This document provides physical characteristics and parameters of the Mantaro River basin in Peru. It includes the basin area (31,747 km2), average altitude (2,518 m), longest river length (14.145 km), and average rainfall by month between 1963-2018 based on data from the Quillabamba weather station. It also lists indices such as drainage density, stream order, and average slopes. In summary, it analyzes key hydrological metrics of the Mantaro River basin through tables of geographic and climatic data.
This document provides funding allocation amounts from three sources (FPM, FUNDEB, FUS) for municipalities in the state of Maranhão, Brazil for the month of January. It lists the municipality name and the amounts allocated from each funding source, as well as total amounts. The document also notes residual funding amounts from 2017. In total, funding allocation amounts for dozens of municipalities are provided for three dates in January 2018.
The document appears to be a market report on futures and options covering various stocks and indices in the Indian market. It provides key data points for the expiry date of March 28, 2013 including open interest, changes in open interest, changes in closing price, support and resistance levels, and closing prices for various underlyings like Nifty, Bank Nifty, stocks etc. It summarizes key data on derivatives trading activity and market movements for the date indicated.
This document contains data on exam scores from the 105th academic year for unspecified subjects. It shows the number and percentage of students who scored within given ranges, cumulatively from highest to lowest scores and vice versa. For example, 1 student scored 100, and 47859 students took the exam, meaning 100% scored below 100. The majority of students scored between 50-60, with over 19000 students scoring between 51-52. Similar data is provided for Chinese scores.
The document provides financial information for a proposed toll road project including:
- The net present value (NPV) is ($456.70) and internal rate of return (IRR) is 10.38%
- Construction costs are estimated at Rs. 960 crore for 80% of the initial Rs. 1200 crore budget and land acquisition costs are Rs. 240 crore
- Annual maintenance costs are estimated at 0.9% of the total construction cost of Rs. 1500 crore
- Toll revenue is projected to grow at 7% annually reaching over Rs. 1400 crore by 2026
The document contains survey data from a road construction project including coordinates, elevations, cut depths, embankment heights, and volumes of material removed and placed at regular intervals along the road. The data is presented in a table with distance along the road in the first column and corresponding coordinate, elevation, cut, embankment and volume metrics in subsequent columns.
The document contains a survey of 6 points (A, B, C, D, E, F) that measures the horizontal angle, distance, and corrected horizontal angle between each point. It also includes measurements of azimuth, northing, southing, easting, westing, and corrected northing and southing coordinates for each point. The total horizontal angle measured is 720°00'10" and total distance is 257.83 meters.
This document provides funding allocation amounts from three sources (FPM, FUNDEB, FUS) for municipalities in the state of Maranhão, Brazil for the month of January. It lists the municipality name and the amounts allocated from each funding source, as well as total amounts. The document also notes residual funding amounts from 2017. In total, funding allocation amounts for dozens of municipalities are provided for three dates in January 2018.
The document appears to be a market report on futures and options covering various stocks and indices in the Indian market. It provides key data points for the expiry date of March 28, 2013 including open interest, changes in open interest, changes in closing price, support and resistance levels, and closing prices for various underlyings like Nifty, Bank Nifty, stocks etc. It summarizes key data on derivatives trading activity and market movements for the date indicated.
This document contains data on exam scores from the 105th academic year for unspecified subjects. It shows the number and percentage of students who scored within given ranges, cumulatively from highest to lowest scores and vice versa. For example, 1 student scored 100, and 47859 students took the exam, meaning 100% scored below 100. The majority of students scored between 50-60, with over 19000 students scoring between 51-52. Similar data is provided for Chinese scores.
The document provides financial information for a proposed toll road project including:
- The net present value (NPV) is ($456.70) and internal rate of return (IRR) is 10.38%
- Construction costs are estimated at Rs. 960 crore for 80% of the initial Rs. 1200 crore budget and land acquisition costs are Rs. 240 crore
- Annual maintenance costs are estimated at 0.9% of the total construction cost of Rs. 1500 crore
- Toll revenue is projected to grow at 7% annually reaching over Rs. 1400 crore by 2026
The document contains survey data from a road construction project including coordinates, elevations, cut depths, embankment heights, and volumes of material removed and placed at regular intervals along the road. The data is presented in a table with distance along the road in the first column and corresponding coordinate, elevation, cut, embankment and volume metrics in subsequent columns.
The document contains a survey of 6 points (A, B, C, D, E, F) that measures the horizontal angle, distance, and corrected horizontal angle between each point. It also includes measurements of azimuth, northing, southing, easting, westing, and corrected northing and southing coordinates for each point. The total horizontal angle measured is 720°00'10" and total distance is 257.83 meters.
This document provides availability data for equipment from September 1, 2016 to June 31, 2017. It lists 22 pieces of equipment (identified as MO06 through TO22) and includes statistics on their effective and operational demand, availability, utilization rates, and time spent in various maintenance states over the reporting period.
The document describes the inventory records and sales of various clothing items sold by the company Sanfetex S.A.C. It provides details of inventory quantities, purchase costs, sales costs and quantities, and ending inventory balances for items including jeans, shorts, skirts, dresses, vests, pants, overalls, jackets, shirts, and purses using the average cost method. Calculations are provided from January 1st through January 31st.
The document appears to be statistics on exam scores from the 106th academic year for unspecified subjects. It provides data on the number and percentage of students who scored within given ranges, cumulatively from the highest to lowest scores. For example, it shows that for scores from 100-100.99, 1 student scored in that range, making up 0% of the total 45,290 students.
This document contains a table summarizing student performance and scores needed to be exempted from final exams in a class. It lists student IDs, scores on various quizzes and exams throughout the semester, average scores, percentage of the overall grade, scores on a pre-final, and the target and minimum scores needed to be exempted from finals. It reminds students that final exams will take place on October 19 from 10-12 PM.
This document provides specifications for oilfield casing including sizes ranging from 7 3/4 to 13 5/8 inches, weights ranging from 16.6 to 88.2 lbs/ft, drift diameters, capacities in barrels per 100 feet, and other details. It lists physical properties and performance metrics for different casing strings to aid in well design and construction.
Know the Sensex like you have never known before. With the slide we ensure understanding Sensex will become simpler and easier.
For more details hop on to our site www.iedforum.com or write to us at contact@iedforum.com
This document provides technical specifications for various types of oil and gas pipes including casing pipes, wash pipes, drill pipes, and drill collars. It lists the nominal diameters, weights, capacities, and properties of each type of pipe. Dimensions include internal and external diameters, wall thickness, and dimensions of threaded connectors. The document also specifies the material grades and connection types for each pipe size.
This document appears to contain student exam and quiz scores along with their calculated grades. It lists each student's ID number followed by their scores on 3 quizzes, an incentive amount, their quiz average which counts for 40% of their midterm grade, their midterm exam score which counts for another 40%, and their final calculated midterm grade. There are over 100 students listed with their various exam and quiz results.
The document discusses investment options for growing money over time. Originally there were two main options: guaranteed investments and variable investments. Guaranteed investments provide a set rate of return but do not allow for much growth, while variable investments like stocks can fluctuate greatly in value and provide either high returns or losses. A new third option is now available called a guaranteed variable investment, which aims to provide aspects of both stability and growth. The document also includes a table showing annual returns of the Dow Jones Industrial Average stock market index dating back to 1896, with about 34% of years experiencing negative returns.
This document provides a summary of funding amounts for various regional laws and programs in Italy from 1982 to 2008. It shows the total amounts funded each year from various sources, including ordinary and special management funds as well as funds from different regional laws. The totals funded increased over time, reaching over 166 million euros in 2008. Approximately 55% of total funding each year was considered "at risk funding".
1. Vitor Sousa won the 4wd Buggy race with 104 laps in 45 minutes and 20.060 seconds.
2. Antonio Pereira came in second with 96 laps, finishing 8 laps behind the winner.
3. Jason took third place completing 88 laps and finishing 16 laps behind the first place finisher.
Snake North 2010 3D SCHEDULE A 25K Final Version Aug23-10Jason Lamberts
The document contains coordinate data for survey points including easting, northing, latitude, and longitude values. It also includes additional information for each point such as identifiers, road names, and other location details. There are over 760 data points listed.
This document provides technical specifications for various oil drilling equipment including casing, drill pipes, heavy weight drill pipes, tubing, drill collars, and drill bits. It includes information on diameters, weights, volumes, buoyancy, mechanical strength, maximum pressures, and make up torques. The document contains specifications for different sizes of equipment ranging from 2-3/8 inches to 30 inches in diameter.
The document provides intra-day technical levels for various commodities futures contracts traded on the MCX commodity exchange in India. It lists the commodity, contract expiry date, previous day's close price, intra-day trend, pivot point, and resistance and support levels for each commodity contract. The levels are used to analyze the commodity's intra-day price movement and determine potential resistance and support areas.
