EARTHWORK FOR
ROADS AND CANALS
Prepared By:
B.Govinda Rajulu
➔
Sl.
No
Chainage
/ Station
Depth /
Height
Mean Depth
/ Height (d)
Width (B) Area of
central portion
(BXd)
Area of sides
(Sd²)
Total sectional
Area
A = (Bd+Sd²)
Length
(L)
Quantity
Q = A X L
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Sl.
No
Chainage
/ Station
Depth /
Height
(d)
Width
(B)
Area of
central
portion (BXd)
Total (A1)
sectional Area
(Bd1 + Sd1²)
Total (A2)
sectional
Area
(Bd2+ Sd2²)
Mean sectional
Area
A = (A1+A2)/2
Length
(L)
Quantity
Q = A X L
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Example – 1:
A canal is in cutting and has a width of 4.00 m at bottom of the depth of cutting is 2.00 m and side slopes are
1 ½ : 1, find the area of cross section?
Solution: Given Data: - Width of canal = 4.00m; Depth of the cutting = 2.00 m; Side slopes = 1 ½ : 1 ( S: 1 / n: 1)
Area of c/s of canal = (b+nd)d (or) Bd + Sd²
(4 + 1.5*2)2 (or) 4x2 + 1.5 x 2²
4+3*2 (or) 8 + 6
= 14.00 Sq.m (or) 14.00 Sq.m
Example – 2:
A) Mid sectional area method.
A) Mean sectional area method.
Solution:
Mid - Sectional Area Method:
Volume of earth work (V) = Area of Mid point X Length
Area of the Midpoint = (b+nd)xd
Where b= 10 m, n = 1.5, d = 1+2+3/3 = 2 m. Am = (10 + 1.5*2)x2 = 26 sq. m
Therefore Volume of earthwork (V) = 26 X 120m = 3120 cu m.
Chainage 0 50 100 150 200
R. L of Ground 97.00 96.50 96.00 97.50 98.00
Height of the
Bank / Cutting
3.00 3.50 4.00 2.50 2.00
Formation Level 100.00 100.00 100.00 100.00 100.00
R. L of Ground 97.00 96.50 96.00 97.50 98.00
Chainage 0 50 100 150 200
…………
₹
₹
Chainage 10 11 12 13 14 15 16 17 18 19 20
R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105.00 104.10 104.62 104.00 103.30
R.L of Formation 107 Down gradient 1 in 150 Down gradient 1 in 100
Depth of
cutting
- - - - - - - - - - -
Height of bank 2.00 1.20 1.16 0.50 0.78 1.60 0.60 1.20 0.38 0.70 1.10
R. L of
Formation
107 106.80 106.60 106.40 106.20 105.90 105.60 105.30 105 104.70 104.40
R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105 104.10 104.62 104 103.30
Distance in m 300 330 360 390 420 450 480 510 540 570 600
Chainage 10 11 12 13 14 15 16 17 18 19 20
Station/
Chainage
Length Height /
Depth
Mean
Height/
Depth
(d)
Central
Area (Bd)
Side
Area
(Sd²)
Total
Section
Area
(Bd +Sd²)
Length in
b/w
stations
(L)
Quantity (Bd+Sd²) X L
Banking Cutting
10 300 2.00 - - - - - - -
11 330 1.20 1.60 16.00 5.12 21.12 30 633.60 -
