Isolated column footing
Pad footing
( uniform thickness )
Sloped footing
Bearing capacity of soil
• The size of footing depends on bearing capacity of soil. The
load on unit area below footing should less than bearing
capacity of soil to prevent settlement of footing.
• Gross bearing capacity :
Total pressure acting at base of footing including self
weight of footing, weight of column , over burden pressure of
soil above footing etc. Is called gross bearing capacity.
The net pressure at base of footing after deducting the
weight of excavated soil is called safe bearing capacity of soil.
Safe B.C. = gross B.C. - overburden pressure
qn = q - γ . D
Where , γ = density of soil
D = depth of footing
Critical sections
• Critical section for B.M. :
For max. Bending moment critical section is taken on the
face of column. B.M. = w l2 / 2
w = net upward pressure * bf
• Critical section for one way shear :
For one way shear critical section is taken at distance d from
the face of column.
τv = Vu / bd Vu = p * bf
• Critical section for two way shear :
It is taken at 0.5 d from face of column.
τv = Vu / bo d
Vu = p * hatched area
• Check for the development length : ( IS : 456 -2000 , P.42 )
Ld = ɸ * 0.87 fy / 4 τbd
• Reinforcement requirement for footing :
1. Minimum reinforcement ( P.66 )
Fe 250 0.15% of gross area
Fe 415 0.12% of gross area
2. Spacing of bar ( T – 15 , P.46 )
3. Cover : Min. 50 mm cover is required.
Fy N/mm2 Clear distance between bars
250 300 mm
415 180 mm
500 150 mm
Example
• Design a rectangular isolated sloped footing for a column of
size 250 mm × 750 mm carrying an axial characteristic load of
2000 kN and reinforced with 10 nos. 25 ɸ bars in M 30 grade
concrete. The allowable bearing on soil is 220 kN/m2 .The
material for footing are grade M 20 concrete and HYSD of
grade fe 415.
(a) Size of footing :
characteristic load on column = 2000 kN
Assume self weight of footing = 200 kN
10% of column load
Total load = 2200 kN
Area of footing required = Total load / SBC
= 2200 / 220 = 10 m2
As footing is rectangular size of footing may be selected
such way that effective cantilever projection on both sides
equal.
Difference between dimensions of column = 0.75 – 0.25
= 0.5 m
• If b is width of footing,
b ( b + 0.5 ) = 10
b = 2.92 d = 2.95 + 0.5
= 3.45 m
Provide size of footing = 2.95 m × 3.45 m
A = 10.17 m2 > 10 m2 ....... OK
(b) Net upward pressure :
p = Factored column load / Area of footing provided
= 1.5 × 2000 / 10.17
= 294.8 kN/m2
(c) Bending moment :
u.d.l along x- direction = p × 2.95
= 294.8 × 2.95
= 869.66 kN.m
u.d.l along y- direction = 294.8 × 2.95
= 1017.06 kN.m
Muy = wl2 / 2 = 869.99 × 1.352 / 2 = 792.48 kN.m
Mux = wl2 / 2 = 1017.06 × 1.352 / 2 = 926.80 kN.m
(d) Depth of footing :
Mux = 0.138 fck b dx
2
926.80 × 106 = 0.138 × 20 × 900 × dx
2
dx = 610.8 mm
[ b = width of resisting section = 750 + 150
= 900 mm ]
Muy = 0.138 fck b dy
2
792.48 × 106 = 0.138 × 20 × 400 × dy
2
dy = 847.2 mm
[ b = 250 + 150 = 400 mm ]
Try overall depth = 950 mm
Assume 12 ɸ bars for footing
• Dy = 950 - 50 – 6 = 894 mm
• Dx = 894 - 12 = 882 mm
Average d = 888 mm
Assume edge depth = 230 mm
(e) Reinforcement :
Along x :
Pt = 0.831 %
Ast = 0.831 / 100 * 400 *894 = 2972 mm2
provide 12 ɸ - 27 nos.
Check for cracking :
Clear distance between bar = (2950 -100-12) /26 = 109.15 mm
c/c distance = 109.15 – 12 =97.15 mm < 180 mm.....O.K.
• Along y:
pt = 0.399 %
Ast = 0.399 /100 * 900 * 882 = 3167 mm2
Reinforcement parallel to shorter direction :
β = long side of footing / short side of footing
= 3.45 / 2.95 = 1.169
Width of central band = b = 2950 mm
Ast in central band = 2/(β + 1 ) * total Ast in y direction
= 2920 mm2
Ast required per meter i central band = 2920 / 2.95 = 990 mm2
Provide 12 mm ɸ @ 110 mm c/c in central band.
Remaining steel = 3167 – 2920 = 247 mm2
Width of end band = 3.45 – 2.95 = 0.5 m
• 720 / 1350 = y’ / 456 y’ = 243.2 mm
• D’ = y’ + ( 230 – 50 - ɸ/2 )
= 243.2 + ( 230 – 50 – 6)
= 417.2 mm
b’ = width of column + 2d
= 250 + 2*894 = 2038 mm
Vu = S.F. At critical section
= p * hatched area
= 294.8 * 2.95 * 0.456 = 396.56 kN
Mu at critical section = wl2 / 2 = 0.4562 / 2 * 869.66 = 90.42 kn.m
tan β = 720 / 1350 = 0.533
• Τv = ( vu - Mu/d
’ tan β ) / b’ d’
= [ 396.56 –(90.42/0.4172) * 0.533 ] *103 / (2038 * 417.2)
= 0.33 N/mm2
Pt = 100 * 3051 / ( 2038* 417.2) = 0.358 %
τc = 0.412 N/mm2
Τv < τc .........O.K.
(g) Check for two way shear :
average depth d = 888 mm
Section id critical at d/2 distance ,
720 / 1350 = y’ / 906 y’ = 483.2 mm
d’ = 483.2 + (230 – 50 – 12 – 6 ) = 645.2 mm
Vu = 294.8 * ( 3.45 * 2.95 - (1.638 * 1.138 )
= 2450.80 kN
• τv = Vu / (bo * d’ )
= 2450.80 *103 / ( 5552 * 645.2 )
= 0.684 N/mm2
τc
’ = ks * τc
ks = 0.5 + βc = 0.5 +(250/750 ) = 0.833
τc = 0.25 √ fck = 0.25 √ 20 = 1.11 N/mm2
τc
’ = 0.833 * 1.11 = 0.93 N/mm2
τv < τc
’ ...........OK
Development length :
Ld = 47 ɸ = 47*12 = 564 mm
Ld provided from face = 1350 – 50 = 1300 mm > 564....OK
Thank you

More Related Content

What's hot

Singly reinforced beam design
Singly reinforced beam   designSingly reinforced beam   design
Singly reinforced beam design
Selvakumar Palanisamy
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
Zawad khalil
 
Design of combined footing ppt
Design of combined footing pptDesign of combined footing ppt
Design of combined footing ppt
Bharti Shinde
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000
PraveenKumar Shanmugam
 
Beam design
Beam designBeam design
PILE foundation (1).pptx
PILE foundation  (1).pptxPILE foundation  (1).pptx
PILE foundation (1).pptx
NIKHILBANDWAL1
 
_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)
sharda university
 
Types of isolated footing and design
Types of isolated footing and design Types of isolated footing and design
Types of isolated footing and design
Sukhvinder Singh
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footing
Arun Kurali
 
Portal and cantilever method
Portal and cantilever methodPortal and cantilever method
Portal and cantilever method
Prionath Roy
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
Afgaab Cumar
 
Stepped footing
Stepped footingStepped footing
Stepped footing
Pritesh Parmar
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
51412
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
kamariya keyur
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
Jayvant Choudhary
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
Muhammad Zain Ul abdin
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
Latif Hyder Wadho
 
Compression member
Compression memberCompression member
Compression member
kamariya keyur
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
sharda university
 
Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.
Pritesh Parmar
 

What's hot (20)

Singly reinforced beam design
Singly reinforced beam   designSingly reinforced beam   design
Singly reinforced beam design
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
 
Design of combined footing ppt
Design of combined footing pptDesign of combined footing ppt
Design of combined footing ppt
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000
 
Beam design
Beam designBeam design
Beam design
 
PILE foundation (1).pptx
PILE foundation  (1).pptxPILE foundation  (1).pptx
PILE foundation (1).pptx
 
_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)
 
Types of isolated footing and design
Types of isolated footing and design Types of isolated footing and design
Types of isolated footing and design
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footing
 
Portal and cantilever method
Portal and cantilever methodPortal and cantilever method
Portal and cantilever method
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
Stepped footing
Stepped footingStepped footing
Stepped footing
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Compression member
Compression memberCompression member
Compression member
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 
Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.
 

Similar to Isolated column footing

final internship ppt.pptx
final internship ppt.pptxfinal internship ppt.pptx
final internship ppt.pptx
KiranKr32
 
Footing design
Footing designFooting design
Footing design
Vikas Mehta
 
Geotechnical Pad Foundation (11-1-2021).pptx
Geotechnical Pad Foundation (11-1-2021).pptxGeotechnical Pad Foundation (11-1-2021).pptx
Geotechnical Pad Foundation (11-1-2021).pptx
muyideenabdulkareem
 
Combined footings
Combined footingsCombined footings
Combined footings
seemavgiri
 
onw way slab design
onw way slab designonw way slab design
onw way slab design
Palak Patel
 
footing design
footing designfooting design
footing design
Suresh Nenavath
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
subhashini214160
 
Analysis and Design of Residential building.pptx
Analysis and Design of Residential building.pptxAnalysis and Design of Residential building.pptx
Analysis and Design of Residential building.pptx
DP NITHIN
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Dhaka University of Engineering & Technology, Gazipur
 
Design of footing
Design of footingDesign of footing
Design of footing
NripeshJha
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
Magdel Kotze
 
design-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdfdesign-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdf
yohannesmesfin7
 
Design of Cantilever retaining wall
Design of Cantilever retaining wallDesign of Cantilever retaining wall
Design of Cantilever retaining wall
Achuthan Karnnan
 
Intze Tank.ppt
Intze Tank.pptIntze Tank.ppt
Intze Tank.ppt
EmilyMuthiga1
 
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkkskIntze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
Krish Bhavsar
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
JayswalShashank1
 
Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)
EngGalaydh Farah Axmed
 
Design ppt
Design pptDesign ppt
Design ppt
tishu001
 
Theatre building PPT.pptx
Theatre building PPT.pptxTheatre building PPT.pptx
Theatre building PPT.pptx
DivyaprabaN
 
Structural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknow
Anchit Agrawal
 

Similar to Isolated column footing (20)

final internship ppt.pptx
final internship ppt.pptxfinal internship ppt.pptx
final internship ppt.pptx
 
Footing design
Footing designFooting design
Footing design
 
Geotechnical Pad Foundation (11-1-2021).pptx
Geotechnical Pad Foundation (11-1-2021).pptxGeotechnical Pad Foundation (11-1-2021).pptx
Geotechnical Pad Foundation (11-1-2021).pptx
 
Combined footings
Combined footingsCombined footings
Combined footings
 
onw way slab design
onw way slab designonw way slab design
onw way slab design
 
footing design
footing designfooting design
footing design
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
 
Analysis and Design of Residential building.pptx
Analysis and Design of Residential building.pptxAnalysis and Design of Residential building.pptx
Analysis and Design of Residential building.pptx
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Design of footing
Design of footingDesign of footing
Design of footing
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
 
design-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdfdesign-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdf
 
Design of Cantilever retaining wall
Design of Cantilever retaining wallDesign of Cantilever retaining wall
Design of Cantilever retaining wall
 
Intze Tank.ppt
Intze Tank.pptIntze Tank.ppt
Intze Tank.ppt
 
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkkskIntze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)
 
Design ppt
Design pptDesign ppt
Design ppt
 
Theatre building PPT.pptx
Theatre building PPT.pptxTheatre building PPT.pptx
Theatre building PPT.pptx
 
Structural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknow
 

More from kamariya keyur

estimation of structure
estimation of structureestimation of structure
estimation of structure
kamariya keyur
 
Pavement
PavementPavement
Pavement
kamariya keyur
 
Curing
CuringCuring
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
kamariya keyur
 
Connections
Connections Connections
Connections
kamariya keyur
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
kamariya keyur
 
Theory of errors
Theory of errors Theory of errors
Theory of errors
kamariya keyur
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
kamariya keyur
 
column and strut
column and strutcolumn and strut
column and strut
kamariya keyur
 
distress of concrete
distress of concretedistress of concrete
distress of concrete
kamariya keyur
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
kamariya keyur
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
kamariya keyur
 
Flat slab
Flat slab Flat slab
Flat slab
kamariya keyur
 
durability and permeability of concrete
durability and permeability of concretedurability and permeability of concrete
durability and permeability of concrete
kamariya keyur
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
kamariya keyur
 

More from kamariya keyur (15)

estimation of structure
estimation of structureestimation of structure
estimation of structure
 
Pavement
PavementPavement
Pavement
 
Curing
CuringCuring
Curing
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 
Connections
Connections Connections
Connections
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
 
Theory of errors
Theory of errors Theory of errors
Theory of errors
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
 
column and strut
column and strutcolumn and strut
column and strut
 
distress of concrete
distress of concretedistress of concrete
distress of concrete
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
 
Flat slab
Flat slab Flat slab
Flat slab
 
durability and permeability of concrete
durability and permeability of concretedurability and permeability of concrete
durability and permeability of concrete
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
 

Recently uploaded

❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
Geoffrey Wardle. MSc. MSc. Snr.MAIAA
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Poonam Singh
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 

Recently uploaded (20)

❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 

Isolated column footing

  • 2. Content • Types of isolated column footing • Bearing capacity of soil • Critical section • Check for development length • Reinforcement requirements • Example
  • 3. Isolated column footing Pad footing ( uniform thickness ) Sloped footing
  • 4. Bearing capacity of soil • The size of footing depends on bearing capacity of soil. The load on unit area below footing should less than bearing capacity of soil to prevent settlement of footing. • Gross bearing capacity : Total pressure acting at base of footing including self weight of footing, weight of column , over burden pressure of soil above footing etc. Is called gross bearing capacity. The net pressure at base of footing after deducting the weight of excavated soil is called safe bearing capacity of soil.
  • 5. Safe B.C. = gross B.C. - overburden pressure qn = q - γ . D Where , γ = density of soil D = depth of footing
  • 6. Critical sections • Critical section for B.M. : For max. Bending moment critical section is taken on the face of column. B.M. = w l2 / 2 w = net upward pressure * bf
  • 7. • Critical section for one way shear : For one way shear critical section is taken at distance d from the face of column. τv = Vu / bd Vu = p * bf
  • 8. • Critical section for two way shear : It is taken at 0.5 d from face of column. τv = Vu / bo d Vu = p * hatched area
  • 9. • Check for the development length : ( IS : 456 -2000 , P.42 ) Ld = ɸ * 0.87 fy / 4 τbd • Reinforcement requirement for footing : 1. Minimum reinforcement ( P.66 ) Fe 250 0.15% of gross area Fe 415 0.12% of gross area 2. Spacing of bar ( T – 15 , P.46 ) 3. Cover : Min. 50 mm cover is required. Fy N/mm2 Clear distance between bars 250 300 mm 415 180 mm 500 150 mm
  • 10. Example • Design a rectangular isolated sloped footing for a column of size 250 mm × 750 mm carrying an axial characteristic load of 2000 kN and reinforced with 10 nos. 25 ɸ bars in M 30 grade concrete. The allowable bearing on soil is 220 kN/m2 .The material for footing are grade M 20 concrete and HYSD of grade fe 415.
  • 11. (a) Size of footing : characteristic load on column = 2000 kN Assume self weight of footing = 200 kN 10% of column load Total load = 2200 kN Area of footing required = Total load / SBC = 2200 / 220 = 10 m2 As footing is rectangular size of footing may be selected such way that effective cantilever projection on both sides equal. Difference between dimensions of column = 0.75 – 0.25 = 0.5 m
  • 12. • If b is width of footing, b ( b + 0.5 ) = 10 b = 2.92 d = 2.95 + 0.5 = 3.45 m Provide size of footing = 2.95 m × 3.45 m A = 10.17 m2 > 10 m2 ....... OK (b) Net upward pressure : p = Factored column load / Area of footing provided = 1.5 × 2000 / 10.17 = 294.8 kN/m2
  • 13. (c) Bending moment : u.d.l along x- direction = p × 2.95 = 294.8 × 2.95 = 869.66 kN.m u.d.l along y- direction = 294.8 × 2.95 = 1017.06 kN.m Muy = wl2 / 2 = 869.99 × 1.352 / 2 = 792.48 kN.m Mux = wl2 / 2 = 1017.06 × 1.352 / 2 = 926.80 kN.m
  • 14. (d) Depth of footing : Mux = 0.138 fck b dx 2 926.80 × 106 = 0.138 × 20 × 900 × dx 2 dx = 610.8 mm [ b = width of resisting section = 750 + 150 = 900 mm ] Muy = 0.138 fck b dy 2 792.48 × 106 = 0.138 × 20 × 400 × dy 2 dy = 847.2 mm [ b = 250 + 150 = 400 mm ] Try overall depth = 950 mm Assume 12 ɸ bars for footing
  • 15. • Dy = 950 - 50 – 6 = 894 mm • Dx = 894 - 12 = 882 mm Average d = 888 mm Assume edge depth = 230 mm (e) Reinforcement : Along x : Pt = 0.831 % Ast = 0.831 / 100 * 400 *894 = 2972 mm2 provide 12 ɸ - 27 nos. Check for cracking : Clear distance between bar = (2950 -100-12) /26 = 109.15 mm c/c distance = 109.15 – 12 =97.15 mm < 180 mm.....O.K.
  • 16. • Along y: pt = 0.399 % Ast = 0.399 /100 * 900 * 882 = 3167 mm2 Reinforcement parallel to shorter direction : β = long side of footing / short side of footing = 3.45 / 2.95 = 1.169 Width of central band = b = 2950 mm Ast in central band = 2/(β + 1 ) * total Ast in y direction = 2920 mm2 Ast required per meter i central band = 2920 / 2.95 = 990 mm2 Provide 12 mm ɸ @ 110 mm c/c in central band. Remaining steel = 3167 – 2920 = 247 mm2 Width of end band = 3.45 – 2.95 = 0.5 m
  • 17.
  • 18. • 720 / 1350 = y’ / 456 y’ = 243.2 mm • D’ = y’ + ( 230 – 50 - ɸ/2 ) = 243.2 + ( 230 – 50 – 6) = 417.2 mm b’ = width of column + 2d = 250 + 2*894 = 2038 mm Vu = S.F. At critical section = p * hatched area = 294.8 * 2.95 * 0.456 = 396.56 kN Mu at critical section = wl2 / 2 = 0.4562 / 2 * 869.66 = 90.42 kn.m tan β = 720 / 1350 = 0.533
  • 19. • Τv = ( vu - Mu/d ’ tan β ) / b’ d’ = [ 396.56 –(90.42/0.4172) * 0.533 ] *103 / (2038 * 417.2) = 0.33 N/mm2 Pt = 100 * 3051 / ( 2038* 417.2) = 0.358 % τc = 0.412 N/mm2 Τv < τc .........O.K. (g) Check for two way shear : average depth d = 888 mm Section id critical at d/2 distance , 720 / 1350 = y’ / 906 y’ = 483.2 mm d’ = 483.2 + (230 – 50 – 12 – 6 ) = 645.2 mm Vu = 294.8 * ( 3.45 * 2.95 - (1.638 * 1.138 ) = 2450.80 kN
  • 20.
  • 21. • τv = Vu / (bo * d’ ) = 2450.80 *103 / ( 5552 * 645.2 ) = 0.684 N/mm2 τc ’ = ks * τc ks = 0.5 + βc = 0.5 +(250/750 ) = 0.833 τc = 0.25 √ fck = 0.25 √ 20 = 1.11 N/mm2 τc ’ = 0.833 * 1.11 = 0.93 N/mm2 τv < τc ’ ...........OK Development length : Ld = 47 ɸ = 47*12 = 564 mm Ld provided from face = 1350 – 50 = 1300 mm > 564....OK
  • 22.