Contents
Definition of Distress
Causes of Distress
Constructional errors
Design Deficiencies
Deterioration of concrete
Need for repairs in structure
Concrete repair system
Durable concrete repair
DISTRESS
• Distress means damage.
• Because of the varying conditions under which it is produced at various
locations, the quality of concrete suffers occasionally either during
production or during service conditions resulting in distress.
2
Causes of distress of concrete
1. Structural causes
- Externally applied loads
- Environmental loads
- Accidents
- Subsidence etc.
2. Errors in design and detailing
3. Poor construction practice
4. Construction overloads
5. Drying shrinkage
6. Thermal stress
7. Weathering
8. Corrosion
3
• In addition to distress in hardened concrete, the plastic concrete may suffer
damage due to,
- Plastic shrinkage
- settlement cracking
- early removal of formwork
- improper design of formwork
4
Construction Errors
1. Use of inferior quality of construction materials.
2. Use of waste water or saline water in construction.
3. Adding of more water to improve workability which increase the w/c
ratio.
4. Poor grading of concrete ingredients.
5. Poor mixing of concrete.
6. Batching of concrete by volume using mortar pans.
7. Insufficient compaction of concrete.
8. Dropping concrete from the height results into segregation.
9. Insufficient reinforcement into slab, beam, column etc.
10. Improper location of reinforcing steel.
5
11. Hooks , bends , overlaps are not properly provided.
12. Formwork props are not resting on a hard surface.
13. Early removal of formwork props.
14. Using props of insufficient strength.
15. Joints are not properly provided.
16. Improper curing of concrete.
17. Segregation of concrete during transportation.
18. Settlement of foundation
6
Design deficiencies
• Inadequate structural design :
1. Error in load calculations.
2. SBC is assumed without carrying out any field test.
3. Design not confirming to IS - 456 : 2000 and IS – 1893 : 1987 guidelines.
4. Design with many cantilevers.
5. Shear wall is not designed in multi storey building.
6. Stiffness in both direction is unequal resulting into torsion.
7. Effect of the short column in single storey.
8. Lack of knowledge of using structural design software like STAAD PRO,
ETABS etc.
7
• Poor design detailing :
1. Abrupt change in section.
2. Insufficient reinforcement at re – entrant corners and openings.
3. Inadequate provision for deflection.
4. Inadequate expansion joints.
5. Inadequate provision of drainage.
6. Material incompatibility.
7. Bent up bars are not properly shown.
8. Spacing of vertical stirrups is wrongly shown.
9. Column spacing of lateral ties is wrongly shown.
10. Ductile detailing is not as per IS – 13920.
8
DETERIORATION in concrete
• Causes of deterioration in concrete :
1. Accidental loading
2. Chemical reactions
- Acid attack
- Alkali carbonate rock reaction
- Alkali silica reaction
- Aggressive water attack
- Sulphate attack
3. Construction errors
4. Corrosion of metals
5. Design errors
- Inadequate structural design
- Poor design details
9
6. Erosion
- Abrasion
- Cavitations
7. Freezing and thawing
8. Settlement and movements
9. Shrinkage
- plastic shrinkage
- Drying shrinkage
10. Temperature changes
- Internally generated
- Externally generated
11. Weathering
10
Need for Repairs of structures
a) Workmanship:
• Repair personnel are responsible for making repairs that are durable and
well bonded to existing structure.
• Workmen should be fully instructed regarding repair procedures and
critical aspects.
• Constant vigilance should be exercised by contractor’s and government
forces to ensure maintenance of necessary standards of workmanship.
11
b) Procedures:
• Use procedures that have been successful or that have a proven high
reliability factor.
• Repairs on new work will develop best bond and likely to be durable and
permanent as original work.
• The method and materials proposed for use should be approved by an
authorized inspector.
12
c) Materials:
• They must be of high quality, relatively fresh and capable of meeting
specifications requirements for particular application or intended use.
• Mill reports or testing laboratory reports is required.
• New, unproven materials should be used only when,
- Standard repair materials are unsuitable
- The owners and parties should be informed about risks associated
with it.
13
Evaluate structures
Project needs
Determine causes of damage & effect
Repair analysis
User needs
Determine repair strategies
Methods and materials
Repair and protect
Urgency Aesthetics Lifespan Environment
Contractibility &
Effectiveness
14
Durable concrete repair
1. Determine the causes of damage
2. Evaluate the extent of damage
3. Evaluate the need of repair
4. Select the repair method
5. Prepare the old concrete for repair
6. Apply the repair method
7. Cure the repair properly
15
1. Determine the causes of damage :
If the cause of the original damage to concrete is not determined and
eliminated , or if an incorrect determination is made, whatever damaged
the original concrete will likely also damage the repaired concrete.
2. Evaluate the extent of damage :
The intent of this step is to determine how much concrete has been
damaged and how this damage will affect serviceability of this structure.
3. Evaluate the need to repair :
With early detection it may be possible to arrest the rate of
deterioration using maintenance procedure . Even if repairs is required,
early detection of damage will allow orderly budgeting of funds to pat the
cost of repair.
16
4. Select the repair methods :
With insufficient information, it is very difficult to make proper ,
economical , and successful selections. This steps define the types of
conditions the repair must resist the available repair construction time
period and when repair must be accomplished.
5. Prepare the old concrete for repair :
Preparation of the old concrete for application of repair material is of
primary importance in the accomplishment of durable repairs.
6. Apply the repair material :
The selected repair material should be applied on the prepared surface
using equipment with proper care.
7. Cure the repair properly :
The repaired concrete should be cured for about 14 days.
17
THANK YOU
18

More Related Content

What's hot

Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repair
Udayram Patil
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
y Sahaja
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
Safiullah Khan
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
Ankit Patel
 
ELECTRO OSMOSIS METHOD OF DEWATERING
ELECTRO OSMOSIS METHOD OF DEWATERINGELECTRO OSMOSIS METHOD OF DEWATERING
ELECTRO OSMOSIS METHOD OF DEWATERING
TejaswiniNarayane
 
Polymer concrete
Polymer concretePolymer concrete
Polymer concrete
Ravikiran Kattoli
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
Satish Kambaliya
 
Types of cracks in concrete
Types of cracks in concreteTypes of cracks in concrete
Types of cracks in concrete
sangeen khan khan
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
kamariya keyur
 
TYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETETYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETE
JASHU JASWANTH
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
Dhaval Jadhav
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
shlok patel
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
Gaurang Kakadiya
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
Nayana 54321
 
Pile load test
Pile load testPile load test
Pile load test
Naman Kantesaria
 
Jacketing
JacketingJacketing
Jacketing
SHAIKH ARSHAD
 
Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structures
Karthi Kavya
 
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEDESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
Karan Patel
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
Avinash Kumar Gupta
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
Rajesh Prasad
 

What's hot (20)

Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repair
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
 
ELECTRO OSMOSIS METHOD OF DEWATERING
ELECTRO OSMOSIS METHOD OF DEWATERINGELECTRO OSMOSIS METHOD OF DEWATERING
ELECTRO OSMOSIS METHOD OF DEWATERING
 
Polymer concrete
Polymer concretePolymer concrete
Polymer concrete
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
 
Types of cracks in concrete
Types of cracks in concreteTypes of cracks in concrete
Types of cracks in concrete
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 
TYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETETYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETE
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
 
Pile load test
Pile load testPile load test
Pile load test
 
Jacketing
JacketingJacketing
Jacketing
 
Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structures
 
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEDESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 

Similar to distress of concrete

Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
hlksd
 
Maintenance and repair strategies Question answers
Maintenance and repair strategies Question answersMaintenance and repair strategies Question answers
Maintenance and repair strategies Question answers
RAMPRASAD KUMAWAT
 
13324396.pptx
13324396.pptx13324396.pptx
13324396.pptx
AdelFerdousi
 
Column & beam
Column & beamColumn & beam
Column & beam
Minh Bui Si
 
Question & Answers RR&S
Question & Answers RR&SQuestion & Answers RR&S
Question & Answers RR&S
RAMPRASAD KUMAWAT
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
Minh Bui Si
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Nangkula utaberta
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
Ramanuj Jaldhari
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
Maria Archana
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
Anees Khan
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergies
Ankit Patel
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
Yamini K
 
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqeThesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
USAMAUSAMA26
 
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Mostafa Sameer
 
Retrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameerRetrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameer
Mostafa Sameer
 
Precast
PrecastPrecast
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete StructureStructural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
IJERA Editor
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
Seetha Ram P G
 
REPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptxREPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptx
KavinKumars19
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategies
Manikandan
 

Similar to distress of concrete (20)

Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Maintenance and repair strategies Question answers
Maintenance and repair strategies Question answersMaintenance and repair strategies Question answers
Maintenance and repair strategies Question answers
 
13324396.pptx
13324396.pptx13324396.pptx
13324396.pptx
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Question & Answers RR&S
Question & Answers RR&SQuestion & Answers RR&S
Question & Answers RR&S
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergies
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
 
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqeThesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
 
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
 
Retrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameerRetrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameer
 
Precast
PrecastPrecast
Precast
 
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete StructureStructural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
 
REPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptxREPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptx
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategies
 

More from kamariya keyur

estimation of structure
estimation of structureestimation of structure
estimation of structure
kamariya keyur
 
Pavement
PavementPavement
Pavement
kamariya keyur
 
Curing
CuringCuring
Connections
Connections Connections
Connections
kamariya keyur
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
kamariya keyur
 
Theory of errors
Theory of errors Theory of errors
Theory of errors
kamariya keyur
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
kamariya keyur
 
column and strut
column and strutcolumn and strut
column and strut
kamariya keyur
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
kamariya keyur
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
kamariya keyur
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footing
kamariya keyur
 
Flat slab
Flat slab Flat slab
Flat slab
kamariya keyur
 
durability and permeability of concrete
durability and permeability of concretedurability and permeability of concrete
durability and permeability of concrete
kamariya keyur
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
kamariya keyur
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
kamariya keyur
 
Compression member
Compression memberCompression member
Compression member
kamariya keyur
 

More from kamariya keyur (16)

estimation of structure
estimation of structureestimation of structure
estimation of structure
 
Pavement
PavementPavement
Pavement
 
Curing
CuringCuring
Curing
 
Connections
Connections Connections
Connections
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
 
Theory of errors
Theory of errors Theory of errors
Theory of errors
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
 
column and strut
column and strutcolumn and strut
column and strut
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footing
 
Flat slab
Flat slab Flat slab
Flat slab
 
durability and permeability of concrete
durability and permeability of concretedurability and permeability of concrete
durability and permeability of concrete
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Compression member
Compression memberCompression member
Compression member
 

Recently uploaded

BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
shourabjaat424
 
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE DelhiESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
AK47
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
kamka4105
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
rupa singh
 

Recently uploaded (20)

BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
 
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE DelhiESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
💋Mature Women / Aunty Call Girls Gurgaon 💯Call Us 🔝 9999965857 🔝💃Independent ...
 

distress of concrete

  • 1. Contents Definition of Distress Causes of Distress Constructional errors Design Deficiencies Deterioration of concrete Need for repairs in structure Concrete repair system Durable concrete repair
  • 2. DISTRESS • Distress means damage. • Because of the varying conditions under which it is produced at various locations, the quality of concrete suffers occasionally either during production or during service conditions resulting in distress. 2
  • 3. Causes of distress of concrete 1. Structural causes - Externally applied loads - Environmental loads - Accidents - Subsidence etc. 2. Errors in design and detailing 3. Poor construction practice 4. Construction overloads 5. Drying shrinkage 6. Thermal stress 7. Weathering 8. Corrosion 3
  • 4. • In addition to distress in hardened concrete, the plastic concrete may suffer damage due to, - Plastic shrinkage - settlement cracking - early removal of formwork - improper design of formwork 4
  • 5. Construction Errors 1. Use of inferior quality of construction materials. 2. Use of waste water or saline water in construction. 3. Adding of more water to improve workability which increase the w/c ratio. 4. Poor grading of concrete ingredients. 5. Poor mixing of concrete. 6. Batching of concrete by volume using mortar pans. 7. Insufficient compaction of concrete. 8. Dropping concrete from the height results into segregation. 9. Insufficient reinforcement into slab, beam, column etc. 10. Improper location of reinforcing steel. 5
  • 6. 11. Hooks , bends , overlaps are not properly provided. 12. Formwork props are not resting on a hard surface. 13. Early removal of formwork props. 14. Using props of insufficient strength. 15. Joints are not properly provided. 16. Improper curing of concrete. 17. Segregation of concrete during transportation. 18. Settlement of foundation 6
  • 7. Design deficiencies • Inadequate structural design : 1. Error in load calculations. 2. SBC is assumed without carrying out any field test. 3. Design not confirming to IS - 456 : 2000 and IS – 1893 : 1987 guidelines. 4. Design with many cantilevers. 5. Shear wall is not designed in multi storey building. 6. Stiffness in both direction is unequal resulting into torsion. 7. Effect of the short column in single storey. 8. Lack of knowledge of using structural design software like STAAD PRO, ETABS etc. 7
  • 8. • Poor design detailing : 1. Abrupt change in section. 2. Insufficient reinforcement at re – entrant corners and openings. 3. Inadequate provision for deflection. 4. Inadequate expansion joints. 5. Inadequate provision of drainage. 6. Material incompatibility. 7. Bent up bars are not properly shown. 8. Spacing of vertical stirrups is wrongly shown. 9. Column spacing of lateral ties is wrongly shown. 10. Ductile detailing is not as per IS – 13920. 8
  • 9. DETERIORATION in concrete • Causes of deterioration in concrete : 1. Accidental loading 2. Chemical reactions - Acid attack - Alkali carbonate rock reaction - Alkali silica reaction - Aggressive water attack - Sulphate attack 3. Construction errors 4. Corrosion of metals 5. Design errors - Inadequate structural design - Poor design details 9
  • 10. 6. Erosion - Abrasion - Cavitations 7. Freezing and thawing 8. Settlement and movements 9. Shrinkage - plastic shrinkage - Drying shrinkage 10. Temperature changes - Internally generated - Externally generated 11. Weathering 10
  • 11. Need for Repairs of structures a) Workmanship: • Repair personnel are responsible for making repairs that are durable and well bonded to existing structure. • Workmen should be fully instructed regarding repair procedures and critical aspects. • Constant vigilance should be exercised by contractor’s and government forces to ensure maintenance of necessary standards of workmanship. 11
  • 12. b) Procedures: • Use procedures that have been successful or that have a proven high reliability factor. • Repairs on new work will develop best bond and likely to be durable and permanent as original work. • The method and materials proposed for use should be approved by an authorized inspector. 12
  • 13. c) Materials: • They must be of high quality, relatively fresh and capable of meeting specifications requirements for particular application or intended use. • Mill reports or testing laboratory reports is required. • New, unproven materials should be used only when, - Standard repair materials are unsuitable - The owners and parties should be informed about risks associated with it. 13
  • 14. Evaluate structures Project needs Determine causes of damage & effect Repair analysis User needs Determine repair strategies Methods and materials Repair and protect Urgency Aesthetics Lifespan Environment Contractibility & Effectiveness 14
  • 15. Durable concrete repair 1. Determine the causes of damage 2. Evaluate the extent of damage 3. Evaluate the need of repair 4. Select the repair method 5. Prepare the old concrete for repair 6. Apply the repair method 7. Cure the repair properly 15
  • 16. 1. Determine the causes of damage : If the cause of the original damage to concrete is not determined and eliminated , or if an incorrect determination is made, whatever damaged the original concrete will likely also damage the repaired concrete. 2. Evaluate the extent of damage : The intent of this step is to determine how much concrete has been damaged and how this damage will affect serviceability of this structure. 3. Evaluate the need to repair : With early detection it may be possible to arrest the rate of deterioration using maintenance procedure . Even if repairs is required, early detection of damage will allow orderly budgeting of funds to pat the cost of repair. 16
  • 17. 4. Select the repair methods : With insufficient information, it is very difficult to make proper , economical , and successful selections. This steps define the types of conditions the repair must resist the available repair construction time period and when repair must be accomplished. 5. Prepare the old concrete for repair : Preparation of the old concrete for application of repair material is of primary importance in the accomplishment of durable repairs. 6. Apply the repair material : The selected repair material should be applied on the prepared surface using equipment with proper care. 7. Cure the repair properly : The repaired concrete should be cured for about 14 days. 17