Pranay Kumar Tode
pktode@yahoo.co.in
 List wood floor systems
 Explain the advantages and disadvantages
of specifying precast over site-cast
concrete.
 Explain why precast concrete structural
elements are usually cured with steam.
 Explain the difference between a one-way
and two-way concrete floor system.
 List and explain the different types of one-
way concrete floor systems.
 List and explain the different types of two-
way concrete floor systems.
 1”x12” T&G sheet floor decking
 Laminated 2”x4”’s or 2”x6”’s on edge at right angles to
the floor beams
 Spiked together side by side
 Can be wood beam or steel beam with wood
nailer on top
 Heavy planks, tongue and groove, spiked to
the beams
 Slabs on grade
› Durability depends on concrete strength
and finish
› Strength of slab depends on reinforcing and
supporting subgrade
 Structural slabs
› Span between columns and beams
› Strength depends on concrete strength and
the amount of reinforcing steel
 Able to control the quality of materials and workmanship
better than onsite (able to build in the rain, sleet, or snow).
 Able to vibrate the concrete mechanically to achieve
maximum density and highest surface quality.
 Able to reuse formwork more than onsite, thus reducing
formwork cost per unit.
 Able to steam cure, thus accelerating curing with the
steam’s heat and adding moisture for full hydration.
 Steam curing, coupled with the use of Type III cement
enables the plant to produce a fully cured structural element
in 24 hours.
 Although light compared to other building
elements, precast structural elements are
heavy to transport over the roads and hoist
into place.
 This also restricts the size and proportions of
most precast elements (they can be long,
but they can only be as wide as the
maximum legal vehicle width of 12 to 14
feet.
 One-Way
 Beams run in one direction, parallel to
one another, between perpendicular
girders that transfer the load to columns.
 Two-Way
 Beams run in two directions, parallel and
perpendicular to one another.
 The One-Way Solid Slab System
 Beams and girders are poured the same
time as the slab.
 Economical when the slab does not
span very far between beams.
 Slab depths are usually 4-10 inches.
 Uneconomical on spans of more than
20’
 The One-Way Concrete Joist System
 Longer one-way spans than solid slab systems.
 Joists are formed with metal pans supported on
longitudinal strips of wood or on a plywood deck.
 Distribution ribs are placed at mid-span to distribute
concentrated loads to more than one joist.
 When fire-resistance requirements of the building
code dictate a slab thickness of 4.5 inches or more,
the slab is capable of spanning a much greater
distance. This enables wide-module pans that
separate the joists by 4-6 feet.
 Beams run in two directions, parallel and
perpendicular to one another.
 “Generally, two way floor systems are
more economical than one-way systems
in buildings where columns can be
spaced in bays that are square or nearly
square in proportion”.
 The Two-Way Solid Flat Slab System
 A system in which the slab is supported by a grid of beams
running in both directions over the columns.
 Used for very heavily loaded industrial floors.
 Slab depth = 4 to 12 inches
 Maximum span = 34 feet
 Most two-way floor systems are made without beams.
Instead, “the slab is reinforced in such a way that the varying
stresses in the different zones of the slab are accommodated
within a uniform thickness of concrete”.
 The Two-Way Solid Flat Slab System (cont.)
 Formwork is completely flat except for a thickening of the
concrete to resist the high shear forces around the top of
each column (drop panel). Historically the columns under
the drop panels also had mushroom capitals.
 “Reinforcing is laid in both directions in half-bay-wide strips of
two fundamental types: column strips are designed to carry
the higher bending forces encountered in the zones of the
slab that cross the columns, and the middle strips have a
lighter reinforcing pattern”.
 The Two-Way Flat Plate System
 “In more lightly loaded buildings, such as
hotels, hospitals, dormitories, and
apartment buildings, the slab need not be
thickened at all over the columns.”
 “This allows some columns to be moved off
of the grid to facilitate a more efficient floor
plan (Allen, p. 483).
 Slab depth = 5-10 inches.
 Maximum span = 32 feet
 The Two-Way Waffle Slab System
 A.k.a. The two-way concrete joist system
 Metal or plastic pans called domes are used to
eliminate the nonworking concrete from the slab,
allowing a greater economy in longer spans.
Domes now have a special fitting that allows one
to shoot compressed air between it and the
concrete to remove the dome.
 Standard Domes form joists 6” wide on 36” centers
or 5” wide on 24” centers.
 Solid concrete heads are created around the tops
of the columns by leaving the domes out of the
formwork. These serve the same function as the
drop panels in the two-way flat slab system.
Introduction to Composite ConstructionIntroduction to Composite Construction
• Composite construction refers to two load-carrying structural members that
are integrally connected and deflect as a single unit
• An example of this is composite metal deck with concrete fill, steel filler
beams, and girders made composite by using headed stud connectors
Composite
Steel Deck
Shear
Connectors
Welded Wire
Fabric
Concrete
• A steel beam which is made composite by using shear connectors,
composite metal decking and concrete is much stronger and stiffer than the
base beam alone
• Composite floor systems are considered by many to be the highest quality
type of construction
• This has become a standard type of construction selected by many
architects, engineers, and developers
Introduction to Composite ConstructionIntroduction to Composite Construction
Advantages of Composite ConstructionAdvantages of Composite Construction
In a composite floor system the concrete acts together with the steel to create
a stiffer, lighter, less expensive structure
Advantages of Composite ConstructionAdvantages of Composite Construction
Connecting the concrete to the steel beams can have several advantages:
• It is typical to have a reduced
structural steel frame cost
• Weight of the structural steel
frame may be decreased which
may reduce foundation costs
• Reduced live load deflections
• Shallower beams may be used
which might reduce building height
• Increased span lengths are
possible
• Stiffer floors
• Puddle welds (above right) are commonly used to attach the decking to
the structural steel below
• Daily output for a four person decking crew ranges from 2700 S.F. to
3860 S.F. per day depending on the depth and gauge of the decking.
Installation of DeckingInstallation of Decking
• As an alternative to welding, powder actuated tools
may be used to attach metal decking to structural steel
• Powder actuated tools use the expanding gases from
a powder load, or booster, to drive a fastener
• A nail-like fastener is driven through the metal deck
into the steel beam
• The powder actuated tool, powder load, and fastener
must be matched to the thickness of the structural
steel beam flanges
Installation of DeckingInstallation of Decking
• Shear connectors are commonly referred to as
“studs” or “shear studs” in the trade
• They are available in a range of sizes, materials,
and grades
• Headed studs (as shown) are most commonly
used
• Other, less common options for shear connectors
include hooked studs or pieces of C-channel
Shear ConnectorsShear Connectors
• Depending on the welding process used, the tip of
the shear connector may be placed in a ceramic
ferrule (arc shield) during welding to retain the weld
• Shear connectors create a strong bond between the
steel beam and the concrete floor slab which is
poured on top of the metal decking
• This bond allows the concrete slab to work with the
steel beams to reduce live load deflection
Shear ConnectorsShear Connectors
• Shear connectors are installed after the decking is in place
• Shear connectors may be installed by the steel erection contractor or a
specialty shear connector installer
• The welding equipment required for installation is provided by the shear
connector installer
• Daily output for shear connector installation averages about 1000 per day
depending on the size of the connectors.
Installation of Shear ConnectorsInstallation of Shear Connectors
• Concrete is installed by a concrete contractor on top of the composite metal
decking, shear connectors, and welded wire fabric or rebar grid (crack control
reinforcing)
• Pumping is a typical installation method for concrete being placed on metal
decking
• 10,000 to 15,000 sq. ft. of concrete slab may be installed per day depending
on slab thickness and crew size.
Installation of ConcreteInstallation of Concrete
• There is an art to the placement of concrete on metal deck and structural steel
• The work, unless shoring is used, must be executed on a deflecting surface
• An experienced concrete contractor should be employed for this work
 Concrete should be deposited over supporting members first, then spread
toward the deck midspans
 The accumulation of a deep pile of concrete must be avoided
Installation of ConcreteInstallation of Concrete
• The contractor must be aware of camber in the beams and the expected
deflections
• Consultation with the structural engineer may be necessary
• As the concrete cures it forms a connection with the composite metal
decking and shear studs
• The composite floor system is now complete
Installation of ConcreteInstallation of Concrete
 1” Metallic Aggregate Mix
 Terra-Cotta Tile (Ceramic)
 Mastic Finish (Epoxy)
 Resilient Tile (VCT)
 Terrazzo
Floor and slabs