The document discusses various factors that should be considered when evaluating highway-rail grade crossings, including:
- The desired geometric characteristics like a perpendicular intersection and no nearby intersections or driveways.
- Issues like uneven crossing elevations, skewed crossings, and sightline obstructions caused by road or rail curvature.
- Variables that must be considered when calculating sight distances and stopping distances at a crossing like train speed, vehicle speed, and approach grade.
The document is an inventory listing for a store called "MI TIENDA!!!" including articles for sale like blouses, earrings and necklaces, boots, jackets, tennis shoes, and shoes. It shows the units available, price per unit, wholesale price, purchases made, total price, and overall totals for the inventory which amounts to 390 units and $3,100 in price per unit for a grand total of $1,636,640.
The document presents regional GDP per capita data for Italian regions from 2000 to 2008. It shows that the richest regions were Valle d'Aosta, Lombardy, and Trentino-Alto Adige, with per capita GDP consistently over 125% of the national average. The poorest regions were Campania, Sicily, and Calabria, with per capita GDP below 65% of the national average throughout the period. Overall, per capita GDP increased across all regions from 2000 to 2008.
The document presents regional GDP per capita data for Italian regions from 2000 to 2008. It shows that the richest regions were Valle d'Aosta, Lombardy, and Trentino-Alto Adige, with per capita GDP consistently over 125% of the national average. The poorest regions were Campania, Sicily, and Calabria, with per capita GDP below 65% of the national average throughout the period. Overall, per capita GDP increased across all regions from 2000 to 2008.
This document contains runoff data from the Ban Yan Din Daeng watershed in Surat Thani, Thailand from 1969 to 2006. It shows the monthly and annual runoff in million cubic meters (MCM) and cubic meters per second (CMS). Runoff was highest from September to November and lowest from February to April. On average, annual runoff was 3758.20 MCM or 119.17 CMS, but varied significantly from year to year.
This document provides specifications for Moyno G2 and G3 series pumps including dimensions and weights. It lists various pump frame sizes from 1E008G2 to 6K175G2 with corresponding measurements and discharge weights at different pipe lengths. Key dimensions included are flange size, length and diameter of pump components. The page notes that dimensions are in inches and provides contact information for Moyno pumps.
This document provides availability data for equipment from September 1, 2016 to June 31, 2017. It lists 22 pieces of equipment (identified as MO06 through TO22) and includes statistics on their effective and operational demand, availability, utilization rates, and time spent in various maintenance states over the reporting period.
The document describes the inventory records and sales of various clothing items sold by the company Sanfetex S.A.C. It provides details of inventory quantities, purchase costs, sales costs and quantities, and ending inventory balances for items including jeans, shorts, skirts, dresses, vests, pants, overalls, jackets, shirts, and purses using the average cost method. Calculations are provided from January 1st through January 31st.
The document appears to be statistics on exam scores from the 106th academic year for unspecified subjects. It provides data on the number and percentage of students who scored within given ranges, cumulatively from the highest to lowest scores. For example, it shows that for scores from 100-100.99, 1 student scored in that range, making up 0% of the total 45,290 students.
This document contains a table summarizing student performance and scores needed to be exempted from final exams in a class. It lists student IDs, scores on various quizzes and exams throughout the semester, average scores, percentage of the overall grade, scores on a pre-final, and the target and minimum scores needed to be exempted from finals. It reminds students that final exams will take place on October 19 from 10-12 PM.
This document provides specifications for oilfield casing including sizes ranging from 7 3/4 to 13 5/8 inches, weights ranging from 16.6 to 88.2 lbs/ft, drift diameters, capacities in barrels per 100 feet, and other details. It lists physical properties and performance metrics for different casing strings to aid in well design and construction.
Know the Sensex like you have never known before. With the slide we ensure understanding Sensex will become simpler and easier.
For more details hop on to our site www.iedforum.com or write to us at contact@iedforum.com
This document provides technical specifications for various types of oil and gas pipes including casing pipes, wash pipes, drill pipes, and drill collars. It lists the nominal diameters, weights, capacities, and properties of each type of pipe. Dimensions include internal and external diameters, wall thickness, and dimensions of threaded connectors. The document also specifies the material grades and connection types for each pipe size.
This document appears to contain student exam and quiz scores along with their calculated grades. It lists each student's ID number followed by their scores on 3 quizzes, an incentive amount, their quiz average which counts for 40% of their midterm grade, their midterm exam score which counts for another 40%, and their final calculated midterm grade. There are over 100 students listed with their various exam and quiz results.
