This document reports on a site surveying leveling project conducted by a group of students. It details the objective of leveling, the equipment used which includes an automatic level, leveling staff, and tripod. It describes how to set up the automatic level and take backsight, intermediate, and foresight readings. The document presents the field data collected using two methods - the rise and fall method and height of collimation method. It also calculates the error distribution and provides the adjusted field data.