Lecture 10
Design of Water Distribution
System
 The design requirements of water distribution system are
to satisfied:
The water need ,and
The minimum residual pressure at each point of the
water distribution system
Pressure in Water Distribution
System
 Pressure in distribution system varies with consumption.
 Min. Pressure at peak flow(not less than 150 kPa to avoid
infiltration, proper flow to other buildings)
 Max. pressure during low flows
 Residential areas (3 stories)-150-300kPa(15-30m)
 Residential areas (firefighting )-400kPa(40m)
 Commercial areas-500KPa(50m)
Velocities in Water Supply
System
 Velocities in water supply system<1m/s
 2m/s upper limit may be reached near fire flows
 Min velocity-0.25m/s (WASA)
Hazen-Williams equation for
pipe flow
Headloss in pipes(water supply network)
Empirical
Named after Allen Hazen and Gardner Stewart Williams.
 H= head loss(m)
 Q= flow rate(m3/sec)
 L= length of pipe(m)
 d= diameter(m)
 C= Hazen William’s coefficient
The Hazen–Williams equation is an empirical relationship which relates the
flow of water in a pipe with the physical properties of the pipe and the
pressure drop caused by friction.
Hazen-Williams Equation for
Pipe Flow
 Hazen William greatly depends upon Roughness of pipe.
 Basic Hazen William Eq is
 Where,
V= velocity ,m/s
C=Hazen William co-efficient
R=Hydraulic radius or hydraulic mean depth
R=A/P(A=Area, P= Wetted Perimeter)
S= Hydraulic gradient=HL / L
H-head loss in meters
Q=flow in cu meter per sec
D= diameter in m
L= length of pipe in meters
For safety factor C=100
Hazen-Williams equation for
pipe flow
Advantages
 Coefficient C is rough measure of relative roughness
 Effect of Reynolds number is included in formula
 Effect of roughness on velocity are given directly
Disadvantages
 It is only valid for water
 Does not differentiate completely between laminar and
turbulent flow
 It does not account for the temperature or viscosity of the
water.error in water pipes can not be applied to all
fluids in all conditions
Hazen William
 Problem 1: Calculate the diameter of pipe 1Km laid to
discharge a flow of 1000m3/day under a head loss of
10m(C=100)
 Problem 2: A 6-km-long, new cast-iron pipeline carries
320 l /s of water .The pipe diameter is 30 cm. Find the
head loss .
Design of Water Distribution
System
Design Criteria for Distribution System
Design Parameter Value
Design flow Peak flow/Max.daily
demand
Population Population per plot
Peaking Factor 2.25/1.5
Minimum Size 75mm
Minimum Residual Head 14m
Input head 20m
Pipe Material AC or PVC, GI, steel pipe
C 100 or 110
Hardy’s Cross Method
Basic Principle
1. Sum of inflows is equal to the sum of outflows at any
junction or any node.
∑inflows=∑outflows
2. Sum of head losses around an elementary loop must be
zero.
∑HL = 0
Hardy’s Cross Method
Procedure
1. Draw the layout of the system.
2. Assign area to each node.
3. Calculate the population for
each node
4. Calculate the average
consumption at each node.
5. Calculate design flow for each
node which should be equal to
peak hourly demand.
6. Measure the length of each pipe.
Hardy’s Cross Method
Procedure
7. Assume flow in each pipe.
8. Assume the diameter of each pipe.
9. Assume any internally consistant
distribution of flow. The sum of flows
entering any junction must equal to
sum of leaving flows
10. Compute the head loss in each pipe by
means of equation(Hazen William) or
diagram. Conventionally clockwise flows
are positive and produce positive head
loss. Anticlockwise flows are negative
and produce negative head loss
Hardy’s Cross Method
Procedure
11. With due attention to the sign ,compute the total head loss
around each loop.
12. Compute without the regard to sign for the same loop for
sum of H/Q
13. Apply the correction to the flow in each line
16. Pipe line common to two loops receive both correction with
due attention to sign.
7. Balance the flow by Hardy cross method.
8. Calculate the residual pressure at all points of the system
and check its adequency.
Hardy’s Cross Method
(Example)
20 m3/min 5 m3/min
10 m3/min
5 m3/min
1500m
445mm
1100m
305mm
1000m
405mm
800m
225mm
1.
Hardy’s Cross Method
(Example)
20 m3/min 5 m3/min
10 m3/min
5 m3/min
1500m
445mm
1100m
305mm
1000m
405mm
800m
225mm
2.
250mm
1100m
Hardy’s Cross Method
(Example)
3.
20
Solution
21
22
23
24
25
26
27

More Related Content

What's hot

L 3 and l-4 water demand
L 3  and l-4 water demandL 3  and l-4 water demand
L 3 and l-4 water demand
Dr. shrikant jahagirdar
 
morfometria_cuenca.pdf
morfometria_cuenca.pdfmorfometria_cuenca.pdf
morfometria_cuenca.pdf
Angela María Zapata Guzmán
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1
Vidhi Khokhani
 
Hydrology presentation
Hydrology presentationHydrology presentation
Hydrology presentation
Hamid_98
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
GAURAV. H .TANDON
 
open channel flow
open channel flowopen channel flow
open channel flow
GeoRuizO
 
Glosario de hidrologia
Glosario de hidrologiaGlosario de hidrologia
Glosario de hidrologia
bianca-natali1
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage discharge
Ankit Gola
 
Structural analysis 1
Structural analysis   1Structural analysis   1
Structural analysis 1
R VIJAYAKUMAR
 
05 water supply system
05 water supply system05 water supply system
05 water supply system
Akepati S. Reddy
 
Hardy cross method of pipe network analysis
Hardy cross method of pipe network analysisHardy cross method of pipe network analysis
Hardy cross method of pipe network analysis
sidrarashiddar
 
Types of Hydraulic Structures
Types of Hydraulic StructuresTypes of Hydraulic Structures
Types of Hydraulic Structures
adityas29
 
Crown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineering
Crown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineeringCrown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineering
Crown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineering
Mayank Oza
 
Hydrology measuring rain
Hydrology measuring rainHydrology measuring rain
Hydrology measuring rain
Sajjad Ahmad
 
Water Hammer
Water HammerWater Hammer
Water Hammer
Dan Barr
 
Gravity Dam Lec1.pdf
Gravity Dam Lec1.pdfGravity Dam Lec1.pdf
Gravity Dam Lec1.pdf
mehariKebede
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
Bibhabasu Mohanty
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
Vignesh Sekar
 
engineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdfengineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdf
govardhanaswamy1
 
Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46
RamyaNarasimhan5
 

What's hot (20)

L 3 and l-4 water demand
L 3  and l-4 water demandL 3  and l-4 water demand
L 3 and l-4 water demand
 
morfometria_cuenca.pdf
morfometria_cuenca.pdfmorfometria_cuenca.pdf
morfometria_cuenca.pdf
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1
 
Hydrology presentation
Hydrology presentationHydrology presentation
Hydrology presentation
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
 
open channel flow
open channel flowopen channel flow
open channel flow
 
Glosario de hidrologia
Glosario de hidrologiaGlosario de hidrologia
Glosario de hidrologia
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage discharge
 
Structural analysis 1
Structural analysis   1Structural analysis   1
Structural analysis 1
 
05 water supply system
05 water supply system05 water supply system
05 water supply system
 
Hardy cross method of pipe network analysis
Hardy cross method of pipe network analysisHardy cross method of pipe network analysis
Hardy cross method of pipe network analysis
 
Types of Hydraulic Structures
Types of Hydraulic StructuresTypes of Hydraulic Structures
Types of Hydraulic Structures
 
Crown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineering
Crown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineeringCrown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineering
Crown corrosion - wwwe - By Mr. Mayank Oza - water and waste water engineering
 
Hydrology measuring rain
Hydrology measuring rainHydrology measuring rain
Hydrology measuring rain
 
Water Hammer
Water HammerWater Hammer
Water Hammer
 
Gravity Dam Lec1.pdf
Gravity Dam Lec1.pdfGravity Dam Lec1.pdf
Gravity Dam Lec1.pdf
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 
engineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdfengineering-hydrology-ppt.pdf
engineering-hydrology-ppt.pdf
 
Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46Water supply and treatment Engineering notes 18 cv46
Water supply and treatment Engineering notes 18 cv46
 

Similar to Lec-10-Week (7)( Hydraulics of water Distribution System).pdf

Hydraulics of water Distribution System
 Hydraulics of water Distribution System Hydraulics of water Distribution System
Hydraulics of water Distribution System
UET Lahore | University of Engineering and Technology
 
wheel
wheelwheel
design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution System
Mian Umair Afzal
 
3.1 hydraulics
3.1  hydraulics3.1  hydraulics
3.1 hydraulics
Muhammad Usman
 
P7-EN.pptx
P7-EN.pptxP7-EN.pptx
P7-EN.pptx
DHYUTHIA
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
AnkitTurambekar
 
pipeline hydraulic design presentation.pptx
pipeline hydraulic design presentation.pptxpipeline hydraulic design presentation.pptx
pipeline hydraulic design presentation.pptx
KokabAzaz
 
Pipe network analysis with examples
Pipe network analysis with examplesPipe network analysis with examples
Pipe network analysis with examples
Mohsin Siddique
 
Flow In Pipes
Flow In PipesFlow In Pipes
Flow In Pipes
Ila Lee
 
Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...
Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...
Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...
Mechanical Engineering Assignment Help
 
Drainage design
Drainage designDrainage design
Drainage design
Okey Felix Lsr
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
inventionjournals
 
DUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptxDUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptx
PraveenMGowdru
 
04 pipeline-channel hydraulics
04 pipeline-channel hydraulics04 pipeline-channel hydraulics
04 pipeline-channel hydraulics
Akepati S. Reddy
 
Design of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationDesign of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimation
Vijay Kumar
 
ChilledWaterSystemDesign
ChilledWaterSystemDesignChilledWaterSystemDesign
ChilledWaterSystemDesign
Wahid H. Mohamed, CEM, PEM, LEED AP
 
Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes
MAULIKM1
 
Piping design sheets
Piping design sheetsPiping design sheets
Piping design sheets
Subramaniam Chandrasekaran
 
Flow through pipes
Flow through pipesFlow through pipes
Flow through pipes
sumitt6_25730773
 
REDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORK
REDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORKREDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORK
REDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORK
iQHub
 

Similar to Lec-10-Week (7)( Hydraulics of water Distribution System).pdf (20)

Hydraulics of water Distribution System
 Hydraulics of water Distribution System Hydraulics of water Distribution System
Hydraulics of water Distribution System
 
wheel
wheelwheel
wheel
 
design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution System
 
3.1 hydraulics
3.1  hydraulics3.1  hydraulics
3.1 hydraulics
 
P7-EN.pptx
P7-EN.pptxP7-EN.pptx
P7-EN.pptx
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
pipeline hydraulic design presentation.pptx
pipeline hydraulic design presentation.pptxpipeline hydraulic design presentation.pptx
pipeline hydraulic design presentation.pptx
 
Pipe network analysis with examples
Pipe network analysis with examplesPipe network analysis with examples
Pipe network analysis with examples
 
Flow In Pipes
Flow In PipesFlow In Pipes
Flow In Pipes
 
Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...
Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...
Microelectromechanical Assignment Help.com_Microelectromechanical Assignment ...
 
Drainage design
Drainage designDrainage design
Drainage design
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
DUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptxDUCT FORMULA Design-2006.pptx
DUCT FORMULA Design-2006.pptx
 
04 pipeline-channel hydraulics
04 pipeline-channel hydraulics04 pipeline-channel hydraulics
04 pipeline-channel hydraulics
 
Design of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationDesign of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimation
 
ChilledWaterSystemDesign
ChilledWaterSystemDesignChilledWaterSystemDesign
ChilledWaterSystemDesign
 
Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes
 
Piping design sheets
Piping design sheetsPiping design sheets
Piping design sheets
 
Flow through pipes
Flow through pipesFlow through pipes
Flow through pipes
 
REDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORK
REDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORKREDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORK
REDUCE WATER LOSS & PREVENT HYGIENIC RISKS IN THE DRINKING WATER NETWORK
 

Recently uploaded

🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
aarusi sexy model
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
tanujaharish2
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
NaveenNaveen726446
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
supriyaDicholkar1
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
foxlyon
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 

Recently uploaded (20)

🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
🔥 Hyderabad Call Girls  👉 9352988975 👫 High Profile Call Girls Whatsapp Numbe...
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 
comptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdfcomptia-security-sy0-701-exam-objectives-(5-0).pdf
comptia-security-sy0-701-exam-objectives-(5-0).pdf
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 

Lec-10-Week (7)( Hydraulics of water Distribution System).pdf

  • 2. Design of Water Distribution System  The design requirements of water distribution system are to satisfied: The water need ,and The minimum residual pressure at each point of the water distribution system
  • 3. Pressure in Water Distribution System  Pressure in distribution system varies with consumption.  Min. Pressure at peak flow(not less than 150 kPa to avoid infiltration, proper flow to other buildings)  Max. pressure during low flows  Residential areas (3 stories)-150-300kPa(15-30m)  Residential areas (firefighting )-400kPa(40m)  Commercial areas-500KPa(50m)
  • 4. Velocities in Water Supply System  Velocities in water supply system<1m/s  2m/s upper limit may be reached near fire flows  Min velocity-0.25m/s (WASA)
  • 5. Hazen-Williams equation for pipe flow Headloss in pipes(water supply network) Empirical Named after Allen Hazen and Gardner Stewart Williams.  H= head loss(m)  Q= flow rate(m3/sec)  L= length of pipe(m)  d= diameter(m)  C= Hazen William’s coefficient The Hazen–Williams equation is an empirical relationship which relates the flow of water in a pipe with the physical properties of the pipe and the pressure drop caused by friction.
  • 6. Hazen-Williams Equation for Pipe Flow  Hazen William greatly depends upon Roughness of pipe.  Basic Hazen William Eq is  Where, V= velocity ,m/s C=Hazen William co-efficient R=Hydraulic radius or hydraulic mean depth R=A/P(A=Area, P= Wetted Perimeter) S= Hydraulic gradient=HL / L
  • 7. H-head loss in meters Q=flow in cu meter per sec D= diameter in m L= length of pipe in meters For safety factor C=100
  • 8.
  • 9. Hazen-Williams equation for pipe flow Advantages  Coefficient C is rough measure of relative roughness  Effect of Reynolds number is included in formula  Effect of roughness on velocity are given directly Disadvantages  It is only valid for water  Does not differentiate completely between laminar and turbulent flow  It does not account for the temperature or viscosity of the water.error in water pipes can not be applied to all fluids in all conditions
  • 10.
  • 11. Hazen William  Problem 1: Calculate the diameter of pipe 1Km laid to discharge a flow of 1000m3/day under a head loss of 10m(C=100)  Problem 2: A 6-km-long, new cast-iron pipeline carries 320 l /s of water .The pipe diameter is 30 cm. Find the head loss .
  • 12. Design of Water Distribution System Design Criteria for Distribution System Design Parameter Value Design flow Peak flow/Max.daily demand Population Population per plot Peaking Factor 2.25/1.5 Minimum Size 75mm Minimum Residual Head 14m Input head 20m Pipe Material AC or PVC, GI, steel pipe C 100 or 110
  • 13. Hardy’s Cross Method Basic Principle 1. Sum of inflows is equal to the sum of outflows at any junction or any node. ∑inflows=∑outflows 2. Sum of head losses around an elementary loop must be zero. ∑HL = 0
  • 14. Hardy’s Cross Method Procedure 1. Draw the layout of the system. 2. Assign area to each node. 3. Calculate the population for each node 4. Calculate the average consumption at each node. 5. Calculate design flow for each node which should be equal to peak hourly demand. 6. Measure the length of each pipe.
  • 15. Hardy’s Cross Method Procedure 7. Assume flow in each pipe. 8. Assume the diameter of each pipe. 9. Assume any internally consistant distribution of flow. The sum of flows entering any junction must equal to sum of leaving flows 10. Compute the head loss in each pipe by means of equation(Hazen William) or diagram. Conventionally clockwise flows are positive and produce positive head loss. Anticlockwise flows are negative and produce negative head loss
  • 16. Hardy’s Cross Method Procedure 11. With due attention to the sign ,compute the total head loss around each loop. 12. Compute without the regard to sign for the same loop for sum of H/Q 13. Apply the correction to the flow in each line 16. Pipe line common to two loops receive both correction with due attention to sign. 7. Balance the flow by Hardy cross method. 8. Calculate the residual pressure at all points of the system and check its adequency.
  • 17. Hardy’s Cross Method (Example) 20 m3/min 5 m3/min 10 m3/min 5 m3/min 1500m 445mm 1100m 305mm 1000m 405mm 800m 225mm 1.
  • 18. Hardy’s Cross Method (Example) 20 m3/min 5 m3/min 10 m3/min 5 m3/min 1500m 445mm 1100m 305mm 1000m 405mm 800m 225mm 2. 250mm 1100m