Introduction:
    Sambhavna offers many flats ranging from 520 sq ft
    to 1520 sq ft in 9 & 12-storey towers.

   Luxuriously planned with the most amicable
    amenities, boasts of 60% open green spaces with
    most apartments facing the central garden.
Project Snapshot :
   The project is located off the Lucknow Rae
    Bareilly road and is 10 kilometres (km)
    away from Amausi Airport and 11 km from
    Hazratganj. The project has good road
    connectivity. The project is targeted to the
    service class in the region.
   A wide range of lifestyle amenities such as a
    club, a swimming pool, indoor and outdoor sport
    facilities, central park and shopping complex are
    available.
   There are in all 17 towers with 14 towers having
    12 floors and remaining 3 towers having 11
    floors each, internal roads were 12 m wide.
   Completion Date:2013
Equipments used:
    Transit mixer:
    It is device that homogeneously combines
     cement, aggregate such as sand or gravel, and
     water to form concrete.
    Transit mixer is truck mounted by a revolving
     drum to mix the components. For smaller
     volume works portable concrete mixers are
     often used so that the concrete can be made at
     the construction site.
Back hoe:
   A backhoe, is a piece of excavating
    equipment or digger consisting of a digging
    bucket on the end of a two-part articulated
    arm.

   They are typically mounted on the back of
    a tractor or front loader. The section of the
    arm closest to the vehicle is known as the
    boom, and the section which carries the
    bucket is known as the dipper or dipper stick.
Concrete Pump:
 The main type of concrete pump is either
  mounted on a truck and known as a truck-
  mounted concrete pump or placed on a
  trailer, and it is commonly referred to as a
  line pump or trailer-mounted concrete pump.
 This pump requires steel or rubber concrete
  placing hoses to be manually attached to the
  outlet of the machine.
BATCHING PLANT
FLY ASH
FLY ASH BRICKS
BRICK WORK
Procedure
 Excavation:
 Excavation was carried out both
  manually as well as mechanically.

   Adequate precautions are taken to see
    that the excavation operations do not
    effect the adjoining structures.
P.C.C:
 After the process of excavation, laying of plain
  cement concrete that is PCC is done. A layer of
  75 mm was made in such a manner that it was
  not mixed with the soil.

   It provides a solid base for the raft foundation
    and a mix of 1:3:6 that is, 1 part of cement to 3
    parts of fine aggregates and 6 parts of coarse
    aggregates by volume were used in it.
LAYING OF FOUNDATION

   At the site, Raft foundations was used to spread
    the load from a structure over a large area,
    normally the entire area of the structure.
      Normally raft foundation is used when large
    load is to be distributed and it is not possible to
    provide individual footings.
        Raft foundations have the advantage of
    reducing differential settlements as the concrete
    slab resists differential movements between
    loading positions.
   They are often needed on soft or loose soils
    with low bearing capacity.
   Raft Foundation had a thickness of 750 mm.
   Bars of 25 mm to 16 mm were used and chairs
    were used.
FORM WORK
   Forms or moulds or shutters are the
    receptacles in which concrete is placed,
    so that it will have the desired shape or
    outline when hardened.
   Once the concrete develops adequate
    strength, the forms are removed. Forms
    are generally made of the materials like
    timber, plywood, steel, etc.
Scaffolding/props used:
   Scaffolding is a temporary structure used to
    support people and material in the construction
    or repair of buildings and other large structures.
    It is usually a modular system of metal pipes or
    tubes, although it can be from other materials.
   The key elements of a scaffold are standards,
    ledgers and transoms.
CONCRETING

   Type of Cement Used :P.P.C (A.C.C)
   Grade of concrete in slabs and beams :M-20
   Grade of concrete in coloumns:M-30
   Grade of concrete in P.C.C work:M-10
   Grade of concrete in Raft foundation:M-25
   Concrete was made at the site only at
    the batching plant.
   From there it was carried upto the site
    with the transit mixer.
   Capacity of a transit mixer :6m3
   Aggregates sizes :20 mm ,10mm
   Fine aggregate (sand):zone 2
REINFORCEMENT


 Fe-500 grade of steel was used.
 High strength deformed bars conforming to
  IS: 1786 ,grade Fe 500, indicate yield
  stresses 500 N/mm2 are commonly used.
Column

   Total no. of columns in a floor was 69 , in
    which 64 have dimension 750*250 and
    remaining 5 columns having dimension
    600*250.
   There were 10 bars used in the columns in
    which the corner bars were of dia. 25
    mm ,and the remaining were 20 mm dia. till
    5 th floor.
   6 th to 9 th floor bars of dia. 20 mm and 16
    mm were provided respectively in the
    corner and in the middle.
   From 9 th onwards till the end the bars of
    dia. 16 mm and 12 mm were provided.
Ring/Tie bars:
   8 mm dia. bars were used as ring.
   The larger ring was of dimension 650*150 mm
    which holds the corner bars and the smaller ring
    was of dimension 350*150 which holds the inner
    bars.

 Spacing between the rings:
 The spacing between the top and the next ring
  was 80 mm and also the same spacing was
  provided for the bottommost and the ring above
  it.
 Rest all the spacing between the rings was
  120mm.
Beams:
   Beams were of sizes 230*400,small beams of
    size 230*160 was also provided.
    Main Reinforcement: Mostly bars of dia 25,20
    and 16 mm were provided.
    Shear Reinforcement:
   Stirrup was of dia. 8mm.
   Stirrups were provided for the shear
    reinforcement ,1 st stirrup is at 40 mm from face
    of the supporting member.
   Spacing of the stirrup was upto 2*(dia of the
    main bar)
Slab:
   Main bars used were of 12 mm at the top and
    also at the bottom.
    Chairs were provided at different locations to
    provide the spacing required between the top
    and bottom reinforcement.
   Thickness of the slab was 100 mm.
   Note: No shear reinforcement is provided in the
    slab.
Cover block:
   Cover blocks are placed to prevent the steel
    rods from touching the shuttering plates and
    there by providing a minimum cover and fix the
    reinforcements as per the design drawings.
   Covers should be made of cement sand mortar
    (1:3). Ideally, cover should have strength similar
    to the surrounding concrete, with the least
    perimeter so that chances of water to penetrate
    through periphery will be minimized.
SAFETY NETS
CONCLUSION
   This training is comprehensive in filling the gap
    between the theoretical & practical studies
   At the site there was a good management
    system between the contractor, the consultant,
    and the client.
   I found that there was good understanding
    between the supervisor and the workers,
    though works are interdependent but there
    were no contradiction between them.
ppt on training civil report on shuttering

More Related Content

What's hot

INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
Ram1239
 
Presentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionPresentation on Summer internship on Road Construction
Presentation on Summer internship on Road Construction
Self-employed
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
GLA University
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential Construction
Mayank Walecha
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
Sumit Singh
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
Abhishek Singh
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
Satyam Anand
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
mukul srivastava
 
PPT on industrial summer training in civil engineer
PPT  on industrial summer training in civil engineer PPT  on industrial summer training in civil engineer
PPT on industrial summer training in civil engineer
ramit raj
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
harshit315
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
Madhu Choudhary
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
Anil Gupta
 
Bituminous Road
 Bituminous Road Bituminous Road
Bituminous Road
shubham paliwal
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
Anshul Shakya
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
chiranjeevulu chinthala
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
Imrul Quesh
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
Akhilesh Kumar
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
Alok Mishra
 
Construction site report
Construction site reportConstruction site report
Construction site report
Ravi Kant Sahu
 
Mukesh ppt cc road
Mukesh ppt cc roadMukesh ppt cc road
Mukesh ppt cc road
HJ Sims
 

What's hot (20)

INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Presentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionPresentation on Summer internship on Road Construction
Presentation on Summer internship on Road Construction
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential Construction
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
 
PPT on industrial summer training in civil engineer
PPT  on industrial summer training in civil engineer PPT  on industrial summer training in civil engineer
PPT on industrial summer training in civil engineer
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Bituminous Road
 Bituminous Road Bituminous Road
Bituminous Road
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 
Construction site report
Construction site reportConstruction site report
Construction site report
 
Mukesh ppt cc road
Mukesh ppt cc roadMukesh ppt cc road
Mukesh ppt cc road
 

Viewers also liked

Industrial training ppt.
Industrial training ppt.Industrial training ppt.
Industrial training ppt.
Tarun Sharma
 
Vivek Mishra
Vivek MishraVivek Mishra
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
alok0025
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
Esmael Aragaw
 
Industrial Training Report-1
Industrial Training Report-1Industrial Training Report-1
Industrial Training Report-1
Rohit Grandhi, EIT
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
Deshan Arachchige
 
Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)
Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)
Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)
Surat Construction PVT LTD
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
Fazal-E- Jalal
 
Multi storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial buildingMulti storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial building
Razes Dhakal
 
Analysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concreteAnalysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concrete
Surat Construction PVT LTD
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
Surat Construction PVT LTD
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
Umed Paliwal
 
Formwork
FormworkFormwork
Formwork
Sneha Kaira
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
mbrsalman
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
Yeronga 1992
Yeronga 1992Yeronga 1992
Yeronga 1992
Simon Brown
 
Concreting operation
Concreting operationConcreting operation
Concreting operation
Masud Alam Ansari
 
Hot Mix Plant
Hot Mix PlantHot Mix Plant
Hot Mix Plant
Sainty Thomas
 
Vivek Mishra
Vivek MishraVivek Mishra
Safety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area AnshulSafety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area Anshul
Anshul Shakya
 

Viewers also liked (20)

Industrial training ppt.
Industrial training ppt.Industrial training ppt.
Industrial training ppt.
 
Vivek Mishra
Vivek MishraVivek Mishra
Vivek Mishra
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
Industrial Training Report-1
Industrial Training Report-1Industrial Training Report-1
Industrial Training Report-1
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)
Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)
Real estate marketing plan ppt (Surat Residency Vrindavan yojana Lucknow)
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Multi storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial buildingMulti storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial building
 
Analysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concreteAnalysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concrete
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
 
Formwork
FormworkFormwork
Formwork
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Yeronga 1992
Yeronga 1992Yeronga 1992
Yeronga 1992
 
Concreting operation
Concreting operationConcreting operation
Concreting operation
 
Hot Mix Plant
Hot Mix PlantHot Mix Plant
Hot Mix Plant
 
Vivek Mishra
Vivek MishraVivek Mishra
Vivek Mishra
 
Safety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area AnshulSafety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area Anshul
 

Similar to ppt on training civil report on shuttering

Field work
Field workField work
Field work
Sachin Rawal
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
ShuBham RaNa
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
PranavKd
 
Plastic cell filled concretepavement .pptx
Plastic cell filled concretepavement .pptxPlastic cell filled concretepavement .pptx
Plastic cell filled concretepavement .pptx
PranavKd
 
Form Work
Form Work Form Work
Form Work
Kezar Ali. Shah
 
road drainage
road drainageroad drainage
road drainage
Durgeshsahu42
 
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
toddr4
 
Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
Pravin Gaurav
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
Kamesh Tripathi
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
sfQyoom
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
ErLavKushPrasad
 
Prestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptxPrestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptx
RajeshKumar25548
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
Minhal Haider
 
Concrete
ConcreteConcrete
Concrete
Nour Salo
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
pradip dangar
 
Piles
PilesPiles
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
JaySinghchib1
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop report
Amelisa Collins
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1
Carlson Ko
 

Similar to ppt on training civil report on shuttering (20)

Field work
Field workField work
Field work
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
 
Plastic cell filled concretepavement .pptx
Plastic cell filled concretepavement .pptxPlastic cell filled concretepavement .pptx
Plastic cell filled concretepavement .pptx
 
Form Work
Form Work Form Work
Form Work
 
road drainage
road drainageroad drainage
road drainage
 
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
 
Formwork
FormworkFormwork
Formwork
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Prestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptxPrestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptx
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
 
Concrete
ConcreteConcrete
Concrete
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Piles
PilesPiles
Piles
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop report
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1
 

Recently uploaded

Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
whatchangedhowreflec
 
The basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptxThe basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptx
heathfieldcps1
 
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
Nguyen Thanh Tu Collection
 
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT KanpurDiversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
Nguyen Thanh Tu Collection
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
Ben Aldrich
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
khabri85
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
Kalna College
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
Derek Wenmoth
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
indexPub
 
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Alexandra N. Martinez
 
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
ShwetaGawande8
 
How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17
Celine George
 
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
220711130083 SUBHASHREE RAKSHIT  Internet resources for social science220711130083 SUBHASHREE RAKSHIT  Internet resources for social science
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
Kalna College
 
Simple-Present-Tense xxxxxxxxxxxxxxxxxxx
Simple-Present-Tense xxxxxxxxxxxxxxxxxxxSimple-Present-Tense xxxxxxxxxxxxxxxxxxx
Simple-Present-Tense xxxxxxxxxxxxxxxxxxx
RandolphRadicy
 
220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology
Kalna College
 
How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17
Celine George
 
8+8+8 Rule Of Time Management For Better Productivity
8+8+8 Rule Of Time Management For Better Productivity8+8+8 Rule Of Time Management For Better Productivity
8+8+8 Rule Of Time Management For Better Productivity
RuchiRathor2
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
OH TEIK BIN
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
Celine George
 

Recently uploaded (20)

Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
 
The basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptxThe basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptx
 
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
 
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT KanpurDiversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT Kanpur
 
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
 
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
 
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
INTRODUCTION TO HOSPITALS & AND ITS ORGANIZATION
 
How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17How to Setup Default Value for a Field in Odoo 17
How to Setup Default Value for a Field in Odoo 17
 
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
220711130083 SUBHASHREE RAKSHIT  Internet resources for social science220711130083 SUBHASHREE RAKSHIT  Internet resources for social science
220711130083 SUBHASHREE RAKSHIT Internet resources for social science
 
Simple-Present-Tense xxxxxxxxxxxxxxxxxxx
Simple-Present-Tense xxxxxxxxxxxxxxxxxxxSimple-Present-Tense xxxxxxxxxxxxxxxxxxx
Simple-Present-Tense xxxxxxxxxxxxxxxxxxx
 
220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology
 
How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17How to Download & Install Module From the Odoo App Store in Odoo 17
How to Download & Install Module From the Odoo App Store in Odoo 17
 
8+8+8 Rule Of Time Management For Better Productivity
8+8+8 Rule Of Time Management For Better Productivity8+8+8 Rule Of Time Management For Better Productivity
8+8+8 Rule Of Time Management For Better Productivity
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
 

ppt on training civil report on shuttering

  • 1.
  • 2. Introduction:  Sambhavna offers many flats ranging from 520 sq ft to 1520 sq ft in 9 & 12-storey towers.  Luxuriously planned with the most amicable amenities, boasts of 60% open green spaces with most apartments facing the central garden.
  • 3. Project Snapshot :  The project is located off the Lucknow Rae Bareilly road and is 10 kilometres (km) away from Amausi Airport and 11 km from Hazratganj. The project has good road connectivity. The project is targeted to the service class in the region.
  • 4. A wide range of lifestyle amenities such as a club, a swimming pool, indoor and outdoor sport facilities, central park and shopping complex are available.  There are in all 17 towers with 14 towers having 12 floors and remaining 3 towers having 11 floors each, internal roads were 12 m wide.  Completion Date:2013
  • 5.
  • 6. Equipments used: Transit mixer:  It is device that homogeneously combines cement, aggregate such as sand or gravel, and water to form concrete.  Transit mixer is truck mounted by a revolving drum to mix the components. For smaller volume works portable concrete mixers are often used so that the concrete can be made at the construction site.
  • 7.
  • 8. Back hoe:  A backhoe, is a piece of excavating equipment or digger consisting of a digging bucket on the end of a two-part articulated arm.  They are typically mounted on the back of a tractor or front loader. The section of the arm closest to the vehicle is known as the boom, and the section which carries the bucket is known as the dipper or dipper stick.
  • 9.
  • 10. Concrete Pump:  The main type of concrete pump is either mounted on a truck and known as a truck- mounted concrete pump or placed on a trailer, and it is commonly referred to as a line pump or trailer-mounted concrete pump.  This pump requires steel or rubber concrete placing hoses to be manually attached to the outlet of the machine.
  • 11.
  • 16. Procedure Excavation:  Excavation was carried out both manually as well as mechanically.  Adequate precautions are taken to see that the excavation operations do not effect the adjoining structures.
  • 17. P.C.C:  After the process of excavation, laying of plain cement concrete that is PCC is done. A layer of 75 mm was made in such a manner that it was not mixed with the soil.  It provides a solid base for the raft foundation and a mix of 1:3:6 that is, 1 part of cement to 3 parts of fine aggregates and 6 parts of coarse aggregates by volume were used in it.
  • 18. LAYING OF FOUNDATION  At the site, Raft foundations was used to spread the load from a structure over a large area, normally the entire area of the structure. Normally raft foundation is used when large load is to be distributed and it is not possible to provide individual footings. Raft foundations have the advantage of reducing differential settlements as the concrete slab resists differential movements between loading positions.
  • 19. They are often needed on soft or loose soils with low bearing capacity.  Raft Foundation had a thickness of 750 mm.  Bars of 25 mm to 16 mm were used and chairs were used.
  • 20.
  • 21. FORM WORK  Forms or moulds or shutters are the receptacles in which concrete is placed, so that it will have the desired shape or outline when hardened.  Once the concrete develops adequate strength, the forms are removed. Forms are generally made of the materials like timber, plywood, steel, etc.
  • 22.
  • 23. Scaffolding/props used:  Scaffolding is a temporary structure used to support people and material in the construction or repair of buildings and other large structures.  It is usually a modular system of metal pipes or tubes, although it can be from other materials.  The key elements of a scaffold are standards, ledgers and transoms.
  • 24.
  • 25. CONCRETING  Type of Cement Used :P.P.C (A.C.C)  Grade of concrete in slabs and beams :M-20  Grade of concrete in coloumns:M-30  Grade of concrete in P.C.C work:M-10  Grade of concrete in Raft foundation:M-25
  • 26. Concrete was made at the site only at the batching plant.  From there it was carried upto the site with the transit mixer.  Capacity of a transit mixer :6m3  Aggregates sizes :20 mm ,10mm  Fine aggregate (sand):zone 2
  • 27. REINFORCEMENT  Fe-500 grade of steel was used.  High strength deformed bars conforming to IS: 1786 ,grade Fe 500, indicate yield stresses 500 N/mm2 are commonly used.
  • 28.
  • 29. Column  Total no. of columns in a floor was 69 , in which 64 have dimension 750*250 and remaining 5 columns having dimension 600*250.  There were 10 bars used in the columns in which the corner bars were of dia. 25 mm ,and the remaining were 20 mm dia. till 5 th floor.  6 th to 9 th floor bars of dia. 20 mm and 16 mm were provided respectively in the corner and in the middle.  From 9 th onwards till the end the bars of dia. 16 mm and 12 mm were provided.
  • 30.
  • 31. Ring/Tie bars:  8 mm dia. bars were used as ring.  The larger ring was of dimension 650*150 mm which holds the corner bars and the smaller ring was of dimension 350*150 which holds the inner bars. Spacing between the rings:  The spacing between the top and the next ring was 80 mm and also the same spacing was provided for the bottommost and the ring above it.  Rest all the spacing between the rings was 120mm.
  • 32.
  • 33. Beams:  Beams were of sizes 230*400,small beams of size 230*160 was also provided.  Main Reinforcement: Mostly bars of dia 25,20 and 16 mm were provided. Shear Reinforcement:  Stirrup was of dia. 8mm.  Stirrups were provided for the shear reinforcement ,1 st stirrup is at 40 mm from face of the supporting member.  Spacing of the stirrup was upto 2*(dia of the main bar)
  • 34.
  • 35. Slab:  Main bars used were of 12 mm at the top and also at the bottom.  Chairs were provided at different locations to provide the spacing required between the top and bottom reinforcement.  Thickness of the slab was 100 mm.  Note: No shear reinforcement is provided in the slab.
  • 36.
  • 37. Cover block:  Cover blocks are placed to prevent the steel rods from touching the shuttering plates and there by providing a minimum cover and fix the reinforcements as per the design drawings.  Covers should be made of cement sand mortar (1:3). Ideally, cover should have strength similar to the surrounding concrete, with the least perimeter so that chances of water to penetrate through periphery will be minimized.
  • 38.
  • 39.
  • 41. CONCLUSION  This training is comprehensive in filling the gap between the theoretical & practical studies  At the site there was a good management system between the contractor, the consultant, and the client.  I found that there was good understanding between the supervisor and the workers, though works are interdependent but there were no contradiction between them.