12 360 1.16 1.18 11.80 2.78 14.58 30 437.40 -
13 390 0.50 0.83 8.30 1.38 9.68 30 290.40 -
14 420 0.78 0.64 6.40 0.82 7.22 30 216.60 -
15 450 1.60 1.19 11.90 2.83 14.73 30 441.90 -
16 480 0.60 1.10 11.00 2.42 13.42 30 402.60 -
17 510 1.20 0.90 9.00 1.62 10.62 30 318.60 -
18 540 0.38 0.79 7.90 1.25 9.15 30 274.50 -
19 570 0.70 0.54 5.40 0.58 5.98 30 179.40 -
20 600 1.10 0.90 9.00 1.62 10.62 30 318.60 -
TOTAL QUANTITY 3513.60 Cu m
Station/Ch
ainage
Length Height/
Depth
Area of
central
portion (Bd)
Area of
sides (Sd²)
Total Sectional
Area
(Bd +Sd²)
Mean
sectional
Area
Length b/w
stations
Quantity (Bd + Sd²) X L
Banking Cutting
10 300 2.00 20.00 8.00 28.00 - - - -
11 330 1.20 12.00 2.88 14.88 21.44 30 643.20 -
12 360 1.16 11.60 2.69 14.29 14.59 30 437.70 -
13 390 0.50 5.00 0.50 5.50 9.90 30 297.00 -
14 420 0.78 7.80 1.22 9.02 7.26 30 217.80 -
15 450 1.60 16.00 5.12 21.12 15.07 30 451.95 -
16 480 0.60 6.00 0.72 6.72 13.92 30 417.60 -
17 510 1.20 12.00 2.88 14.88 10.80 30 324.00 -
18 540 0.38 3.80 0.29 4.09 9.49 30 284.4 -
19 570 0.70 7.00 0.98 7.98 6.03 30 180.90 -
20 600 1.10 11.00 2.42 13.42 10.70 30 321.00 -
TOTAL QUANTITY 3575.10 cu m
Station /
Chainage
Length/
Distance
Height / Depth Mean Height /
Depth (d)
Sloping
Breadth of side
slope d√s²+1
Length in
between stations/
chainage
Total Area of both side
slopes (2X L X d√s²+1)
10 300 2.00 - - - -
11 330 1.20 1.60 3.58 30 214.80
12 360 1.16 1.18 2.63 30 157.80
13 390 0.50 0.83 1.85 30 111.00
14 420 0.78 0.64 1.42 30 85.80
15 450 1.60 1.19 2.65 30 159.60
16 480 0.60 1.10 2.45 30 147.60
17 510 1.20 0.90 2.00 30 120.60
18 540 0.38 0.79 1.77 30 106.20
19 570 0.70 0.54 1.20 30 72.60
20 600 1.10 0.90 2.00 30 120.60
TOTAL QUANTITY 1294.80 sq m
Item no Particulars of item Quantity Unit Rate Per Amount in
₹.
1 Earth work in Banking 3513.06 Cu m 345 % cu m 12,120.00
2 Turfing/ pitching for Side slopes 1294.80 Sq m 270 % sq m 3495.96
TOTAL COST in Rs. 16,000.00
₹
Chainage / Station / Distance of the point R. L. of Ground Level
420 118.60
450 119.25
480 119.40
510 118.85
540 118.50
570 117.25
600 116.80
630 117.15
660 117.20
Chainage 420 450 480 510 540 570 600 630 660
R.L. of G.L 118.60 119.25 119.40 118.85 118.50 117.25 116.80 117.15 117.20
R.L. of F.L 118.60 118.45 118.30 118.15 118.00 117.85 117.70 117.55 117.40
Height of the bank 0 - - - - 0.60 0.90 0.40 0.20
Depth of the Cutting 0 0.80 1.1 0.7 0.50 - - - -
Chainage R.L of
Ground
Distance Height /
Depth
Mean
height /
depth
Central
Area (Bd)
Area of
sides
(Sd²)
Total Sectional
Area (Bd+Sd²)
Length b/w
stations
Quantity (Bd+Sd²) X L
Banking Cutting
420 118.60 420 0 - - - - - - -
450 119.25 450 - 0.80 -0.40 4.80 0.24 5.04 30 - 151.20
480 119.40 480 -1.10 -0.95 11.40 1.35 12.75 30 - 382.50
510 118.85 510 -0.70 -0.90 10.80 1.22 12.02 30 - 360.60
540 118.50 540 -0.50 -0.60 7.20 0.54 7.74 30 - 232.20
passes 118.50 0 0 -0.25 3.00 0.09 3.09 14 - 43.26
570 117.25 570 0.60 0.30 3.60 0.18 3.78 16 60.48 -
600 116.80 600 0.90 0.75 9.00 1.23 10.23 30 306.90 -
630 117.15 630 0.40 0.65 7.80 0.85 8.65 30 259.50 -
660 117.20 660 0.20 0.30 3.60 0.18 3.70 30 113.40 -
Total Quantity 740.28
Cu m
1169.76
Cu m
Station /
Chainage
Height / Depth Mean Height / Depth
(d)
Sloping Breadth of
side slope d√s²+1
Length in between
stations/ chainage
Total Area of both side slopes
(2X L X d√s²+1)
420 0.00
450 - 0.80
480 -1.1 Being Cutting - No Turfing is to be taken.
510 -0.70
540 -0.50
Passes 0.00
570 0.60 0.30 0.67 16 21.44
600 0.90 0.75 1.68 30 100.80
630 0.40 0.65 1.45 30 87.00
660 0.20 0.30 0.67 30 40.20
TOTAL QUANTITY 249.54 sq .m
Item no Description of item Quantity Unit Rate Per Amount in
₹.
1 Earth work in Cutting 1169.76 Cu m 13.00 Cu m 15,206.88
2 Earthwork in banking 740.28 Cu m 13.00 Cu m 9,623.64
3 Turfing/ pitching for Side slopes 294.54 Sq m 9.00 Sq m 2,650.86
Sundries 518.62
TOTAL COST in Rs. 28,000.00
Chainage / Distance / Station R.L. of Ground
0 78.10
20 77.74
40 77.80
60 78.20 & 80.40
80 80.75
100 80.20
120 79.98
Chainage 0 20 40 60 80 100 120
R.L. of Ground 78.10 77.74 77.80 78.20
&
80.40
80.75 80.20 79.98
Formation Level 78.50 78.70 78.90 79.10 79.30 79.50 79.70
Height of Bank 0.40 0.96 1.10 0.90 - - -
Depth of Cutting - - - 1.30 1.45 0.70 0.28
Chainage R.L of
Ground
Distance Height /
Depth
Mean
height /
depth
Central
Area (Bd)
Area of
sides
(Sd²)
Total Sectional
Area (Bd+Sd²)
Length b/w
stations
Quantity (Bd+Sd²) X L
Banking Cutting
0 78.10 0 0.40 - - - - - - -
20 77.74 20 0.96 0.68 8.16 0.92 9.08 20 181.60 -
40 77.80 40 1.10 1.03 12.36 2.12 14.48 20 289.60 -
60 78.20 60 0.90 1.00 12.00 2.00 14.00 20 280.00 -
60 80.40 60 -1.30 - - - - - - -
80 80.75 80 -1.45 -1.375 -16.50 1.89 18.39 20 - 367.80
100 80.20 100 -0.70 -1.075 -12.90 1.16 14.06 20 - 281.20
120 79.98 120 -0.28 -0.49 -5.88 0.24 6.12 20 - 122.40
Total Quantity 751.20
Cu m
771.40
Cu m
EQS -  EARTHWORK FOR ROADS AND CANALS.pdf

More Related Content

What's hot

Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
Anirudhan K M
 
Earth pressure
Earth pressureEarth pressure
Earth pressure
Abhishek Kansara
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
ALI HYDER GADHI
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
GAURAV. H .TANDON
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
Satish Kambaliya
 
3) sampling
3) sampling3) sampling
3) sampling
jagadish108
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
Malla Reddy University
 
Job layout per
Job layout perJob layout per
Job layout per
raj balar
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
Latif Hyder Wadho
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
Simarpreet Singh
 
L 9 pumping stations
L 9 pumping stationsL 9 pumping stations
L 9 pumping stations
Dr. shrikant jahagirdar
 
Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)
Latif Hyder Wadho
 
Irrigation
Irrigation Irrigation
Irrigation
Tulsi Makwana
 
3 a index properties of soil
3 a index properties of soil3 a index properties of soil
3 a index properties of soil
Saurabh Kumar
 
Standard Penetration Test
Standard Penetration TestStandard Penetration Test
Standard Penetration Test
INDRANIL BANERJEE
 
Water treatment
Water treatmentWater treatment
Water treatment
Yasir Hashmi
 
Principles of groundwater flow
Principles of groundwater flowPrinciples of groundwater flow
Principles of groundwater flow
Fritz Lejarso
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
Vaibhav Pathak
 
Determination of co efficient of consolidation method
Determination of co efficient of consolidation methodDetermination of co efficient of consolidation method
Determination of co efficient of consolidation method
Parth Joshi
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
Mohsin Siddique
 

What's hot (20)

Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Earth pressure
Earth pressureEarth pressure
Earth pressure
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
 
3) sampling
3) sampling3) sampling
3) sampling
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
 
Job layout per
Job layout perJob layout per
Job layout per
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
L 9 pumping stations
L 9 pumping stationsL 9 pumping stations
L 9 pumping stations
 
Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)
 
Irrigation
Irrigation Irrigation
Irrigation
 
3 a index properties of soil
3 a index properties of soil3 a index properties of soil
3 a index properties of soil
 
Standard Penetration Test
Standard Penetration TestStandard Penetration Test
Standard Penetration Test
 
Water treatment
Water treatmentWater treatment
Water treatment
 
Principles of groundwater flow
Principles of groundwater flowPrinciples of groundwater flow
Principles of groundwater flow
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
 
Determination of co efficient of consolidation method
Determination of co efficient of consolidation methodDetermination of co efficient of consolidation method
Determination of co efficient of consolidation method
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 

Similar to EQS - EARTHWORK FOR ROADS AND CANALS.pdf

Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Erik Ong
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
Sow Wei Henn
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
Penny3688
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
algifakhri bagus maulana
 
23262483 unit-cost-derivation
23262483 unit-cost-derivation23262483 unit-cost-derivation
23262483 unit-cost-derivation
imaduddin91
 
Tabel baja standard
Tabel baja standardTabel baja standard
Tabel baja standard
Rudi Putra Reog
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
ANANDA DS
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
Omar Faruque
 
Wide flange-shape-jisg3192
Wide flange-shape-jisg3192Wide flange-shape-jisg3192
Wide flange-shape-jisg3192
Junaida Wally
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good file
Ziad Salem
 
Lecture9 traverse
Lecture9 traverseLecture9 traverse
Lecture9 traverse
Ethan Nagekeo
 
محاسبات
محاسباتمحاسبات
محاسبات
alireza hashemi
 
Datos fins terrs
Datos fins terrsDatos fins terrs
Datos fins terrs
construye_sa
 
SLM project presentation
SLM project presentationSLM project presentation
SLM project presentation
Hesham Ibrahim
 
Hss dimensions steeltubeinstitute
Hss dimensions steeltubeinstituteHss dimensions steeltubeinstitute
Hss dimensions steeltubeinstitute
tecnidibujos
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
Ciclovia: Goiânia - Trindade
Ciclovia: Goiânia - TrindadeCiclovia: Goiânia - Trindade
Ciclovia: Goiânia - Trindade
Prefeito Municipal de Trindade Jânio Darrot
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
ing_eliali4748
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
darmadi ir,mm
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
imaduddin91
 

Similar to EQS - EARTHWORK FOR ROADS AND CANALS.pdf (20)

Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
 
23262483 unit-cost-derivation
23262483 unit-cost-derivation23262483 unit-cost-derivation
23262483 unit-cost-derivation
 
Tabel baja standard
Tabel baja standardTabel baja standard
Tabel baja standard
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Wide flange-shape-jisg3192
Wide flange-shape-jisg3192Wide flange-shape-jisg3192
Wide flange-shape-jisg3192
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good file
 
Lecture9 traverse
Lecture9 traverseLecture9 traverse
Lecture9 traverse
 
محاسبات
محاسباتمحاسبات
محاسبات
 
Datos fins terrs
Datos fins terrsDatos fins terrs
Datos fins terrs
 
SLM project presentation
SLM project presentationSLM project presentation
SLM project presentation
 
Hss dimensions steeltubeinstitute
Hss dimensions steeltubeinstituteHss dimensions steeltubeinstitute
Hss dimensions steeltubeinstitute
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
LBA-1.pdf
 
Ciclovia: Goiânia - Trindade
Ciclovia: Goiânia - TrindadeCiclovia: Goiânia - Trindade
Ciclovia: Goiânia - Trindade
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 

Recently uploaded

My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
Geoffrey Wardle. MSc. MSc. Snr.MAIAA
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEERDELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
EMERSON EDUARDO RODRIGUES
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
NaveenNaveen726446
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
DharmaBanothu
 

Recently uploaded (20)

My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEERDELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
 

EQS - EARTHWORK FOR ROADS AND CANALS.pdf

  • 1. EARTHWORK FOR ROADS AND CANALS Prepared By: B.Govinda Rajulu
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. Sl. No Chainage / Station Depth / Height Mean Depth / Height (d) Width (B) Area of central portion (BXd) Area of sides (Sd²) Total sectional Area A = (Bd+Sd²) Length (L) Quantity Q = A X L (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Sl. No Chainage / Station Depth / Height (d) Width (B) Area of central portion (BXd) Total (A1) sectional Area (Bd1 + Sd1²) Total (A2) sectional Area (Bd2+ Sd2²) Mean sectional Area A = (A1+A2)/2 Length (L) Quantity Q = A X L (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
  • 9. Example – 1: A canal is in cutting and has a width of 4.00 m at bottom of the depth of cutting is 2.00 m and side slopes are 1 ½ : 1, find the area of cross section? Solution: Given Data: - Width of canal = 4.00m; Depth of the cutting = 2.00 m; Side slopes = 1 ½ : 1 ( S: 1 / n: 1) Area of c/s of canal = (b+nd)d (or) Bd + Sd² (4 + 1.5*2)2 (or) 4x2 + 1.5 x 2² 4+3*2 (or) 8 + 6 = 14.00 Sq.m (or) 14.00 Sq.m
  • 10. Example – 2: A) Mid sectional area method. A) Mean sectional area method. Solution:
  • 11. Mid - Sectional Area Method: Volume of earth work (V) = Area of Mid point X Length Area of the Midpoint = (b+nd)xd Where b= 10 m, n = 1.5, d = 1+2+3/3 = 2 m. Am = (10 + 1.5*2)x2 = 26 sq. m Therefore Volume of earthwork (V) = 26 X 120m = 3120 cu m.
  • 12. Chainage 0 50 100 150 200 R. L of Ground 97.00 96.50 96.00 97.50 98.00
  • 13. Height of the Bank / Cutting 3.00 3.50 4.00 2.50 2.00 Formation Level 100.00 100.00 100.00 100.00 100.00 R. L of Ground 97.00 96.50 96.00 97.50 98.00 Chainage 0 50 100 150 200
  • 15.
  • 16.
  • 17. ₹ ₹ Chainage 10 11 12 13 14 15 16 17 18 19 20 R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105.00 104.10 104.62 104.00 103.30 R.L of Formation 107 Down gradient 1 in 150 Down gradient 1 in 100
  • 18. Depth of cutting - - - - - - - - - - - Height of bank 2.00 1.20 1.16 0.50 0.78 1.60 0.60 1.20 0.38 0.70 1.10 R. L of Formation 107 106.80 106.60 106.40 106.20 105.90 105.60 105.30 105 104.70 104.40 R. L of Ground 105 105.60 105.44 105.90 105.42 104.30 105 104.10 104.62 104 103.30 Distance in m 300 330 360 390 420 450 480 510 540 570 600 Chainage 10 11 12 13 14 15 16 17 18 19 20
  • 19. Station/ Chainage Length Height / Depth Mean Height/ Depth (d) Central Area (Bd) Side Area (Sd²) Total Section Area (Bd +Sd²) Length in b/w stations (L) Quantity (Bd+Sd²) X L Banking Cutting 10 300 2.00 - - - - - - - 11 330 1.20 1.60 16.00 5.12 21.12 30 633.60 - 12 360 1.16 1.18 11.80 2.78 14.58 30 437.40 - 13 390 0.50 0.83 8.30 1.38 9.68 30 290.40 - 14 420 0.78 0.64 6.40 0.82 7.22 30 216.60 - 15 450 1.60 1.19 11.90 2.83 14.73 30 441.90 - 16 480 0.60 1.10 11.00 2.42 13.42 30 402.60 - 17 510 1.20 0.90 9.00 1.62 10.62 30 318.60 - 18 540 0.38 0.79 7.90 1.25 9.15 30 274.50 - 19 570 0.70 0.54 5.40 0.58 5.98 30 179.40 - 20 600 1.10 0.90 9.00 1.62 10.62 30 318.60 - TOTAL QUANTITY 3513.60 Cu m
  • 20. Station/Ch ainage Length Height/ Depth Area of central portion (Bd) Area of sides (Sd²) Total Sectional Area (Bd +Sd²) Mean sectional Area Length b/w stations Quantity (Bd + Sd²) X L Banking Cutting 10 300 2.00 20.00 8.00 28.00 - - - - 11 330 1.20 12.00 2.88 14.88 21.44 30 643.20 - 12 360 1.16 11.60 2.69 14.29 14.59 30 437.70 - 13 390 0.50 5.00 0.50 5.50 9.90 30 297.00 - 14 420 0.78 7.80 1.22 9.02 7.26 30 217.80 - 15 450 1.60 16.00 5.12 21.12 15.07 30 451.95 - 16 480 0.60 6.00 0.72 6.72 13.92 30 417.60 - 17 510 1.20 12.00 2.88 14.88 10.80 30 324.00 - 18 540 0.38 3.80 0.29 4.09 9.49 30 284.4 - 19 570 0.70 7.00 0.98 7.98 6.03 30 180.90 - 20 600 1.10 11.00 2.42 13.42 10.70 30 321.00 - TOTAL QUANTITY 3575.10 cu m
  • 21. Station / Chainage Length/ Distance Height / Depth Mean Height / Depth (d) Sloping Breadth of side slope d√s²+1 Length in between stations/ chainage Total Area of both side slopes (2X L X d√s²+1) 10 300 2.00 - - - - 11 330 1.20 1.60 3.58 30 214.80 12 360 1.16 1.18 2.63 30 157.80 13 390 0.50 0.83 1.85 30 111.00 14 420 0.78 0.64 1.42 30 85.80 15 450 1.60 1.19 2.65 30 159.60 16 480 0.60 1.10 2.45 30 147.60 17 510 1.20 0.90 2.00 30 120.60 18 540 0.38 0.79 1.77 30 106.20 19 570 0.70 0.54 1.20 30 72.60 20 600 1.10 0.90 2.00 30 120.60 TOTAL QUANTITY 1294.80 sq m
  • 22. Item no Particulars of item Quantity Unit Rate Per Amount in ₹. 1 Earth work in Banking 3513.06 Cu m 345 % cu m 12,120.00 2 Turfing/ pitching for Side slopes 1294.80 Sq m 270 % sq m 3495.96 TOTAL COST in Rs. 16,000.00
  • 23. ₹ Chainage / Station / Distance of the point R. L. of Ground Level 420 118.60 450 119.25 480 119.40 510 118.85 540 118.50 570 117.25 600 116.80 630 117.15 660 117.20
  • 24. Chainage 420 450 480 510 540 570 600 630 660 R.L. of G.L 118.60 119.25 119.40 118.85 118.50 117.25 116.80 117.15 117.20 R.L. of F.L 118.60 118.45 118.30 118.15 118.00 117.85 117.70 117.55 117.40 Height of the bank 0 - - - - 0.60 0.90 0.40 0.20 Depth of the Cutting 0 0.80 1.1 0.7 0.50 - - - -
  • 25. Chainage R.L of Ground Distance Height / Depth Mean height / depth Central Area (Bd) Area of sides (Sd²) Total Sectional Area (Bd+Sd²) Length b/w stations Quantity (Bd+Sd²) X L Banking Cutting 420 118.60 420 0 - - - - - - - 450 119.25 450 - 0.80 -0.40 4.80 0.24 5.04 30 - 151.20 480 119.40 480 -1.10 -0.95 11.40 1.35 12.75 30 - 382.50 510 118.85 510 -0.70 -0.90 10.80 1.22 12.02 30 - 360.60 540 118.50 540 -0.50 -0.60 7.20 0.54 7.74 30 - 232.20 passes 118.50 0 0 -0.25 3.00 0.09 3.09 14 - 43.26 570 117.25 570 0.60 0.30 3.60 0.18 3.78 16 60.48 - 600 116.80 600 0.90 0.75 9.00 1.23 10.23 30 306.90 - 630 117.15 630 0.40 0.65 7.80 0.85 8.65 30 259.50 - 660 117.20 660 0.20 0.30 3.60 0.18 3.70 30 113.40 - Total Quantity 740.28 Cu m 1169.76 Cu m
  • 26. Station / Chainage Height / Depth Mean Height / Depth (d) Sloping Breadth of side slope d√s²+1 Length in between stations/ chainage Total Area of both side slopes (2X L X d√s²+1) 420 0.00 450 - 0.80 480 -1.1 Being Cutting - No Turfing is to be taken. 510 -0.70 540 -0.50 Passes 0.00 570 0.60 0.30 0.67 16 21.44 600 0.90 0.75 1.68 30 100.80 630 0.40 0.65 1.45 30 87.00 660 0.20 0.30 0.67 30 40.20 TOTAL QUANTITY 249.54 sq .m
  • 27. Item no Description of item Quantity Unit Rate Per Amount in ₹. 1 Earth work in Cutting 1169.76 Cu m 13.00 Cu m 15,206.88 2 Earthwork in banking 740.28 Cu m 13.00 Cu m 9,623.64 3 Turfing/ pitching for Side slopes 294.54 Sq m 9.00 Sq m 2,650.86 Sundries 518.62 TOTAL COST in Rs. 28,000.00
  • 28. Chainage / Distance / Station R.L. of Ground 0 78.10 20 77.74 40 77.80 60 78.20 & 80.40 80 80.75 100 80.20 120 79.98
  • 29. Chainage 0 20 40 60 80 100 120 R.L. of Ground 78.10 77.74 77.80 78.20 & 80.40 80.75 80.20 79.98 Formation Level 78.50 78.70 78.90 79.10 79.30 79.50 79.70 Height of Bank 0.40 0.96 1.10 0.90 - - - Depth of Cutting - - - 1.30 1.45 0.70 0.28
  • 30. Chainage R.L of Ground Distance Height / Depth Mean height / depth Central Area (Bd) Area of sides (Sd²) Total Sectional Area (Bd+Sd²) Length b/w stations Quantity (Bd+Sd²) X L Banking Cutting 0 78.10 0 0.40 - - - - - - - 20 77.74 20 0.96 0.68 8.16 0.92 9.08 20 181.60 - 40 77.80 40 1.10 1.03 12.36 2.12 14.48 20 289.60 - 60 78.20 60 0.90 1.00 12.00 2.00 14.00 20 280.00 - 60 80.40 60 -1.30 - - - - - - - 80 80.75 80 -1.45 -1.375 -16.50 1.89 18.39 20 - 367.80 100 80.20 100 -0.70 -1.075 -12.90 1.16 14.06 20 - 281.20 120 79.98 120 -0.28 -0.49 -5.88 0.24 6.12 20 - 122.40 Total Quantity 751.20 Cu m 771.40 Cu m
  翻译: