尊敬的 微信汇率:1円 ≈ 0.046166 元 支付宝汇率:1円 ≈ 0.046257元 [退出登录]
SlideShare a Scribd company logo
System Development Life Cycle
&
Implementation of MIS
George V James
CONTENTS
What is SDLC?
Stages in SDLC
Implementation of MIS
Steps in Implementation of MIS
What is SDLC?
Stages in SDLC
Implementation of MIS
Steps in Implementation of MIS
What is SDLC?
Mainly used in Systems Engineering,
Information Systems & Software
Engineering.
 A process of creating, or altering
information systems, and the models &
methodologies used to develop the
systems.
Mainly used in Systems Engineering,
Information Systems & Software
Engineering.
 A process of creating, or altering
information systems, and the models &
methodologies used to develop the
systems.
Stages/Phases of Life Cycle
 Systems Investigation
 Systems Analysis
 Systems Design
 Systems Development
 Systems Implementation
 Systems Maintenance
 Systems Investigation
 Systems Analysis
 Systems Design
 Systems Development
 Systems Implementation
 Systems Maintenance
Model of the System
Development Life Cycle
1. Systems Investigation
Assesses feasibility and practicality of system
Determine if a new system is needed
Five primary tasks:
1. List problems, opportunities and directives
2. Negotiate preliminary scope
3. Assess project worth
4. Plan the project
5. Present the project and plan
Assesses feasibility and practicality of system
Determine if a new system is needed
Five primary tasks:
1. List problems, opportunities and directives
2. Negotiate preliminary scope
3. Assess project worth
4. Plan the project
5. Present the project and plan
2. Systems Analysis
 In depth study of old system and identifying
new system requirements
 Defines system from user's view
 Forms of analysis
1. Organisational Analysis
2. Analysis of Present System
3. Functional Requirements Analysis
 In depth study of old system and identifying
new system requirements
 Defines system from user's view
 Forms of analysis
1. Organisational Analysis
2. Analysis of Present System
3. Functional Requirements Analysis
3. Systems Design
 Design new/alternative system
 Specifies how the system will accomplish the
objectives.
 Consists of design activities to be
implemented that was done earlier in the
systems analysis stage
Systems design consists of 4 major activities:-
1. User Interface Design
2. Data Design
3. Process Design
4. System Specifications
 Design new/alternative system
 Specifies how the system will accomplish the
objectives.
 Consists of design activities to be
implemented that was done earlier in the
systems analysis stage
Systems design consists of 4 major activities:-
1. User Interface Design
2. Data Design
3. Process Design
4. System Specifications
4. Systems Development
 Build the system to the design specifications
 Develop the software
1. Purchase off-the-shelf software OR
2. Write custom software
 Acquire the hardware
 Test the new system
1. Module (unit) test - tests each part of system
2. Integration testing - tests system as one unit
 Create manuals for users and operators
 Build the system to the design specifications
 Develop the software
1. Purchase off-the-shelf software OR
2. Write custom software
 Acquire the hardware
 Test the new system
1. Module (unit) test - tests each part of system
2. Integration testing - tests system as one unit
 Create manuals for users and operators
5. Systems Implementation
 Installing the system
 Convert from old system to new system
 Train end users
 Compile final documentation
 Testing & Evaluating the new system
 Installing the system
 Convert from old system to new system
 Train end users
 Compile final documentation
 Testing & Evaluating the new system
5. Systems Implementation
Types Of Conversion
 Direct/plunge/crash approach – entire new system
completely replaces entire old system, in one step
 Parallel approach - both systems are operated side by
side until the new system proves itself
 Pilot/location approach - launched new system for only
one group within the business -- once new system is
operating smoothly, implementation goes company-wide
 Phased/staged/incremental approach - individual parts
of new system are gradually phased-in over time, using
either crash or parallel for each piece.
 Direct/plunge/crash approach – entire new system
completely replaces entire old system, in one step
 Parallel approach - both systems are operated side by
side until the new system proves itself
 Pilot/location approach - launched new system for only
one group within the business -- once new system is
operating smoothly, implementation goes company-wide
 Phased/staged/incremental approach - individual parts
of new system are gradually phased-in over time, using
either crash or parallel for each piece.
IMPLEMENTATION
ACTIVITIES
ACQUISATION OF HARDWARE,
SOFTWARE & SERVICES
SOFTWARE DEVELOPMENT OR
MODIFICATION
END USER TRAINING
IMPLEMENTATION
ACTIVITIES SYSTEM
DOCUMENTATION
CONVERSION:-
PARALLEL
PHASED
PILOT
PLUNGE
6. Systems Maintenance
(Operations)
Types of changes undertaken in this phase:-
 Physical repair of the system
 Correction of new bugs found (corrective)
 System adjustments to environmental
changes(Systems Audit)
 Adjustments for users’ changing needs
(adaptive)
 Changes to user better techniques when they
become available (perfective)
Types of changes undertaken in this phase:-
 Physical repair of the system
 Correction of new bugs found (corrective)
 System adjustments to environmental
changes(Systems Audit)
 Adjustments for users’ changing needs
(adaptive)
 Changes to user better techniques when they
become available (perfective)
IMPLEMENTATION OF
MIS
IMPLEMENTATION OF
MIS
Introduction
• After the design & development process of an
information system, comes it implementation.
• By implementation, it means to put the system to work.
• There are 4 basic methods of implementation of MIS:
1. Install the system in a new operation or
organisation.
2. Cut off the old system and install the new.
3. Cut over by segments.
4. Operate in parallel and cut over.
• After the design & development process of an
information system, comes it implementation.
• By implementation, it means to put the system to work.
• There are 4 basic methods of implementation of MIS:
1. Install the system in a new operation or
organisation.
2. Cut off the old system and install the new.
3. Cut over by segments.
4. Operate in parallel and cut over.
Steps in Implementation
1. Planning the implementation activities.
2. Acquiring and laying out facilities and offices.
3. Organising the personnel for implementation.
4. Developing procedures for installation and testing.
5. Developing the training program for operating personnel.
6. Completing the system’s software.
7. Acquiring the required hardware.
8. Generating files.
9. Designing forms.
10.Testing the entire system.
11.Complete cutover to the new system.
12.Documenting the new system.
13.Evaluating the MIS.
14.Providing System Maintenance (debugging & Improving).
1. Planning the implementation activities.
2. Acquiring and laying out facilities and offices.
3. Organising the personnel for implementation.
4. Developing procedures for installation and testing.
5. Developing the training program for operating personnel.
6. Completing the system’s software.
7. Acquiring the required hardware.
8. Generating files.
9. Designing forms.
10.Testing the entire system.
11.Complete cutover to the new system.
12.Documenting the new system.
13.Evaluating the MIS.
14.Providing System Maintenance (debugging & Improving).
References
Management Information
System- Gordon B. Davis
Wikipedia.com
MIS Blogs
Slideshare.net
Management Information
System- Gordon B. Davis
Wikipedia.com
MIS Blogs
Slideshare.net
System Development Life Cycle & Implementation of MIS

More Related Content

What's hot

Management information system ( MIS )
Management information system ( MIS )Management information system ( MIS )
Management information system ( MIS )
QualitativeIn
 
Transaction processing system
Transaction processing systemTransaction processing system
Transaction processing system
anjana1994
 
Types o f information systems
Types o f information systemsTypes o f information systems
Types o f information systems
Bimbashree K.G
 
EDI
 EDI EDI
Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system design
Rahul Hedau
 
Mis & Decision Making
Mis & Decision MakingMis & Decision Making
Mis & Decision Making
Arun Mishra
 
FORMAL & INFORMAL INFORMATION SYSTEM
FORMAL & INFORMAL  INFORMATION SYSTEMFORMAL & INFORMAL  INFORMATION SYSTEM
FORMAL & INFORMAL INFORMATION SYSTEM
Zahid Parvez
 
Financial Information System
Financial Information SystemFinancial Information System
Financial Information System
university of education,Lahore
 
Sub systems of information system - MIS
Sub systems of information system - MISSub systems of information system - MIS
Sub systems of information system - MIS
SanaRiaz789
 
Decision making and mis
Decision making and misDecision making and mis
Decision making and mis
adityapareek26
 
Decision Support System(DSS)
Decision Support System(DSS)Decision Support System(DSS)
Decision Support System(DSS)
Sayantan Sur
 
Mis structure of digital firm
Mis structure of digital firmMis structure of digital firm
Mis structure of digital firm
Dr. Vardhan choubey
 
Application of mis
Application of misApplication of mis
Application of mis
deepa bhattarai
 
Advantages and Disadvantages of MIS
Advantages and Disadvantages of MISAdvantages and Disadvantages of MIS
Advantages and Disadvantages of MIS
Neeti Naag
 
Decision Support System - Management Information System
Decision Support System - Management Information SystemDecision Support System - Management Information System
Decision Support System - Management Information System
Nijaz N
 
E commerce (edi)
E commerce (edi)E commerce (edi)
E commerce (edi)
Arnav Chowdhury
 
Management information systems
Management information systemsManagement information systems
Management information systems
navin1
 
Functional information system
Functional  information systemFunctional  information system
Functional information system
amazing19
 
Unit 3 Management Information System
Unit 3 Management Information SystemUnit 3 Management Information System
Unit 3 Management Information System
Abhishek Iyer
 
strategic information system
strategic information systemstrategic information system
strategic information system
Prateek Singh
 

What's hot (20)

Management information system ( MIS )
Management information system ( MIS )Management information system ( MIS )
Management information system ( MIS )
 
Transaction processing system
Transaction processing systemTransaction processing system
Transaction processing system
 
Types o f information systems
Types o f information systemsTypes o f information systems
Types o f information systems
 
EDI
 EDI EDI
EDI
 
Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system design
 
Mis & Decision Making
Mis & Decision MakingMis & Decision Making
Mis & Decision Making
 
FORMAL & INFORMAL INFORMATION SYSTEM
FORMAL & INFORMAL  INFORMATION SYSTEMFORMAL & INFORMAL  INFORMATION SYSTEM
FORMAL & INFORMAL INFORMATION SYSTEM
 
Financial Information System
Financial Information SystemFinancial Information System
Financial Information System
 
Sub systems of information system - MIS
Sub systems of information system - MISSub systems of information system - MIS
Sub systems of information system - MIS
 
Decision making and mis
Decision making and misDecision making and mis
Decision making and mis
 
Decision Support System(DSS)
Decision Support System(DSS)Decision Support System(DSS)
Decision Support System(DSS)
 
Mis structure of digital firm
Mis structure of digital firmMis structure of digital firm
Mis structure of digital firm
 
Application of mis
Application of misApplication of mis
Application of mis
 
Advantages and Disadvantages of MIS
Advantages and Disadvantages of MISAdvantages and Disadvantages of MIS
Advantages and Disadvantages of MIS
 
Decision Support System - Management Information System
Decision Support System - Management Information SystemDecision Support System - Management Information System
Decision Support System - Management Information System
 
E commerce (edi)
E commerce (edi)E commerce (edi)
E commerce (edi)
 
Management information systems
Management information systemsManagement information systems
Management information systems
 
Functional information system
Functional  information systemFunctional  information system
Functional information system
 
Unit 3 Management Information System
Unit 3 Management Information SystemUnit 3 Management Information System
Unit 3 Management Information System
 
strategic information system
strategic information systemstrategic information system
strategic information system
 

Viewers also liked

MIS Role in Production
MIS Role in ProductionMIS Role in Production
MIS Role in Production
pugsrockon
 
System concepts
System conceptsSystem concepts
System concepts
Gurpreet Singh
 
Data Flow Diagrams
Data Flow DiagramsData Flow Diagrams
Data Flow Diagrams
Sinhaa Yash
 
CRM with MIS
CRM with MISCRM with MIS
CRM with MIS
Dr. C.V. Suresh Babu
 
System approach and contingency approach
System approach and contingency approachSystem approach and contingency approach
System approach and contingency approach
AB Amit
 
MIS 13 Customer Relationship Management
MIS 13 Customer Relationship ManagementMIS 13 Customer Relationship Management
MIS 13 Customer Relationship Management
Tushar B Kute
 
Types Of Information Systems
Types Of Information SystemsTypes Of Information Systems
Types Of Information Systems
Manuel Ardales
 
Marketing information system
Marketing information systemMarketing information system
Marketing information system
Akash Maurya
 
Information system for production management
Information system for production managementInformation system for production management
Information system for production management
wimmba
 
Customer relationship management in mis (2)
Customer relationship management in mis (2)Customer relationship management in mis (2)
Customer relationship management in mis (2)
Sahil Kamdar
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systems
Online
 
SYSTEM CONCEPT
SYSTEM CONCEPTSYSTEM CONCEPT
SYSTEM CONCEPT
Kak Yong
 
The role of mis in crm
The role of mis in crmThe role of mis in crm
The role of mis in crm
NCBA&E Multan Campus
 
Financial Information Systems
Financial Information SystemsFinancial Information Systems
Financial Information Systems
catch_ashutosh
 
Finance information system
Finance information systemFinance information system
Finance information system
Suby A John
 
Dfd examples
Dfd examplesDfd examples
Dfd examples
Mohit
 
Customer relationship management in mis ppt
Customer relationship management in mis pptCustomer relationship management in mis ppt
Customer relationship management in mis ppt
Ranjani Witted
 
System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and Design
Aamir Abbas
 
System concepts, elements and types of systems ppt
System concepts, elements and types of systems pptSystem concepts, elements and types of systems ppt
System concepts, elements and types of systems ppt
Shobhit Sharma
 
Human resource informtion system ppt
Human resource informtion system pptHuman resource informtion system ppt
Human resource informtion system ppt
Ankur Bhadauria
 

Viewers also liked (20)

MIS Role in Production
MIS Role in ProductionMIS Role in Production
MIS Role in Production
 
System concepts
System conceptsSystem concepts
System concepts
 
Data Flow Diagrams
Data Flow DiagramsData Flow Diagrams
Data Flow Diagrams
 
CRM with MIS
CRM with MISCRM with MIS
CRM with MIS
 
System approach and contingency approach
System approach and contingency approachSystem approach and contingency approach
System approach and contingency approach
 
MIS 13 Customer Relationship Management
MIS 13 Customer Relationship ManagementMIS 13 Customer Relationship Management
MIS 13 Customer Relationship Management
 
Types Of Information Systems
Types Of Information SystemsTypes Of Information Systems
Types Of Information Systems
 
Marketing information system
Marketing information systemMarketing information system
Marketing information system
 
Information system for production management
Information system for production managementInformation system for production management
Information system for production management
 
Customer relationship management in mis (2)
Customer relationship management in mis (2)Customer relationship management in mis (2)
Customer relationship management in mis (2)
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systems
 
SYSTEM CONCEPT
SYSTEM CONCEPTSYSTEM CONCEPT
SYSTEM CONCEPT
 
The role of mis in crm
The role of mis in crmThe role of mis in crm
The role of mis in crm
 
Financial Information Systems
Financial Information SystemsFinancial Information Systems
Financial Information Systems
 
Finance information system
Finance information systemFinance information system
Finance information system
 
Dfd examples
Dfd examplesDfd examples
Dfd examples
 
Customer relationship management in mis ppt
Customer relationship management in mis pptCustomer relationship management in mis ppt
Customer relationship management in mis ppt
 
System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and Design
 
System concepts, elements and types of systems ppt
System concepts, elements and types of systems pptSystem concepts, elements and types of systems ppt
System concepts, elements and types of systems ppt
 
Human resource informtion system ppt
Human resource informtion system pptHuman resource informtion system ppt
Human resource informtion system ppt
 

Similar to System Development Life Cycle & Implementation of MIS

IS L02 - Development of Information Systems
IS L02 - Development of Information SystemsIS L02 - Development of Information Systems
IS L02 - Development of Information Systems
Jan Wong
 
System development life cycle and Implementation of IS
System development life cycle and Implementation of ISSystem development life cycle and Implementation of IS
System development life cycle and Implementation of IS
Abdullah Khosa
 
SDLC
SDLC SDLC
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
LucySim1
 
1. system development ruchika
1. system development   ruchika1. system development   ruchika
1. system development ruchika
Karansingh2258
 
System Development Life Cycle (Notes)
System Development Life Cycle (Notes)System Development Life Cycle (Notes)
System Development Life Cycle (Notes)
Manik Bhola
 
Week 10
Week 10Week 10
Week 10
adrenal
 
Week 10
Week 10Week 10
Week 10
adrenal
 
Mis unit iii by arnav
Mis unit iii by arnavMis unit iii by arnav
Mis unit iii by arnav
Arnav Chowdhury
 
Sec7.3 sdlc
Sec7.3 sdlcSec7.3 sdlc
Sec7.3 sdlc
Iranna Lekkihal
 
SAD_SDLC.pptx
SAD_SDLC.pptxSAD_SDLC.pptx
SAD_SDLC.pptx
SharmilaMore5
 
System Analysis And Design 2011
System Analysis And Design  2011System Analysis And Design  2011
System Analysis And Design 2011
tgushi12
 
Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycle
Oneil Powers
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycle
FLYMAN TECHNOLOGY LIMITED
 
Sdlc
SdlcSdlc
Sad1
Sad1Sad1
system development life cycle SDLC
system development life cycle SDLCsystem development life cycle SDLC
system development life cycle SDLC
sujithsunil
 
MIS 49100 Week 2 Systems Development Life Cycle
MIS 49100 Week 2 Systems Development Life CycleMIS 49100 Week 2 Systems Development Life Cycle
MIS 49100 Week 2 Systems Development Life Cycle
oudesign
 
Sdlc
SdlcSdlc
Sdlc
SdlcSdlc

Similar to System Development Life Cycle & Implementation of MIS (20)

IS L02 - Development of Information Systems
IS L02 - Development of Information SystemsIS L02 - Development of Information Systems
IS L02 - Development of Information Systems
 
System development life cycle and Implementation of IS
System development life cycle and Implementation of ISSystem development life cycle and Implementation of IS
System development life cycle and Implementation of IS
 
SDLC
SDLC SDLC
SDLC
 
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
 
1. system development ruchika
1. system development   ruchika1. system development   ruchika
1. system development ruchika
 
System Development Life Cycle (Notes)
System Development Life Cycle (Notes)System Development Life Cycle (Notes)
System Development Life Cycle (Notes)
 
Week 10
Week 10Week 10
Week 10
 
Week 10
Week 10Week 10
Week 10
 
Mis unit iii by arnav
Mis unit iii by arnavMis unit iii by arnav
Mis unit iii by arnav
 
Sec7.3 sdlc
Sec7.3 sdlcSec7.3 sdlc
Sec7.3 sdlc
 
SAD_SDLC.pptx
SAD_SDLC.pptxSAD_SDLC.pptx
SAD_SDLC.pptx
 
System Analysis And Design 2011
System Analysis And Design  2011System Analysis And Design  2011
System Analysis And Design 2011
 
Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycle
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycle
 
Sdlc
SdlcSdlc
Sdlc
 
Sad1
Sad1Sad1
Sad1
 
system development life cycle SDLC
system development life cycle SDLCsystem development life cycle SDLC
system development life cycle SDLC
 
MIS 49100 Week 2 Systems Development Life Cycle
MIS 49100 Week 2 Systems Development Life CycleMIS 49100 Week 2 Systems Development Life Cycle
MIS 49100 Week 2 Systems Development Life Cycle
 
Sdlc
SdlcSdlc
Sdlc
 
Sdlc
SdlcSdlc
Sdlc
 

More from George V James

LISTING OF SECURITIES
LISTING OF SECURITIESLISTING OF SECURITIES
LISTING OF SECURITIES
George V James
 
Corporate Governance In Indian Prespective
Corporate Governance In Indian PrespectiveCorporate Governance In Indian Prespective
Corporate Governance In Indian Prespective
George V James
 
SEBI ACT
SEBI ACTSEBI ACT
SEBI ACT
George V James
 
Life Insurance- A Case Study
Life Insurance- A Case StudyLife Insurance- A Case Study
Life Insurance- A Case Study
George V James
 
strategy formulation vs strategy implementation
strategy formulation vs strategy implementationstrategy formulation vs strategy implementation
strategy formulation vs strategy implementation
George V James
 
Economic role of government in Indian Business
Economic role of government in Indian BusinessEconomic role of government in Indian Business
Economic role of government in Indian Business
George V James
 
TRADING BLOCKS
TRADING BLOCKSTRADING BLOCKS
TRADING BLOCKS
George V James
 

More from George V James (7)

LISTING OF SECURITIES
LISTING OF SECURITIESLISTING OF SECURITIES
LISTING OF SECURITIES
 
Corporate Governance In Indian Prespective
Corporate Governance In Indian PrespectiveCorporate Governance In Indian Prespective
Corporate Governance In Indian Prespective
 
SEBI ACT
SEBI ACTSEBI ACT
SEBI ACT
 
Life Insurance- A Case Study
Life Insurance- A Case StudyLife Insurance- A Case Study
Life Insurance- A Case Study
 
strategy formulation vs strategy implementation
strategy formulation vs strategy implementationstrategy formulation vs strategy implementation
strategy formulation vs strategy implementation
 
Economic role of government in Indian Business
Economic role of government in Indian BusinessEconomic role of government in Indian Business
Economic role of government in Indian Business
 
TRADING BLOCKS
TRADING BLOCKSTRADING BLOCKS
TRADING BLOCKS
 

Recently uploaded

Askxx.com Complete Pitch Deck Course Online
Askxx.com Complete Pitch Deck Course OnlineAskxx.com Complete Pitch Deck Course Online
Askxx.com Complete Pitch Deck Course Online
AskXX.com
 
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl KolkataCall Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Yukti Singh
 
Call Girls Dehradun (india) ☎️ +91-74260 Dehradun Call Girl
Call Girls Dehradun (india) ☎️ +91-74260 Dehradun Call GirlCall Girls Dehradun (india) ☎️ +91-74260 Dehradun Call Girl
Call Girls Dehradun (india) ☎️ +91-74260 Dehradun Call Girl
Happy Singh
 
Leading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable ProductsLeading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable Products
Aggregage
 
Satta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdf
Satta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdfSatta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdf
Satta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdf
KALYAN HEAD OFFICE
 
Satta matka DP boss matka Kalyan result India matka
Satta matka DP boss matka Kalyan result India matkaSatta matka DP boss matka Kalyan result India matka
Satta matka DP boss matka Kalyan result India matka
➑➌➋➑➒➎➑➑➊➍
 
Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024
Hector Del Castillo, CPM, CPMM
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
DP Boss Satta Matka Kalyan Matka
 
➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
DP boss matka results IndiaMART Kalyan guessing
DP boss matka results IndiaMART Kalyan guessingDP boss matka results IndiaMART Kalyan guessing
DP boss matka results IndiaMART Kalyan guessing
➑➌➋➑➒➎➑➑➊➍
 
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
taqyea
 
Kanban Coaching Exchange with Dave White - Sample SDR Report
Kanban Coaching Exchange with Dave White - Sample SDR ReportKanban Coaching Exchange with Dave White - Sample SDR Report
Kanban Coaching Exchange with Dave White - Sample SDR Report
Helen Meek
 
Stainless Steel Conveyor Manufacturers Chennai
Stainless Steel Conveyor Manufacturers ChennaiStainless Steel Conveyor Manufacturers Chennai
Stainless Steel Conveyor Manufacturers Chennai
ConveyorSystem
 
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka ResultsKalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Satta Matka Dpboss Kalyan Matka Results
 
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
taqyea
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
一比一原版(毕业证)一桥大学毕业证如何办理
一比一原版(毕业证)一桥大学毕业证如何办理一比一原版(毕业证)一桥大学毕业证如何办理
一比一原版(毕业证)一桥大学毕业证如何办理
taqyea
 
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call GirlCall Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Happy Singh
 
5 Whys Analysis Toolkit: Uncovering Root Causes with Precision
5 Whys Analysis Toolkit: Uncovering Root Causes with Precision5 Whys Analysis Toolkit: Uncovering Root Causes with Precision
5 Whys Analysis Toolkit: Uncovering Root Causes with Precision
Operational Excellence Consulting
 

Recently uploaded (20)

Askxx.com Complete Pitch Deck Course Online
Askxx.com Complete Pitch Deck Course OnlineAskxx.com Complete Pitch Deck Course Online
Askxx.com Complete Pitch Deck Course Online
 
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl KolkataCall Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
 
Call Girls Dehradun (india) ☎️ +91-74260 Dehradun Call Girl
Call Girls Dehradun (india) ☎️ +91-74260 Dehradun Call GirlCall Girls Dehradun (india) ☎️ +91-74260 Dehradun Call Girl
Call Girls Dehradun (india) ☎️ +91-74260 Dehradun Call Girl
 
Leading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable ProductsLeading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable Products
 
Satta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdf
Satta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdfSatta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdf
Satta Matka Dpboss Matka Guessing Indian Matka Kalyan Matka.pdf
 
Satta matka DP boss matka Kalyan result India matka
Satta matka DP boss matka Kalyan result India matkaSatta matka DP boss matka Kalyan result India matka
Satta matka DP boss matka Kalyan result India matka
 
Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Satta Matta Matka Dpboss Matka Guessing Kalyan panel Chart
 
DP boss matka results IndiaMART Kalyan guessing
DP boss matka results IndiaMART Kalyan guessingDP boss matka results IndiaMART Kalyan guessing
DP boss matka results IndiaMART Kalyan guessing
 
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
 
Kanban Coaching Exchange with Dave White - Sample SDR Report
Kanban Coaching Exchange with Dave White - Sample SDR ReportKanban Coaching Exchange with Dave White - Sample SDR Report
Kanban Coaching Exchange with Dave White - Sample SDR Report
 
Stainless Steel Conveyor Manufacturers Chennai
Stainless Steel Conveyor Manufacturers ChennaiStainless Steel Conveyor Manufacturers Chennai
Stainless Steel Conveyor Manufacturers Chennai
 
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka ResultsKalyan Chart Satta Matka Dpboss Kalyan Matka Results
Kalyan Chart Satta Matka Dpboss Kalyan Matka Results
 
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
一比一原版(毕业证)一桥大学毕业证如何办理
一比一原版(毕业证)一桥大学毕业证如何办理一比一原版(毕业证)一桥大学毕业证如何办理
一比一原版(毕业证)一桥大学毕业证如何办理
 
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
 
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call GirlCall Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
 
5 Whys Analysis Toolkit: Uncovering Root Causes with Precision
5 Whys Analysis Toolkit: Uncovering Root Causes with Precision5 Whys Analysis Toolkit: Uncovering Root Causes with Precision
5 Whys Analysis Toolkit: Uncovering Root Causes with Precision
 