The document discusses investment options for growing money over time. Originally there were two main options: guaranteed investments and variable investments. Guaranteed investments provide a set rate of return but do not allow for much growth, while variable investments like stocks can fluctuate greatly in value and provide either high returns or losses. A new third option is now available called a guaranteed variable investment, which aims to provide aspects of both stability and growth. The document also includes a table showing annual returns of the Dow Jones Industrial Average stock market index dating back to 1896, with about 34% of years experiencing negative returns.
This document provides a summary of funding amounts for various regional laws and programs in Italy from 1982 to 2008. It shows the total amounts funded each year from various sources, including ordinary and special management funds as well as funds from different regional laws. The totals funded increased over time, reaching over 166 million euros in 2008. Approximately 55% of total funding each year was considered "at risk funding".
1. Vitor Sousa won the 4wd Buggy race with 104 laps in 45 minutes and 20.060 seconds.
2. Antonio Pereira came in second with 96 laps, finishing 8 laps behind the winner.
3. Jason took third place completing 88 laps and finishing 16 laps behind the first place finisher.
Snake North 2010 3D SCHEDULE A 25K Final Version Aug23-10Jason Lamberts
The document contains coordinate data for survey points including easting, northing, latitude, and longitude values. It also includes additional information for each point such as identifiers, road names, and other location details. There are over 760 data points listed.
This document provides technical specifications for various oil drilling equipment including casing, drill pipes, heavy weight drill pipes, tubing, drill collars, and drill bits. It includes information on diameters, weights, volumes, buoyancy, mechanical strength, maximum pressures, and make up torques. The document contains specifications for different sizes of equipment ranging from 2-3/8 inches to 30 inches in diameter.
The document provides intra-day technical levels for various commodities futures contracts traded on the MCX commodity exchange in India. It lists the commodity, contract expiry date, previous day's close price, intra-day trend, pivot point, and resistance and support levels for each commodity contract. The levels are used to analyze the commodity's intra-day price movement and determine potential resistance and support areas.
The document discusses various factors that should be considered when evaluating highway-rail grade crossings, including:
- The desired geometric characteristics like a perpendicular intersection and no nearby intersections or driveways.
- Issues like uneven crossing elevations, skewed crossings, and sightline obstructions caused by road or rail curvature.
- Variables that must be considered when calculating sight distances and stopping distances at a crossing like train speed, vehicle speed, and approach grade.
The document is an inventory listing for a store called "MI TIENDA!!!" including articles for sale like blouses, earrings and necklaces, boots, jackets, tennis shoes, and shoes. It shows the units available, price per unit, wholesale price, purchases made, total price, and overall totals for the inventory which amounts to 390 units and $3,100 in price per unit for a grand total of $1,636,640.
The document presents regional GDP per capita data for Italian regions from 2000 to 2008. It shows that the richest regions were Valle d'Aosta, Lombardy, and Trentino-Alto Adige, with per capita GDP consistently over 125% of the national average. The poorest regions were Campania, Sicily, and Calabria, with per capita GDP below 65% of the national average throughout the period. Overall, per capita GDP increased across all regions from 2000 to 2008.
The document presents regional GDP per capita data for Italian regions from 2000 to 2008. It shows that the richest regions were Valle d'Aosta, Lombardy, and Trentino-Alto Adige, with per capita GDP consistently over 125% of the national average. The poorest regions were Campania, Sicily, and Calabria, with per capita GDP below 65% of the national average throughout the period. Overall, per capita GDP increased across all regions from 2000 to 2008.
This document contains runoff data from the Ban Yan Din Daeng watershed in Surat Thani, Thailand from 1969 to 2006. It shows the monthly and annual runoff in million cubic meters (MCM) and cubic meters per second (CMS). Runoff was highest from September to November and lowest from February to April. On average, annual runoff was 3758.20 MCM or 119.17 CMS, but varied significantly from year to year.
This document provides specifications for Moyno G2 and G3 series pumps including dimensions and weights. It lists various pump frame sizes from 1E008G2 to 6K175G2 with corresponding measurements and discharge weights at different pipe lengths. Key dimensions included are flange size, length and diameter of pump components. The page notes that dimensions are in inches and provides contact information for Moyno pumps.
This document contains a table listing basic values for L and H parameters corresponding to kinematic viscosity measurements in the 40-100°C system. The table includes kinematic viscosity values in mm2/s at 100°C along with the associated L and H parameters for determining kinematic viscosity at other temperatures between 40-100°C. There are over 70 rows of viscosity values ranging from 2 to 70 mm2/s at 100°C with calculations to estimate viscosity at different temperatures within the specified range.
The document reports stock market data from the Dhaka Stock Exchange of Bangladesh for January 25, 2017. It provides details on the number of issues that advanced, declined, and remained unchanged across different categories. Overall, most issues declined, with 89 advancing and 228 declining out of a total of 328 issues traded. It also lists transaction numbers and volumes, as well as market capitalization values and price information for some leading equity issues.
This document provides specifications for wide flange steel shapes, including:
1) Dimensional specifications and properties like cross-sectional area, moments of inertia, radii of gyration, and modulus of section for various steel sizes.
2) Tolerances for dimensions of widths, depths, thicknesses.
3) Chemical composition and mechanical properties for different grades of steel.
4) Table of weights in kg/m and kg/12m for common hot rolled beam, wide flange, and H-beam sizes.
The document contains an Erlang B traffic table that shows the maximum offered load versus B and N, where B is the blocking probability in % and N is the number of circuits. The table provides load values for different combinations of B ranging from 0.01 to 40% and N ranging from 1 to 77 circuits. The load values indicate the maximum number of external calls that can be offered to the system without exceeding the blocking probability B for a given number of circuits N.
This document provides specifications for various standard H-beam, wide flange, lip channel, and equal angle steel sections. It includes dimensions such as height, width, thickness, area, weight, moments of inertia, radii of gyration, and other geometric properties. Sections range in size from 100x100 mm to 588x300 mm for H-beams, 148x100 mm to 500x200 mm for wide flanges, 100x50x20 mm to 200x75x20 mm for lip channels, and 40x40 mm to 120x120 mm for equal angles. Properties are specified in metric units.
The document is an Erlang B traffic table that shows the maximum offered traffic load versus blocking probability (B) and number of lines (N). It provides traffic load values for various combinations of B (ranging from 0.01 to 40%) and N (ranging from 1 to 77 lines). The higher the traffic load, the higher the blocking probability will be for a given number of lines.
The document is an Erlang B traffic table that shows the maximum offered traffic load versus blocking probability (B) and number of lines (N). It provides traffic load values for various combinations of B (ranging from 0.01 to 40%) and N (ranging from 1 to 77 lines). The higher the traffic load, the higher the blocking probability will be for a given number of lines.
The document is an Erlang B traffic table that shows the maximum offered traffic load versus blocking probability (B) and number of lines (N). It provides traffic load values for various combinations of B ranging from 0.01 to 40% and N ranging from 1 to 77 lines. The higher the traffic load, the higher the blocking probability will be for a given number of lines.
This document contains a chart listing pipe sizes, outside diameters, wall thicknesses, and weights. The pipe sizes range from 1/8 inch to 72 inches in nominal diameter. For each size, the chart provides the outside diameter in mm and the wall thickness in mm for various standard wall thickness designations including SCH 10, SCH 20, SCH 30, etc. Heavier wall thicknesses are shown for larger pipe sizes.
This document summarizes dairy product import data to Colombia from 1991-2011, including the kilograms and US dollar cost of imports for milk powders, evaporated milk, condensed milk, liquid milk, butter, cheeses, whey, and totals. It shows that import quantities and costs generally increased over time, with the largest imports being milk powders, liquid milk, and cheeses.
The document contains two tables providing future value interest factors for one dollar and one dollar annuities compounded at various interest rates over different periods of time. Table A-1 shows the future value of $1 invested at rates from 1% to 30% over periods from 1 to 30 years. Table A-2 shows the future value of a $1 annuity invested at the same rates and periods. The tables allow users to determine the future values of single investments and annuities based on the interest rate and time period.
The document contains two tables providing future value interest factors for present values compounded over time at given interest rates. Table A-1 gives the future value of $1 invested for a given number of periods at rates from 1% to 30%. Table A-2 gives the future value of a $1 annuity invested over the same periods and rates. Both tables allow users to determine the future value of investments based on the interest rate and length of time compounded.
The document contains two tables providing future value interest factors for one dollar and one dollar annuities compounded at various interest rates over different periods of time. Table A-1 shows the future value of $1 invested at rates from 1% to 30% over periods from 1 to 30 years. Table A-2 shows the future value of a $1 annuity invested at the same rates and periods. The tables allow users to determine the future values of single investments and annuities based on the interest rate and time horizon.
The document contains two tables providing future value interest factors for present values compounded over time at given interest rates. Table A-1 gives the future value of $1 invested for a given number of periods at rates from 1% to 30%. Table A-2 gives the future value of a $1 annuity invested over the same periods and rates. The tables allow users to calculate future or present values of investments compounded at different rates over different lengths of time.
This document provides a chart that lists steel pipe sizes and their corresponding wall thicknesses and weights. It includes pipe sizes from 1/8 inch to 48 inches in outer diameter. For each size, it specifies the wall thickness in inches for various ANSI pipe schedules as well as the weight per foot of pipe in pounds. It also lists contact information at the bottom for several Tubular Steel Supply Company locations.
The document provides reference tables for refrigerant pressure-temperature charts for R22, R134a, and R407C refrigerants. It also includes charts converting between kg/cm2 and psi pressure units, as well as common conversion factors for units like mm, m, kg, kW, °C, and °F.
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfBalvir Singh
Sri Guru Hargobind Ji (19 June 1595 - 3 March 1644) is revered as the Sixth Nanak.
• On 25 May 1606 Guru Arjan nominated his son Sri Hargobind Ji as his successor. Shortly
afterwards, Guru Arjan was arrested, tortured and killed by order of the Mogul Emperor
Jahangir.
• Guru Hargobind's succession ceremony took place on 24 June 1606. He was barely
eleven years old when he became 6th Guru.
• As ordered by Guru Arjan Dev Ji, he put on two swords, one indicated his spiritual
authority (PIRI) and the other, his temporal authority (MIRI). He thus for the first time
initiated military tradition in the Sikh faith to resist religious persecution, protect
people’s freedom and independence to practice religion by choice. He transformed
Sikhs to be Saints and Soldier.
• He had a long tenure as Guru, lasting 37 years, 9 months and 3 days
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...DharmaBanothu
Natural language processing (NLP) has
recently garnered significant interest for the
computational representation and analysis of human
language. Its applications span multiple domains such
as machine translation, email spam detection,
information extraction, summarization, healthcare,
and question answering. This paper first delineates
four phases by examining various levels of NLP and
components of Natural Language Generation,
followed by a review of the history and progression of
NLP. Subsequently, we delve into the current state of
the art by presenting diverse NLP applications,
contemporary trends, and challenges. Finally, we
discuss some available datasets, models, and
evaluation metrics in NLP.
Data Communication and Computer Networks Management System Project Report.pdfKamal Acharya
Networking is a telecommunications network that allows computers to exchange data. In
computer networks, networked computing devices pass data to each other along data
connections. Data is transferred in the form of packets. The connections between nodes are
established using either cable media or wireless media.
Better Builder Magazine brings together premium product manufactures and leading builders to create better differentiated homes and buildings that use less energy, save water and reduce our impact on the environment. The magazine is published four times a year.
This study Examines the Effectiveness of Talent Procurement through the Imple...DharmaBanothu
In the world with high technology and fast
forward mindset recruiters are walking/showing interest
towards E-Recruitment. Present most of the HRs of
many companies are choosing E-Recruitment as the best
choice for recruitment. E-Recruitment is being done
through many online platforms like Linkedin, Naukri,
Instagram , Facebook etc. Now with high technology E-
Recruitment has gone through next level by using
Artificial Intelligence too.
Key Words : Talent Management, Talent Acquisition , E-
Recruitment , Artificial Intelligence Introduction
Effectiveness of Talent Acquisition through E-
Recruitment in this topic we will discuss about 4important
and interlinked topics which are
Covid Management System Project Report.pdfKamal Acharya
CoVID-19 sprang up in Wuhan China in November 2019 and was declared a pandemic by the in January 2020 World Health Organization (WHO). Like the Spanish flu of 1918 that claimed millions of lives, the COVID-19 has caused the demise of thousands with China, Italy, Spain, USA and India having the highest statistics on infection and mortality rates. Regardless of existing sophisticated technologies and medical science, the spread has continued to surge high. With this COVID-19 Management System, organizations can respond virtually to the COVID-19 pandemic and protect, educate and care for citizens in the community in a quick and effective manner. This comprehensive solution not only helps in containing the virus but also proactively empowers both citizens and care providers to minimize the spread of the virus through targeted strategies and education.
1. CARACTERISTICAS FISICAS Y PARAMETROS DE LA
CUENCA MANTOREAL
Cuadro N° 01
ÍTEM DESCRIPCION UNIDAD VARIABLE PARAMETRO
01. UBICACIÓN
m Este (X) 760,250.70
m Norte (Y) 8,594,415.33
gº m' s'' Latitud S 12º42'13.90"
gº m' s'' Longitud W 72º36'12.69"
02. AREA Y PERIMETRO DE LA CUENCA
Area de la Cuenca Km2
AT 31.747
Perímetro de la Cuenca Km P 29.668
03. FRECUENCIA DE ALTITUDES
Altitud Media de la Cuenca m.s.n.m. ZMedia 2,518.272
Altitud mas Frecuente m.s.n.m. ZFrec. 2,850.000
Altitud de Frecuencia Media m.s.n.m. ZFrec.Media 2,263.128
% de Área para la Altitud más Frecuente % 4.04%
Desnivel de la Cuenca Km D HC 2.363
04. INDICES REPRESENTATIVOS
Factor de Forma F 0.416
Indice de Compacidad o Indice de Gravelious: K 1.485
05. RECTANGULO EQUIVALENTE
Largo Equivalente Km L 12.381
Ancho Equivalente Km B 2.564
06. INDICE DE PENDIENTE
Índice de Pendiente Ip 0.407
07. PENDIENTE DE LA CUENCA
Criterio del Rectangulo Equivalente Km/Km SC.1 0.191
Criterio de Alvord Km/Km SC.2 0.661
Pendiente de la Cuenca Km/Km SC 0.661
08. PERFIL LONGITUDINAL DEL CAUCE PRINCIPAL
Longitud del Cauce Principal Km LRIO 14.145
Desnivel del Cauce Principal Km D HRIO 1.913
Longitud al Centroide Km LCG 7.870
09. PENDIENTE DEL CAUCE PRINCIPAL
Metodo I : Pendiente Uniforme Km/Km SRÍO.1 0.135
Metodo II : Ecuacion de Taylor y Schwarz Km/Km SRÍO.2 0.050
Metodo III : Criterio de Nash Km/Km SRÍO.3 0.675
Pendiente del Cauce Principal Km/Km SRÍO 0.135
10. RED DE DRENAJE
Orden de las Corrientes 2.000
Longitud de los Tributarios Km 16.040
Densidad de Corriente Dc 0.094
Densidad de Drenaje Km/Km² Dd 0.505
11. CURVA HIPSOMETRICA 12. POLÍGONO DE FRECUENCIAS
13. PERFIL LONGITUDINAL DEL CAUCE PRINCIPAL 14. CUENCA
Centro de Gravedad de la Cuenca
Coordenadas
800
1,200
1,600
2,000
2,400
2,800
3,200
0 4 8 12 16 20 24 28 32
Altitud
(m.s.n.m.)
Area (Km²)
Curva Hipsométrica
0% 1% 2% 3% 4% 5%
887
1,000
1,125
1,250
1,375
1,500
1,625
1,750
1,875
2,000
2,125
2,250
2,375
2,500
2,625
2,750
2,875
3,000
3,125
3,250
% De Area entre cotas
Altitud
(m.s.n.m.)
Poligono de Frecuencias
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Altitud
(m.s.n.m.)
Longitud (Km)
Perfil Longitudinal del Cauce Principal
10. ALTITUD PRECIPITACION PRECIPITACION
MEDIA MEDIA ANUAL MEDIA ANUAL CORREGIDA
msnm mm X2
Y2
X*Y2
Y4
mm
QUILLABAMBA 990.00 1,219.13 9.80E+05 1.49E+06 1.47E+09 2.21E+12 1,320.67
QUEBRADA 1,185.00 1,457.75 1.40E+06 2.13E+06 2.52E+09 4.52E+12 1,444.51
MACHUPICCHU 2,563.00 2,077.80 6.57E+06 4.32E+06 1.11E+10 1.86E+13 2,122.86
HUYRO 1,700.00 1,843.84 2.89E+06 3.40E+06 5.78E+09 1.16E+13 1,729.45
SUMA 6,438.00 6,598.52 1.18E+07 1.13E+07 2.08E+10 3.69E+13 6,617.49
n 4 4 4 4 4 4 4
PROMEDIO 1,609.50 1,649.63 2.96E+06 2.83E+06 5.21E+09 9.23E+12 1654.37
FORMULAS PARA EL CALCULO DE PARAMETROS DE REGRESION
A= SUM X 6.44E+03 G = C-(A^2)/n 1.48E+06 COEF. INDEPENDIENTE Bo = 5.631E+03
B= SUM Y 6.60E+03 H = F-A*D/n 2.60E+09 COEF. DEPENDIENTE B1 = 1.756E+03
C= SUM X^2 1.18E+07 I = F-(D^2)/n 4.84E+12 COEF. DE CORRELACION r = 0.972
D= SUM Y^2 1.13E+07 J = H/G 1.76E+03
E= SUM X*Y^2 2.08E+10 K = (D-J*A)/n 5.63E+03 PRECIP. MEDIA ANUAL EN LAS MICROCUENCAS
F= SUM Y^4 3.69E+13 CUENCAS
FORMULAS DE PARAMETROS DE REGRESION Cuenca Mantoreal 2,518.27 2,104.28
COEF. INDEPENDIENTE Bo= (D-J*A)/n
COEF. DEPENDIENTE B1= H/G
COEF. DE CORRELACION r = H/SQRT(G*I)
DESVIACION ESTANDAR S = (D-A^2/n)-(K*(A*D-A*B)/n) AREAS DE CULTIVO
Área de Cultivos 790.00 1,180.23
DATE & HOUR OF PROCESS :
VALORES DE PARAMETROS DE REGRESION
02/08/2019 16:19
ANALISIS REGIONAL DE PRECIPITACION
ECUACION DE REGRESION PRECIPITACION - ALTITUD
Cuadro N° 10
NOMBRE DE LA
ESTACION
ECUACION DE REGRESION
P2
= BO + B1 * H
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600
PRECIPITACION
(mm)
ALTITUD (msnm)
REEGIONALIZACION DE LA PRECIPITACION
HISTORICA REGIONALIZADA
11. Altitud Precipitac.
º ' " Grados º ' " Grados Media Media E.C01 E.C01
156302 E1 QUILLABAMBA Urubamba 12 51 21 12.86 72 41 30 72.69 990.00 1,219.13
156322 E2 QUEBRADA Urubamba 12 40 43.9 12.68 72 16 42 72.28 1,185.00 1,457.75
156312 E3 MACHUPICCHU Urubamba 13 10 00 13.17 72 32 44 72.55 2,563.00 2,077.80
156310 E4 HUYRO Urubamba 13 04 01 13.07 72 27 01 72.45 1,700.00 1,843.84
E5
E6
E7
E8
E9
001 E.C01 Cuenca Mantoreal 12 42 14 12.70 72 36 13 72.60 2,518.27 2,104.28 E.C01 = 0.731 x E1 + 0.329 x E2 + 0.162 x E3 + 0.215 x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
002 E.C02 E.C02 = x E1 + x E2 + x E3 + x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
003 E.C03 E.C03 = x E1 + x E2 + x E3 + x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
004 E.C04 E.C04 = x E1 + x E2 + x E3 + x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
005 E.C05 E.C05 = x E1 + x E2 + x E3 + x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
006 E.S06 Área de Cultivos 12 39 17.81 12.65 72 33 46.03 72.56 790.00 1,180.23 E.S06 = 0.338 x E1 + 0.237 x E2 + 0.093 x E3 + 0.125 x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
007 E.S07 E.S07 = x E1 + x E2 + x E3 + x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
008 E.S08 E.S08 = x E1 + x E2 + x E3 + x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
009 E.S09 E.S09 = x E1 + x E2 + x E3 + x E4 + x E5 + x E6 + x E 7 + x E8 + x E9
ECUACIONES DE INFLUENCIA ENTRE ESTACIONES BASE Y ESTACIONES EN ESTUDIO
Cuadro N° 11
COD
HEC
VARIABLE ESTACION CUENCA
Latitud Sur Longitud Oeste FACTOR INFLUENCIA ALTITUDINAL (ai) FACTOR INFLUENCIA GEOGRAFICA (bi)
E.S06 E.S07 E.S08 E.S09
E.C03 E.C04 E.C05
E.S08 E.S09 E.C02
E.C02 E.C03 E.C04 E.C05 E.S06 E.S07
1.73 0.97 0.25 0.25 0.35 0.25 0.25 0.25
0.42 0.25 0.25
0.25 0.25 0.25
0.23 0.25 0.25
1.01 0.57
0.25 0.25 0.29
1.44 0.81
0.25 0.25 0.16 0.25 0.25 0.25
0.16 0.25 0.25
0.25 0.25 0.25
0.19 0.25 0.25 0.25 0.25 0.20
1.14 0.64
ESTACIONES EN ESTUDIO (Ei) ECUACIONES DE INFLUENCIA