M. Sumair Hassan Reg. #: 2015-ME-431
Page | 1
Project management and Economics
Title:
To develop a Statement of Work for the Designing and fabrication of a solar water heater
with minimum manufacturing cost, providing maximum temperature.
Submitted By: Muhammad Sumair Hassan (2015-ME-431)
Project Advisor: Engr. Ehtisham Riaz
Submission date: 13-April-2018
Department Of Mechanical Engineering
University of Engineering and Technology Lahore
(RCET Campus)
M. Sumair Hassan Reg. #: 2015-ME-431
Page | 2
Project management and Economics
Table of Contents
1. Statement of Work.................................................................................................................... 3
a.) The Purpose Statement: ...................................................................................................... 3
b.) The Scope Statement:.......................................................................................................... 3
c.) The Project Deliverables: .................................................................................................... 3
d.) The Goals and Objectives: .................................................................................................. 3
e.) The Cost and Schedule Estimates: ..................................................................................... 3
f.) The list of stakeholders: ....................................................................................................... 4
g.) Assumptions and Agreements: ........................................................................................... 4
h.) The Communication Plan:.................................................................................................. 4
2. Precedence Diagram and Gantt Chart: .................................................................................. 5
a.) Project Action plan:............................................................................................................. 5
b.) Precedence Network Diagram using Activities on Nodes (AON): .................................. 5
c.) Gantt Chart: ......................................................................................................................... 6
3. Memo: ........................................................................................................................................ 7
M. Sumair Hassan Reg. #: 2015-ME-431
Page | 3
Project management and Economics
1. Statement of Work
a.) The Purpose Statement:
The purpose of this Project is to design and fabricate a water heating system, Aqua or
Water lens utilizing Sun as renewable energy source. Design would be made as simple as
possible, portable with no complexities involved and conveniently useable even by a non-
technical person.
b.) The Scope Statement:
The scope of this project is to develop a heat generating system that can generate high
temperature with minimum amount of costing. This Solar water heating system will be designed
from commonly available cheap materials (wood, plastic sheet, etc.) and fabricated in such a way
so as to give maximum efficiency.
c.) The Project Deliverables:
The successful completion of this project will be able to deliver a Water Lens that would
generate a temperature of 700
C within 20 minutes of time. It will be a portable device that can be
used conveniently used in remote areas.
d.) The Goals and Objectives:
This project is aimed to produce a cost-effective and efficient heat generating system that
can be used for purification of water. As most of the Bacteria and pathogens die at 500
C so it
would be useful in backward areas where there is lack of adequate supply of clean water.
e.) The Cost and Schedule Estimates:
Cost Estimates for this project are as follow:
Sr. # Material Cost (Rupees)
1. Wood 350
2. Polyvinyl Plastic Sheet 250 ×2
3. Water Vessel 100
4. Insulation material 150
5. Labor/hour 150×4
6. Miscellaneous 150
Net-cost = 1850 Rs.
Tentative Schedule of carrying out this project is as follow:
Sr. # Activity Date
1. Preliminary Design Report 01-Jan-2018
2. Detailed Design Report 10-Jan-2018
3. Testing and Evaluation 17-Jan-2018
4. Complete Fabrication 30-Jan-2018
M. Sumair Hassan Reg. #: 2015-ME-431
Page | 4
Project management and Economics
f.) The list of stakeholders:
The key stakeholders in this project are as follow:
Key Stakeholders
Muhammad Sumair Hassan Project Manager
Shaheer Amjad Resource Manager
Muhammad Saad Khan Project Designer
Adnan Iqbal Testing and Evaluation Manager
Tanseer Hyder Project Support Member
Abdullah Akbar Project Support Member
g.) Assumptions and Agreements:
To allow the Project to be executed conveniently, following assumptions and agreements
must be followed:
1. Design approach:
The design approach to be followed should be simple,
cost-effective and must be feasible for project.
2.
Budget-Controlled
Project:
Material and any other labor cost must not exceed
Project Budget.
3. Scheduled Tasks:
A schedule assigned to any task will not be changed and
task must be completed within its time-frame.
4.
Safety
Responsibility:
All members involved in this project must follow safety
precautions. They will be responsible themselves for
their safety.
h.) The Communication Plan:
Deliverable Info Recipient Delivery Method Schedule
Responsible
Member
Project Information Project Team
E-mail,
Conference call,
Meeting
On-going Project Designer
Project Status Project Manager Meeting, E-mail Every Thursday
Project Support
Member
Testing
Information
Project Manager E-mail Weekly
Testing and
Evaluation
Manager
Material
Requirements
Project Designer E-mail, Meeting On-going
Resource
Manager
Project Timeline Project Manager E-mail Bi-Weekly Project Manager
Project Risks Project Manager
E-mail,
Conference call,
Meeting
On-going Project Manager
M. Sumair Hassan Reg. #: 2015-ME-431
Page | 5
Project management and Economics
2. Precedence Diagram and Gantt Chart:
a.) Project Action plan:
Designation Task Precedence Responsibility
Time
(days)
Resources Outcome
A
Working out
the Design
Concept:
-
Project leader
(M. Sumair
hassan)
7
Research Papers,
Books and Internet
Successfully
Formed idea
to work out
the plan
B
3d Modeling
of Project
Design:
A
Member
(Saad Khan)
3 Solidworks
Successfully
prepared 3d
model
C
Fulfilling the
Material
needs:
A
Members
(Saad Khan and
Tanseer Hyder)
3 Market
Successfully
gathered
required
material
D
Constructing
Aqua Lens:
B,C
Members
(Rai Adnan and
Shaheer Amjad)
5 Workshop
Success
(A little
change in
size required)
E
Testing the
Project:
D All members 7
A bright day/Shining
Sun
Successfully
tested Aqua
Lens
F
Modifying the
Design:
E
Members
(Saad khan and
Abdullah Akbar)
3 Research paper
Successfully
modified the
Design
G
Writing
Project
Report:
D,E,F
Project leader
(M. Sumair
Hassan)
2
Computer/Microsoft
Office
Report
Successfully
Written
b.) Precedence Network Diagram using Activity on Nodes (AON):
START A
FB
D
E
C
G END
M. Sumair Hassan Reg. #: 2015-ME-431
Page | 6
Project management and Economics
c.) Gantt Chart:
Gantt Chart for this Project Action Plan is as follow:
Task Designation Start Date Finish Date Duration
Task A 1-Jan-18 8-Jan-18 7
Task B 8-Jan-18 10-Jan-18 3
Task C 11-Jan-18 13-Jan-18 3
Task D 14-Jan-18 18-Jan-18 5
Task E 19-Jan-18 25-Jan-18 7
Task F 26-Jan-18 28-Jan-18 3
Task G 29-Jan-18 31-Jan-18 2
1-Jan-18
2-Jan-18
3-Jan-18
4-Jan-18
5-Jan-18
6-Jan-18
7-Jan-18
8-Jan-18
9-Jan-18
10-Jan-18
11-Jan-18
12-Jan-18
13-Jan-18
14-Jan-18
15-Jan-18
16-Jan-18
17-Jan-18
18-Jan-18
19-Jan-18
20-Jan-18
21-Jan-18
22-Jan-18
23-Jan-18
24-Jan-18
25-Jan-18
26-Jan-18
27-Jan-18
28-Jan-18
29-Jan-18
30-Jan-18
31-Jan-18
1-Feb-18
2-Feb-18
Task A
Task B
Task C
Task D
Task E
Task F
Task G
M. Sumair Hassan Reg. #: 2015-ME-431
Page | 7
Project management and Economics
3. Memo:
TO: Engr. Ehtisham Riaz.
FROM: M. Sumair Hassan.
SUBJECT: To write a reflective memo of the Project Statement of Work (SoW).
DATE: 13-April-2018
By writing the Project Statement of Work, I was able to look deep into the nature of a
Project and covered many different factors that can either make the project successful or lead to
the failure of a Project. Anyone writing the Statement of Work can easily determine the
feasibility of the project.
Without wasting much time, this document (SoW) can tell us whether the Project is
within the Defined Scope and will be able to provide Required Deliverables or not. Everything
being well pre-planned in Statement of Work makes the Project Actions easy to be followed
with Minimum Risk.
One of the most useful learning outcome of this Project was the use of Precedence
Networking Diagram. The use of these networking diagrams makes it easy to recognize what
needs to be done first in order to allow the smooth execution of all the Project activities.
The important aspect of this project was the Practical use of Gantt Chart. The use of this
Graphical Scheduling Technique solved most the difficulties in executing project tasks within
their required time-frame.
This Project was quite helpful in developing my Project Management and Formal
Document Writing Skills. This project gave me a thorough understanding of handling
different situations like “What to Do” and “When to Do” when working as Team.

More Related Content

What's hot

PROJECT CHARTER
PROJECT CHARTERPROJECT CHARTER
PROJECT CHARTER
Muneeb HaXan
 
Epc for module mm1 mm2 baseline schedule level 3
Epc for module mm1  mm2  baseline schedule level 3Epc for module mm1  mm2  baseline schedule level 3
Epc for module mm1 mm2 baseline schedule level 3
robotbietcuoi
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
Mujahid Ali Akhtar
 
Software Project Management: Project Summary
Software Project Management: Project SummarySoftware Project Management: Project Summary
Software Project Management: Project Summary
Minhas Kamal
 
Design engineering - II (A) report
Design engineering - II (A) reportDesign engineering - II (A) report
Design engineering - II (A) report
AshishBhadani4
 
MY SIWES REPORT
MY SIWES REPORTMY SIWES REPORT
MY SIWES REPORT
Ayo Odomo mtn
 
DevTools at Netflix: Culture, Speed & Innovation
DevTools at Netflix: Culture, Speed & InnovationDevTools at Netflix: Culture, Speed & Innovation
DevTools at Netflix: Culture, Speed & Innovation
Atlassian
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
MD SABBIR SHARIF
 
Project Planning Scheduling
Project Planning SchedulingProject Planning Scheduling
Project Planning Scheduling
Sadhanandavel Ramdoss
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and Differences
Ricardo Viana Vargas
 
SIWES REPORT SAMPLE
SIWES REPORT SAMPLESIWES REPORT SAMPLE
SIWES REPORT SAMPLE
Fejiro Iluezi-Ogbaudu
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
ssuserb4074f
 
Project Management
Project ManagementProject Management
Project Management
Dustin Morgan
 
project management entrance exam content.pdf
project management entrance exam content.pdfproject management entrance exam content.pdf
project management entrance exam content.pdf
baabaadur
 
Project charter - website design
Project charter - website designProject charter - website design
Project charter - website design
Dave Jones
 
Project management by MS Project 2010
Project management by MS Project 2010Project management by MS Project 2010
Project management by MS Project 2010
Wadhwani Foundation
 
Mohit's Project Poster Presentation
Mohit's Project Poster PresentationMohit's Project Poster Presentation
Mohit's Project Poster Presentation
Mohit Kumar Srivastava
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
Casual Project Management
 
MS Project
MS ProjectMS Project
MS Project
Mustafa Sonasath
 
Advanced Work Packaging: Applying Project Controls
Advanced Work Packaging: Applying Project ControlsAdvanced Work Packaging: Applying Project Controls
Advanced Work Packaging: Applying Project Controls
The Advanced Work Packaging Institute
 

What's hot (20)

PROJECT CHARTER
PROJECT CHARTERPROJECT CHARTER
PROJECT CHARTER
 
Epc for module mm1 mm2 baseline schedule level 3
Epc for module mm1  mm2  baseline schedule level 3Epc for module mm1  mm2  baseline schedule level 3
Epc for module mm1 mm2 baseline schedule level 3
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Software Project Management: Project Summary
Software Project Management: Project SummarySoftware Project Management: Project Summary
Software Project Management: Project Summary
 
Design engineering - II (A) report
Design engineering - II (A) reportDesign engineering - II (A) report
Design engineering - II (A) report
 
MY SIWES REPORT
MY SIWES REPORTMY SIWES REPORT
MY SIWES REPORT
 
DevTools at Netflix: Culture, Speed & Innovation
DevTools at Netflix: Culture, Speed & InnovationDevTools at Netflix: Culture, Speed & Innovation
DevTools at Netflix: Culture, Speed & Innovation
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project Planning Scheduling
Project Planning SchedulingProject Planning Scheduling
Project Planning Scheduling
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and Differences
 
SIWES REPORT SAMPLE
SIWES REPORT SAMPLESIWES REPORT SAMPLE
SIWES REPORT SAMPLE
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
 
Project Management
Project ManagementProject Management
Project Management
 
project management entrance exam content.pdf
project management entrance exam content.pdfproject management entrance exam content.pdf
project management entrance exam content.pdf
 
Project charter - website design
Project charter - website designProject charter - website design
Project charter - website design
 
Project management by MS Project 2010
Project management by MS Project 2010Project management by MS Project 2010
Project management by MS Project 2010
 
Mohit's Project Poster Presentation
Mohit's Project Poster PresentationMohit's Project Poster Presentation
Mohit's Project Poster Presentation
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
 
MS Project
MS ProjectMS Project
MS Project
 
Advanced Work Packaging: Applying Project Controls
Advanced Work Packaging: Applying Project ControlsAdvanced Work Packaging: Applying Project Controls
Advanced Work Packaging: Applying Project Controls
 

Similar to To develop a statement of work for the designing and fabrication of a solar water heater with minimum manufacturing cost, providing maximum temperature.

Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
Sharon Yu Jung Lim
 
76 s201905
76 s20190576 s201905
76 s201905
IJRAT
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET Journal
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET Journal
 
Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...
Emre Dirlik
 
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
IRJET Journal
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
 
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
Sagar Kaptan
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
JamesMoy7
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET Journal
 
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET Journal
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET Journal
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
ACHAL JOSHI
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
suzzanekan
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
Nishant Pandey
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javed
Waqar Ahmed
 
B1303020508
B1303020508B1303020508
B1303020508
IOSR Journals
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
#win(ashwin) Work
 
Project background
Project backgroundProject background
Project background
Nicholas Yap Wei Tyng
 

Similar to To develop a statement of work for the designing and fabrication of a solar water heater with minimum manufacturing cost, providing maximum temperature. (20)

Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
 
76 s201905
76 s20190576 s201905
76 s201905
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
 
Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...
 
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
 
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javed
 
B1303020508
B1303020508B1303020508
B1303020508
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
 
Project background
Project backgroundProject background
Project background
 

More from Peachy Essay

Internship Experience at Eracew Limited - Ghana
Internship Experience at Eracew Limited - GhanaInternship Experience at Eracew Limited - Ghana
Internship Experience at Eracew Limited - Ghana
Peachy Essay
 
Kraft Heinz
Kraft HeinzKraft Heinz
Kraft Heinz
Peachy Essay
 
Healthcare Technology in Nursing
Healthcare Technology in NursingHealthcare Technology in Nursing
Healthcare Technology in Nursing
Peachy Essay
 
THE PROBLEM OF CHINA’S AGING POPULATION
THE PROBLEM OF CHINA’S AGING POPULATIONTHE PROBLEM OF CHINA’S AGING POPULATION
THE PROBLEM OF CHINA’S AGING POPULATION
Peachy Essay
 
ILLEGAL IMMIGRATION IN UNITED KINGDOM
ILLEGAL IMMIGRATION IN UNITED KINGDOMILLEGAL IMMIGRATION IN UNITED KINGDOM
ILLEGAL IMMIGRATION IN UNITED KINGDOM
Peachy Essay
 
Patient/Family Discharge Teaching Plan
Patient/Family Discharge Teaching Plan Patient/Family Discharge Teaching Plan
Patient/Family Discharge Teaching Plan
Peachy Essay
 
Feminist Criticism Mother Tongue
Feminist Criticism Mother TongueFeminist Criticism Mother Tongue
Feminist Criticism Mother Tongue
Peachy Essay
 
Explorations in Economic History
Explorations in Economic HistoryExplorations in Economic History
Explorations in Economic History
Peachy Essay
 
THE OPTIC NERVE
THE OPTIC NERVETHE OPTIC NERVE
THE OPTIC NERVE
Peachy Essay
 
The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...
The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...
The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...
Peachy Essay
 
Negligence Risks Liabilities In Clean Public Business Facility
Negligence Risks Liabilities In Clean Public Business FacilityNegligence Risks Liabilities In Clean Public Business Facility
Negligence Risks Liabilities In Clean Public Business Facility
Peachy Essay
 
Sustainable and Accessible Resort
Sustainable and Accessible ResortSustainable and Accessible Resort
Sustainable and Accessible Resort
Peachy Essay
 
RNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKEND
RNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKENDRNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKEND
RNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKEND
Peachy Essay
 
International Business Cultural Analysis of Singapore
International Business Cultural Analysis of SingaporeInternational Business Cultural Analysis of Singapore
International Business Cultural Analysis of Singapore
Peachy Essay
 
Bethesda Mining Company
Bethesda Mining CompanyBethesda Mining Company
Bethesda Mining Company
Peachy Essay
 
Remote Patient Monitoring System at Mayo Clinic
Remote Patient Monitoring System at Mayo ClinicRemote Patient Monitoring System at Mayo Clinic
Remote Patient Monitoring System at Mayo Clinic
Peachy Essay
 
Opioid Crisis During Pandemic in BC
Opioid Crisis During Pandemic in BCOpioid Crisis During Pandemic in BC
Opioid Crisis During Pandemic in BC
Peachy Essay
 
Explanation: Inverted Yield Curve
Explanation: Inverted Yield CurveExplanation: Inverted Yield Curve
Explanation: Inverted Yield Curve
Peachy Essay
 
Magnet Recognition Program
Magnet Recognition ProgramMagnet Recognition Program
Magnet Recognition Program
Peachy Essay
 
Empirical Indicators: Johnson’s Behavioral System Model
Empirical Indicators: Johnson’s Behavioral System ModelEmpirical Indicators: Johnson’s Behavioral System Model
Empirical Indicators: Johnson’s Behavioral System Model
Peachy Essay
 

More from Peachy Essay (20)

Internship Experience at Eracew Limited - Ghana
Internship Experience at Eracew Limited - GhanaInternship Experience at Eracew Limited - Ghana
Internship Experience at Eracew Limited - Ghana
 
Kraft Heinz
Kraft HeinzKraft Heinz
Kraft Heinz
 
Healthcare Technology in Nursing
Healthcare Technology in NursingHealthcare Technology in Nursing
Healthcare Technology in Nursing
 
THE PROBLEM OF CHINA’S AGING POPULATION
THE PROBLEM OF CHINA’S AGING POPULATIONTHE PROBLEM OF CHINA’S AGING POPULATION
THE PROBLEM OF CHINA’S AGING POPULATION
 
ILLEGAL IMMIGRATION IN UNITED KINGDOM
ILLEGAL IMMIGRATION IN UNITED KINGDOMILLEGAL IMMIGRATION IN UNITED KINGDOM
ILLEGAL IMMIGRATION IN UNITED KINGDOM
 
Patient/Family Discharge Teaching Plan
Patient/Family Discharge Teaching Plan Patient/Family Discharge Teaching Plan
Patient/Family Discharge Teaching Plan
 
Feminist Criticism Mother Tongue
Feminist Criticism Mother TongueFeminist Criticism Mother Tongue
Feminist Criticism Mother Tongue
 
Explorations in Economic History
Explorations in Economic HistoryExplorations in Economic History
Explorations in Economic History
 
THE OPTIC NERVE
THE OPTIC NERVETHE OPTIC NERVE
THE OPTIC NERVE
 
The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...
The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...
The Impact of Covid-19-Induced Remote Consultations on Nurse-Patient Relation...
 
Negligence Risks Liabilities In Clean Public Business Facility
Negligence Risks Liabilities In Clean Public Business FacilityNegligence Risks Liabilities In Clean Public Business Facility
Negligence Risks Liabilities In Clean Public Business Facility
 
Sustainable and Accessible Resort
Sustainable and Accessible ResortSustainable and Accessible Resort
Sustainable and Accessible Resort
 
RNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKEND
RNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKENDRNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKEND
RNN ARCHITECTURES: LSTM and GRU WITH TENSORFLOW BACKEND
 
International Business Cultural Analysis of Singapore
International Business Cultural Analysis of SingaporeInternational Business Cultural Analysis of Singapore
International Business Cultural Analysis of Singapore
 
Bethesda Mining Company
Bethesda Mining CompanyBethesda Mining Company
Bethesda Mining Company
 
Remote Patient Monitoring System at Mayo Clinic
Remote Patient Monitoring System at Mayo ClinicRemote Patient Monitoring System at Mayo Clinic
Remote Patient Monitoring System at Mayo Clinic
 
Opioid Crisis During Pandemic in BC
Opioid Crisis During Pandemic in BCOpioid Crisis During Pandemic in BC
Opioid Crisis During Pandemic in BC
 
Explanation: Inverted Yield Curve
Explanation: Inverted Yield CurveExplanation: Inverted Yield Curve
Explanation: Inverted Yield Curve
 
Magnet Recognition Program
Magnet Recognition ProgramMagnet Recognition Program
Magnet Recognition Program
 
Empirical Indicators: Johnson’s Behavioral System Model
Empirical Indicators: Johnson’s Behavioral System ModelEmpirical Indicators: Johnson’s Behavioral System Model
Empirical Indicators: Johnson’s Behavioral System Model
 

Recently uploaded

Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
NaveenNaveen726446
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
Lubi Valves
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 

Recently uploaded (20)

Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 

To develop a statement of work for the designing and fabrication of a solar water heater with minimum manufacturing cost, providing maximum temperature.

  • 1. M. Sumair Hassan Reg. #: 2015-ME-431 Page | 1 Project management and Economics Title: To develop a Statement of Work for the Designing and fabrication of a solar water heater with minimum manufacturing cost, providing maximum temperature. Submitted By: Muhammad Sumair Hassan (2015-ME-431) Project Advisor: Engr. Ehtisham Riaz Submission date: 13-April-2018 Department Of Mechanical Engineering University of Engineering and Technology Lahore (RCET Campus)
  • 2. M. Sumair Hassan Reg. #: 2015-ME-431 Page | 2 Project management and Economics Table of Contents 1. Statement of Work.................................................................................................................... 3 a.) The Purpose Statement: ...................................................................................................... 3 b.) The Scope Statement:.......................................................................................................... 3 c.) The Project Deliverables: .................................................................................................... 3 d.) The Goals and Objectives: .................................................................................................. 3 e.) The Cost and Schedule Estimates: ..................................................................................... 3 f.) The list of stakeholders: ....................................................................................................... 4 g.) Assumptions and Agreements: ........................................................................................... 4 h.) The Communication Plan:.................................................................................................. 4 2. Precedence Diagram and Gantt Chart: .................................................................................. 5 a.) Project Action plan:............................................................................................................. 5 b.) Precedence Network Diagram using Activities on Nodes (AON): .................................. 5 c.) Gantt Chart: ......................................................................................................................... 6 3. Memo: ........................................................................................................................................ 7
  • 3. M. Sumair Hassan Reg. #: 2015-ME-431 Page | 3 Project management and Economics 1. Statement of Work a.) The Purpose Statement: The purpose of this Project is to design and fabricate a water heating system, Aqua or Water lens utilizing Sun as renewable energy source. Design would be made as simple as possible, portable with no complexities involved and conveniently useable even by a non- technical person. b.) The Scope Statement: The scope of this project is to develop a heat generating system that can generate high temperature with minimum amount of costing. This Solar water heating system will be designed from commonly available cheap materials (wood, plastic sheet, etc.) and fabricated in such a way so as to give maximum efficiency. c.) The Project Deliverables: The successful completion of this project will be able to deliver a Water Lens that would generate a temperature of 700 C within 20 minutes of time. It will be a portable device that can be used conveniently used in remote areas. d.) The Goals and Objectives: This project is aimed to produce a cost-effective and efficient heat generating system that can be used for purification of water. As most of the Bacteria and pathogens die at 500 C so it would be useful in backward areas where there is lack of adequate supply of clean water. e.) The Cost and Schedule Estimates: Cost Estimates for this project are as follow: Sr. # Material Cost (Rupees) 1. Wood 350 2. Polyvinyl Plastic Sheet 250 ×2 3. Water Vessel 100 4. Insulation material 150 5. Labor/hour 150×4 6. Miscellaneous 150 Net-cost = 1850 Rs. Tentative Schedule of carrying out this project is as follow: Sr. # Activity Date 1. Preliminary Design Report 01-Jan-2018 2. Detailed Design Report 10-Jan-2018 3. Testing and Evaluation 17-Jan-2018 4. Complete Fabrication 30-Jan-2018
  • 4. M. Sumair Hassan Reg. #: 2015-ME-431 Page | 4 Project management and Economics f.) The list of stakeholders: The key stakeholders in this project are as follow: Key Stakeholders Muhammad Sumair Hassan Project Manager Shaheer Amjad Resource Manager Muhammad Saad Khan Project Designer Adnan Iqbal Testing and Evaluation Manager Tanseer Hyder Project Support Member Abdullah Akbar Project Support Member g.) Assumptions and Agreements: To allow the Project to be executed conveniently, following assumptions and agreements must be followed: 1. Design approach: The design approach to be followed should be simple, cost-effective and must be feasible for project. 2. Budget-Controlled Project: Material and any other labor cost must not exceed Project Budget. 3. Scheduled Tasks: A schedule assigned to any task will not be changed and task must be completed within its time-frame. 4. Safety Responsibility: All members involved in this project must follow safety precautions. They will be responsible themselves for their safety. h.) The Communication Plan: Deliverable Info Recipient Delivery Method Schedule Responsible Member Project Information Project Team E-mail, Conference call, Meeting On-going Project Designer Project Status Project Manager Meeting, E-mail Every Thursday Project Support Member Testing Information Project Manager E-mail Weekly Testing and Evaluation Manager Material Requirements Project Designer E-mail, Meeting On-going Resource Manager Project Timeline Project Manager E-mail Bi-Weekly Project Manager Project Risks Project Manager E-mail, Conference call, Meeting On-going Project Manager
  • 5. M. Sumair Hassan Reg. #: 2015-ME-431 Page | 5 Project management and Economics 2. Precedence Diagram and Gantt Chart: a.) Project Action plan: Designation Task Precedence Responsibility Time (days) Resources Outcome A Working out the Design Concept: - Project leader (M. Sumair hassan) 7 Research Papers, Books and Internet Successfully Formed idea to work out the plan B 3d Modeling of Project Design: A Member (Saad Khan) 3 Solidworks Successfully prepared 3d model C Fulfilling the Material needs: A Members (Saad Khan and Tanseer Hyder) 3 Market Successfully gathered required material D Constructing Aqua Lens: B,C Members (Rai Adnan and Shaheer Amjad) 5 Workshop Success (A little change in size required) E Testing the Project: D All members 7 A bright day/Shining Sun Successfully tested Aqua Lens F Modifying the Design: E Members (Saad khan and Abdullah Akbar) 3 Research paper Successfully modified the Design G Writing Project Report: D,E,F Project leader (M. Sumair Hassan) 2 Computer/Microsoft Office Report Successfully Written b.) Precedence Network Diagram using Activity on Nodes (AON): START A FB D E C G END
  • 6. M. Sumair Hassan Reg. #: 2015-ME-431 Page | 6 Project management and Economics c.) Gantt Chart: Gantt Chart for this Project Action Plan is as follow: Task Designation Start Date Finish Date Duration Task A 1-Jan-18 8-Jan-18 7 Task B 8-Jan-18 10-Jan-18 3 Task C 11-Jan-18 13-Jan-18 3 Task D 14-Jan-18 18-Jan-18 5 Task E 19-Jan-18 25-Jan-18 7 Task F 26-Jan-18 28-Jan-18 3 Task G 29-Jan-18 31-Jan-18 2 1-Jan-18 2-Jan-18 3-Jan-18 4-Jan-18 5-Jan-18 6-Jan-18 7-Jan-18 8-Jan-18 9-Jan-18 10-Jan-18 11-Jan-18 12-Jan-18 13-Jan-18 14-Jan-18 15-Jan-18 16-Jan-18 17-Jan-18 18-Jan-18 19-Jan-18 20-Jan-18 21-Jan-18 22-Jan-18 23-Jan-18 24-Jan-18 25-Jan-18 26-Jan-18 27-Jan-18 28-Jan-18 29-Jan-18 30-Jan-18 31-Jan-18 1-Feb-18 2-Feb-18 Task A Task B Task C Task D Task E Task F Task G
  • 7. M. Sumair Hassan Reg. #: 2015-ME-431 Page | 7 Project management and Economics 3. Memo: TO: Engr. Ehtisham Riaz. FROM: M. Sumair Hassan. SUBJECT: To write a reflective memo of the Project Statement of Work (SoW). DATE: 13-April-2018 By writing the Project Statement of Work, I was able to look deep into the nature of a Project and covered many different factors that can either make the project successful or lead to the failure of a Project. Anyone writing the Statement of Work can easily determine the feasibility of the project. Without wasting much time, this document (SoW) can tell us whether the Project is within the Defined Scope and will be able to provide Required Deliverables or not. Everything being well pre-planned in Statement of Work makes the Project Actions easy to be followed with Minimum Risk. One of the most useful learning outcome of this Project was the use of Precedence Networking Diagram. The use of these networking diagrams makes it easy to recognize what needs to be done first in order to allow the smooth execution of all the Project activities. The important aspect of this project was the Practical use of Gantt Chart. The use of this Graphical Scheduling Technique solved most the difficulties in executing project tasks within their required time-frame. This Project was quite helpful in developing my Project Management and Formal Document Writing Skills. This project gave me a thorough understanding of handling different situations like “What to Do” and “When to Do” when working as Team.
  翻译: