ESTIMATION
Estimation or estimating is the process of
calculating the quantities of various items of
works involved in the project.
ESTIMATE
Estimate is a document which furnishes the quantities
of different works involved, their rates and the
expenditure anticipate in a project
NECESSITY OF ESTIMATES
 To know about the approximate cost of the
building construction.
To calculate the tax of the building
To fix the rent of building
The know about the various items of works
involved in the building construction and arrange
the available materials of the construction.
To arrange the labours of the construction works.
Take the approval for the government projects.
To having the loan from the bank.
QUANTITY SURVEYOR
 Takking Off Quantities
 Squaring Dimension And Calculating Of Quantity
 Data (Calculation Of Rate Per Unit)
 Abstract Estimate
 Measurement Billing.
DUTIES OF QUANTITY SURVEYOR
The quantity surveyor must be well versed with the
drawing of work.
He should be able to read the drawing correctly and
bill the quantities accurately.
He should have the knowledge of the construction
procedure
He should be able to write the description of different
works.
He should able to prepare the schedule of the project
He should be able to value all variations under the
contract.
TYPES OF ESTIMATE
The estimates may be divided in to the following categories:-
(1) Preliminary or Approximate estimate.
(2) Rough cost estimate based on plinth area.
(3) Rough cost estimate based on cubic contents.
(4) Detailed estimate.
(5) Annual repair estimate.
(6) Special repair estimate.
(7) Revised estimate
(8) Supplementary estimate.
(9)Complete estimate.
1. Preliminary or Approximate
Estimate
This estimate is prepared to decide financial aspect,
policy and to give idea of the cost of the proposal to the
competent sanctioning authority. It should clearly show the
necessity of the proposal and how the cost has been arrived
at .
The estimate which is prepared using any rough
method to get approximate cost of the construction
anticipate in a project is called approximate estimate.
The following documents should be attached with it.
(a) Detailed report
(b) Site plan of the proposal
(c) It should also clearly mention about the acquisition of
land, Provision of electric and water supply etc.
2. Plinth area Estimate (Based on
Rough Cost)
Plinth area of a building means Length x Breadth ( roofed
portion only ) excluding plinth offsets. The estimates are prepared on
the basis of plinth areas of the various buildings proposed to be
constructed. The rates are being arrived at the dividing the total cost of
construction with its plinth area.
The following documents are attached with the estimate.
(a) Line plan with brief specifications.
(b) Cost of various services added i.e. electric and water supply etc.
(c) North line should be shown clearly on line plan.
3. Detailed Estimate
 After getting Administrative approval on rough cost
estimate, detailed estimates are prepared.
 The estimate which provide the itemwise quantities of
works, itemwise unit rate and itemwise expenditure in
the project is called detailed estimate.
 In this, the estimate is divided in to sub-heads and
quantities of various items are calculated individually.
 The detailed estimate shall also provide for the cost of
approach road, water supply, electric installations and
acquisition of land etc., so as to call it a comprehensive
estimate.
4. Cubic Contents Estimate
 The cubic contents of a building means plinth area x
height of the building. The height is taken from top
of floor level to top of roof.
 The cubic contents of the proposed building are
multiplied with cubic rates arrived at for the similar
construction i.e. total cost of construction divided by
cubic contents = cost per cubic metre.
5. Annual maintenance estimate
Annual maintenance estimates are being prepared
by the concerned department for getting allocation
of funds made in the annual budgets.
In order to keep building and roads in perfect condition,
annual repairs should be carried out as follow:-
 (i) In case of a building-white washing, oiling and
painting of doors and windows, cement plaster repairs
(inside & outside), repairs of floors etc. In no case this
annual repair amount should increase more that 11/2%
to 2% of the capital cost of the building.
 (ii) In case of a road-filling patches, maintenance of
berms etc.
6. Special repair estimate
If the work cannot be carried out of the annual repair
funds due to certain reasons resulting in the genuine
increase in cost, then special repairs estimate is to be
prepared.
The reason of increase may be:-
 (i) In case of a building-opening of new doors, change of
floors, plastering walls etc.
 (ii) In case of roads-if the whole surface is full of
corrugation & patches, then the total surface is to be
scarified. The old metal is taken out, consolidation by
adding more metal is done and top surface is repainted.
7. Revised estimate
When the sanctioned estimate exceeds by 5% either due
to the rate being found insufficient or due to some other
reasons, a fresh estimate is prepared which is called a
Revised Estimate. A comparative statement on the last
page of the estimate is attached giving there in the
reasons of the increase of cost in case of each item.
8. Supplementary Estimate
This is fresh detailed estimate in addition to the original
sanctioned estimate prepared when additional works are
deemed necessary during the progress of a work to
supplement the original works. The abstract of cost
should show the amount of the original sanctioned
estimate as well as the supplementary amount of the
original sanctioned estimate as well as the
supplementary amount for which sanction is required.
9.Complete estimate
 The estimate which includes, in addition to the cost of
construction, the cost of land, the expenses towards
surveying, preparation of plans and estimates, legal
assistance, registration of documents, payment of
taxes and service charges , etc…. Is called complete
estimate.
Sub estimate
Sub estimate are being prepared for
each and every such items in detail
to ensure and see that the expense
towards these items do not exceed
the corresponding provisions already
made in the original estimate.
THANKING YOU

More Related Content

What's hot

Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
DhavalMithaiwala
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
RANJIT KUMAR PANDA
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
Simarpreet Singh
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
Janak Mehta
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
Kishor Ade
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
Waqas Aslam
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
Kailash Chander
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
Arpit Sethia
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Aabid Ansar
 
Rate analysis
Rate analysisRate analysis
Rate analysis
DhavalMithaiwala
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
Sakshi Kirar
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
Ashar Gill
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
AshwiniChaudhari13
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
Ganesh Tatikonda
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
Ar.Vijay Kumar
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
sonali parashar
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
Raj Shah
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil Engineering
Kailash Chander
 
rate analysis
rate analysisrate analysis
rate analysis
Ganesh Tatikonda
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
Shahin MB
 

What's hot (20)

Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil Engineering
 
rate analysis
rate analysisrate analysis
rate analysis
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 

Similar to Estimating & Costing - I

0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
Nat Rice
 
EQS - PREPARATION OF DPR, VALUATION & ACCOUNTING.ppt
EQS -  PREPARATION OF DPR, VALUATION & ACCOUNTING.pptEQS -  PREPARATION OF DPR, VALUATION & ACCOUNTING.ppt
EQS - PREPARATION OF DPR, VALUATION & ACCOUNTING.ppt
GovindarajuluBadana
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
2cd
 
Lec05.pptx
Lec05.pptxLec05.pptx
Lec05.pptx
AHMADAHMAD735251
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
Educational Learner
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
NaumanIjaz12
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
Himani762003
 
Estimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxEstimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptx
cricketreview
 
Ecv
EcvEcv
IV -I - EQS - .pptx
IV -I - EQS - .pptxIV -I - EQS - .pptx
IV -I - EQS - .pptx
GovindarajuluBadana
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
Padmasinh Patil
 
ECV All Chapters
ECV All ChaptersECV All Chapters
ECV All Chapters
Padmasinh Patil
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimate
LIJI A
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
lckr117
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
Shabaz Khan
 
Types of estimate - Estimation, Costing and Valuation Engineering
Types of estimate - Estimation, Costing and Valuation EngineeringTypes of estimate - Estimation, Costing and Valuation Engineering
Types of estimate - Estimation, Costing and Valuation Engineering
Shanmugasundaram N
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structures
Ayan Sengupta
 
Quantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsQuantity Survey and Estimation basic terms
Quantity Survey and Estimation basic terms
meghajain275
 
Fundamentals of estimating_and_costing
Fundamentals of estimating_and_costingFundamentals of estimating_and_costing
Fundamentals of estimating_and_costing
Prasad Manerikar
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
BALAMURUGANR53
 

Similar to Estimating & Costing - I (20)

0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
 
EQS - PREPARATION OF DPR, VALUATION & ACCOUNTING.ppt
EQS -  PREPARATION OF DPR, VALUATION & ACCOUNTING.pptEQS -  PREPARATION OF DPR, VALUATION & ACCOUNTING.ppt
EQS - PREPARATION OF DPR, VALUATION & ACCOUNTING.ppt
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
 
Lec05.pptx
Lec05.pptxLec05.pptx
Lec05.pptx
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
 
Estimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxEstimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptx
 
Ecv
EcvEcv
Ecv
 
IV -I - EQS - .pptx
IV -I - EQS - .pptxIV -I - EQS - .pptx
IV -I - EQS - .pptx
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
 
ECV All Chapters
ECV All ChaptersECV All Chapters
ECV All Chapters
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimate
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
Types of estimate - Estimation, Costing and Valuation Engineering
Types of estimate - Estimation, Costing and Valuation EngineeringTypes of estimate - Estimation, Costing and Valuation Engineering
Types of estimate - Estimation, Costing and Valuation Engineering
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structures
 
Quantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsQuantity Survey and Estimation basic terms
Quantity Survey and Estimation basic terms
 
Fundamentals of estimating_and_costing
Fundamentals of estimating_and_costingFundamentals of estimating_and_costing
Fundamentals of estimating_and_costing
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 

Recently uploaded

Keynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse CityKeynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse City
PJ Caposey
 
Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024
Friends of African Village Libraries
 
The Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptxThe Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptx
PriyaKumari928991
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
OH TEIK BIN
 
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
Nguyen Thanh Tu Collection
 
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
Nguyen Thanh Tu Collection
 
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Alexandra N. Martinez
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
khabri85
 
Observational Learning
Observational Learning Observational Learning
Observational Learning
sanamushtaq922
 
220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology
Kalna College
 
How to Create User Notification in Odoo 17
How to Create User Notification in Odoo 17How to Create User Notification in Odoo 17
How to Create User Notification in Odoo 17
Celine George
 
Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”
Taste
 
Post init hook in the odoo 17 ERP Module
Post init hook in the  odoo 17 ERP ModulePost init hook in the  odoo 17 ERP Module
Post init hook in the odoo 17 ERP Module
Celine George
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
Celine George
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
Derek Wenmoth
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
chaudharyreet2244
 
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
Kalna College
 
managing Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptxmanaging Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptx
nabaegha
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
indexPub
 
bryophytes.pptx bsc botany honours second semester
bryophytes.pptx bsc botany honours  second semesterbryophytes.pptx bsc botany honours  second semester
bryophytes.pptx bsc botany honours second semester
Sarojini38
 

Recently uploaded (20)

Keynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse CityKeynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse City
 
Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024
 
The Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptxThe Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptx
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
 
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
BỘ BÀI TẬP TEST THEO UNIT - FORM 2025 - TIẾNG ANH 12 GLOBAL SUCCESS - KÌ 1 (B...
 
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN TẬP VÀ PHÁT TRIỂN CÂU HỎI TRONG ĐỀ MINH HỌA THI TỐT NGHIỆP THPT ...
 
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
Dreamin in Color '24 - (Workshop) Design an API Specification with MuleSoft's...
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
 
Observational Learning
Observational Learning Observational Learning
Observational Learning
 
220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology220711130097 Tulip Samanta Concept of Information and Communication Technology
220711130097 Tulip Samanta Concept of Information and Communication Technology
 
How to Create User Notification in Odoo 17
How to Create User Notification in Odoo 17How to Create User Notification in Odoo 17
How to Create User Notification in Odoo 17
 
Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”
 
Post init hook in the odoo 17 ERP Module
Post init hook in the  odoo 17 ERP ModulePost init hook in the  odoo 17 ERP Module
Post init hook in the odoo 17 ERP Module
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
 
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx78 Microsoft-Publisher - Sirin Sultana Bora.pptx
78 Microsoft-Publisher - Sirin Sultana Bora.pptx
 
managing Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptxmanaging Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptx
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
 
bryophytes.pptx bsc botany honours second semester
bryophytes.pptx bsc botany honours  second semesterbryophytes.pptx bsc botany honours  second semester
bryophytes.pptx bsc botany honours second semester
 

Estimating & Costing - I

  • 1.
  • 2. ESTIMATION Estimation or estimating is the process of calculating the quantities of various items of works involved in the project.
  • 3. ESTIMATE Estimate is a document which furnishes the quantities of different works involved, their rates and the expenditure anticipate in a project
  • 4. NECESSITY OF ESTIMATES  To know about the approximate cost of the building construction. To calculate the tax of the building To fix the rent of building The know about the various items of works involved in the building construction and arrange the available materials of the construction. To arrange the labours of the construction works. Take the approval for the government projects. To having the loan from the bank.
  • 5. QUANTITY SURVEYOR  Takking Off Quantities  Squaring Dimension And Calculating Of Quantity  Data (Calculation Of Rate Per Unit)  Abstract Estimate  Measurement Billing.
  • 6. DUTIES OF QUANTITY SURVEYOR The quantity surveyor must be well versed with the drawing of work. He should be able to read the drawing correctly and bill the quantities accurately. He should have the knowledge of the construction procedure He should be able to write the description of different works. He should able to prepare the schedule of the project He should be able to value all variations under the contract.
  • 7. TYPES OF ESTIMATE The estimates may be divided in to the following categories:- (1) Preliminary or Approximate estimate. (2) Rough cost estimate based on plinth area. (3) Rough cost estimate based on cubic contents. (4) Detailed estimate. (5) Annual repair estimate. (6) Special repair estimate. (7) Revised estimate (8) Supplementary estimate. (9)Complete estimate.
  • 8. 1. Preliminary or Approximate Estimate This estimate is prepared to decide financial aspect, policy and to give idea of the cost of the proposal to the competent sanctioning authority. It should clearly show the necessity of the proposal and how the cost has been arrived at . The estimate which is prepared using any rough method to get approximate cost of the construction anticipate in a project is called approximate estimate. The following documents should be attached with it. (a) Detailed report (b) Site plan of the proposal (c) It should also clearly mention about the acquisition of land, Provision of electric and water supply etc.
  • 9. 2. Plinth area Estimate (Based on Rough Cost) Plinth area of a building means Length x Breadth ( roofed portion only ) excluding plinth offsets. The estimates are prepared on the basis of plinth areas of the various buildings proposed to be constructed. The rates are being arrived at the dividing the total cost of construction with its plinth area. The following documents are attached with the estimate. (a) Line plan with brief specifications. (b) Cost of various services added i.e. electric and water supply etc. (c) North line should be shown clearly on line plan.
  • 10. 3. Detailed Estimate  After getting Administrative approval on rough cost estimate, detailed estimates are prepared.  The estimate which provide the itemwise quantities of works, itemwise unit rate and itemwise expenditure in the project is called detailed estimate.  In this, the estimate is divided in to sub-heads and quantities of various items are calculated individually.  The detailed estimate shall also provide for the cost of approach road, water supply, electric installations and acquisition of land etc., so as to call it a comprehensive estimate.
  • 11. 4. Cubic Contents Estimate  The cubic contents of a building means plinth area x height of the building. The height is taken from top of floor level to top of roof.  The cubic contents of the proposed building are multiplied with cubic rates arrived at for the similar construction i.e. total cost of construction divided by cubic contents = cost per cubic metre.
  • 12. 5. Annual maintenance estimate Annual maintenance estimates are being prepared by the concerned department for getting allocation of funds made in the annual budgets. In order to keep building and roads in perfect condition, annual repairs should be carried out as follow:-  (i) In case of a building-white washing, oiling and painting of doors and windows, cement plaster repairs (inside & outside), repairs of floors etc. In no case this annual repair amount should increase more that 11/2% to 2% of the capital cost of the building.  (ii) In case of a road-filling patches, maintenance of berms etc.
  • 13. 6. Special repair estimate If the work cannot be carried out of the annual repair funds due to certain reasons resulting in the genuine increase in cost, then special repairs estimate is to be prepared. The reason of increase may be:-  (i) In case of a building-opening of new doors, change of floors, plastering walls etc.  (ii) In case of roads-if the whole surface is full of corrugation & patches, then the total surface is to be scarified. The old metal is taken out, consolidation by adding more metal is done and top surface is repainted.
  • 14. 7. Revised estimate When the sanctioned estimate exceeds by 5% either due to the rate being found insufficient or due to some other reasons, a fresh estimate is prepared which is called a Revised Estimate. A comparative statement on the last page of the estimate is attached giving there in the reasons of the increase of cost in case of each item.
  • 15. 8. Supplementary Estimate This is fresh detailed estimate in addition to the original sanctioned estimate prepared when additional works are deemed necessary during the progress of a work to supplement the original works. The abstract of cost should show the amount of the original sanctioned estimate as well as the supplementary amount of the original sanctioned estimate as well as the supplementary amount for which sanction is required.
  • 16. 9.Complete estimate  The estimate which includes, in addition to the cost of construction, the cost of land, the expenses towards surveying, preparation of plans and estimates, legal assistance, registration of documents, payment of taxes and service charges , etc…. Is called complete estimate.
  • 17. Sub estimate Sub estimate are being prepared for each and every such items in detail to ensure and see that the expense towards these items do not exceed the corresponding provisions already made in the original estimate.