Verification and validation should establish
confidence that the software is fit for purpose
This does NOT mean completely free of
defects
Rather, it must be good enough for its
intended use and the type of use will
determine the degree of confidence that is
needed
•

•

Verification: The software should conform
to its specification (Are we building the
product right?)
Validation: The software should do what
the user really requires (Are we building
the right product?)









Requirements Phase
Specification Phase (Analysis)
Planning Phase
Design Phase
Implementation Phase
Integration and Testing
Maintenance
Retirement
•

•

Is a whole life-cycle process - V & V
must be applied at each stage in the
software process.
Has two principal objectives
– The discovery of defects in a system
– The assessment of whether or not the
system is usable in an operational situation.
•

•

Software inspections and walkthroughs
- Concerned with analysis of the static
system representation to discover
problems (static verification)
Software testing - Concerned with
exercising and observing product
behaviour (dynamic verification)

– The system is executed with test data and its
operational behaviour is observed
S t at ic
verifi cat io n

R equ irem ent s
s pecifi cat io n

P ro to ty pe

Hi g h-lev el
d es ig n

Fo rm al
s pecifi cat io n

Det ail ed
d es ig n

P rog ram

Dy nam i c
v ali dat io n
•

•

•

•

Careful planning is required to get the most out of
testing and inspection processes
Planning should start early in the development
process
The plan should identify the balance between
static verification and testing
Test planning is about defining standards for the
testing process rather than describing product
tests
Requ ir em ent s
s pecifi cat io n

S y st em
s pecifi cat io n

S y st em
i nt eg rat io n
t es t pl an

Accep tan ce
t es t pl an

S ervi ce

Sy stem
d es ig n

Accep tan ce
t es t

Det ail ed
d es ig n

S u b-s ys tem
i nt eg rat io n
t es t pl an

Sy stem
i nt eg ratio n t est

S u b-s ys tem
i nt eg rat io n t est

M o du le an d
u ni t co de
and t ess








The testing process
Requirements traceability
Tested items
Testing schedule
Test recording procedures
Hardware and software requirements
Constraints



Informal examination of a product (document)
Made up of:
◦
◦
◦
◦



developers
client
next phase developers
Software Quality Assurance group leader

Produces:
◦ list of items not understood
◦ list of items thought to be incorrect








Involve people examining the source
representation with the aim of discovering
anomalies and defects
Do not require execution of a system so may be
used before implementation
May be applied to any representation of the
system (requirements, design, test data, etc.)
Very effective technique for discovering errors




Many different defects may be discovered in
a single inspection. In testing, one defect
may mask another so several executions are
required
The reuse domain and programming
knowledge so reviewers are likely to have
seen the types of error that commonly arise







Inspections and testing are complementary and
not opposing verification techniques
Both should be used during the V & V process
Inspections can check conformance with a
specification but not conformance with the
customer‟s real requirements
Inspections cannot check non-functional
characteristics such as performance, usability, etc.





Formalised approach to document reviews
Intended explicitly for defect DETECTION
(not correction)
Defects may be logical errors, anomalies in
the code that might indicate an erroneous
condition (e.g. an un-initialised variable) or
non-compliance with standards










A precise specification must be available
Team members must be familiar with the
organisation standards
Syntactically correct code must be available
An error checklist should be prepared
Management must accept that inspection will
increase costs early in the software process
Management must not use inspections for staff
appraisal









System overview presented to inspection team
Code and associated documents are
distributed to inspection team in advance
Inspection takes place and discovered errors
are noted
Modifications are made to repair discovered
errors
Re-inspection may or may not be required









Made up of at least 4 members
Author of the code being inspected
Inspector who finds errors, omissions and
inconsistencies
Reader who reads the code to the team
Moderator who chairs the meeting and notes
discovered errors
Other roles are Scribe and Chief moderator








Checklist of common errors should be used to
drive the inspection
Error checklist is programming language
dependent
The 'weaker' the type checking, the larger the
checklist
Examples: Initialization, Constant naming, loop
termination, array bounds, etc.








500 statements/hour during overview
125 source statement/hour during individual
preparation
90-125 statements/hour can be inspected
Inspection is therefore an expensive process
Inspecting 500 lines costs about 40 man/hours
effort (@ $50/hr = $2000!!!)
•

•

•

•

Can reveal the presence of errors NOT their
absence
A successful test is a test which discovers one or
more errors
The only validation technique for non-functional
requirements
Should be used in conjunction with static
verification to provide full V&V coverage






“Program testing can be a very effective way to
show the presents of bugs but is hopelessly
inadequate for showing their absence” [Dijkstra]
Fault: “bug” incorrect piece of code
Failure: result of a fault
Error: mistake made by the programmer/developer
•

•

•

•

Defect testing and debugging are distinct
processes
Verification and validation is concerned with
establishing the existence of defects in a program
Debugging is concerned with locating and
repairing these errors
Debugging involves formulating a hypothesis
about program behaviour then testing these
hypotheses to find the system error
Test
resu lt s

Lo cat e
erro r

Test
cases

Sp eci ficat io n

Des ig n
erro r repai r

Repai r
erro r

R e-tes t
p rog ram
C o m po nent
t es ti ng

Int egrat io n
t es ti ng

So ftw are dev elo per

Ind epen den t tes ti ng team


Component testing
◦
◦
◦



Testing of individual program components
Usually the responsibility of the component
developer (except sometimes for critical systems)
Tests are derived from the developer‟s experience

Integration testing
◦

◦
◦

Testing of groups of components integrated to
create a system or sub-system
The responsibility of an independent testing team
Tests are based on a system specification
•

•

•

•

Only exhaustive testing can show a program is
free from defects. However, exhaustive testing is
impossible
Tests should exercise a system's capabilities
rather than its components
Testing old capabilities is more important than
testing new capabilities
Testing typical situations is more important than
boundary value cases
•

Test data Inputs which have been devised

•

Test cases Inputs to test the system and

to test the system

the predicted outputs from these inputs if
the system operates according to its
specification






Test cases and test scenarios comprise
much of a software systems testware.
Black box test cases are developed by
domain analysis and examination of the
system requirements and specification.

Glass box test cases are developed by
examining the behavior of the source code.


Test to specification:
◦
◦
◦
◦



Black box,
Data driven
Functional testing
Code is ignored: only use specification document
to develop test cases

Test to code:
◦ Glass box/White box
◦ Logic driven testing
◦ Ignore specification and only examine the code.





An approach to testing where the program
is considered as a „black-box‟
The program test cases are based on the
system specification
Test planning can begin early in the
software process
I

n

a

Inp ut t est dat a

I

p

n

b

u

t

o

m

h

e

a

s

c

a

v

l

i

a

o

o

u

u

u

s

i

n

g

s

r

e

S

y

s

t

e

m

O

t

Ou t pu t t est resu lt s

Oe

d

u

h

t

e

e

p

u

p

f

e

t

r

c

e

t

s

s

s

w

e

h

n

c

i

e

c

h

o

r

f

e

v

e

a

l
•

•

•

•

Sometime called structural testing or glass-box
testing
Derivation of test cases according to program
structure
Knowledge of the program is used to identify
additional test cases
Objective is to exercise all program statements
(not all path combinations)


Statement coverage ◦ Test cases which will execute every statement at least once.
◦ Tools exist for help
◦ No guarantee that all branches are properly tested. Loop
exit?



Branch coverage
◦ All branches are tested once



Path coverage - Restriction of type of paths:
◦ Linear code sequences
◦ Definition/Use checking (all definition/use paths)
◦ Can locate dead code
Test d at a

Test s

Deri ves

C o m po nent
cod e

Test
o ut pu ts

More Related Content

What's hot

ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3
Chandukar
 
Software testing
Software testingSoftware testing
Software testing
Omar Al-Bokari
 
Fundamentals of software testing
Fundamentals of software testingFundamentals of software testing
Fundamentals of software testing
Noha Gamal
 
Software testing
Software testingSoftware testing
Software testing
Madhumita Chatterjee
 
Software Testing 101
Software Testing 101Software Testing 101
Software Testing 101
QA Hannah
 
Testing concepts [3] - Software Testing Techniques (CIS640)
Testing concepts [3] - Software Testing Techniques (CIS640)Testing concepts [3] - Software Testing Techniques (CIS640)
Testing concepts [3] - Software Testing Techniques (CIS640)
Venkatesh Prasad Ranganath
 
Test Levels & Techniques
Test Levels & TechniquesTest Levels & Techniques
Test Levels & Techniques
Dhanasekaran Nagarajan
 
ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1
Yogindernath Gupta
 
ISTQB / ISEB Foundation Exam Practice - 6
ISTQB / ISEB Foundation Exam Practice - 6ISTQB / ISEB Foundation Exam Practice - 6
ISTQB / ISEB Foundation Exam Practice - 6
Yogindernath Gupta
 
Manual testing concepts course 1
Manual testing concepts course 1Manual testing concepts course 1
Manual testing concepts course 1
Raghu Kiran
 
Testing fundamentals
Testing fundamentalsTesting fundamentals
Testing fundamentals
Raviteja Chowdary Adusumalli
 
powerpoint template for testing training
powerpoint template for testing trainingpowerpoint template for testing training
powerpoint template for testing training
John Roddy
 
Tlc
TlcTlc
Iseb, ISTQB Static Testing
Iseb, ISTQB Static TestingIseb, ISTQB Static Testing
Iseb, ISTQB Static Testing
onsoftwaretest
 
Static testing techniques
Static testing techniquesStatic testing techniques
Static testing techniques
Mazenetsolution
 
TESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPTTESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPT
suhasreddy1
 
Software testing
Software testing Software testing
Software testing
Kunal Prajapati
 
Basic Guide to Manual Testing
Basic Guide to Manual TestingBasic Guide to Manual Testing
Basic Guide to Manual Testing
Hiral Gosani
 
St
StSt
Manual testing
Manual testingManual testing
Manual testing
Vivek V
 

What's hot (20)

ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3
 
Software testing
Software testingSoftware testing
Software testing
 
Fundamentals of software testing
Fundamentals of software testingFundamentals of software testing
Fundamentals of software testing
 
Software testing
Software testingSoftware testing
Software testing
 
Software Testing 101
Software Testing 101Software Testing 101
Software Testing 101
 
Testing concepts [3] - Software Testing Techniques (CIS640)
Testing concepts [3] - Software Testing Techniques (CIS640)Testing concepts [3] - Software Testing Techniques (CIS640)
Testing concepts [3] - Software Testing Techniques (CIS640)
 
Test Levels & Techniques
Test Levels & TechniquesTest Levels & Techniques
Test Levels & Techniques
 
ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1ISTQB / ISEB Foundation Exam Practice -1
ISTQB / ISEB Foundation Exam Practice -1
 
ISTQB / ISEB Foundation Exam Practice - 6
ISTQB / ISEB Foundation Exam Practice - 6ISTQB / ISEB Foundation Exam Practice - 6
ISTQB / ISEB Foundation Exam Practice - 6
 
Manual testing concepts course 1
Manual testing concepts course 1Manual testing concepts course 1
Manual testing concepts course 1
 
Testing fundamentals
Testing fundamentalsTesting fundamentals
Testing fundamentals
 
powerpoint template for testing training
powerpoint template for testing trainingpowerpoint template for testing training
powerpoint template for testing training
 
Tlc
TlcTlc
Tlc
 
Iseb, ISTQB Static Testing
Iseb, ISTQB Static TestingIseb, ISTQB Static Testing
Iseb, ISTQB Static Testing
 
Static testing techniques
Static testing techniquesStatic testing techniques
Static testing techniques
 
TESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPTTESTING LIFE CYCLE PPT
TESTING LIFE CYCLE PPT
 
Software testing
Software testing Software testing
Software testing
 
Basic Guide to Manual Testing
Basic Guide to Manual TestingBasic Guide to Manual Testing
Basic Guide to Manual Testing
 
St
StSt
St
 
Manual testing
Manual testingManual testing
Manual testing
 

Viewers also liked

Basic service capability, logistics and supply chain management
Basic service capability, logistics and supply chain managementBasic service capability, logistics and supply chain management
Basic service capability, logistics and supply chain management
Indraja Modem
 
UPS Industrial Buying Dynamics
UPS Industrial Buying DynamicsUPS Industrial Buying Dynamics
UPS Industrial Buying Dynamics
Global Business Professor
 
From Zero to Agile: The Learnings of a First-time Quality Analyst
From Zero to Agile: The Learnings of a First-time Quality AnalystFrom Zero to Agile: The Learnings of a First-time Quality Analyst
From Zero to Agile: The Learnings of a First-time Quality Analyst
Tom Oketch
 
Preparing for new project inbound material logistics operation
Preparing for new project inbound material logistics operationPreparing for new project inbound material logistics operation
Preparing for new project inbound material logistics operation
Wei Li
 
Business Analyst Training in Hyderabad
Business Analyst Training in HyderabadBusiness Analyst Training in Hyderabad
Business Analyst Training in Hyderabad
Ugs8008
 
Scorecard for subcontracted 2 p ls & 3pls
Scorecard for subcontracted 2 p ls & 3plsScorecard for subcontracted 2 p ls & 3pls
Scorecard for subcontracted 2 p ls & 3pls
Wei Li
 
Business Analyst Modules
Business Analyst ModulesBusiness Analyst Modules
Business Analyst Modules
sfsugis
 
Service Blueprint - Supply Chain Logistics DHL
Service Blueprint - Supply Chain Logistics DHLService Blueprint - Supply Chain Logistics DHL
Service Blueprint - Supply Chain Logistics DHL
Tushar G
 
Customer oriented logistics management
Customer oriented logistics managementCustomer oriented logistics management
Customer oriented logistics management
Aruzmahajan
 
What Every Project Manager Should Know About Itil
What Every Project Manager Should Know About ItilWhat Every Project Manager Should Know About Itil
What Every Project Manager Should Know About Itil
Daniel Cayouette
 
Internal Auditor Course
Internal Auditor CourseInternal Auditor Course
Internal Auditor Course
Dan Stehling
 
IT and Business Service Catalogs
IT and Business Service CatalogsIT and Business Service Catalogs
IT and Business Service Catalogs
ITSM Academy, Inc.
 
Logistics as Customer Service
Logistics as Customer ServiceLogistics as Customer Service
Logistics as Customer Service
Yonus Siddiqui
 
Courier And Logistics
Courier And LogisticsCourier And Logistics
Courier And Logistics
Jitendra
 
Air cargo overview ppt
Air cargo overview pptAir cargo overview ppt
Air cargo overview ppt
Dr Suddhendu Misra
 
Business Analyst Training
Business  Analyst  TrainingBusiness  Analyst  Training
Business Analyst Training
Craig Brown
 
Air Cargo 101
Air Cargo 101Air Cargo 101
Air Cargo 101
Yanli Liu
 
Principles Of Logistics Management
Principles Of Logistics ManagementPrinciples Of Logistics Management
Principles Of Logistics Management
Yvonne
 
Freight forwarding presentation
Freight forwarding presentationFreight forwarding presentation
Freight forwarding presentation
Danna
 
Logistics Management Presentation
Logistics Management PresentationLogistics Management Presentation
Logistics Management Presentation
ctburns72
 

Viewers also liked (20)

Basic service capability, logistics and supply chain management
Basic service capability, logistics and supply chain managementBasic service capability, logistics and supply chain management
Basic service capability, logistics and supply chain management
 
UPS Industrial Buying Dynamics
UPS Industrial Buying DynamicsUPS Industrial Buying Dynamics
UPS Industrial Buying Dynamics
 
From Zero to Agile: The Learnings of a First-time Quality Analyst
From Zero to Agile: The Learnings of a First-time Quality AnalystFrom Zero to Agile: The Learnings of a First-time Quality Analyst
From Zero to Agile: The Learnings of a First-time Quality Analyst
 
Preparing for new project inbound material logistics operation
Preparing for new project inbound material logistics operationPreparing for new project inbound material logistics operation
Preparing for new project inbound material logistics operation
 
Business Analyst Training in Hyderabad
Business Analyst Training in HyderabadBusiness Analyst Training in Hyderabad
Business Analyst Training in Hyderabad
 
Scorecard for subcontracted 2 p ls & 3pls
Scorecard for subcontracted 2 p ls & 3plsScorecard for subcontracted 2 p ls & 3pls
Scorecard for subcontracted 2 p ls & 3pls
 
Business Analyst Modules
Business Analyst ModulesBusiness Analyst Modules
Business Analyst Modules
 
Service Blueprint - Supply Chain Logistics DHL
Service Blueprint - Supply Chain Logistics DHLService Blueprint - Supply Chain Logistics DHL
Service Blueprint - Supply Chain Logistics DHL
 
Customer oriented logistics management
Customer oriented logistics managementCustomer oriented logistics management
Customer oriented logistics management
 
What Every Project Manager Should Know About Itil
What Every Project Manager Should Know About ItilWhat Every Project Manager Should Know About Itil
What Every Project Manager Should Know About Itil
 
Internal Auditor Course
Internal Auditor CourseInternal Auditor Course
Internal Auditor Course
 
IT and Business Service Catalogs
IT and Business Service CatalogsIT and Business Service Catalogs
IT and Business Service Catalogs
 
Logistics as Customer Service
Logistics as Customer ServiceLogistics as Customer Service
Logistics as Customer Service
 
Courier And Logistics
Courier And LogisticsCourier And Logistics
Courier And Logistics
 
Air cargo overview ppt
Air cargo overview pptAir cargo overview ppt
Air cargo overview ppt
 
Business Analyst Training
Business  Analyst  TrainingBusiness  Analyst  Training
Business Analyst Training
 
Air Cargo 101
Air Cargo 101Air Cargo 101
Air Cargo 101
 
Principles Of Logistics Management
Principles Of Logistics ManagementPrinciples Of Logistics Management
Principles Of Logistics Management
 
Freight forwarding presentation
Freight forwarding presentationFreight forwarding presentation
Freight forwarding presentation
 
Logistics Management Presentation
Logistics Management PresentationLogistics Management Presentation
Logistics Management Presentation
 

Similar to Quality Analyst Training - Gain America

Software testing-and-analysis
Software testing-and-analysisSoftware testing-and-analysis
Software testing-and-analysis
WBUTTUTORIALS
 
SENG202-v-and-v-modeling_121810.pptx
SENG202-v-and-v-modeling_121810.pptxSENG202-v-and-v-modeling_121810.pptx
SENG202-v-and-v-modeling_121810.pptx
MinsasWorld
 
Sv&V Rim
Sv&V RimSv&V Rim
Sv&V Rim
wachakhan
 
Verification and Validation in Software Engineering SE19
Verification and Validation in Software Engineering SE19Verification and Validation in Software Engineering SE19
Verification and Validation in Software Engineering SE19
koolkampus
 
L software testing
L   software testingL   software testing
L software testing
Fáber D. Giraldo
 
verification and validation
verification and validationverification and validation
verification and validation
Dinesh Pasi
 
Software Quality
Software Quality Software Quality
Software Quality
Danial Mirza
 
Mca se chapter_07_software_validation
Mca se chapter_07_software_validationMca se chapter_07_software_validation
Mca se chapter_07_software_validation
Aman Adhikari
 
Software Quality Assurance
Software Quality AssuranceSoftware Quality Assurance
Software Quality Assurance
Saqib Raza
 
SECh1920
SECh1920SECh1920
SECh1920
Joe Christensen
 
Software testing & Quality Assurance
Software testing & Quality Assurance Software testing & Quality Assurance
Software testing & Quality Assurance
Webtech Learning
 
Objectorientedtesting 160320132146
Objectorientedtesting 160320132146Objectorientedtesting 160320132146
Objectorientedtesting 160320132146
vidhyyav
 
Object oriented testing
Object oriented testingObject oriented testing
Object oriented testing
Haris Jamil
 
Ch22
Ch22Ch22
Ch22
phanleson
 
Software Testing PPT | Software All Testing
Software Testing PPT | Software All TestingSoftware Testing PPT | Software All Testing
Software Testing PPT | Software All Testing
sankalpkumarsahoo174
 
Software testing and software development process
Software testing and software development processSoftware testing and software development process
Software testing and software development process
Gen Aloys Ochola Badde
 
SW Testing Fundamentals
SW Testing FundamentalsSW Testing Fundamentals
SW Testing Fundamentals
Ismail aboulezz
 
testing.pptx
testing.pptxtesting.pptx
testing.pptx
jagadeeppapisettipal
 
Software_Testing_ppt.pptx
Software_Testing_ppt.pptxSoftware_Testing_ppt.pptx
Software_Testing_ppt.pptx
BharathReddy615859
 
softwaretestingppt-120810095500-phpapp02 (1).pdf
softwaretestingppt-120810095500-phpapp02 (1).pdfsoftwaretestingppt-120810095500-phpapp02 (1).pdf
softwaretestingppt-120810095500-phpapp02 (1).pdf
BabaShaikh3
 

Similar to Quality Analyst Training - Gain America (20)

Software testing-and-analysis
Software testing-and-analysisSoftware testing-and-analysis
Software testing-and-analysis
 
SENG202-v-and-v-modeling_121810.pptx
SENG202-v-and-v-modeling_121810.pptxSENG202-v-and-v-modeling_121810.pptx
SENG202-v-and-v-modeling_121810.pptx
 
Sv&V Rim
Sv&V RimSv&V Rim
Sv&V Rim
 
Verification and Validation in Software Engineering SE19
Verification and Validation in Software Engineering SE19Verification and Validation in Software Engineering SE19
Verification and Validation in Software Engineering SE19
 
L software testing
L   software testingL   software testing
L software testing
 
verification and validation
verification and validationverification and validation
verification and validation
 
Software Quality
Software Quality Software Quality
Software Quality
 
Mca se chapter_07_software_validation
Mca se chapter_07_software_validationMca se chapter_07_software_validation
Mca se chapter_07_software_validation
 
Software Quality Assurance
Software Quality AssuranceSoftware Quality Assurance
Software Quality Assurance
 
SECh1920
SECh1920SECh1920
SECh1920
 
Software testing & Quality Assurance
Software testing & Quality Assurance Software testing & Quality Assurance
Software testing & Quality Assurance
 
Objectorientedtesting 160320132146
Objectorientedtesting 160320132146Objectorientedtesting 160320132146
Objectorientedtesting 160320132146
 
Object oriented testing
Object oriented testingObject oriented testing
Object oriented testing
 
Ch22
Ch22Ch22
Ch22
 
Software Testing PPT | Software All Testing
Software Testing PPT | Software All TestingSoftware Testing PPT | Software All Testing
Software Testing PPT | Software All Testing
 
Software testing and software development process
Software testing and software development processSoftware testing and software development process
Software testing and software development process
 
SW Testing Fundamentals
SW Testing FundamentalsSW Testing Fundamentals
SW Testing Fundamentals
 
testing.pptx
testing.pptxtesting.pptx
testing.pptx
 
Software_Testing_ppt.pptx
Software_Testing_ppt.pptxSoftware_Testing_ppt.pptx
Software_Testing_ppt.pptx
 
softwaretestingppt-120810095500-phpapp02 (1).pdf
softwaretestingppt-120810095500-phpapp02 (1).pdfsoftwaretestingppt-120810095500-phpapp02 (1).pdf
softwaretestingppt-120810095500-phpapp02 (1).pdf
 

Recently uploaded

LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
DanBrown980551
 
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
anilsa9823
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
FilipTomaszewski5
 
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
Mydbops
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
UiPathCommunity
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB
 
intra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_Enintra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_En
NTTDATA INTRAMART
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
Ortus Solutions, Corp
 
Facilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptxFacilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptx
Knoldus Inc.
 
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time MLMongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
ScyllaDB
 
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDBScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB
 
Day 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio FundamentalsDay 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio Fundamentals
UiPathCommunity
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
Enterprise Knowledge
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
ScyllaDB
 
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
zjhamm304
 
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to SuccessMongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
ScyllaDB
 
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
AlexanderRichford
 
APJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes WebinarAPJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes Webinar
ThousandEyes
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving
 

Recently uploaded (20)

LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
 
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
 
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
 
intra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_Enintra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_En
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
 
Facilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptxFacilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptx
 
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time MLMongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
 
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDBScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
 
Day 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio FundamentalsDay 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio Fundamentals
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
 
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
 
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to SuccessMongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
 
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
 
APJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes WebinarAPJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes Webinar
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
 

Quality Analyst Training - Gain America

  • 1.
  • 2.    Verification and validation should establish confidence that the software is fit for purpose This does NOT mean completely free of defects Rather, it must be good enough for its intended use and the type of use will determine the degree of confidence that is needed
  • 3. • • Verification: The software should conform to its specification (Are we building the product right?) Validation: The software should do what the user really requires (Are we building the right product?)
  • 4.         Requirements Phase Specification Phase (Analysis) Planning Phase Design Phase Implementation Phase Integration and Testing Maintenance Retirement
  • 5. • • Is a whole life-cycle process - V & V must be applied at each stage in the software process. Has two principal objectives – The discovery of defects in a system – The assessment of whether or not the system is usable in an operational situation.
  • 6. • • Software inspections and walkthroughs - Concerned with analysis of the static system representation to discover problems (static verification) Software testing - Concerned with exercising and observing product behaviour (dynamic verification) – The system is executed with test data and its operational behaviour is observed
  • 7. S t at ic verifi cat io n R equ irem ent s s pecifi cat io n P ro to ty pe Hi g h-lev el d es ig n Fo rm al s pecifi cat io n Det ail ed d es ig n P rog ram Dy nam i c v ali dat io n
  • 8. • • • • Careful planning is required to get the most out of testing and inspection processes Planning should start early in the development process The plan should identify the balance between static verification and testing Test planning is about defining standards for the testing process rather than describing product tests
  • 9. Requ ir em ent s s pecifi cat io n S y st em s pecifi cat io n S y st em i nt eg rat io n t es t pl an Accep tan ce t es t pl an S ervi ce Sy stem d es ig n Accep tan ce t es t Det ail ed d es ig n S u b-s ys tem i nt eg rat io n t es t pl an Sy stem i nt eg ratio n t est S u b-s ys tem i nt eg rat io n t est M o du le an d u ni t co de and t ess
  • 10.        The testing process Requirements traceability Tested items Testing schedule Test recording procedures Hardware and software requirements Constraints
  • 11.   Informal examination of a product (document) Made up of: ◦ ◦ ◦ ◦  developers client next phase developers Software Quality Assurance group leader Produces: ◦ list of items not understood ◦ list of items thought to be incorrect
  • 12.     Involve people examining the source representation with the aim of discovering anomalies and defects Do not require execution of a system so may be used before implementation May be applied to any representation of the system (requirements, design, test data, etc.) Very effective technique for discovering errors
  • 13.   Many different defects may be discovered in a single inspection. In testing, one defect may mask another so several executions are required The reuse domain and programming knowledge so reviewers are likely to have seen the types of error that commonly arise
  • 14.     Inspections and testing are complementary and not opposing verification techniques Both should be used during the V & V process Inspections can check conformance with a specification but not conformance with the customer‟s real requirements Inspections cannot check non-functional characteristics such as performance, usability, etc.
  • 15.    Formalised approach to document reviews Intended explicitly for defect DETECTION (not correction) Defects may be logical errors, anomalies in the code that might indicate an erroneous condition (e.g. an un-initialised variable) or non-compliance with standards
  • 16.       A precise specification must be available Team members must be familiar with the organisation standards Syntactically correct code must be available An error checklist should be prepared Management must accept that inspection will increase costs early in the software process Management must not use inspections for staff appraisal
  • 17.      System overview presented to inspection team Code and associated documents are distributed to inspection team in advance Inspection takes place and discovered errors are noted Modifications are made to repair discovered errors Re-inspection may or may not be required
  • 18.       Made up of at least 4 members Author of the code being inspected Inspector who finds errors, omissions and inconsistencies Reader who reads the code to the team Moderator who chairs the meeting and notes discovered errors Other roles are Scribe and Chief moderator
  • 19.     Checklist of common errors should be used to drive the inspection Error checklist is programming language dependent The 'weaker' the type checking, the larger the checklist Examples: Initialization, Constant naming, loop termination, array bounds, etc.
  • 20.      500 statements/hour during overview 125 source statement/hour during individual preparation 90-125 statements/hour can be inspected Inspection is therefore an expensive process Inspecting 500 lines costs about 40 man/hours effort (@ $50/hr = $2000!!!)
  • 21. • • • • Can reveal the presence of errors NOT their absence A successful test is a test which discovers one or more errors The only validation technique for non-functional requirements Should be used in conjunction with static verification to provide full V&V coverage
  • 22.     “Program testing can be a very effective way to show the presents of bugs but is hopelessly inadequate for showing their absence” [Dijkstra] Fault: “bug” incorrect piece of code Failure: result of a fault Error: mistake made by the programmer/developer
  • 23. • • • • Defect testing and debugging are distinct processes Verification and validation is concerned with establishing the existence of defects in a program Debugging is concerned with locating and repairing these errors Debugging involves formulating a hypothesis about program behaviour then testing these hypotheses to find the system error
  • 24. Test resu lt s Lo cat e erro r Test cases Sp eci ficat io n Des ig n erro r repai r Repai r erro r R e-tes t p rog ram
  • 25. C o m po nent t es ti ng Int egrat io n t es ti ng So ftw are dev elo per Ind epen den t tes ti ng team
  • 26.  Component testing ◦ ◦ ◦  Testing of individual program components Usually the responsibility of the component developer (except sometimes for critical systems) Tests are derived from the developer‟s experience Integration testing ◦ ◦ ◦ Testing of groups of components integrated to create a system or sub-system The responsibility of an independent testing team Tests are based on a system specification
  • 27. • • • • Only exhaustive testing can show a program is free from defects. However, exhaustive testing is impossible Tests should exercise a system's capabilities rather than its components Testing old capabilities is more important than testing new capabilities Testing typical situations is more important than boundary value cases
  • 28. • Test data Inputs which have been devised • Test cases Inputs to test the system and to test the system the predicted outputs from these inputs if the system operates according to its specification
  • 29.    Test cases and test scenarios comprise much of a software systems testware. Black box test cases are developed by domain analysis and examination of the system requirements and specification. Glass box test cases are developed by examining the behavior of the source code.
  • 30.  Test to specification: ◦ ◦ ◦ ◦  Black box, Data driven Functional testing Code is ignored: only use specification document to develop test cases Test to code: ◦ Glass box/White box ◦ Logic driven testing ◦ Ignore specification and only examine the code.
  • 31.    An approach to testing where the program is considered as a „black-box‟ The program test cases are based on the system specification Test planning can begin early in the software process
  • 32. I n a Inp ut t est dat a I p n b u t o m h e a s c a v l i a o o u u u s i n g s r e S y s t e m O t Ou t pu t t est resu lt s Oe d u h t e e p u p f e t r c e t s s s w e h n c i e c h o r f e v e a l
  • 33. • • • • Sometime called structural testing or glass-box testing Derivation of test cases according to program structure Knowledge of the program is used to identify additional test cases Objective is to exercise all program statements (not all path combinations)
  • 34.  Statement coverage ◦ Test cases which will execute every statement at least once. ◦ Tools exist for help ◦ No guarantee that all branches are properly tested. Loop exit?  Branch coverage ◦ All branches are tested once  Path coverage - Restriction of type of paths: ◦ Linear code sequences ◦ Definition/Use checking (all definition/use paths) ◦ Can locate dead code
  • 35. Test d at a Test s Deri ves C o m po nent cod e Test o ut pu ts