More Related Content

What's hot

basic structural system in architecture
basic structural system in architecturebasic structural system in architecture
basic structural system in architecture
shahul130103
 
Masonry construction (Building Construction)
Masonry construction (Building Construction)Masonry construction (Building Construction)
Masonry construction (Building Construction)
Er.Navazhushen Patel
 
Shoring
ShoringShoring
Types of roof
Types of roofTypes of roof
Types of roof
Aamir Farhan Sheikh
 
Beams
Beams Beams
Composite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureComposite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and Architecture
Mimi Alguidano
 
Stairs
StairsStairs
Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1
Luke D'Arcy
 
Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and construction
EyobAlene1
 
Masonry of Building
Masonry of Building Masonry of Building
Masonry of Building
Yasir Hussain
 
Brick bond
Brick bondBrick bond
Brick bond
Kamrul Hasan Sagar
 
Stone masonry
Stone masonryStone masonry
Stone masonry
Jitesh Dhule
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircases
KHUSHBU SHAH
 
Walls
WallsWalls
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
nancy debora
 
Chapter 9 roofs and roofs coverings
Chapter 9 roofs and roofs coveringsChapter 9 roofs and roofs coverings
Chapter 9 roofs and roofs coverings
KHUSHBU SHAH
 
Rivet connection
Rivet connectionRivet connection
Rivet connection
Manishraj102
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
Surhan Fatima
 
Roof designs and Types of roofs
Roof designs and Types of roofsRoof designs and Types of roofs
Roof designs and Types of roofs
Abhishek kumar
 
Types of masonry walls
Types of masonry wallsTypes of masonry walls
Types of masonry walls
Mohit Dwivedi
 

What's hot (20)

basic structural system in architecture
basic structural system in architecturebasic structural system in architecture
basic structural system in architecture
 
Masonry construction (Building Construction)
Masonry construction (Building Construction)Masonry construction (Building Construction)
Masonry construction (Building Construction)
 
Shoring
ShoringShoring
Shoring
 
Types of roof
Types of roofTypes of roof
Types of roof
 
Beams
Beams Beams
Beams
 
Composite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureComposite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and Architecture
 
Stairs
StairsStairs
Stairs
 
Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1
 
Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and construction
 
Masonry of Building
Masonry of Building Masonry of Building
Masonry of Building
 
Brick bond
Brick bondBrick bond
Brick bond
 
Stone masonry
Stone masonryStone masonry
Stone masonry
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircases
 
Walls
WallsWalls
Walls
 
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
 
Chapter 9 roofs and roofs coverings
Chapter 9 roofs and roofs coveringsChapter 9 roofs and roofs coverings
Chapter 9 roofs and roofs coverings
 
Rivet connection
Rivet connectionRivet connection
Rivet connection
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
 
Roof designs and Types of roofs
Roof designs and Types of roofsRoof designs and Types of roofs
Roof designs and Types of roofs
 
Types of masonry walls
Types of masonry wallsTypes of masonry walls
Types of masonry walls
 

Viewers also liked

Placing column layout
Placing  column layoutPlacing  column layout
Placing column layout
Pranay Kumar Tode
 
Floors slideshare
Floors slideshareFloors slideshare
Floors slideshare
Julian Swindell
 
Seismic Microzonation
Seismic MicrozonationSeismic Microzonation
Seismic Microzonation
Muhammad Nouman
 
Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)
Divyesh Mistry
 
The effect of fiber orientation and laminate stacking sequences on the torsio...
The effect of fiber orientation and laminate stacking sequences on the torsio...The effect of fiber orientation and laminate stacking sequences on the torsio...
The effect of fiber orientation and laminate stacking sequences on the torsio...
eSAT Journals
 
Are pocket structures
Are pocket structuresAre pocket structures
Are pocket structures
Taty Genda de Reynoso
 
Gantovnik2006
Gantovnik2006Gantovnik2006
Gantovnik2006
gantovnik
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
Ramin Vaghei
 
Composite slab
Composite slabComposite slab
Composite slab
Sandipan Sinha
 
Finite element modelling and analysis in ansys workbench
Finite element modelling and analysis in ansys workbenchFinite element modelling and analysis in ansys workbench
Finite element modelling and analysis in ansys workbench
Sanjeet Kumar Singh
 
BUCKLING ANALYSIS
BUCKLING ANALYSISBUCKLING ANALYSIS
BUCKLING ANALYSIS
prashanthgun
 
Post tension Floor System
Post tension Floor SystemPost tension Floor System
Post tension Floor System
Aditya Shah
 
ALL ABOUT PRECAST
ALL ABOUT PRECASTALL ABOUT PRECAST
ALL ABOUT PRECAST
jagrutib22
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential building
govt.poly kalamassery
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
Yazid Hamoda
 
STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)
STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)
STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)
niajkumar
 
Steel reinforcement hand book
Steel reinforcement hand bookSteel reinforcement hand book
Steel reinforcement hand book
Dadan Yupi Andika
 
Ansys Workbench Basics
Ansys Workbench BasicsAnsys Workbench Basics
Ansys Workbench Basics
Aryan Gupta
 
FEA Using Ansys
FEA Using AnsysFEA Using Ansys
FEA Using Ansys
Radhakrishnan Ramkumar
 
Buckling Analysis in ANSYS
Buckling Analysis in ANSYSBuckling Analysis in ANSYS
Buckling Analysis in ANSYS
Maha Hassan
 

Viewers also liked (20)

Placing column layout
Placing  column layoutPlacing  column layout
Placing column layout
 
Floors slideshare
Floors slideshareFloors slideshare
Floors slideshare
 
Seismic Microzonation
Seismic MicrozonationSeismic Microzonation
Seismic Microzonation
 
Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)
 
The effect of fiber orientation and laminate stacking sequences on the torsio...
The effect of fiber orientation and laminate stacking sequences on the torsio...The effect of fiber orientation and laminate stacking sequences on the torsio...
The effect of fiber orientation and laminate stacking sequences on the torsio...
 
Are pocket structures
Are pocket structuresAre pocket structures
Are pocket structures
 
Gantovnik2006
Gantovnik2006Gantovnik2006
Gantovnik2006
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Composite slab
Composite slabComposite slab
Composite slab
 
Finite element modelling and analysis in ansys workbench
Finite element modelling and analysis in ansys workbenchFinite element modelling and analysis in ansys workbench
Finite element modelling and analysis in ansys workbench
 
BUCKLING ANALYSIS
BUCKLING ANALYSISBUCKLING ANALYSIS
BUCKLING ANALYSIS
 
Post tension Floor System
Post tension Floor SystemPost tension Floor System
Post tension Floor System
 
ALL ABOUT PRECAST
ALL ABOUT PRECASTALL ABOUT PRECAST
ALL ABOUT PRECAST
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential building
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)
STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)
STRESS & STRAIN ANALYSIS IN FRICTION STIR WELDING WITH THE ANSYS TOOL(ppt)
 
Steel reinforcement hand book
Steel reinforcement hand bookSteel reinforcement hand book
Steel reinforcement hand book
 
Ansys Workbench Basics
Ansys Workbench BasicsAnsys Workbench Basics
Ansys Workbench Basics
 
FEA Using Ansys
FEA Using AnsysFEA Using Ansys
FEA Using Ansys
 
Buckling Analysis in ANSYS
Buckling Analysis in ANSYSBuckling Analysis in ANSYS
Buckling Analysis in ANSYS
 

Similar to Floor and slabs

BUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptxBUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptx
LawrenceMartinez7
 
TRUSS 2020.pptx
TRUSS 2020.pptxTRUSS 2020.pptx
TRUSS 2020.pptx
PranavVashishth1
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
Sujith Velloor Sudarsanakumar Nair
 
Ppt
PptPpt
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
anik7nziza
 
Design highrise
Design highriseDesign highrise
Design highrise
Somyaa Jain
 
Prestressed Concrete Basics
Prestressed Concrete BasicsPrestressed Concrete Basics
Prestressed Concrete Basics
Sachin Kulkarni
 
Final presentation by Akramul masum from southeast university bangladesh.
Final presentation by Akramul masum from southeast university bangladesh.Final presentation by Akramul masum from southeast university bangladesh.
Final presentation by Akramul masum from southeast university bangladesh.
Integrated Design
 
Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/Frame
Abdul Rahman
 
prestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptxprestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptx
PRASANNABHAVANGR1
 
Multi storey frames
Multi storey framesMulti storey frames
Multi storey frames
LALITH KUMAR
 
Joints
JointsJoints
Roof truss
Roof trussRoof truss
Roof truss
Pankajkumar Singh
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slab
Vikas Mehta
 
Item of work truss
Item of work truss Item of work truss
Item of work truss
Prabhat chhirolya
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Parag Pal
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Rajesh Burde
 
Steel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementSteel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcement
Bekaert
 
(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf
(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf
(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf
MohdAzharNumaniShah
 
Special structure
Special structureSpecial structure

Similar to Floor and slabs (20)

BUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptxBUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptx
 
TRUSS 2020.pptx
TRUSS 2020.pptxTRUSS 2020.pptx
TRUSS 2020.pptx
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
Ppt
PptPpt
Ppt
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
 
Design highrise
Design highriseDesign highrise
Design highrise
 
Prestressed Concrete Basics
Prestressed Concrete BasicsPrestressed Concrete Basics
Prestressed Concrete Basics
 
Final presentation by Akramul masum from southeast university bangladesh.
Final presentation by Akramul masum from southeast university bangladesh.Final presentation by Akramul masum from southeast university bangladesh.
Final presentation by Akramul masum from southeast university bangladesh.
 
Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/Frame
 
prestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptxprestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptx
 
Multi storey frames
Multi storey framesMulti storey frames
Multi storey frames
 
Joints
JointsJoints
Joints
 
Roof truss
Roof trussRoof truss
Roof truss
 
Grid waffle slab
Grid waffle slabGrid waffle slab
Grid waffle slab
 
Item of work truss
Item of work truss Item of work truss
Item of work truss
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Steel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementSteel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcement
 
(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf
(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf
(M AZHAR NUMANI-'B') ADVANCED STRUCTURAL SYSTEM1.pdf
 
Special structure
Special structureSpecial structure
Special structure
 

More from Pranay Kumar Tode

Hindu Temple Architecture | History of Architecture
Hindu Temple Architecture | History of ArchitectureHindu Temple Architecture | History of Architecture
Hindu Temple Architecture | History of Architecture
Pranay Kumar Tode
 
Maratha Architecture | History of Architecture
Maratha Architecture | History of ArchitectureMaratha Architecture | History of Architecture
Maratha Architecture | History of Architecture
Pranay Kumar Tode
 
Landscape and design elements in an institutional campus.
Landscape and design elements in an institutional campus.Landscape and design elements in an institutional campus.
Landscape and design elements in an institutional campus.
Pranay Kumar Tode
 
How to write a cv or resume
How to write a cv or resumeHow to write a cv or resume
How to write a cv or resume
Pranay Kumar Tode
 
How to write architectural thesis
How to write architectural thesisHow to write architectural thesis
How to write architectural thesis
Pranay Kumar Tode
 
The architects act, 1972
The architects act, 1972The architects act, 1972
The architects act, 1972
Pranay Kumar Tode
 
JUMP FORM WORK
JUMP FORM WORKJUMP FORM WORK
JUMP FORM WORK
Pranay Kumar Tode
 

More from Pranay Kumar Tode (7)

Hindu Temple Architecture | History of Architecture
Hindu Temple Architecture | History of ArchitectureHindu Temple Architecture | History of Architecture
Hindu Temple Architecture | History of Architecture
 
Maratha Architecture | History of Architecture
Maratha Architecture | History of ArchitectureMaratha Architecture | History of Architecture
Maratha Architecture | History of Architecture
 
Landscape and design elements in an institutional campus.
Landscape and design elements in an institutional campus.Landscape and design elements in an institutional campus.
Landscape and design elements in an institutional campus.
 
How to write a cv or resume
How to write a cv or resumeHow to write a cv or resume
How to write a cv or resume
 
How to write architectural thesis
How to write architectural thesisHow to write architectural thesis
How to write architectural thesis
 
The architects act, 1972
The architects act, 1972The architects act, 1972
The architects act, 1972
 
JUMP FORM WORK
JUMP FORM WORKJUMP FORM WORK
JUMP FORM WORK
 

Recently uploaded

Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”
Taste
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
Kalna College
 
adjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammaradjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammar
7DFarhanaMohammed
 
What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17
Celine George
 
Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17
Celine George
 
The Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptxThe Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptx
PriyaKumari928991
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
Derek Wenmoth
 
Project- Comparison among Chhattisgarh and kerala.pptx
Project- Comparison among Chhattisgarh and kerala.pptxProject- Comparison among Chhattisgarh and kerala.pptx
Project- Comparison among Chhattisgarh and kerala.pptx
jeevankraghuraman
 
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
Accounting for Restricted Grants When and How To Record Properly
Accounting for Restricted Grants  When and How To Record ProperlyAccounting for Restricted Grants  When and How To Record Properly
Accounting for Restricted Grants When and How To Record Properly
TechSoup
 
bryophytes.pptx bsc botany honours second semester
bryophytes.pptx bsc botany honours  second semesterbryophytes.pptx bsc botany honours  second semester
bryophytes.pptx bsc botany honours second semester
Sarojini38
 
Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
whatchangedhowreflec
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
Ben Aldrich
 
managing Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptxmanaging Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptx
nabaegha
 
The basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptxThe basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptx
heathfieldcps1
 
How to stay relevant as a cyber professional: Skills, trends and career paths...
How to stay relevant as a cyber professional: Skills, trends and career paths...How to stay relevant as a cyber professional: Skills, trends and career paths...
How to stay relevant as a cyber professional: Skills, trends and career paths...
Infosec
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
Kalna College
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
OH TEIK BIN
 
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
biruktesfaye27
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
chaudharyreet2244
 

Recently uploaded (20)

Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”Creative Restart 2024: Mike Martin - Finding a way around “no”
Creative Restart 2024: Mike Martin - Finding a way around “no”
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
 
adjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammaradjectives.ppt for class 1 to 6, grammar
adjectives.ppt for class 1 to 6, grammar
 
What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17
 
Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17Creation or Update of a Mandatory Field is Not Set in Odoo 17
Creation or Update of a Mandatory Field is Not Set in Odoo 17
 
The Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptxThe Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptx
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
 
Project- Comparison among Chhattisgarh and kerala.pptx
Project- Comparison among Chhattisgarh and kerala.pptxProject- Comparison among Chhattisgarh and kerala.pptx
Project- Comparison among Chhattisgarh and kerala.pptx
 
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
 
Accounting for Restricted Grants When and How To Record Properly
Accounting for Restricted Grants  When and How To Record ProperlyAccounting for Restricted Grants  When and How To Record Properly
Accounting for Restricted Grants When and How To Record Properly
 
bryophytes.pptx bsc botany honours second semester
bryophytes.pptx bsc botany honours  second semesterbryophytes.pptx bsc botany honours  second semester
bryophytes.pptx bsc botany honours second semester
 
Erasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES CroatiaErasmus + DISSEMINATION ACTIVITIES Croatia
Erasmus + DISSEMINATION ACTIVITIES Croatia
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
 
managing Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptxmanaging Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptx
 
The basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptxThe basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptx
 
How to stay relevant as a cyber professional: Skills, trends and career paths...
How to stay relevant as a cyber professional: Skills, trends and career paths...How to stay relevant as a cyber professional: Skills, trends and career paths...
How to stay relevant as a cyber professional: Skills, trends and career paths...
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
 
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptxA Free 200-Page eBook ~ Brain and Mind Exercise.pptx
A Free 200-Page eBook ~ Brain and Mind Exercise.pptx
 
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
Ethiopia and Eritrea Eritrea's journey has been marked by resilience and dete...
 
nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...nutrition in plants chapter 1 class 7...
nutrition in plants chapter 1 class 7...
 

Floor and slabs

  • 2.  List wood floor systems  Explain the advantages and disadvantages of specifying precast over site-cast concrete.  Explain why precast concrete structural elements are usually cured with steam.  Explain the difference between a one-way and two-way concrete floor system.  List and explain the different types of one- way concrete floor systems.  List and explain the different types of two- way concrete floor systems.
  • 3.  1”x12” T&G sheet floor decking  Laminated 2”x4”’s or 2”x6”’s on edge at right angles to the floor beams  Spiked together side by side
  • 4.  Can be wood beam or steel beam with wood nailer on top  Heavy planks, tongue and groove, spiked to the beams
  • 5.  Slabs on grade › Durability depends on concrete strength and finish › Strength of slab depends on reinforcing and supporting subgrade  Structural slabs › Span between columns and beams › Strength depends on concrete strength and the amount of reinforcing steel
  • 6.  Able to control the quality of materials and workmanship better than onsite (able to build in the rain, sleet, or snow).  Able to vibrate the concrete mechanically to achieve maximum density and highest surface quality.  Able to reuse formwork more than onsite, thus reducing formwork cost per unit.  Able to steam cure, thus accelerating curing with the steam’s heat and adding moisture for full hydration.  Steam curing, coupled with the use of Type III cement enables the plant to produce a fully cured structural element in 24 hours.
  • 7.  Although light compared to other building elements, precast structural elements are heavy to transport over the roads and hoist into place.  This also restricts the size and proportions of most precast elements (they can be long, but they can only be as wide as the maximum legal vehicle width of 12 to 14 feet.
  • 8.  One-Way  Beams run in one direction, parallel to one another, between perpendicular girders that transfer the load to columns.  Two-Way  Beams run in two directions, parallel and perpendicular to one another.
  • 9.  The One-Way Solid Slab System  Beams and girders are poured the same time as the slab.  Economical when the slab does not span very far between beams.  Slab depths are usually 4-10 inches.  Uneconomical on spans of more than 20’
  • 10.
  • 11.
  • 12.  The One-Way Concrete Joist System  Longer one-way spans than solid slab systems.  Joists are formed with metal pans supported on longitudinal strips of wood or on a plywood deck.  Distribution ribs are placed at mid-span to distribute concentrated loads to more than one joist.  When fire-resistance requirements of the building code dictate a slab thickness of 4.5 inches or more, the slab is capable of spanning a much greater distance. This enables wide-module pans that separate the joists by 4-6 feet.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.  Beams run in two directions, parallel and perpendicular to one another.  “Generally, two way floor systems are more economical than one-way systems in buildings where columns can be spaced in bays that are square or nearly square in proportion”.
  • 19.  The Two-Way Solid Flat Slab System  A system in which the slab is supported by a grid of beams running in both directions over the columns.  Used for very heavily loaded industrial floors.  Slab depth = 4 to 12 inches  Maximum span = 34 feet  Most two-way floor systems are made without beams. Instead, “the slab is reinforced in such a way that the varying stresses in the different zones of the slab are accommodated within a uniform thickness of concrete”.
  • 20.  The Two-Way Solid Flat Slab System (cont.)  Formwork is completely flat except for a thickening of the concrete to resist the high shear forces around the top of each column (drop panel). Historically the columns under the drop panels also had mushroom capitals.  “Reinforcing is laid in both directions in half-bay-wide strips of two fundamental types: column strips are designed to carry the higher bending forces encountered in the zones of the slab that cross the columns, and the middle strips have a lighter reinforcing pattern”.
  • 21.
  • 22.
  • 23.
  • 24.  The Two-Way Flat Plate System  “In more lightly loaded buildings, such as hotels, hospitals, dormitories, and apartment buildings, the slab need not be thickened at all over the columns.”  “This allows some columns to be moved off of the grid to facilitate a more efficient floor plan (Allen, p. 483).  Slab depth = 5-10 inches.  Maximum span = 32 feet
  • 25.
  • 26.  The Two-Way Waffle Slab System  A.k.a. The two-way concrete joist system  Metal or plastic pans called domes are used to eliminate the nonworking concrete from the slab, allowing a greater economy in longer spans. Domes now have a special fitting that allows one to shoot compressed air between it and the concrete to remove the dome.  Standard Domes form joists 6” wide on 36” centers or 5” wide on 24” centers.  Solid concrete heads are created around the tops of the columns by leaving the domes out of the formwork. These serve the same function as the drop panels in the two-way flat slab system.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. Introduction to Composite ConstructionIntroduction to Composite Construction • Composite construction refers to two load-carrying structural members that are integrally connected and deflect as a single unit • An example of this is composite metal deck with concrete fill, steel filler beams, and girders made composite by using headed stud connectors Composite Steel Deck Shear Connectors Welded Wire Fabric Concrete
  • 32. • A steel beam which is made composite by using shear connectors, composite metal decking and concrete is much stronger and stiffer than the base beam alone • Composite floor systems are considered by many to be the highest quality type of construction • This has become a standard type of construction selected by many architects, engineers, and developers Introduction to Composite ConstructionIntroduction to Composite Construction
  • 33. Advantages of Composite ConstructionAdvantages of Composite Construction In a composite floor system the concrete acts together with the steel to create a stiffer, lighter, less expensive structure
  • 34. Advantages of Composite ConstructionAdvantages of Composite Construction Connecting the concrete to the steel beams can have several advantages: • It is typical to have a reduced structural steel frame cost • Weight of the structural steel frame may be decreased which may reduce foundation costs • Reduced live load deflections • Shallower beams may be used which might reduce building height • Increased span lengths are possible • Stiffer floors
  • 35. • Puddle welds (above right) are commonly used to attach the decking to the structural steel below • Daily output for a four person decking crew ranges from 2700 S.F. to 3860 S.F. per day depending on the depth and gauge of the decking. Installation of DeckingInstallation of Decking
  • 36. • As an alternative to welding, powder actuated tools may be used to attach metal decking to structural steel • Powder actuated tools use the expanding gases from a powder load, or booster, to drive a fastener • A nail-like fastener is driven through the metal deck into the steel beam • The powder actuated tool, powder load, and fastener must be matched to the thickness of the structural steel beam flanges Installation of DeckingInstallation of Decking
  • 37. • Shear connectors are commonly referred to as “studs” or “shear studs” in the trade • They are available in a range of sizes, materials, and grades • Headed studs (as shown) are most commonly used • Other, less common options for shear connectors include hooked studs or pieces of C-channel Shear ConnectorsShear Connectors
  • 38. • Depending on the welding process used, the tip of the shear connector may be placed in a ceramic ferrule (arc shield) during welding to retain the weld • Shear connectors create a strong bond between the steel beam and the concrete floor slab which is poured on top of the metal decking • This bond allows the concrete slab to work with the steel beams to reduce live load deflection Shear ConnectorsShear Connectors
  • 39. • Shear connectors are installed after the decking is in place • Shear connectors may be installed by the steel erection contractor or a specialty shear connector installer • The welding equipment required for installation is provided by the shear connector installer • Daily output for shear connector installation averages about 1000 per day depending on the size of the connectors. Installation of Shear ConnectorsInstallation of Shear Connectors
  • 40. • Concrete is installed by a concrete contractor on top of the composite metal decking, shear connectors, and welded wire fabric or rebar grid (crack control reinforcing) • Pumping is a typical installation method for concrete being placed on metal decking • 10,000 to 15,000 sq. ft. of concrete slab may be installed per day depending on slab thickness and crew size. Installation of ConcreteInstallation of Concrete
  • 41. • There is an art to the placement of concrete on metal deck and structural steel • The work, unless shoring is used, must be executed on a deflecting surface • An experienced concrete contractor should be employed for this work  Concrete should be deposited over supporting members first, then spread toward the deck midspans  The accumulation of a deep pile of concrete must be avoided Installation of ConcreteInstallation of Concrete
  • 42. • The contractor must be aware of camber in the beams and the expected deflections • Consultation with the structural engineer may be necessary • As the concrete cures it forms a connection with the composite metal decking and shear studs • The composite floor system is now complete Installation of ConcreteInstallation of Concrete
  • 43.  1” Metallic Aggregate Mix  Terra-Cotta Tile (Ceramic)  Mastic Finish (Epoxy)  Resilient Tile (VCT)  Terrazzo
  翻译: