 16
1.600 13.592 -0.1785 13.414 17
1.565 13.627 -0.1890 13.438 18
1.599 13.593 -0.1995 13.394 19
1.612 13.580 -0.2100 13.370 20
1.739 13.453 -0.2205 13.233 21
1.911 1.962 15.141 13.230 -0.2310 12.999 22
2.198 12.943 -0.2415 12.702 23
2.048 13.093 -0.2520 12.841 24
1.282 13.859 -0.2625 13.597 25
1.265 13.876 -0.2730 13.603 26
1.245 13.896 -0.2835 13.613 27
1.620 13.521 -0.2940 13.227 28
1.254 13.887 -0.3045 13.583 29
1.320 13.839 -0.3150 13.524 30
1.328 13.813 -0.3255 13.488 31
1.325 13.816 -0.3360 13.480 32
1.312 1.309 13.832 -0.3465 13.486 33
1..177 13.964 -0.3570 13.607 TBM
ANALYSIS DATA
• Give the formula for calculation of arithmetic checking and use the
collection data calculates arithmetic checking.
• Show step for calculate the correction of reduce level.
ARITHMETIC CHECKIN
∑BS - ∑FS = URL – IRL
5.755 m – 5.761 m = 13.964 m – 13.922 m
-0.006 m = 0.042 m
MISELOSURE
13.964 m – 13.922 m = +0.042m
MISELOSURE LIMIT
(± 5 √𝑛 ) 𝑚𝑚, 𝑛
= 𝑏𝑖𝑙𝑎𝑛𝑔𝑎𝑛 𝑘𝑒𝑑𝑢𝑑𝑢𝑘𝑎𝑛 𝑎𝑙𝑎𝑡
= ± 5 √4
= ± 10 mm
CORRECTION
−0.042
𝑛
=
−0.042
4
= -0.0105 m
RISE 1
= RL + BS
= 13.922 + 1.230
= 15.152 m
RISE 2
= RL + BS
= 13.922 + 1.302
= 15.192 m
RL 1
= 15.152 – 2.085
= 13.067 m
DISCUSSION
THE PROBLEMS THAT WE WERE FACE DURING LEVELLING SURVEY IS
- Unsure weather conditions like rain
- Automatic level battery running out is an example of a technical
problem
STEPS WE WERE TAKE TO BEAT THIS ISSUE IS
- When it rains, practical equipment must be stored first. If the rain
doesn't stop, the marked position point must be stable and difficult to
fall from
- Provide an extra battery, before using the automatic level, you must
first inspect the equipment in terms of battery and such
THE CONCLUSION
In conclusion, the practical results we obtained are acceptable and can be used
after the readings we obtained were corrected. The wind disturbance factor is
one of the causes of the correction required on our readings. This causes the
equipment to provide inaccurate data.
The correction required for series leveling is - 0.1315 m, while the correction
required for long section, cross section, and contour is - 0.0105 m. The final
reduce level (rl) for the leveling series is 14.556 m, while the long and cross
section contour is 13.832 m. According to the graph we created, the land we
analysed has an unequal land area.

More Related Content

What's hot

Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
Sarchia Khursheed
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
MuhammadMuazzam16
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
Doreen Yeo
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
Ghulam Mustafa Vira
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
tfkc1212
 
Hydrostatic force
Hydrostatic forceHydrostatic force
Hydrostatic force
Natalie Ulza
 
Tranverse report
Tranverse report Tranverse report
Tranverse report
Wen Crystal
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
Shze Hwa Lee
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
Haziq1511
 
Setting out work
Setting out workSetting out work
Setting out work
Shivam Mehta
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
Darren Lee
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
Sarchia Khursheed
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
Est
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
마 이환
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
Shweta Sagar
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
Sarchia Khursheed
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
XinYee Khoo
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
Natalie Ulza
 
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
YASMINE HASLAN
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
XinYee Khoo
 

What's hot (20)

Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Hydrostatic force
Hydrostatic forceHydrostatic force
Hydrostatic force
 
Tranverse report
Tranverse report Tranverse report
Tranverse report
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Setting out work
Setting out workSetting out work
Setting out work
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
 
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 

Similar to REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf

Bridge site survey 02
Bridge site survey 02Bridge site survey 02
Project 1
Project 1Project 1
Project 1
Herbert Hand
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
Enoch Wong
 
Csr922c Attain to 051.812.955.17 Sandro Suzart
Csr922c  Attain to 051.812.955.17 Sandro SuzartCsr922c  Attain to 051.812.955.17 Sandro Suzart
Csr922c Attain to 051.812.955.17 Sandro Suzart
Sandro Suzart
 
iMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.pptiMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.ppt
shakeelabbas23
 
Topographic map level transfer to traverse
Topographic map level transfer to traverseTopographic map level transfer to traverse
Topographic map level transfer to traverse
Dhaka University of Engineering & Technology, Gazipur
 
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docxEENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
jack60216
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
seenyee
 
Levelling final
Levelling finalLevelling final
Levelling final
seenyee
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
chloeesim
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Erik Ong
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
Sow Wei Henn
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Penny3688
 
Magnetic Survey for exploration and its interpretation.pptx
Magnetic Survey for exploration and its interpretation.pptxMagnetic Survey for exploration and its interpretation.pptx
Magnetic Survey for exploration and its interpretation.pptx
University of Kerala
 
City council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentation
City of San Angelo Texas
 
Calculation template
Calculation templateCalculation template
Calculation template
Yekian Ian
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
736.500Tunnel As.pdf
736.500Tunnel As.pdf736.500Tunnel As.pdf
736.500Tunnel As.pdf
SumanBiswas825463
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SUMARDIONO .
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
Sheng Zhe
 

Similar to REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf (20)

Bridge site survey 02
Bridge site survey 02Bridge site survey 02
Bridge site survey 02
 
Project 1
Project 1Project 1
Project 1
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
 
Csr922c Attain to 051.812.955.17 Sandro Suzart
Csr922c  Attain to 051.812.955.17 Sandro SuzartCsr922c  Attain to 051.812.955.17 Sandro Suzart
Csr922c Attain to 051.812.955.17 Sandro Suzart
 
iMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.pptiMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.ppt
 
Topographic map level transfer to traverse
Topographic map level transfer to traverseTopographic map level transfer to traverse
Topographic map level transfer to traverse
 
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docxEENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
EENG 3305Linear Circuit Analysis IIFinal ExamDecembe.docx
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Levelling final
Levelling finalLevelling final
Levelling final
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Magnetic Survey for exploration and its interpretation.pptx
Magnetic Survey for exploration and its interpretation.pptxMagnetic Survey for exploration and its interpretation.pptx
Magnetic Survey for exploration and its interpretation.pptx
 
City council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentation
 
Calculation template
Calculation templateCalculation template
Calculation template
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
LBA-1.pdf
 
736.500Tunnel As.pdf
736.500Tunnel As.pdf736.500Tunnel As.pdf
736.500Tunnel As.pdf
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 

More from MuhammadMuazzam16

MPU23052 STKI SESI 1 2022/2023 KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...
MPU23052 STKI SESI 1 2022/2023KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...MPU23052 STKI SESI 1 2022/2023KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...
MPU23052 STKI SESI 1 2022/2023 KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...
MuhammadMuazzam16
 
DCC10032 CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAAN
DCC10032	CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAANDCC10032	CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAAN
DCC10032 CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAAN
MuhammadMuazzam16
 
Presentation contract.pptx
Presentation contract.pptxPresentation contract.pptx
Presentation contract.pptx
MuhammadMuazzam16
 
DCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdf
DCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdfDCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdf
DCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdf
MuhammadMuazzam16
 
PENGHAYATAN ETIKA DAN PERADABAN .pdf
PENGHAYATAN ETIKA DAN PERADABAN .pdfPENGHAYATAN ETIKA DAN PERADABAN .pdf
PENGHAYATAN ETIKA DAN PERADABAN .pdf
MuhammadMuazzam16
 
PENGHAYATAN ETIKA PERADABAN .pdf
PENGHAYATAN ETIKA PERADABAN .pdfPENGHAYATAN ETIKA PERADABAN .pdf
PENGHAYATAN ETIKA PERADABAN .pdf
MuhammadMuazzam16
 
SAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdf
SAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdfSAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdf
SAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdf
MuhammadMuazzam16
 

More from MuhammadMuazzam16 (7)

MPU23052 STKI SESI 1 2022/2023 KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...
MPU23052 STKI SESI 1 2022/2023KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...MPU23052 STKI SESI 1 2022/2023KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...
MPU23052 STKI SESI 1 2022/2023 KEPERLUAN SAINS TEKNOLOGI DAN KEJURUTERAAN DAL...
 
DCC10032 CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAAN
DCC10032	CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAANDCC10032	CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAAN
DCC10032 CIVIL ENGINEERING MATERIALS JENTERA & MESIN DALAM PEMBINAAN
 
Presentation contract.pptx
Presentation contract.pptxPresentation contract.pptx
Presentation contract.pptx
 
DCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdf
DCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdfDCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdf
DCC20042P CARPENTRY TANGGAM KAYU (WOOD JOINT).pdf
 
PENGHAYATAN ETIKA DAN PERADABAN .pdf
PENGHAYATAN ETIKA DAN PERADABAN .pdfPENGHAYATAN ETIKA DAN PERADABAN .pdf
PENGHAYATAN ETIKA DAN PERADABAN .pdf
 
PENGHAYATAN ETIKA PERADABAN .pdf
PENGHAYATAN ETIKA PERADABAN .pdfPENGHAYATAN ETIKA PERADABAN .pdf
PENGHAYATAN ETIKA PERADABAN .pdf
 
SAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdf
SAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdfSAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdf
SAINS TEKNOLOGI KEJURUTERAAN ISLAM E-FOLIO.pdf
 

Recently uploaded

BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
aarusi sexy model
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
dulbh kashyap
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
Lubi Valves
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 

Recently uploaded (20)

BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 

REPORT SURVEY LEVELLING CIVIL ENGINEERING.pdf

  • 1. CIVIL ENGINEERING DEPARTMENT DCC 20063 ENGINEERING SURVEY FIELD WORK REPORT FIELD WORK TITLE LEVELLING NAME MUHAMMAD MUAZZAM BIN MAZLAN REG NUMBER 03DKA21F2013 MEMBER OF GROUP MOHAMMAD FARHAT BIN SUHAIMI CRITERIA MARK MUHAMAD SUFYAN IZZUDINBIN MUHAMAD SUHAIMI INTRODUCTION /5 MATERIALS AND METHODS /5 DATA /5 PLOTTING /5 ANALYSIS /5 DISCUSSION /5 CONCLUSION /5 COURSE/SESSION DKA SESSION 1 2022/2023 TOTAL MARK LECTERUR SAMSUL NIZAN BIN MOHD EHSAN COMMENT:
  • 2. LABSHEET 1: SERIES LEVELLING INTRODUCTION Levelling is a part of reviewing, the object of which is to lay out or confirm or quantify the level of determined guides relative toward a datum. It is generally utilized in geodesy and map making to gauge vertical situation concerning an upward datum, and in development to quantify level contrasts of development relics. It is the most generally utilized strategy for evening out. In this technique, estimations are noticed straightforwardly from evening out instrument. In view of the perception focuses and instrument positions direct evening out is separated into various sorts as follows simple leveling, differential leveling, fly leveling, profile leveling, precise leveling and reciprocal leveling. Following that, levelling overviews are utilized to design expressways, rail lines, trenches, sewers, and water supply frameworks, as well as decide the volume of earthworks, orchestrate development projects as indicated by expected heights, and break down waste qualities. Beside that, the most critical thing for staff to comprehend is the hypothesis as well as the common sense. This is on the grounds that evening out exactness is basic in site arrangement, establishment, and consequently quality affirmation.
  • 3. MATERIALS AUTOMATIC LEVEL TRIPOD STAFF STAFF BUBBLES PEG MEASUREMENT TAPE RANGING POLE
  • 4. RISE AND FALL METHOD WITH EXAMPLES Rise and fall is the strategy for studying to settle the evening out to figure out the distinction in height and rise of two places. In this strategy like we want to ascertain the distinction in rise of the staff of two places. The two stations places where the staff readings are taken, we know the RL of ground of one station and we need to track down the RL of another. BS IS FS RISE FALL RL ADJ ADJ RL REMARKS 1.230 - 13.922 - 13.922 TBM 1.258 1.345 0.115 13.807 -0.1315 13.675 1 1.312 1.315 0.057 13.750 -0.2630 13.487 2 1.293 1.308 0.004 13.754 -0.3945 13.359 3 1.310 1.310 0.017 13.737 -0.5260 13.211 4 1.361 1.414 0.104 13.633 -0.6575 12.976 5 1.391 1.312 0.049 13.682 -0.7890 12.893 6
  • 5. PRACTICAL : SERIES LEVELLING PROCEDURE a) Let A and B be the two point and the level is set up between A and B anywhere in the ground. A is a point of known elevation, TBM1 = 13.922 m. b) The telescope is directed towards A and reading vertically held staff at point A. This is B.S reading = 1.230 m. c) The telescope is directed on the staff at point B. The F.S reading is 1.345 m. d) Then move level at any stable ground between next point B and C. e) Repeat the procedure b) and c). Also take reading for B.S and F.S. f) Repeat the procedure until the unknown point. Then close the reading to TBM1.
  • 6. DATA SERIES LEVELLING (RISE AND FALL) BS IS FS RISE FALL RL ADJ ADJ RL REMARKS 1.230 13.922 - 13.922 TBM 1.258 1.345 0.115 13.807 -0.1315 13.675 1 1.312 1.315 0.057 13.750 -0.2630 13.487 2 1.293 1.308 0.004 13.754 -0.3945 13.359 3 1.310 1.310 0.017 13.737 -0.5260 13.211 4 1.361 1.414 0.104 13.633 -0.6575 12.976 5 1.391 1.312 0.049 13.682 -0.7890 12.893 6 1.908 1.420 0.029 13.653 -0.9205 12.733 7 2.298 1.937 0.029 13.624 -1.052 12.572 8 1.335 1.314 0.984 14.608 -1.1835 13.425 9 1.328 1.360 0.025 14.583 -1.3150 13.268 10 2.315 1.355 0.027 14.556 -1.4465 13.109 11 1.370 0.945 15.501 -1.579 13.922 TBM ∑BS = 18.339 ∑FS = 16.760 ∑R = 1.982 ∑F = 0.403
  • 7. ANALYSIS DATA • Give the formula for calculation of arithmetic checking and use the collection data calculates arithmetic checking. • Show step for calculate the correction of reduce level. ARITHMETIC CHECKING ∑BS - ∑FS = ∑R - ∑F = URL – IRL 18.339 m – 16.760 m = 1.982 m – 0.403 m = 15.501 m – 13.922 m 1.579 m = 1.579 m = 1.579 m MISCLOSURE 15.501 m – 13.922 m = + 1.579 m MISCLOSURE LIMIT (± 5 √𝑛) mm , n = bilangan kedudukan alat = 5 √12 = ±17.321 mm -17.321 < 1579.000 < + 17.321 CORRECTION - 1.579/n = - 1.579/12 = - 0.1315 m (ADJ) -0.1315 × 2 = - 0.2630 m (ADJ BACAAN KE-2)
  • 8. PRACTICAL : LONG SECTION AND CROSS SECTION SURVEY PROCEDURE a) Set up center line with given points@ equal distance as known as longitudinal section. b) Set up the points at right angles on either side of the center line of the proposed center line. c) Set up instrument at any suitable points, a number of change points, CP along with intermediate sights, IS may be required. d) The intermediate sights, IS are taken on stations, at breaks in the ground surface, at points of change of slope and other critical points.
  • 9. DATA LONG SECTION AND CROSS SECTION (RISE AND FALL) Σ BS = 5.755 Σ FS = 5.761 BS IS FS RISE FALL RL ADJ ADJ-RL REMARKS 1.230 15.152 13.922 - 13.922 TBM 2.085 13.067 -0.0105 13.057 1 2.068 13.084 -0.021 13.063 2 1.492 13.660 -0.0315 13.629 3 1.364 13.788 -0.0420 13.746 4 1.345 13.807 -0.0525 13.755 5 1.322 13.830 -0.0630 13.767 6 1.380 13.772 -0.0735 13.699 7 1.369 13.783 -0.0840 13.699 8 1.382 13.770 -0.0945 13.676 9 1.342 13.810 -0.1050 13.705 10 1.302 1.313 15.192 13.890 -0.1155 13.775 11 1.552 13.640 -0.1260 13.514 12 1.558 13.634 -0.1365 13.498 13 1.605 13.587 -0.1470 13.440 14 1.572 13.620 -0.1575 13.463 15 1.538 13.604 -0.1168 13.436 16 1.600 13.592 -0.1785 13.414 17 1.565 13.627 -0.1890 13.438 18 1.599 13.593 -0.1995 13.394 19 1.612 13.580 -0.2100 13.370 20 1.739 13.453 -0.2205 13.233 21 1.911 1.962 15.141 13.230 -0.2310 12.999 22 2.198 12.943 -0.2415 12.702 23 2.048 13.093 -0.2520 12.841 24 1.282 13.859 -0.2625 13.597 25 1.265 13.876 -0.2730 13.603 26 1.245 13.896 -0.2835 13.613 27 1.620 13.521 -0.2940 13.227 28 1.254 13.887 -0.3045 13.583 29 1.320 13.839 -0.3150 13.524 30 1.328 13.813 -0.3255 13.488 31 1.325 13.816 -0.3360 13.480 32 1.312 1.309 13.832 -0.3465 13.486 33 1..177 13.964 -0.3570 13.607 TBM
  • 10. ANALYSIS DATA • Give the formula for calculation of arithmetic checking and use the collection data calculates arithmetic checking. • Show step for calculate the correction of reduce level. ARITHMETIC CHECKING ∑BS - ∑FS = URL - IRL 5.755 m – 5.761 m = 13.964 m – 13.922 m -0.006 m = 0.042 m MISELOSURE 13.964 m – 13.922 m = +0.042 m MISELOSURE LIMIT (± 5 √𝑛 ) 𝑚𝑚, 𝑛 = 𝑏𝑖𝑙𝑎𝑛𝑔𝑎𝑛 𝑘𝑒𝑑𝑢𝑑𝑢𝑘𝑎𝑛 𝑎𝑙𝑎𝑡 = ± 5 √4 = ± 10 mm CORRECTION −0.042 𝑛 = −0.042 4 = -0.0105 m
  • 11. PRACTICAL : CONTOUR PROCEDURE a) Make a grid line 3 m x 3 m with ranging pole and measurement tape. b) Mark each point (eg: A, B, C, D and). c) Start back-sight reading at given TBM = 1.230 m. d) Intermediate sight reading at marking point. e) Then close the reading to TBM. A B C D E F G H I J K L
  • 12. DATA CONTOUR (RISE AND FALL) Σ BS = 5.755 Σ FS = 5.761 BS IS FS RISE FALL RL ADJ ADJ-RL REMARKS 1.230 15.152 13.922 - 13.922 TBM 2.085 13.067 -0.0105 13.057 1 2.068 13.084 -0.021 13.063 2 1.492 13.660 -0.0315 13.629 3 1.364 13.788 -0.0420 13.746 4 1.345 13.807 -0.0525 13.755 5 1.322 13.830 -0.0630 13.767 6 1.380 13.772 -0.0735 13.699 7 1.369 13.783 -0.0840 13.699 8 1.382 13.770 -0.0945 13.676 9 1.342 13.810 -0.1050 13.705 10 1.302 1.313 15.192 13.890 -0.1155 13.775 11 1.552 13.640 -0.1260 13.514 12 1.558 13.634 -0.1365 13.498 13 1.605 13.587 -0.1470 13.440 14 1.572 13.620 -0.1575 13.463 15 1.538 13.604 -0.1168 13.436 16 1.600 13.592 -0.1785 13.414 17 1.565 13.627 -0.1890 13.438 18 1.599 13.593 -0.1995 13.394 19 1.612 13.580 -0.2100 13.370 20 1.739 13.453 -0.2205 13.233 21 1.911 1.962 15.141 13.230 -0.2310 12.999 22 2.198 12.943 -0.2415 12.702 23 2.048 13.093 -0.2520 12.841 24 1.282 13.859 -0.2625 13.597 25 1.265 13.876 -0.2730 13.603 26 1.245 13.896 -0.2835 13.613 27 1.620 13.521 -0.2940 13.227 28 1.254 13.887 -0.3045 13.583 29 1.320 13.839 -0.3150 13.524 30 1.328 13.813 -0.3255 13.488 31 1.325 13.816 -0.3360 13.480 32 1.312 1.309 13.832 -0.3465 13.486 33 1..177 13.964 -0.3570 13.607 TBM
  • 13. ANALYSIS DATA • Give the formula for calculation of arithmetic checking and use the collection data calculates arithmetic checking. • Show step for calculate the correction of reduce level. ARITHMETIC CHECKIN ∑BS - ∑FS = URL – IRL 5.755 m – 5.761 m = 13.964 m – 13.922 m -0.006 m = 0.042 m MISELOSURE 13.964 m – 13.922 m = +0.042m MISELOSURE LIMIT (± 5 √𝑛 ) 𝑚𝑚, 𝑛 = 𝑏𝑖𝑙𝑎𝑛𝑔𝑎𝑛 𝑘𝑒𝑑𝑢𝑑𝑢𝑘𝑎𝑛 𝑎𝑙𝑎𝑡 = ± 5 √4 = ± 10 mm CORRECTION −0.042 𝑛 = −0.042 4 = -0.0105 m RISE 1 = RL + BS = 13.922 + 1.230 = 15.152 m RISE 2 = RL + BS = 13.922 + 1.302 = 15.192 m RL 1 = 15.152 – 2.085 = 13.067 m
  • 14. DISCUSSION THE PROBLEMS THAT WE WERE FACE DURING LEVELLING SURVEY IS - Unsure weather conditions like rain - Automatic level battery running out is an example of a technical problem STEPS WE WERE TAKE TO BEAT THIS ISSUE IS - When it rains, practical equipment must be stored first. If the rain doesn't stop, the marked position point must be stable and difficult to fall from - Provide an extra battery, before using the automatic level, you must first inspect the equipment in terms of battery and such THE CONCLUSION In conclusion, the practical results we obtained are acceptable and can be used after the readings we obtained were corrected. The wind disturbance factor is one of the causes of the correction required on our readings. This causes the equipment to provide inaccurate data. The correction required for series leveling is - 0.1315 m, while the correction required for long section, cross section, and contour is - 0.0105 m. The final reduce level (rl) for the leveling series is 14.556 m, while the long and cross section contour is 13.832 m. According to the graph we created, the land we analysed has an unequal land area.