RIGID PAVEMENTS :
Pavements usually constructed using plain or
unreinforced cement concrete slabs having high
flexural strength.
It serves as good and durable wearing surface as
well as an effective and strong base course of
highway pavements.
WHERE ARE RIGID PAVEMENT PROVIDED ?
Rigid pavements are usually provided when
road stretch is subjected to adverse
conditions:
1. Very heavy rainfall.
2. Poor soil conditions
3. Poor drainage
4. Extreme climatic conditions
5. Combinations of some of these conditions
which may lead to development of cracks
in pavements.
MATERIALS FOR CONSTRUCTION OF CC
PAVEMENTS :
Portland cement :
--OPC of grade 43.
--OPC of grade 53.
--Portland pozzolona cement with fly ash (20 per cent)
Portland slag cement.
2. Coarse aggregates :
Los angeles abration value < 35 %
Combined flakiness and
Elongation index
<35%
Water absorption <3%
soundness For Na2So4 <12%
For MgSo4 <18%
Fine aggregates :
clean natural sand / crushed stones
/combination of both.
It should be free of clay ,coal and ignite. Well
graded with 100% passing 10 mm sieve.
WATER: Water used for mixing and curing of
concrete shall be clean and free from injurious
amount of oil, salt, acid, vegetable matter or
other substances harmful to the finished
concrete. It shall meet the requirements
stipulated in IS:456.
Reinforcement:
 steel dowel bars (rounded) with yield
strength 240 MPa are used for the load
transfer across in expansion and construction
joints.
 Plain or twisted steel bars are used as tie
bars are used as tie bars at longitudinal
joints.
Basic Components of CC Pavements:
 --soil subgrade.
 --drainage layer.
 --sub-base course generally constructed using
lean cement concrete or ‘dry lean concrete’
 --separation membrane laid on top of base
course.
 --CC pavement slabs Using ‘ paving quality
concrete’ (PQC)
 --construction of different types of joints in
CC pavements.
Equipments required for the different
phases of concrete road construction:
 Three wheeled or vibratory roller for compaction purpose
 Shovels, spades and Sieving screens
 Concrete mixer for mixing of concrete
 Formwork and iron stakes
 Watering devices - Water Lorries, water carriers or
watering cans
 Wooden hand tampers for concrete compaction
 Cycle pump/pneumatic air blower for cleaning of joint
 Mild steel sections and blocks for making joint grooves for
finishing purpose
 METHODS OF CONSTRUCTION OF CC PAVEMENTS :
1. Construction by Slip Form Paver
2. Construction by Fixed Form Paver.
3. Construction by Fixed Form and labour oriented
method of paving.
 Basically different operation involved in
construction of CC pavements slabs are :
a) spreading prepared concrete mix to desired
thickness, grade and cross profiles.
b) Compacting.
c) Finishing the surface to desired surface profile.
d) Texturing.
e) Curing
f) Cutting of construction joints and longitudinal
joints.
Site Preparation
 Before construction begins, the construction site
must be carefully prepared, This includes preparing
the grade or road base, sub grade and sub base-
 First the site is graded to cut high points and fill
low areas to the desired roadway profile
elevations.
 Generally, cut material can be used as embankment
fill.
 A course of material is placed on the sub grade to
provide drainage and stability.
CONSTRUCTION BY SLIP FORM PAVER
1. The slip form paving train spreads,
compacts and finishes the concrete in a
continuous operation, by internal vibration
and shape it between the side forms with
either a conforming plate or by vibrating
and oscillating finishing beams.
VIDEO OF SLIP FORM PAVER 01
( video no 2 : fix form)
TYPES OF JOINTS IN CC PAVEMENTS:
A) Longitudinal joints ( parallel to traffic flow).
B) Transverse joints ( perpendicular to traffic
flow)
-- Contraction joints
-- Expansion joints.
-- construction joints.
 Longitudinal joints
 During initial period of curing ,shrinkage
cracks usually develops in CC pavements
,when length or width of the slabs exceeds
4.5 to 5 m width or more.
 Hence longitudinal joints are provided whose
spacing depends on width of traffic lane . For
instance if width is 3.5 or3.75 , then spacing
of longitudinal joints is also 3.5 or 3.75m
respectively.
CONTRACTION JOINTS :
• These are purposely made weakened planes
which relieve the tensile stresses in the concrete
Caused due to changes in the moisture content
(Drying shrinkage) and/or temperature and
• Prevent the formation of irregular cracks due to
restraint in free contraction of concrete .
Purpose of joints in Concrete Roads
1. To absorb expansion & contraction due to variation in
temperature.
2. To avoid warping of slab edges
3. To grant facility in construction .
Construction of contraction joints :
• They are formed initially by sawing a groove
of 3-5 mm with up to about one-fourth to one-
third the slab which facilitates the formation
of a natural crack at this location extending to
the full depth.
Two methods of construction of contraction
joints:
1. As ‘plain joints without dowel bars’.
2. With dowel bars.
Expansion joints
• There are full-depth joints provided
transversely into which pavement can expand,
thus relieving compressive stresses due to
expansion of concrete slabs, and preventing any
tendency towards distortion and buckling.
• They are allows expansion of slabs due to
temperature.
• A joint filler board of compressible material is
used to fill the gap between the adjacent slabs
at the joint.
• The height of the filler board is such that its
top is 23-25mm below the surface of the
pavement.
• The joint groove is filled by a sealant .
CONSTRUCTION OF EXPANSION JOINT WITH LOAD
TRANSFER DOWEL BARS
1. A steel bulk head with drilled holes at desired
intervals is provided to support end of slabs adjoining
expansion joint such that dowel bar can be inserted
up to mid-length and held in correct position.
2. Concreting is done , filler board is inserted through
gap of expansion joint ,so that dowel bars are
properly placed in position .
3. Now filler board will be 25mm below the surface of
slab.
4. Wooden strips of 20x25 size and 25 mm depth are
placed on top of filler to fill gap during concreting .
5. After concrete is cured for a period of 14 days
,wooden strips are removed and gap is thoroughly
cleaned .
6. The sealant is heated ,poured in gap of joint, above
filler board. Top of sealant shall be at same level as
EFFECT OF REINFORCEMENT IN CONCRETE
PAVEMENTS
WORKING OF EXPANSION
JOINTS :
 During hot climate CC
slab expands towards
the gap provided at
expansion joint, due to
which filler board and
joint sealer gets
compressed and pushed
up.
 Dowel bars also move
along with the slab,
occupying the space in
the metal cap attached
at the end of each
dowel bar.
 AND, During cold
climate slabs
contracts and gap
increases and dowel
bars also move
along with slab.
 The compressed
filler board may
partly recover and
joint sealer moves
down.
OPENING TO TRAFFIC
The entire surface of newly laid pavement is
carefully examined for :
1. Fine cracks have developed on surface
2. Non-uniform settlements of CC slabs has
taken place near abutments or along high
embankments.
If any such defect is noticed ,then corrective
measures may be taken up.
A newly constructed CC pavement stretch shall
be opened to traffic only after a minimum
curing of 28 days.
• Longer lasting - 40 year Design Life .
• Heavy duty Pavements have generally the lowest
cost.
• Pavement maintenance costs are up to 10
times cheaper than the same for flexible
pavements.
• Minimum maintenance requirements result in less
traffic disruption, minimum congestion time and as
a result Work zone safety.
• Lowest Life Cycle Cost of all Heavy Duty
pavements and highest salvage value.
Advantages of Concrete Pavement
Disadvantages of Rigid Pavement
•To provide economics and quality, it requires
larger projects.
•Set-up costs are significant.
•On-site batch plant is essential for slip
forming. •Slip forming requires minimum
200 m runs.
•Concrete must achieve a certain strength before it
can be placed under traffic
•Re·
pairs take longer = traffic disruption and work
site safety.
•Unless longitudinal grooving is used, tyre/road
[1] IRC-58-2011 Guidelines for the design of
plain jointed rigid pavements for highway
s .
[2] IRC-9-1972 Traffic census on Non- urban
road.
[3] S.K. Khanna -C.E.G Justo , book of
highway
. .
engmeermg .
[4] R Srinivas Kumar , Book of Highway
Reference
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx

More Related Content

Similar to Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx

Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)
eddie fonte
 
Rigid pavement in Magallanes Interchange
Rigid pavement in Magallanes InterchangeRigid pavement in Magallanes Interchange
Rigid pavement in Magallanes Interchange
haroldtaylor1113
 
Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumar
Akshay kumar
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
Himanshumangal12
 
Concrete
ConcreteConcrete
Concrete
Nour Salo
 
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptxTYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
rathankumar1213
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
Zaid Ansari
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
ErankajKumar
 
Construction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptxConstruction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptx
vaibhavchaudhary7017
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
ssuser480182
 
Prestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptxPrestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptx
RajeshKumar25548
 
Acm assignment
Acm assignmentAcm assignment
Acm assignment
Aaqib Iqbal
 
Maintenence of road
Maintenence of roadMaintenence of road
Maintenence of road
holegajendra
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
KumarS250747
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitation
KumarS250747
 
Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concrete
ErankajKumar
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
YingHongKang
 
Form Work
Form Work Form Work
Form Work
Kezar Ali. Shah
 
Conen 442 module3 S2021 Pavement Design and Construction
Conen  442 module3  S2021 Pavement Design and Construction Conen  442 module3  S2021 Pavement Design and Construction
Conen 442 module3 S2021 Pavement Design and Construction
Wael ElDessouki
 

Similar to Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx (20)

Formwork
FormworkFormwork
Formwork
 
PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)
 
Rigid pavement in Magallanes Interchange
Rigid pavement in Magallanes InterchangeRigid pavement in Magallanes Interchange
Rigid pavement in Magallanes Interchange
 
Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumar
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
Concrete
ConcreteConcrete
Concrete
 
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptxTYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
 
Construction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptxConstruction of Rigid Pavement.pptx
Construction of Rigid Pavement.pptx
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Prestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptxPrestressed Concrete Bridge.pptx
Prestressed Concrete Bridge.pptx
 
Acm assignment
Acm assignmentAcm assignment
Acm assignment
 
Maintenence of road
Maintenence of roadMaintenence of road
Maintenence of road
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitation
 
Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concrete
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
Form Work
Form Work Form Work
Form Work
 
Conen 442 module3 S2021 Pavement Design and Construction
Conen  442 module3  S2021 Pavement Design and Construction Conen  442 module3  S2021 Pavement Design and Construction
Conen 442 module3 S2021 Pavement Design and Construction
 

Recently uploaded

Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
NaveenNaveen726446
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 

Recently uploaded (20)

Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 

Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx

  • 1. Bhargava college of engineering and technology Supwal samba PRESENTATION REPORT ON CONSTRUCTION OF RIGID PAVEMENT Presenting By:-Asif Qayoom
  • 2.
  • 3. RIGID PAVEMENTS : Pavements usually constructed using plain or unreinforced cement concrete slabs having high flexural strength. It serves as good and durable wearing surface as well as an effective and strong base course of highway pavements.
  • 4.
  • 5. WHERE ARE RIGID PAVEMENT PROVIDED ? Rigid pavements are usually provided when road stretch is subjected to adverse conditions: 1. Very heavy rainfall. 2. Poor soil conditions 3. Poor drainage 4. Extreme climatic conditions 5. Combinations of some of these conditions which may lead to development of cracks in pavements.
  • 6.
  • 7. MATERIALS FOR CONSTRUCTION OF CC PAVEMENTS : Portland cement : --OPC of grade 43. --OPC of grade 53. --Portland pozzolona cement with fly ash (20 per cent) Portland slag cement. 2. Coarse aggregates : Los angeles abration value < 35 % Combined flakiness and Elongation index <35% Water absorption <3% soundness For Na2So4 <12% For MgSo4 <18%
  • 8. Fine aggregates : clean natural sand / crushed stones /combination of both. It should be free of clay ,coal and ignite. Well graded with 100% passing 10 mm sieve. WATER: Water used for mixing and curing of concrete shall be clean and free from injurious amount of oil, salt, acid, vegetable matter or other substances harmful to the finished concrete. It shall meet the requirements stipulated in IS:456.
  • 9. Reinforcement:  steel dowel bars (rounded) with yield strength 240 MPa are used for the load transfer across in expansion and construction joints.  Plain or twisted steel bars are used as tie bars are used as tie bars at longitudinal joints.
  • 10. Basic Components of CC Pavements:  --soil subgrade.  --drainage layer.  --sub-base course generally constructed using lean cement concrete or ‘dry lean concrete’  --separation membrane laid on top of base course.  --CC pavement slabs Using ‘ paving quality concrete’ (PQC)  --construction of different types of joints in CC pavements.
  • 11.
  • 12. Equipments required for the different phases of concrete road construction:  Three wheeled or vibratory roller for compaction purpose  Shovels, spades and Sieving screens  Concrete mixer for mixing of concrete  Formwork and iron stakes  Watering devices - Water Lorries, water carriers or watering cans  Wooden hand tampers for concrete compaction  Cycle pump/pneumatic air blower for cleaning of joint  Mild steel sections and blocks for making joint grooves for finishing purpose
  • 13.  METHODS OF CONSTRUCTION OF CC PAVEMENTS : 1. Construction by Slip Form Paver 2. Construction by Fixed Form Paver. 3. Construction by Fixed Form and labour oriented method of paving.  Basically different operation involved in construction of CC pavements slabs are : a) spreading prepared concrete mix to desired thickness, grade and cross profiles. b) Compacting. c) Finishing the surface to desired surface profile. d) Texturing. e) Curing f) Cutting of construction joints and longitudinal joints.
  • 14. Site Preparation  Before construction begins, the construction site must be carefully prepared, This includes preparing the grade or road base, sub grade and sub base-  First the site is graded to cut high points and fill low areas to the desired roadway profile elevations.  Generally, cut material can be used as embankment fill.  A course of material is placed on the sub grade to provide drainage and stability.
  • 15.
  • 16. CONSTRUCTION BY SLIP FORM PAVER 1. The slip form paving train spreads, compacts and finishes the concrete in a continuous operation, by internal vibration and shape it between the side forms with either a conforming plate or by vibrating and oscillating finishing beams.
  • 17. VIDEO OF SLIP FORM PAVER 01
  • 18. ( video no 2 : fix form)
  • 19. TYPES OF JOINTS IN CC PAVEMENTS: A) Longitudinal joints ( parallel to traffic flow). B) Transverse joints ( perpendicular to traffic flow) -- Contraction joints -- Expansion joints. -- construction joints.
  • 20.
  • 21.  Longitudinal joints  During initial period of curing ,shrinkage cracks usually develops in CC pavements ,when length or width of the slabs exceeds 4.5 to 5 m width or more.  Hence longitudinal joints are provided whose spacing depends on width of traffic lane . For instance if width is 3.5 or3.75 , then spacing of longitudinal joints is also 3.5 or 3.75m respectively.
  • 22. CONTRACTION JOINTS : • These are purposely made weakened planes which relieve the tensile stresses in the concrete Caused due to changes in the moisture content (Drying shrinkage) and/or temperature and • Prevent the formation of irregular cracks due to restraint in free contraction of concrete . Purpose of joints in Concrete Roads 1. To absorb expansion & contraction due to variation in temperature. 2. To avoid warping of slab edges 3. To grant facility in construction .
  • 23. Construction of contraction joints : • They are formed initially by sawing a groove of 3-5 mm with up to about one-fourth to one- third the slab which facilitates the formation of a natural crack at this location extending to the full depth. Two methods of construction of contraction joints: 1. As ‘plain joints without dowel bars’. 2. With dowel bars.
  • 24.
  • 25. Expansion joints • There are full-depth joints provided transversely into which pavement can expand, thus relieving compressive stresses due to expansion of concrete slabs, and preventing any tendency towards distortion and buckling. • They are allows expansion of slabs due to temperature. • A joint filler board of compressible material is used to fill the gap between the adjacent slabs at the joint. • The height of the filler board is such that its top is 23-25mm below the surface of the pavement. • The joint groove is filled by a sealant .
  • 26.
  • 27. CONSTRUCTION OF EXPANSION JOINT WITH LOAD TRANSFER DOWEL BARS 1. A steel bulk head with drilled holes at desired intervals is provided to support end of slabs adjoining expansion joint such that dowel bar can be inserted up to mid-length and held in correct position. 2. Concreting is done , filler board is inserted through gap of expansion joint ,so that dowel bars are properly placed in position . 3. Now filler board will be 25mm below the surface of slab. 4. Wooden strips of 20x25 size and 25 mm depth are placed on top of filler to fill gap during concreting . 5. After concrete is cured for a period of 14 days ,wooden strips are removed and gap is thoroughly cleaned . 6. The sealant is heated ,poured in gap of joint, above filler board. Top of sealant shall be at same level as
  • 28.
  • 29. EFFECT OF REINFORCEMENT IN CONCRETE PAVEMENTS
  • 30.
  • 31. WORKING OF EXPANSION JOINTS :  During hot climate CC slab expands towards the gap provided at expansion joint, due to which filler board and joint sealer gets compressed and pushed up.  Dowel bars also move along with the slab, occupying the space in the metal cap attached at the end of each dowel bar.
  • 32.  AND, During cold climate slabs contracts and gap increases and dowel bars also move along with slab.  The compressed filler board may partly recover and joint sealer moves down.
  • 33. OPENING TO TRAFFIC The entire surface of newly laid pavement is carefully examined for : 1. Fine cracks have developed on surface 2. Non-uniform settlements of CC slabs has taken place near abutments or along high embankments. If any such defect is noticed ,then corrective measures may be taken up. A newly constructed CC pavement stretch shall be opened to traffic only after a minimum curing of 28 days.
  • 34. • Longer lasting - 40 year Design Life . • Heavy duty Pavements have generally the lowest cost. • Pavement maintenance costs are up to 10 times cheaper than the same for flexible pavements. • Minimum maintenance requirements result in less traffic disruption, minimum congestion time and as a result Work zone safety. • Lowest Life Cycle Cost of all Heavy Duty pavements and highest salvage value. Advantages of Concrete Pavement
  • 35. Disadvantages of Rigid Pavement •To provide economics and quality, it requires larger projects. •Set-up costs are significant. •On-site batch plant is essential for slip forming. •Slip forming requires minimum 200 m runs. •Concrete must achieve a certain strength before it can be placed under traffic •Re· pairs take longer = traffic disruption and work site safety. •Unless longitudinal grooving is used, tyre/road
  • 36. [1] IRC-58-2011 Guidelines for the design of plain jointed rigid pavements for highway s . [2] IRC-9-1972 Traffic census on Non- urban road. [3] S.K. Khanna -C.E.G Justo , book of highway . . engmeermg . [4] R Srinivas Kumar , Book of Highway Reference