尊敬的 微信汇率:1円 ≈ 0.046239 元 支付宝汇率:1円 ≈ 0.04633元 [退出登录]
SlideShare a Scribd company logo
Prepared By
Prof. Ashish Makwana
Civil Engg. Dept.
Prof. Ashish Makwana 1
PRESENTATION
OUTLINE…
• Introduction
• Methods for making linear measurement
• Types of Chain
• Types of Tapes
• Terms related with chain surveying
• Point for selection of survey station + Operation in
chain surveying
Prof. Ashish Makwana 2
LINEAR
MEASUREMENT
2.
INSTRUMENT
USED IN
CHAINING
3.
CHAIN SURVEYING
4.
OPERATION IN
CHAIN SURVEYING
1.Chaining
2.Ranging
3.offfsetting
5.
OBSTACLES
6.
ERROR IN CHAINING
7.
TAPE
CORRECTION
1. INTRODUCTION
3Prof. Ashish Makwana
INTRODUCTION :-
What is Linear
measurement?
Measurement of
horizontal distance
between two points
on the surface of the
earth.
A---------------------B
4Prof. Ashish Makwana
ranging
rod at -A
Distance between A & B ,m
ranging rod
at -B
5
GROUND
Prof. Ashish Makwana
6
There are three methods for making
linear measurement :
Direct Methods
Optical Methods
E.D.M. Methods
Prof. Ashish Makwana
Direct Methods without instruments
1) Judging the distance
2) Pacing
3) Time interval
7Prof. Ashish Makwana
2) Pacing
8Prof. Ashish Makwana
9Prof. Ashish Makwana
Direct Methods with instruments
1) Chain
2) Odometer
3) Passometer
4) Pedometer
5) Speedometer
10Prof. Ashish Makwana
Chain
11
Engineer’s Chain
Prof. Ashish Makwana
Odometer
12
An Odometer is a simple device which can be attached to
the wheel of a bicycle or any such vehicle.
Prof. Ashish Makwana
oThe odometer registers the number of revolution
made by the wheel.
oThe distance covered is equal to the product of
the number of revolutions and the perimeter of
the wheel.
13Prof. Ashish Makwana
Passometer
14Prof. Ashish Makwana
The Passometer counts your steps
It is a small instrument which counts the number of paces.
15Prof. Ashish Makwana
Pedometer
16Prof. Ashish Makwana
17Prof. Ashish Makwana
The Pedometer measures distances
Pedometer directly gives the distance by multiplying the number of
paces with the average pace length of the person .
18Prof. Ashish Makwana
Speedometer
19
This is used in automobiles for measuring distances.
Prof. Ashish Makwana
• 1.Chain -
• 1.Metric
• 2.Gunter’s
• 3.Engineer’s
• 4.Revenue
• 5.Steel band or band chain
• 2.Tapes -
• 1.Cloth of linen tape
• 2.Fibre glass
• 3.Metallic tape
• 4.Steel
• 5.Invar tape
• 3.Arrow
• 4.Ranging rods and Offset rods
• 5.Pegs
• 6.Plumb bob
Instrument used
20Prof. Ashish Makwana
Types of Chain
Metric Chain : It Consists of galvanized mild steel wire of 4mm
diameter known as link.
• It is available in 20m, 30m, 50m length which consists of 100
links.
Gunter’s Chain : A 66 feet long chain consists of 100 links, each of
0.66 feet, it is known as Gunter’s chain.
• This chain is suitable for taking length in miles.
Engineer’s Chain : A 100 feet long chain consisting of 100 links
each of 1 feet is known as engineer’s chain.
• This chain is used to measure length in feet and area in sq.yard.
Revenue Chain : it is 33 feet long chain consisting of 16 links.
• This chain is used for distance measurements in feet & inches for
smaller areas.
21Prof. Ashish Makwana
22Prof. Ashish Makwana
23Prof. Ashish Makwana
24Prof. Ashish Makwana
Steel Band chain : It is more preferable than chains because they
are more accurate, but the disadvantage is that they get broken
easily and are difficult to repair in the field.
• They are 20 or 30 m long, 12 to 16 mm wide and 0.3 to 0.6 mm
thick.
Types of Tapes
Cloth tape or Linen Tape : they are woven linen and varnished
to resist moisture.
• They are generally 10m, 20m, 30m long and 12 to 15 mm wide.
Fibre tape : These tapes are similar to linen and plastic coated
tapes but these are made of Glass Fibre.
• These tapes are don’t stretch and shrink due to temperature.
• It is available in 20m, 30m and 50 m length.
25Prof. Ashish Makwana
Metallic Tape : A linen tape reinforced with brass or copper
wires to prevent the stretching or twisting of fibres is called a
metallic tape.
• It is commonly used for taking offsets in chain surveying.
Steel tape : It is made up with steel material and commonly
available in 20 m, 30m or 50m length.
• It is graduated in mt and cm.
Invar Tape : It is made of an alloy of nickel 36 % and steel 64 %
having very low thermal expansion. These are 6mm wide and
generally available in 30m, 50m and 100m.
26Prof. Ashish Makwana
Arrows :
• Arrows are made of tempered steel wire of dia 4mm. One end
of the arrow is bent into ring of diameter 50mm and other end
is pointed.
• Its overall length is 400mm. Arrows are used for counting the
number of chains while measuring chain line. And it is also
used to established a intermediate station.
Ranging Rods or Offset rods :
• Ranging rods are used for ranging some intermediate points on
the survey line.
• It is generally 2 to 3 m in length and are painted with alternate
bands of black and white or red colors with length of each
equalizing 20 cm.
• The offset rod is similar to the ranging rod with the expectation
that instead of the hook, a flag is provided at the top.
27Prof. Ashish Makwana
Pegs :
• Pegs are made of timber or steel and they are used to mark the
position of the stations or terminal points of survey line.
• Wooden pegs are 15cm long and driven in to the ground with
the help of hammer.
Plumb-Bob :
• It is used to transfer points on the ground. It is also used for
fixing the instruments exactly over the station point marked on
the ground by checking the center of the instrument whether
coincides with the center of the peg.
28Prof. Ashish Makwana
29Prof. Ashish Makwana
30Prof. Ashish Makwana
Chain
surveying
• In chain surveying - only linear measurement is
taken in the field – no angular measurement are
taken.
• Done for small area and work .
• 1.Locate boundary of plot / land
• 2.Locate existing features
• Area is divided in to network of triangles and
sides of triangles are measured directly with -
chain or tape.
• Principle of chain surveying :-
• Triangulation is the principle of chain surveying.
• Triangulation means - To divide area in to
network of well conditional triangles ( angles >
30° and < 120°) of suitable sides.
31Prof. Ashish Makwana
Main
Station -A
Main Station -D Main
Station -
C
Main
Station -B
BASE LINE
CHECK LINE
TIE LINE
MAIN SURVEY LINE
building
pond
32
temple
T2
T1
S2
S1
Prof. Ashish Makwana
ranging
rod at -A
Distance between A & B ,m
ranging rod
at -B
33
A
S2
S1
T2
T1
D
C
B
BASE LINE
CHECK LINE
TIE LINE
Prof. Ashish Makwana
ranging
rod at -A
Distance between A & B ,m
ranging rod
at -B
34
A
S2
S1
T2
T1
D
C
B
Offset
BASE LINE
CHECK LINE
TIE LINE
Prof. Ashish Makwana
Terms
related
with
chain
surveying
• (1) Survey station :- means points at the beginning and at the
end of a main survey line or chain line
• Types
• 1.Main station :-
• Taken along boundary of an area as control points
• Line joining main station – main survey line
• main survey line – should cover whole survey area
• Denoted by , with letter A,B, C,D, etc.
• 2.Subsidiary station :-
• Station on the – main survey line or any other survey lines
• Line joining subsidiary station – subsidiary survey line
• Taken to
• 1.divide area in to triangles.
• 2.Checking accuracy of triangles
• 3.Locating internal details
• Denoted by , with letter S1, S2, S3 etc.
35Prof. Ashish Makwana
Terms
related
with
chain
surveying
• 3.Tie station :-
• Taken on main survey line
• Line joining tie station tie line
• 1.Locating internal details
• Denoted by , with letter T1, T2, T3 etc.
• (2) Main survey line :-
• Line joining main station – called main survey line or chain
line.
• AB ,BC ,CD and DA -main survey line
• (3) Base line:-
• It creates frame work of survey is built
• Most imp line
• longest of main survey line is considered as base line
• Taken through level ground & measure accurately.
36Prof. Ashish Makwana
Terms
related
with
chain
surveying
• (4) Check line :-
• Line joining apex point of triangle to some fixed points on its
base.
• 1.Check accuracy of triangles
• 2.Locate internal details
• CS1 , AS2 etc.- check line
• (3) Tie line:-
• Line joining tie station
• 1.Avoid long offset
• 2.Locate internal details – which are far away form main line
• T1T2 – tie line
37Prof. Ashish Makwana
Point for
selection
of survey
station
+
Operation
in chain
surveying
• 1.Station – should be intervisible
• 2.Should be minimum
• 3.Should form well conditional triangle
• 4.Should be so located to form – base , check, and tie – line
• 5.Selected within the boundary of survey area
• 6.Taken through level ground.
• Operation in chain surveying
• 1.Chaining
• 2.Ranging
• 3.Offseting
38Prof. Ashish Makwana
THANK YOU
39Prof. Ashish Makwana

More Related Content

What's hot

Levelling
LevellingLevelling
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
GAURAV. H .TANDON
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
Muhammad Usman
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
Self-employed
 
Area & Volume
Area & VolumeArea & Volume
Area & Volume
GAURAV. H .TANDON
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
Umarfarook Momin
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
Gokul Saud
 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1
Decentumang
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
Sujith Velloor Sudarsanakumar Nair
 
Linear measurement for surveying by chaining
Linear measurement for surveying by chainingLinear measurement for surveying by chaining
Linear measurement for surveying by chaining
Shree Swami atmanand saraswati inst. of technology, surat
 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouring
Abdul Majid
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
Krish Bhavsar
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
GAURAV. H .TANDON
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Rakesh Verma
 
Levelling
LevellingLevelling
SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033
MOHANAHARIHARAN R
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
neharajpl
 
Levelling
LevellingLevelling
Contouring
ContouringContouring
Contouring
syedalikhan2009
 
INTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYINGINTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYING
farhana saiyed
 

What's hot (20)

Levelling
LevellingLevelling
Levelling
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Area & Volume
Area & VolumeArea & Volume
Area & Volume
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
 
Linear measurement for surveying by chaining
Linear measurement for surveying by chainingLinear measurement for surveying by chaining
Linear measurement for surveying by chaining
 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouring
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Levelling
LevellingLevelling
Levelling
 
SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Levelling
LevellingLevelling
Levelling
 
Contouring
ContouringContouring
Contouring
 
INTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYINGINTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYING
 

Similar to Chain survey_Surveying, Civil Engineering

Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil Engineering
A Makwana
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
Nirant Patel
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Rai University
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Rai University
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
KHUSHBU SHAH
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
PAAVAI ENGINEERING COLLEGE
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
Kamal B
 
chain.pptx
chain.pptxchain.pptx
chain.pptx
AshishJadhav655553
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Parimal Jha
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
Zewdu Minwuye Dessie
 
2.2 linear measurement
2.2 linear measurement2.2 linear measurement
2.2 linear measurement
Digvijaysinh Gohil
 
Linear measurement
Linear measurement Linear measurement
Linear measurement
RAMPRASAD KUMAWAT
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
Mujeeb Muji
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
AsadKhan606012
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
Ashok Narisetti
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manuals
avineshgautam
 
Linear measurement
Linear measurementLinear measurement
Surveying
SurveyingSurveying
Surveying
PRATAPBAISNAB
 
L5 measurement of screw thread
L5 measurement of screw threadL5 measurement of screw thread
L5 measurement of screw thread
taruian
 
2-Linear-Measurements.pptx
2-Linear-Measurements.pptx2-Linear-Measurements.pptx
2-Linear-Measurements.pptx
ojjeswigautam
 

Similar to Chain survey_Surveying, Civil Engineering (20)

Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil Engineering
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
 
chain.pptx
chain.pptxchain.pptx
chain.pptx
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
 
2.2 linear measurement
2.2 linear measurement2.2 linear measurement
2.2 linear measurement
 
Linear measurement
Linear measurement Linear measurement
Linear measurement
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manuals
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Surveying
SurveyingSurveying
Surveying
 
L5 measurement of screw thread
L5 measurement of screw threadL5 measurement of screw thread
L5 measurement of screw thread
 
2-Linear-Measurements.pptx
2-Linear-Measurements.pptx2-Linear-Measurements.pptx
2-Linear-Measurements.pptx
 

More from A Makwana

Attributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewAttributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a review
A Makwana
 
A Review on Thin-shell Structures: Advances and Trends
A Review on Thin-shell Structures: Advances and TrendsA Review on Thin-shell Structures: Advances and Trends
A Review on Thin-shell Structures: Advances and Trends
A Makwana
 
Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...
Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...
Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...
A Makwana
 
Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)
A Makwana
 
Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...
Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...
Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...
A Makwana
 
Economical Concrete
Economical ConcreteEconomical Concrete
Economical Concrete
A Makwana
 
Bacterial Concrete
Bacterial ConcreteBacterial Concrete
Bacterial Concrete
A Makwana
 
Risk in PPP Projects
Risk in PPP ProjectsRisk in PPP Projects
Risk in PPP Projects
A Makwana
 
Eco-Friendly Mortar
Eco-Friendly MortarEco-Friendly Mortar
Eco-Friendly Mortar
A Makwana
 
Risk Management: High Rise Construction
Risk Management: High Rise ConstructionRisk Management: High Rise Construction
Risk Management: High Rise Construction
A Makwana
 
Infrastructure Engineering & Management
Infrastructure Engineering & ManagementInfrastructure Engineering & Management
Infrastructure Engineering & Management
A Makwana
 
Utilization of Industrial Waste in Pervious Concrete
Utilization of Industrial Waste in Pervious ConcreteUtilization of Industrial Waste in Pervious Concrete
Utilization of Industrial Waste in Pervious Concrete
A Makwana
 
Application of Graphs through MS Excel & MATLAB for Research work
Application of Graphs through MS Excel & MATLAB for Research workApplication of Graphs through MS Excel & MATLAB for Research work
Application of Graphs through MS Excel & MATLAB for Research work
A Makwana
 
Ready Mixed Concrete Selection through Management Approach
Ready Mixed Concrete Selection through Management ApproachReady Mixed Concrete Selection through Management Approach
Ready Mixed Concrete Selection through Management Approach
A Makwana
 
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
A Makwana
 
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUESEXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
A Makwana
 
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACHDEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
A Makwana
 
ANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRY
ANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRYANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRY
ANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRY
A Makwana
 
INTELLIGENT BUILDING NEW ERA OF TODAYS WORLD
INTELLIGENT BUILDING NEW ERA OF TODAYS WORLDINTELLIGENT BUILDING NEW ERA OF TODAYS WORLD
INTELLIGENT BUILDING NEW ERA OF TODAYS WORLD
A Makwana
 
POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...
POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...
POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...
A Makwana
 

More from A Makwana (20)

Attributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewAttributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a review
 
A Review on Thin-shell Structures: Advances and Trends
A Review on Thin-shell Structures: Advances and TrendsA Review on Thin-shell Structures: Advances and Trends
A Review on Thin-shell Structures: Advances and Trends
 
Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...
Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...
Soft Computing: Autoclaved Aerated Concrete Block using Chi-Square Test throu...
 
Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)
 
Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...
Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...
Poster Presentation: An Integrated Approach for Enhancing Ready Mixed Concret...
 
Economical Concrete
Economical ConcreteEconomical Concrete
Economical Concrete
 
Bacterial Concrete
Bacterial ConcreteBacterial Concrete
Bacterial Concrete
 
Risk in PPP Projects
Risk in PPP ProjectsRisk in PPP Projects
Risk in PPP Projects
 
Eco-Friendly Mortar
Eco-Friendly MortarEco-Friendly Mortar
Eco-Friendly Mortar
 
Risk Management: High Rise Construction
Risk Management: High Rise ConstructionRisk Management: High Rise Construction
Risk Management: High Rise Construction
 
Infrastructure Engineering & Management
Infrastructure Engineering & ManagementInfrastructure Engineering & Management
Infrastructure Engineering & Management
 
Utilization of Industrial Waste in Pervious Concrete
Utilization of Industrial Waste in Pervious ConcreteUtilization of Industrial Waste in Pervious Concrete
Utilization of Industrial Waste in Pervious Concrete
 
Application of Graphs through MS Excel & MATLAB for Research work
Application of Graphs through MS Excel & MATLAB for Research workApplication of Graphs through MS Excel & MATLAB for Research work
Application of Graphs through MS Excel & MATLAB for Research work
 
Ready Mixed Concrete Selection through Management Approach
Ready Mixed Concrete Selection through Management ApproachReady Mixed Concrete Selection through Management Approach
Ready Mixed Concrete Selection through Management Approach
 
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
 
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUESEXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
EXPANSION JOINT TREATMENT: MATERIAL & TECHNIQUES
 
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACHDEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
 
ANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRY
ANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRYANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRY
ANTI-TERMITE TREATMENT: NEED OF CONSTRUCTION INDUSTRY
 
INTELLIGENT BUILDING NEW ERA OF TODAYS WORLD
INTELLIGENT BUILDING NEW ERA OF TODAYS WORLDINTELLIGENT BUILDING NEW ERA OF TODAYS WORLD
INTELLIGENT BUILDING NEW ERA OF TODAYS WORLD
 
POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...
POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...
POSTER PRESENTATION_BRICKS SELECTION THROUGH MANAGEMENT APPROACH BY AHP, RII,...
 

Recently uploaded

INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
dulbh kashyap
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine
 
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEERDELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
EMERSON EDUARDO RODRIGUES
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
tanujaharish2
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 

Recently uploaded (20)

INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
 
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEERDELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
DELTA V MES EMERSON EDUARDO RODRIGUES ENGINEER
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 

Chain survey_Surveying, Civil Engineering

  • 1. Prepared By Prof. Ashish Makwana Civil Engg. Dept. Prof. Ashish Makwana 1
  • 2. PRESENTATION OUTLINE… • Introduction • Methods for making linear measurement • Types of Chain • Types of Tapes • Terms related with chain surveying • Point for selection of survey station + Operation in chain surveying Prof. Ashish Makwana 2
  • 3. LINEAR MEASUREMENT 2. INSTRUMENT USED IN CHAINING 3. CHAIN SURVEYING 4. OPERATION IN CHAIN SURVEYING 1.Chaining 2.Ranging 3.offfsetting 5. OBSTACLES 6. ERROR IN CHAINING 7. TAPE CORRECTION 1. INTRODUCTION 3Prof. Ashish Makwana
  • 4. INTRODUCTION :- What is Linear measurement? Measurement of horizontal distance between two points on the surface of the earth. A---------------------B 4Prof. Ashish Makwana
  • 5. ranging rod at -A Distance between A & B ,m ranging rod at -B 5 GROUND Prof. Ashish Makwana
  • 6. 6 There are three methods for making linear measurement : Direct Methods Optical Methods E.D.M. Methods Prof. Ashish Makwana
  • 7. Direct Methods without instruments 1) Judging the distance 2) Pacing 3) Time interval 7Prof. Ashish Makwana
  • 10. Direct Methods with instruments 1) Chain 2) Odometer 3) Passometer 4) Pedometer 5) Speedometer 10Prof. Ashish Makwana
  • 12. Odometer 12 An Odometer is a simple device which can be attached to the wheel of a bicycle or any such vehicle. Prof. Ashish Makwana
  • 13. oThe odometer registers the number of revolution made by the wheel. oThe distance covered is equal to the product of the number of revolutions and the perimeter of the wheel. 13Prof. Ashish Makwana
  • 15. The Passometer counts your steps It is a small instrument which counts the number of paces. 15Prof. Ashish Makwana
  • 18. The Pedometer measures distances Pedometer directly gives the distance by multiplying the number of paces with the average pace length of the person . 18Prof. Ashish Makwana
  • 19. Speedometer 19 This is used in automobiles for measuring distances. Prof. Ashish Makwana
  • 20. • 1.Chain - • 1.Metric • 2.Gunter’s • 3.Engineer’s • 4.Revenue • 5.Steel band or band chain • 2.Tapes - • 1.Cloth of linen tape • 2.Fibre glass • 3.Metallic tape • 4.Steel • 5.Invar tape • 3.Arrow • 4.Ranging rods and Offset rods • 5.Pegs • 6.Plumb bob Instrument used 20Prof. Ashish Makwana
  • 21. Types of Chain Metric Chain : It Consists of galvanized mild steel wire of 4mm diameter known as link. • It is available in 20m, 30m, 50m length which consists of 100 links. Gunter’s Chain : A 66 feet long chain consists of 100 links, each of 0.66 feet, it is known as Gunter’s chain. • This chain is suitable for taking length in miles. Engineer’s Chain : A 100 feet long chain consisting of 100 links each of 1 feet is known as engineer’s chain. • This chain is used to measure length in feet and area in sq.yard. Revenue Chain : it is 33 feet long chain consisting of 16 links. • This chain is used for distance measurements in feet & inches for smaller areas. 21Prof. Ashish Makwana
  • 25. Steel Band chain : It is more preferable than chains because they are more accurate, but the disadvantage is that they get broken easily and are difficult to repair in the field. • They are 20 or 30 m long, 12 to 16 mm wide and 0.3 to 0.6 mm thick. Types of Tapes Cloth tape or Linen Tape : they are woven linen and varnished to resist moisture. • They are generally 10m, 20m, 30m long and 12 to 15 mm wide. Fibre tape : These tapes are similar to linen and plastic coated tapes but these are made of Glass Fibre. • These tapes are don’t stretch and shrink due to temperature. • It is available in 20m, 30m and 50 m length. 25Prof. Ashish Makwana
  • 26. Metallic Tape : A linen tape reinforced with brass or copper wires to prevent the stretching or twisting of fibres is called a metallic tape. • It is commonly used for taking offsets in chain surveying. Steel tape : It is made up with steel material and commonly available in 20 m, 30m or 50m length. • It is graduated in mt and cm. Invar Tape : It is made of an alloy of nickel 36 % and steel 64 % having very low thermal expansion. These are 6mm wide and generally available in 30m, 50m and 100m. 26Prof. Ashish Makwana
  • 27. Arrows : • Arrows are made of tempered steel wire of dia 4mm. One end of the arrow is bent into ring of diameter 50mm and other end is pointed. • Its overall length is 400mm. Arrows are used for counting the number of chains while measuring chain line. And it is also used to established a intermediate station. Ranging Rods or Offset rods : • Ranging rods are used for ranging some intermediate points on the survey line. • It is generally 2 to 3 m in length and are painted with alternate bands of black and white or red colors with length of each equalizing 20 cm. • The offset rod is similar to the ranging rod with the expectation that instead of the hook, a flag is provided at the top. 27Prof. Ashish Makwana
  • 28. Pegs : • Pegs are made of timber or steel and they are used to mark the position of the stations or terminal points of survey line. • Wooden pegs are 15cm long and driven in to the ground with the help of hammer. Plumb-Bob : • It is used to transfer points on the ground. It is also used for fixing the instruments exactly over the station point marked on the ground by checking the center of the instrument whether coincides with the center of the peg. 28Prof. Ashish Makwana
  • 31. Chain surveying • In chain surveying - only linear measurement is taken in the field – no angular measurement are taken. • Done for small area and work . • 1.Locate boundary of plot / land • 2.Locate existing features • Area is divided in to network of triangles and sides of triangles are measured directly with - chain or tape. • Principle of chain surveying :- • Triangulation is the principle of chain surveying. • Triangulation means - To divide area in to network of well conditional triangles ( angles > 30° and < 120°) of suitable sides. 31Prof. Ashish Makwana
  • 32. Main Station -A Main Station -D Main Station - C Main Station -B BASE LINE CHECK LINE TIE LINE MAIN SURVEY LINE building pond 32 temple T2 T1 S2 S1 Prof. Ashish Makwana
  • 33. ranging rod at -A Distance between A & B ,m ranging rod at -B 33 A S2 S1 T2 T1 D C B BASE LINE CHECK LINE TIE LINE Prof. Ashish Makwana
  • 34. ranging rod at -A Distance between A & B ,m ranging rod at -B 34 A S2 S1 T2 T1 D C B Offset BASE LINE CHECK LINE TIE LINE Prof. Ashish Makwana
  • 35. Terms related with chain surveying • (1) Survey station :- means points at the beginning and at the end of a main survey line or chain line • Types • 1.Main station :- • Taken along boundary of an area as control points • Line joining main station – main survey line • main survey line – should cover whole survey area • Denoted by , with letter A,B, C,D, etc. • 2.Subsidiary station :- • Station on the – main survey line or any other survey lines • Line joining subsidiary station – subsidiary survey line • Taken to • 1.divide area in to triangles. • 2.Checking accuracy of triangles • 3.Locating internal details • Denoted by , with letter S1, S2, S3 etc. 35Prof. Ashish Makwana
  • 36. Terms related with chain surveying • 3.Tie station :- • Taken on main survey line • Line joining tie station tie line • 1.Locating internal details • Denoted by , with letter T1, T2, T3 etc. • (2) Main survey line :- • Line joining main station – called main survey line or chain line. • AB ,BC ,CD and DA -main survey line • (3) Base line:- • It creates frame work of survey is built • Most imp line • longest of main survey line is considered as base line • Taken through level ground & measure accurately. 36Prof. Ashish Makwana
  • 37. Terms related with chain surveying • (4) Check line :- • Line joining apex point of triangle to some fixed points on its base. • 1.Check accuracy of triangles • 2.Locate internal details • CS1 , AS2 etc.- check line • (3) Tie line:- • Line joining tie station • 1.Avoid long offset • 2.Locate internal details – which are far away form main line • T1T2 – tie line 37Prof. Ashish Makwana
  • 38. Point for selection of survey station + Operation in chain surveying • 1.Station – should be intervisible • 2.Should be minimum • 3.Should form well conditional triangle • 4.Should be so located to form – base , check, and tie – line • 5.Selected within the boundary of survey area • 6.Taken through level ground. • Operation in chain surveying • 1.Chaining • 2.Ranging • 3.Offseting 38Prof. Ashish Makwana
  翻译: