GHCL Limited implemented several automation projects to improve data collection and entry processes across various textile departments. This reduced paperwork, duplicate data entry, and reliance on skilled users. Specifically: 1) A weaving automation project transferred loom machine data to SAP online, reducing data collection time from 4 hours to 10 minutes per shift. 2) An inspection automation project uploaded inspection machine data directly to SAP via an interface, reducing data entry time from 20 minutes to fully automated and requiring only one operator per shift. 3) A cutting automation project allowed online data entry at cutting machines with validation, eliminating the need for a data entry operator. 4) A madeups automation project was being implemented to similarly