System Development Life Cycle & Implementation of MIS

  • 1. System Development Life Cycle & Implementation of MIS George V James
  • 2. CONTENTS What is SDLC? Stages in SDLC Implementation of MIS Steps in Implementation of MIS What is SDLC? Stages in SDLC Implementation of MIS Steps in Implementation of MIS
  • 3. What is SDLC? Mainly used in Systems Engineering, Information Systems & Software Engineering.  A process of creating, or altering information systems, and the models & methodologies used to develop the systems. Mainly used in Systems Engineering, Information Systems & Software Engineering.  A process of creating, or altering information systems, and the models & methodologies used to develop the systems.
  • 4. Stages/Phases of Life Cycle  Systems Investigation  Systems Analysis  Systems Design  Systems Development  Systems Implementation  Systems Maintenance  Systems Investigation  Systems Analysis  Systems Design  Systems Development  Systems Implementation  Systems Maintenance
  • 5. Model of the System Development Life Cycle
  • 6. 1. Systems Investigation Assesses feasibility and practicality of system Determine if a new system is needed Five primary tasks: 1. List problems, opportunities and directives 2. Negotiate preliminary scope 3. Assess project worth 4. Plan the project 5. Present the project and plan Assesses feasibility and practicality of system Determine if a new system is needed Five primary tasks: 1. List problems, opportunities and directives 2. Negotiate preliminary scope 3. Assess project worth 4. Plan the project 5. Present the project and plan
  • 7. 2. Systems Analysis  In depth study of old system and identifying new system requirements  Defines system from user's view  Forms of analysis 1. Organisational Analysis 2. Analysis of Present System 3. Functional Requirements Analysis  In depth study of old system and identifying new system requirements  Defines system from user's view  Forms of analysis 1. Organisational Analysis 2. Analysis of Present System 3. Functional Requirements Analysis
  • 8. 3. Systems Design  Design new/alternative system  Specifies how the system will accomplish the objectives.  Consists of design activities to be implemented that was done earlier in the systems analysis stage Systems design consists of 4 major activities:- 1. User Interface Design 2. Data Design 3. Process Design 4. System Specifications  Design new/alternative system  Specifies how the system will accomplish the objectives.  Consists of design activities to be implemented that was done earlier in the systems analysis stage Systems design consists of 4 major activities:- 1. User Interface Design 2. Data Design 3. Process Design 4. System Specifications
  • 9. 4. Systems Development  Build the system to the design specifications  Develop the software 1. Purchase off-the-shelf software OR 2. Write custom software  Acquire the hardware  Test the new system 1. Module (unit) test - tests each part of system 2. Integration testing - tests system as one unit  Create manuals for users and operators  Build the system to the design specifications  Develop the software 1. Purchase off-the-shelf software OR 2. Write custom software  Acquire the hardware  Test the new system 1. Module (unit) test - tests each part of system 2. Integration testing - tests system as one unit  Create manuals for users and operators
  • 10. 5. Systems Implementation  Installing the system  Convert from old system to new system  Train end users  Compile final documentation  Testing & Evaluating the new system  Installing the system  Convert from old system to new system  Train end users  Compile final documentation  Testing & Evaluating the new system
  • 11. 5. Systems Implementation Types Of Conversion  Direct/plunge/crash approach – entire new system completely replaces entire old system, in one step  Parallel approach - both systems are operated side by side until the new system proves itself  Pilot/location approach - launched new system for only one group within the business -- once new system is operating smoothly, implementation goes company-wide  Phased/staged/incremental approach - individual parts of new system are gradually phased-in over time, using either crash or parallel for each piece.  Direct/plunge/crash approach – entire new system completely replaces entire old system, in one step  Parallel approach - both systems are operated side by side until the new system proves itself  Pilot/location approach - launched new system for only one group within the business -- once new system is operating smoothly, implementation goes company-wide  Phased/staged/incremental approach - individual parts of new system are gradually phased-in over time, using either crash or parallel for each piece.
  • 12. IMPLEMENTATION ACTIVITIES ACQUISATION OF HARDWARE, SOFTWARE & SERVICES SOFTWARE DEVELOPMENT OR MODIFICATION END USER TRAINING IMPLEMENTATION ACTIVITIES SYSTEM DOCUMENTATION CONVERSION:- PARALLEL PHASED PILOT PLUNGE
  • 13. 6. Systems Maintenance (Operations) Types of changes undertaken in this phase:-  Physical repair of the system  Correction of new bugs found (corrective)  System adjustments to environmental changes(Systems Audit)  Adjustments for users’ changing needs (adaptive)  Changes to user better techniques when they become available (perfective) Types of changes undertaken in this phase:-  Physical repair of the system  Correction of new bugs found (corrective)  System adjustments to environmental changes(Systems Audit)  Adjustments for users’ changing needs (adaptive)  Changes to user better techniques when they become available (perfective)
  • 15. Introduction • After the design & development process of an information system, comes it implementation. • By implementation, it means to put the system to work. • There are 4 basic methods of implementation of MIS: 1. Install the system in a new operation or organisation. 2. Cut off the old system and install the new. 3. Cut over by segments. 4. Operate in parallel and cut over. • After the design & development process of an information system, comes it implementation. • By implementation, it means to put the system to work. • There are 4 basic methods of implementation of MIS: 1. Install the system in a new operation or organisation. 2. Cut off the old system and install the new. 3. Cut over by segments. 4. Operate in parallel and cut over.
  • 16. Steps in Implementation 1. Planning the implementation activities. 2. Acquiring and laying out facilities and offices. 3. Organising the personnel for implementation. 4. Developing procedures for installation and testing. 5. Developing the training program for operating personnel. 6. Completing the system’s software. 7. Acquiring the required hardware. 8. Generating files. 9. Designing forms. 10.Testing the entire system. 11.Complete cutover to the new system. 12.Documenting the new system. 13.Evaluating the MIS. 14.Providing System Maintenance (debugging & Improving). 1. Planning the implementation activities. 2. Acquiring and laying out facilities and offices. 3. Organising the personnel for implementation. 4. Developing procedures for installation and testing. 5. Developing the training program for operating personnel. 6. Completing the system’s software. 7. Acquiring the required hardware. 8. Generating files. 9. Designing forms. 10.Testing the entire system. 11.Complete cutover to the new system. 12.Documenting the new system. 13.Evaluating the MIS. 14.Providing System Maintenance (debugging & Improving).
  • 17. References Management Information System- Gordon B. Davis Wikipedia.com MIS Blogs Slideshare.net Management Information System- Gordon B. Davis Wikipedia.com MIS Blogs Slideshare.net
  翻译: