This document provides details about the planning and design of a reinforced concrete bridge at Challathadi, Aivarnadu. A team of civil engineering students conducted surveys of the site, designed a T-beam bridge using limit state methods, and created drawings, estimates, and a model. They reviewed literature on bridge design and failure factors. The objective was to plan, analyze, and design an RCC bridge to connect local villages. The methodology included site visits, surveys, fixation of dimensions, AutoCAD drawings, manual design, estimation, and model making. The work was carried out from December to March under the guidance of a professor.