尊敬的 微信汇率:1円 ≈ 0.046239 元 支付宝汇率:1円 ≈ 0.04633元 [退出登录]
SlideShare a Scribd company logo
Mehran University of Engineering and
Technology, Jamshoro
Surveying
Surveying Camp:
In Surveying camp Different tasks are performed by using
different technics for taking observations in the field.
Determine the Independent Coordinates of
Existing Building
Calculated coordinates of
Buildings are;
(528,-73)
(684,34)
(545,215)
(647,294)
(762,161)
(1280,146)
(1059,477)
(1036,355)
(919,486)
(960,514)
(1023,525)
(1036,567)
(1075,594)
(1105,578)
(1095,527)
(1384,224)
(1628,231)
(1458,276)
(1694,652)
(1277,594)
(1174,608)
(1198,614)
(1200,639)
(1228,647)
(1276,728)
(1231,704)
(1208,709)
(1207,733)
(1189,756)
(1247,794)
(1334,749)
(1561,1142)
(1367,975)
(1295,1064)
(1234,1304)
(1179,1104)
(871,1239)
(1056,1094)
(953,1022)
(709,967)
(879,901)
(858,711)
(994,748)
(901,779)
(1021,828)
(1102,764)
(1048,737)
(1050,625)
(1012,602)
(972,639)
(867,614)
(906,597)
(947,550)
(898,515)
(775,647)
(476,643)
(388,356)
(349,402)
(247,523)
(202,285)
-200
0
200
400
600
800
1000
1200
0 200 400 600 800 1000 1200 1400 1600
The plan of existing building by plotting
the coordinates using Microsoft Excel
The plan of existing building by plotting the
coordinates using AutoCAD software
Measurement 0f the Area of a Closed Traverse
and Existing Biulding Using GPS
Geographic Coordinate System:
A geographic coordinate system is a coordinate system that enables every location
on Earth to be specified by a set of numbers, letters or symbols.
160
170
180
190
200
210
220
230
160 170 180 190 200 210 220 230 240
Northings
Eastings
Graph of Travers on
GPS(Garmin etrex 10)
Graph of Biulding on
GPS(Garmin etrex 10)
S.
N
O
Lin
e
Len
gth
(me
ters
)
Stadia’s (m) Bearings
(Ө)
Consecutive
coordinates
Independent
coordinates
Lat:
=LcosӨ
Dep: =
LsinӨ
Eastings
(E)
Northings
(N)U/S, C/S, L/S
1 O … ……. …….. …….. 200 200
2 OA 31 195ᶱ27’30’’ -29.878 -8.263 191.737 170.122
3 OB 30.
5
1.625, 1.52,
1.37
213ᶱ44’05’’ -25.443 -16.819 183.181 174.557
4 OC 32.
5
1.73, 1.57,
1.405
234ᶱ28’40’’ -18.883 -26.451 173.549 181.117
5 OD 35.
5
1.785, 1.605,
1.40
247ᶱ52’30’’ -13.370 -32.886 167.114 186.63
6 OE 36.
5
1.76, 1.575,
1.393
258ᶱ33’55’’ -7.236 -35.775 164.225 192.764
7 OF 37 1.785, 1.59,
1.415
268ᶱ26’44’’ -1.004 -36.986 163.014 198.996
8 OG 31 1.69, 1.53, 1.38 277ᶱ55’35’’ +4.275 -30.704 169.296 204.275
9 OH 28 1.63, 1.43, 1.34 289ᶱ02’40’’ +9.136 -26.467 173.467 209.136
1
0
OI 24 1.46, 1.34, 1.34 302ᶱ18’05’’ +12.825 -20.286 179.714 212.825
1
1
OJ 21 1.46, 1.34, 1.22 317ᶱ04’00’’ +17.988 -14.304 185.696 217.988
1
2
OK 23 1.34, 1.24, 1.13 342ᶱ05’35’’ +21.886 -7.072 192.928 221.886
1
3
OL 25 1.29, 1.175,
1.06
10ᶱ23’25’’ +24.590 +4.509 204.509 224.590
1
4
O
M
24.
5
1.285, 1.16,
1.04
26ᶱ30’05’’ +21.926 +10.932 210.932 221.926
1
5
ON 31.
5
1.01, 0.85,
0.695
38ᶱ46’10’’ +24.559 +19.725 219.725 224.559
1
6
OO
’
35.
5
0.745, 0.57,
0.39
53ᶱ03’35’’ +21.335 +28.374 228.374 221.335
1
7
OP 26 0.89, 0.76, 0.63 74ᶱ41’40’’ +6.863 ++25.07
8
225.078 206.863
1
8
OQ 33.
5
0.863, 0.7, 0.53 94ᶱ53’35’’ -2.857 +33.378 233.378 197.143
1
9
OR 32 1.24, 1.08, 0.92 121ᶱ07’30’’ -16.541 +27.393 227.393 183.459
2
0
OS 29 1.365, 1.22,
1.075
141ᶱ23’50’’ -22.663 +18.093 218.093 177.337
2
1
OT 28 1.61, 1.47, 1.33 161ᶱ37’40’’ -26.573 +8.825 208.825 173.427
Observations and Calculations:
The plan of existing building by plotting the
coordinates using Microsoft Excel
Profile Leveling and Plotting of L-section of Ground
Profile or L-section:
It is the graph between distance and reduce
levels of ground or road. In case of road
profile levelling the level of the road can
be determined at different points by
reading the road profile level.
Distance:
Total ground length taken 300 meters and
take the readings at the interval of
10meters
S.N
O
Statio
ns/lin
es
Distance Staff readings(m) H.I Reduced
levels(m)
Remarks
B.S I.S F.S
1 O 0 0.995 100.99
5
100 B.M
2 A 10 0.48 100.52
3 B 20 0.48 100.515
4 C 30 0.78 100.215
5 D 40 1.61 99.385
6 E 50 2.75 98.245
7 F 60 4.11 96.885
8 G 70 0.28 4.64 96.64 96.36 C.P1
9 H 80 0.91 95.73
10 I 90 1.10 95.54
11 J 100 1.31 95.335
12 K 110 1.75 94.885
13 L 120 1.85 94.785
14 M 130 2.00 94.64
15 N 140 2.09 94.55
16 O’ 150 2.19 94.45
17 P 160 1.17 2.19 95.62 94.45 C.P2
18 Q 170 1.28 94.345
19 R 180 1.37 94.25
20 S 190 1.38 94.24
21 T 200 1.54 94.085
22 U 210 1.44 94.18
23 V 220 1.40 94.22
24 W 230 1.26 94.36
25 X 240 1.25 94.367
26 Y 250 1.415 0.73 96.305 94.89 C.P3
27 Z’ 260 1.42 94.89
28 A’ 270 1.41 94.9
29 B’ 280 1.38 94.93
30 C’ 290 1.33 94.98
31 D’ 300 1.24 95.065
32 E’ 310 1.16 95.145
∑B.S=
3.86
∑F.S=
8.715
Observations and Calculations:
93
94
95
96
97
98
99
100
101
0 50 100 150 200 250 300 350
R.Ls.(Meters)
Distance (Meters)
Profile of Ground
Profile of Ground or L-section on
Microsoft Excel
Layout of Simple Curve by Deflection Angle
Method
Definition of Simple Curve:
It is the curve which consists of single arc of circle to connect two straight lines. This
curve is tangential to both lines. It has constant radius.
Point Chainages Chord Length Small
deflection
angles
Total
Deflection
Angles
T1 1183 ----- ------ -----
P1 1190 7 0ᶱ48’08’’ 0ᶱ48’08’’
P2 1210 20 2ᶱ17’31’’ 3ᶱ5’40’’
P3 1230 20 2ᶱ17’31’’ 5ᶱ23’00’’
P4 1250 20 2ᶱ17’31’’ 7ᶱ40’40’’
P5 1270 20 2ᶱ17’31’’ 9ᶱ58’00’’
P6 1290 20 2ᶱ17’31’’ 12ᶱ15’40’’
P7 1310 20 2ᶱ17’31’’ 14ᶱ33’20’’
T2 1313 3 0ᶱ26’45’’ 15ᶱ00’00’’
T=6
7
E=8.
82
P
C
M=8.8
5
P
T
L
Setting out Table:
Graph of Simple Circular Curve
Layout of Building Plan or Marking of
Columns and Grids
The process of laying out (setting out) of a building or structure is an important
part of surveying, as it enables the works to proceed on site exactly according to
the prepared designs. It constitutes of marking boundary walls or grids (center
line of columns) by using Pythagoras theorem method.
Graph in AutoCAD Field picture of Layout of Building

More Related Content

What's hot

Baja wf
Baja wfBaja wf
Ejemplo de aplicación #2 osawa
Ejemplo de aplicación #2   osawaEjemplo de aplicación #2   osawa
Ejemplo de aplicación #2 osawa
Anthony Sandoval Valenzuela
 
Bryan
BryanBryan
BW Fittings Brochure
BW Fittings BrochureBW Fittings Brochure
BW Fittings Brochure
Dawn McKendry
 
Eligheor
EligheorEligheor
Eligheor
nickjeorly
 
Tabel baja-wf-lrfd
Tabel baja-wf-lrfdTabel baja-wf-lrfd
Tabel baja-wf-lrfd
Gunawan Sulistyo
 
TABEL BAUT
TABEL BAUTTABEL BAUT
Z table
Z tableZ table
Gam km_Spec Sheet
Gam km_Spec SheetGam km_Spec Sheet
Gam km_Spec Sheet
Electromate
 
H Sections- Plate Fabricated Sections Product List
H Sections- Plate Fabricated Sections Product List H Sections- Plate Fabricated Sections Product List
H Sections- Plate Fabricated Sections Product List
MRUDEET VALIA
 
Development of Disc Coupling Design for Railways
Development of Disc Coupling Design for RailwaysDevelopment of Disc Coupling Design for Railways
Development of Disc Coupling Design for Railways
Gehendra Sharma
 
Capítulo 03 materiais
Capítulo 03   materiaisCapítulo 03   materiais
Capítulo 03 materiais
Jhayson Carvalho
 
Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)
Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)
Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)
Sayogyo Rahman Doko
 
I Sections- Plate Fabricated Sections Product List
I Sections- Plate Fabricated Sections Product ListI Sections- Plate Fabricated Sections Product List
I Sections- Plate Fabricated Sections Product List
MRUDEET VALIA
 
What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...
What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...
What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...
aj126love
 
Calculation template
Calculation templateCalculation template
Calculation template
Yekian Ian
 
Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...
Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...
Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...
Jaehyun Song
 
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
azhar ahmad
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
ing_eliali4748
 

What's hot (19)

Baja wf
Baja wfBaja wf
Baja wf
 
Ejemplo de aplicación #2 osawa
Ejemplo de aplicación #2   osawaEjemplo de aplicación #2   osawa
Ejemplo de aplicación #2 osawa
 
Bryan
BryanBryan
Bryan
 
BW Fittings Brochure
BW Fittings BrochureBW Fittings Brochure
BW Fittings Brochure
 
Eligheor
EligheorEligheor
Eligheor
 
Tabel baja-wf-lrfd
Tabel baja-wf-lrfdTabel baja-wf-lrfd
Tabel baja-wf-lrfd
 
TABEL BAUT
TABEL BAUTTABEL BAUT
TABEL BAUT
 
Z table
Z tableZ table
Z table
 
Gam km_Spec Sheet
Gam km_Spec SheetGam km_Spec Sheet
Gam km_Spec Sheet
 
H Sections- Plate Fabricated Sections Product List
H Sections- Plate Fabricated Sections Product List H Sections- Plate Fabricated Sections Product List
H Sections- Plate Fabricated Sections Product List
 
Development of Disc Coupling Design for Railways
Development of Disc Coupling Design for RailwaysDevelopment of Disc Coupling Design for Railways
Development of Disc Coupling Design for Railways
 
Capítulo 03 materiais
Capítulo 03   materiaisCapítulo 03   materiais
Capítulo 03 materiais
 
Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)
Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)
Homework 3: Metode Schrenk dan Gaya Dalam (Schrenk’s Method and Internal Forces)
 
I Sections- Plate Fabricated Sections Product List
I Sections- Plate Fabricated Sections Product ListI Sections- Plate Fabricated Sections Product List
I Sections- Plate Fabricated Sections Product List
 
What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...
What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...
What is the Effect of Various Road Surfaces in Beijing on the Deceleration of...
 
Calculation template
Calculation templateCalculation template
Calculation template
 
Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...
Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...
Review: Cyrus, Samii, Laura Paler, and Sarah Zukerman Daly. 2016. “Retrospect...
 
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
 

Similar to Poster of surveying tasks

Tablice beton
Tablice betonTablice beton
Tablice beton
ako123arko
 
Shi20396 ch03
Shi20396 ch03Shi20396 ch03
Shi20396 ch03
Paralafakyou Mens
 
LED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORTLED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORT
Luminhome Lighting
 
Regression project
Regression projectRegression project
Regression project
shrinivasvasala
 
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandroTarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
Alejandro Cabrera
 
02 cuadros hidrologia
02 cuadros hidrologia02 cuadros hidrologia
02 cuadros hidrologia
ChrisRedfield29
 
Ch02
Ch02Ch02
Calculo de volumen
Calculo de volumenCalculo de volumen
Calculo de volumen
jose montilla
 
04.08121302
04.0812130204.08121302
736.500Tunnel As.pdf
736.500Tunnel As.pdf736.500Tunnel As.pdf
736.500Tunnel As.pdf
SumanBiswas825463
 
Cp 24062018 2241
Cp 24062018 2241Cp 24062018 2241
Cp 24062018 2241
Shze Hwa Lee
 
Rio cojedes total mediciones
Rio cojedes total medicionesRio cojedes total mediciones
Rio cojedes total mediciones
Orlando Rodriguez
 
Study on baltim field,b.sc graduation project 2015, by atam team
Study on baltim field,b.sc graduation project 2015, by atam teamStudy on baltim field,b.sc graduation project 2015, by atam team
Study on baltim field,b.sc graduation project 2015, by atam team
PE Mahmoud Jad
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SUMARDIONO .
 
Metode nakayasu
Metode nakayasuMetode nakayasu
Metode nakayasu
Arista Aulia
 
Perhitunngan
PerhitunnganPerhitunngan
Perhitunngan
Nadya Herida
 
R and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdf
R and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdfR and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdf
R and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdf
ssuserc0e014
 
Linear regression an 80 year study of the dow jones industrial average
Linear regression  an 80 year study of the dow jones industrial averageLinear regression  an 80 year study of the dow jones industrial average
Linear regression an 80 year study of the dow jones industrial average
TehyaSingleton
 
Linear regression an 80 year study of the dow jones industrial average
Linear regression  an 80 year study of the dow jones industrial averageLinear regression  an 80 year study of the dow jones industrial average
Linear regression an 80 year study of the dow jones industrial average
TehyaSingleton
 
Tablas normal chi cuadrado y t student 1-semana 6
Tablas normal chi cuadrado y t student 1-semana 6Tablas normal chi cuadrado y t student 1-semana 6
Tablas normal chi cuadrado y t student 1-semana 6
Karla Diaz
 

Similar to Poster of surveying tasks (20)

Tablice beton
Tablice betonTablice beton
Tablice beton
 
Shi20396 ch03
Shi20396 ch03Shi20396 ch03
Shi20396 ch03
 
LED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORTLED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORT
 
Regression project
Regression projectRegression project
Regression project
 
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandroTarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
 
02 cuadros hidrologia
02 cuadros hidrologia02 cuadros hidrologia
02 cuadros hidrologia
 
Ch02
Ch02Ch02
Ch02
 
Calculo de volumen
Calculo de volumenCalculo de volumen
Calculo de volumen
 
04.08121302
04.0812130204.08121302
04.08121302
 
736.500Tunnel As.pdf
736.500Tunnel As.pdf736.500Tunnel As.pdf
736.500Tunnel As.pdf
 
Cp 24062018 2241
Cp 24062018 2241Cp 24062018 2241
Cp 24062018 2241
 
Rio cojedes total mediciones
Rio cojedes total medicionesRio cojedes total mediciones
Rio cojedes total mediciones
 
Study on baltim field,b.sc graduation project 2015, by atam team
Study on baltim field,b.sc graduation project 2015, by atam teamStudy on baltim field,b.sc graduation project 2015, by atam team
Study on baltim field,b.sc graduation project 2015, by atam team
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
 
Metode nakayasu
Metode nakayasuMetode nakayasu
Metode nakayasu
 
Perhitunngan
PerhitunnganPerhitunngan
Perhitunngan
 
R and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdf
R and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdfR and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdf
R and B SOR FOR BUILDING WORKS AHMEDABAD CITY 2021_22.pdf
 
Linear regression an 80 year study of the dow jones industrial average
Linear regression  an 80 year study of the dow jones industrial averageLinear regression  an 80 year study of the dow jones industrial average
Linear regression an 80 year study of the dow jones industrial average
 
Linear regression an 80 year study of the dow jones industrial average
Linear regression  an 80 year study of the dow jones industrial averageLinear regression  an 80 year study of the dow jones industrial average
Linear regression an 80 year study of the dow jones industrial average
 
Tablas normal chi cuadrado y t student 1-semana 6
Tablas normal chi cuadrado y t student 1-semana 6Tablas normal chi cuadrado y t student 1-semana 6
Tablas normal chi cuadrado y t student 1-semana 6
 

Recently uploaded

Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Poonam Singh
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
Geoffrey Wardle. MSc. MSc. Snr.MAIAA
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
tanujaharish2
 

Recently uploaded (20)

Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
 

Poster of surveying tasks

  • 1. Mehran University of Engineering and Technology, Jamshoro Surveying Surveying Camp: In Surveying camp Different tasks are performed by using different technics for taking observations in the field. Determine the Independent Coordinates of Existing Building Calculated coordinates of Buildings are; (528,-73) (684,34) (545,215) (647,294) (762,161) (1280,146) (1059,477) (1036,355) (919,486) (960,514) (1023,525) (1036,567) (1075,594) (1105,578) (1095,527) (1384,224) (1628,231) (1458,276) (1694,652) (1277,594) (1174,608) (1198,614) (1200,639) (1228,647) (1276,728) (1231,704) (1208,709) (1207,733) (1189,756) (1247,794) (1334,749) (1561,1142) (1367,975) (1295,1064) (1234,1304) (1179,1104) (871,1239) (1056,1094) (953,1022) (709,967) (879,901) (858,711) (994,748) (901,779) (1021,828) (1102,764) (1048,737) (1050,625) (1012,602) (972,639) (867,614) (906,597) (947,550) (898,515) (775,647) (476,643) (388,356) (349,402) (247,523) (202,285) -200 0 200 400 600 800 1000 1200 0 200 400 600 800 1000 1200 1400 1600 The plan of existing building by plotting the coordinates using Microsoft Excel The plan of existing building by plotting the coordinates using AutoCAD software Measurement 0f the Area of a Closed Traverse and Existing Biulding Using GPS Geographic Coordinate System: A geographic coordinate system is a coordinate system that enables every location on Earth to be specified by a set of numbers, letters or symbols. 160 170 180 190 200 210 220 230 160 170 180 190 200 210 220 230 240 Northings Eastings Graph of Travers on GPS(Garmin etrex 10) Graph of Biulding on GPS(Garmin etrex 10) S. N O Lin e Len gth (me ters ) Stadia’s (m) Bearings (Ө) Consecutive coordinates Independent coordinates Lat: =LcosӨ Dep: = LsinӨ Eastings (E) Northings (N)U/S, C/S, L/S 1 O … ……. …….. …….. 200 200 2 OA 31 195ᶱ27’30’’ -29.878 -8.263 191.737 170.122 3 OB 30. 5 1.625, 1.52, 1.37 213ᶱ44’05’’ -25.443 -16.819 183.181 174.557 4 OC 32. 5 1.73, 1.57, 1.405 234ᶱ28’40’’ -18.883 -26.451 173.549 181.117 5 OD 35. 5 1.785, 1.605, 1.40 247ᶱ52’30’’ -13.370 -32.886 167.114 186.63 6 OE 36. 5 1.76, 1.575, 1.393 258ᶱ33’55’’ -7.236 -35.775 164.225 192.764 7 OF 37 1.785, 1.59, 1.415 268ᶱ26’44’’ -1.004 -36.986 163.014 198.996 8 OG 31 1.69, 1.53, 1.38 277ᶱ55’35’’ +4.275 -30.704 169.296 204.275 9 OH 28 1.63, 1.43, 1.34 289ᶱ02’40’’ +9.136 -26.467 173.467 209.136 1 0 OI 24 1.46, 1.34, 1.34 302ᶱ18’05’’ +12.825 -20.286 179.714 212.825 1 1 OJ 21 1.46, 1.34, 1.22 317ᶱ04’00’’ +17.988 -14.304 185.696 217.988 1 2 OK 23 1.34, 1.24, 1.13 342ᶱ05’35’’ +21.886 -7.072 192.928 221.886 1 3 OL 25 1.29, 1.175, 1.06 10ᶱ23’25’’ +24.590 +4.509 204.509 224.590 1 4 O M 24. 5 1.285, 1.16, 1.04 26ᶱ30’05’’ +21.926 +10.932 210.932 221.926 1 5 ON 31. 5 1.01, 0.85, 0.695 38ᶱ46’10’’ +24.559 +19.725 219.725 224.559 1 6 OO ’ 35. 5 0.745, 0.57, 0.39 53ᶱ03’35’’ +21.335 +28.374 228.374 221.335 1 7 OP 26 0.89, 0.76, 0.63 74ᶱ41’40’’ +6.863 ++25.07 8 225.078 206.863 1 8 OQ 33. 5 0.863, 0.7, 0.53 94ᶱ53’35’’ -2.857 +33.378 233.378 197.143 1 9 OR 32 1.24, 1.08, 0.92 121ᶱ07’30’’ -16.541 +27.393 227.393 183.459 2 0 OS 29 1.365, 1.22, 1.075 141ᶱ23’50’’ -22.663 +18.093 218.093 177.337 2 1 OT 28 1.61, 1.47, 1.33 161ᶱ37’40’’ -26.573 +8.825 208.825 173.427 Observations and Calculations: The plan of existing building by plotting the coordinates using Microsoft Excel Profile Leveling and Plotting of L-section of Ground Profile or L-section: It is the graph between distance and reduce levels of ground or road. In case of road profile levelling the level of the road can be determined at different points by reading the road profile level. Distance: Total ground length taken 300 meters and take the readings at the interval of 10meters S.N O Statio ns/lin es Distance Staff readings(m) H.I Reduced levels(m) Remarks B.S I.S F.S 1 O 0 0.995 100.99 5 100 B.M 2 A 10 0.48 100.52 3 B 20 0.48 100.515 4 C 30 0.78 100.215 5 D 40 1.61 99.385 6 E 50 2.75 98.245 7 F 60 4.11 96.885 8 G 70 0.28 4.64 96.64 96.36 C.P1 9 H 80 0.91 95.73 10 I 90 1.10 95.54 11 J 100 1.31 95.335 12 K 110 1.75 94.885 13 L 120 1.85 94.785 14 M 130 2.00 94.64 15 N 140 2.09 94.55 16 O’ 150 2.19 94.45 17 P 160 1.17 2.19 95.62 94.45 C.P2 18 Q 170 1.28 94.345 19 R 180 1.37 94.25 20 S 190 1.38 94.24 21 T 200 1.54 94.085 22 U 210 1.44 94.18 23 V 220 1.40 94.22 24 W 230 1.26 94.36 25 X 240 1.25 94.367 26 Y 250 1.415 0.73 96.305 94.89 C.P3 27 Z’ 260 1.42 94.89 28 A’ 270 1.41 94.9 29 B’ 280 1.38 94.93 30 C’ 290 1.33 94.98 31 D’ 300 1.24 95.065 32 E’ 310 1.16 95.145 ∑B.S= 3.86 ∑F.S= 8.715 Observations and Calculations: 93 94 95 96 97 98 99 100 101 0 50 100 150 200 250 300 350 R.Ls.(Meters) Distance (Meters) Profile of Ground Profile of Ground or L-section on Microsoft Excel Layout of Simple Curve by Deflection Angle Method Definition of Simple Curve: It is the curve which consists of single arc of circle to connect two straight lines. This curve is tangential to both lines. It has constant radius. Point Chainages Chord Length Small deflection angles Total Deflection Angles T1 1183 ----- ------ ----- P1 1190 7 0ᶱ48’08’’ 0ᶱ48’08’’ P2 1210 20 2ᶱ17’31’’ 3ᶱ5’40’’ P3 1230 20 2ᶱ17’31’’ 5ᶱ23’00’’ P4 1250 20 2ᶱ17’31’’ 7ᶱ40’40’’ P5 1270 20 2ᶱ17’31’’ 9ᶱ58’00’’ P6 1290 20 2ᶱ17’31’’ 12ᶱ15’40’’ P7 1310 20 2ᶱ17’31’’ 14ᶱ33’20’’ T2 1313 3 0ᶱ26’45’’ 15ᶱ00’00’’ T=6 7 E=8. 82 P C M=8.8 5 P T L Setting out Table: Graph of Simple Circular Curve Layout of Building Plan or Marking of Columns and Grids The process of laying out (setting out) of a building or structure is an important part of surveying, as it enables the works to proceed on site exactly according to the prepared designs. It constitutes of marking boundary walls or grids (center line of columns) by using Pythagoras theorem method. Graph in AutoCAD Field picture of Layout of Building
  翻译: