Question #1
You have been appointed a project manager within an information systems organization. Your
job is to build an application that is quite similar to others your team has built, although this one
is larger and more complex. Requirements have been thoroughly documented by the customer.
What software process model(s) would you choose and why? Explain in detail.
Answer:
As the information system already exists in which some development is to be made and
released. Now Developer just need to make some addition in the previous application because
Customer requirements are documented, which mean requirements are well understood and
have no need to modified requirement.
Process Selected:.
Prototype model will be used in development of this application. In prototype model application
or project is made in series of increment throughout project. In prototype model we first make a
prototype and give to the customer and make changes in it accordingly as required by the
customer. Further increment made after previous ones. Large systems are particularly suitable
for prototype model.
Prototype model is a strategy that allows system to be developed in pieces. Prototype
model allows the additions in process as per requirements, process change can be
implemented.
To make this application we have to use the already existing application and make increments
in it and made new more complex and large application Requirements are fulfilled already for
this application.
Question# 2
University of Gujrat is currently running through different departments like Administration,
Accounts, Examination, Admission, Library, Computer Labs, Faculty Management, and Student
Management etc. Every department has its own specific processes and each department is
using computer-based system to some extent but not complete computer based solutions.
There is also inter-departmental communication for the smooth running of all functions in
respective departments. It is decided by the higher management that all the departments should
be integrated under one system and that system should accommodate all the processes
existing in all departments. It is also decided that if this system is implemented successfully then
it will also be used in other departments of University of Gujrat independently after configuring it
according to their needs. Higher Management wants to see this system within this year. Risks,
which can arise, should be accommodated implicitly keeping the time factor in mind. As the
system will be used in public sector, so verification and validation factors must be administered
accordingly. What software process model(s) would you choose and why? Explain in detail
System need modification and integration .System is large and use in public sector .University
of Gujrat all department use this system according to their needs, which mean departments
have some same function and some different function. Risks analysis is also important factor
which should be resolve in given time frame. As system use in public sector, so verification and
validation factors must be administered accordingly.
Selected Process Model:
Selected process model is “Component Model” use to develop this system.
In the majority of software projects, there is some software reuse. This often happens informally
when people working on the project know of designs or code that are similar to what is required.
They look for these, modify them as needed, and incorporate them into their system. A general
process model for reuse-based development. Although the initial requirements specification
stage and the validation stage are comparable with other software processes, the intermediate
stages in a reuse oriented process are different. These stages are:
1. Component analysis given the requirements specification, a search is made for components
to implement that specification. Usually, there is no exact match and the components that may
be used only provide some of the functionality required.
2. Requirements modification during this stage, the requirements are analyzed using information
about the components that have been discovered. They are then modified to reflect the
available components. Where modifications are impossible, the component analysis activity
may be re-entered to search for alternative solutions.
3. System design with reuse during this phase, the framework of the system is designed or an
existing framework is reused. The designers take into account the components that are reused
and organize the framework to cater for this. Some new software may have to be designed if
reusable components are not available.
4. Development and integration Software that cannot be externally procured is developed, and
the components and COTS systems are integrated to create the new system. System
integration, in this model, may be part of the development process rather than a separate
activity.
Component software engineering has the obvious advantage of reducing the amount of
software to be developed and so reducing cost and risks. It usually also leads to faster delivery
of the software.System boundaries should be defined and clearly specified in a component-
based approach requirement analysis also implies that it is necessary to analyze whether
requirements can be fulfilled with available components. System is use in public sector. All
departments have some same function and some different function .We use component base
approach to reuse the same component in this way we reduce our code and save time. This
becomes important as we complete project in this year. The risk is analysis in every component
by doing this risk is reducing and project become more accurate and efficient. This project
approach is as useful when we need to modifier the some component we do not need to modify
all project we just modify that component. Another reason for using this approach is to save time
and complete this project in given time frame, risk is also reduce by this approach. Validation
and verification also made on each component.
Question #3
You have been appointed a project manager for a major software products company. Your job
is to manage the development of the next generation version of its widely used word-processing
software. Because competition is intense, tight deadlines have been established and
announced. What software process model(s) would you choose and why?
Assumptions
We have to use that process model which meets the requirements to make the version in the
given time limit because the deadline has been defined already.
Selected Process Model
We will use the RAD (Rapid Application Development) model because tight deadline has been
announced for project completion. We need to modify the previous version of word-processing
software. As Rapid Application Development is a linear sequential software development
process model that emphasises an extremely short development cycle.
A component-based construction approach is used. There can be several teams working on
different components during this time limit announced.
Reason for selection:
The main reason for choosing
Question# 4
You have been asked to develop a small application that analyzes each course offered by a
university and reports the average grade obtained in the course (for a given term). What
software model(s) would you choose and why?
As the requirements are simply known and understood that we have to just develop a small
application that analyzes each course offered by a university and reports the average grade
obtained in the course
Selected Process Model:
The sequential/Waterfall Model is better for this application. Because water fall model is used
when the requirements are well understood for the start and no changes are needed in that so
as the requirements of the application is well understood for the start so waterfall model is
suitable for this.
Software Engineering Assignment

More Related Content

What's hot

Threads (operating System)
Threads (operating System)Threads (operating System)
Threads (operating System)
Prakhar Maurya
 
Ontology engineering
Ontology engineering Ontology engineering
Ontology engineering
Aliabbas Petiwala
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
Bala Ganesh
 
unit 1 ppt.pptx
unit 1 ppt.pptxunit 1 ppt.pptx
unit 1 ppt.pptx
SadikshyaTimilsina1
 
Data Designs (Software Engg.)
Data Designs (Software Engg.)Data Designs (Software Engg.)
Data Designs (Software Engg.)
Arun Shukla
 
Introduction to Compiler design
Introduction to Compiler design Introduction to Compiler design
Introduction to Compiler design
Dr. C.V. Suresh Babu
 
Interaction Modeling
Interaction ModelingInteraction Modeling
Interaction Modeling
Hemant Sharma
 
DeadLock in Operating-Systems
DeadLock in Operating-SystemsDeadLock in Operating-Systems
DeadLock in Operating-Systems
Venkata Sreeram
 
Architectural styles and patterns
Architectural styles and patternsArchitectural styles and patterns
Architectural styles and patterns
Himanshu
 
Lecture 01 introduction to compiler
Lecture 01 introduction to compilerLecture 01 introduction to compiler
Lecture 01 introduction to compiler
Iffat Anjum
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)
AmanSharma1172
 
Expert system
Expert systemExpert system
Expert system
Sayeed Far Ooqui
 
Knowledge representation in AI
Knowledge representation in AIKnowledge representation in AI
Knowledge representation in AI
Vishal Singh
 
UML
UMLUML
Architecture of operating system
Architecture of operating systemArchitecture of operating system
Architecture of operating system
Supriya Kumari
 
Token, Pattern and Lexeme
Token, Pattern and LexemeToken, Pattern and Lexeme
Token, Pattern and Lexeme
A. S. M. Shafi
 
Register allocation and assignment
Register allocation and assignmentRegister allocation and assignment
Register allocation and assignment
Karthi Keyan
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
Saqib Raza
 
Online Quiz System Project Report
Online Quiz System Project Report Online Quiz System Project Report
Online Quiz System Project Report
Kishan Maurya
 
Uml in software engineering
Uml in software engineeringUml in software engineering
Uml in software engineering
Mubashir Jutt
 

What's hot (20)

Threads (operating System)
Threads (operating System)Threads (operating System)
Threads (operating System)
 
Ontology engineering
Ontology engineering Ontology engineering
Ontology engineering
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
unit 1 ppt.pptx
unit 1 ppt.pptxunit 1 ppt.pptx
unit 1 ppt.pptx
 
Data Designs (Software Engg.)
Data Designs (Software Engg.)Data Designs (Software Engg.)
Data Designs (Software Engg.)
 
Introduction to Compiler design
Introduction to Compiler design Introduction to Compiler design
Introduction to Compiler design
 
Interaction Modeling
Interaction ModelingInteraction Modeling
Interaction Modeling
 
DeadLock in Operating-Systems
DeadLock in Operating-SystemsDeadLock in Operating-Systems
DeadLock in Operating-Systems
 
Architectural styles and patterns
Architectural styles and patternsArchitectural styles and patterns
Architectural styles and patterns
 
Lecture 01 introduction to compiler
Lecture 01 introduction to compilerLecture 01 introduction to compiler
Lecture 01 introduction to compiler
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)
 
Expert system
Expert systemExpert system
Expert system
 
Knowledge representation in AI
Knowledge representation in AIKnowledge representation in AI
Knowledge representation in AI
 
UML
UMLUML
UML
 
Architecture of operating system
Architecture of operating systemArchitecture of operating system
Architecture of operating system
 
Token, Pattern and Lexeme
Token, Pattern and LexemeToken, Pattern and Lexeme
Token, Pattern and Lexeme
 
Register allocation and assignment
Register allocation and assignmentRegister allocation and assignment
Register allocation and assignment
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
Online Quiz System Project Report
Online Quiz System Project Report Online Quiz System Project Report
Online Quiz System Project Report
 
Uml in software engineering
Uml in software engineeringUml in software engineering
Uml in software engineering
 

Viewers also liked

Software engineering Questions and Answers
Software engineering Questions and AnswersSoftware engineering Questions and Answers
Software engineering Questions and Answers
Bala Ganesh
 
SOFTWARE ENGINEERING
SOFTWARE ENGINEERINGSOFTWARE ENGINEERING
SOFTWARE ENGINEERING
Mahalakshmi Seenaswamy
 
Software Engineering Sample Question paper for 2012
Software Engineering Sample Question paper for 2012Software Engineering Sample Question paper for 2012
Software Engineering Sample Question paper for 2012
Neelamani Samal
 
Assignment 2nd(sdlc)id-17
Assignment 2nd(sdlc)id-17Assignment 2nd(sdlc)id-17
Assignment 2nd(sdlc)id-17
Pardeep Bhadwal
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
Jesse Manalansan
 
A2
A2A2
Types of computer
Types of computerTypes of computer
Types of computer
Kimberley Mason
 
962 sech04
962 sech04962 sech04
962 sech04
aldwal
 
Software engineering
Software engineeringSoftware engineering
Software engineering
faisalwajid
 
Software Engineering ppt
Software Engineering pptSoftware Engineering ppt
Software Engineering ppt
shruths2890
 
software engineering notes for cse/it fifth semester
software engineering notes for cse/it fifth semestersoftware engineering notes for cse/it fifth semester
software engineering notes for cse/it fifth semester
rajesh199155
 
Software requirements specification of Library Management System
Software requirements specification of Library Management SystemSoftware requirements specification of Library Management System
Software requirements specification of Library Management System
Soumili Sen
 
All Database Design Tuts V1.3
All Database Design Tuts V1.3All Database Design Tuts V1.3
All Database Design Tuts V1.3
Cathie101
 
Dynamic analysis in Software Testing
Dynamic analysis in Software TestingDynamic analysis in Software Testing
Dynamic analysis in Software Testing
Sagar Pednekar
 
Aula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanAula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger Pressman
Rogerio P C do Nascimento
 
Software re engineering
Software re engineeringSoftware re engineering
Software re engineering
Indu Sharma Bhardwaj
 
Use Case diagram-UML diagram-2
Use Case diagram-UML diagram-2Use Case diagram-UML diagram-2
Use Case diagram-UML diagram-2
Ramakant Soni
 
Software engineering lecture notes
Software engineering   lecture notesSoftware engineering   lecture notes
Software engineering lecture notes
Ammar Shafiq
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentation
adinmani
 
Notes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNotes of Software engineering and Project Management
Notes of Software engineering and Project Management
NANDINI SHARMA
 

Viewers also liked (20)

Software engineering Questions and Answers
Software engineering Questions and AnswersSoftware engineering Questions and Answers
Software engineering Questions and Answers
 
SOFTWARE ENGINEERING
SOFTWARE ENGINEERINGSOFTWARE ENGINEERING
SOFTWARE ENGINEERING
 
Software Engineering Sample Question paper for 2012
Software Engineering Sample Question paper for 2012Software Engineering Sample Question paper for 2012
Software Engineering Sample Question paper for 2012
 
Assignment 2nd(sdlc)id-17
Assignment 2nd(sdlc)id-17Assignment 2nd(sdlc)id-17
Assignment 2nd(sdlc)id-17
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
A2
A2A2
A2
 
Types of computer
Types of computerTypes of computer
Types of computer
 
962 sech04
962 sech04962 sech04
962 sech04
 
Software engineering
Software engineeringSoftware engineering
Software engineering
 
Software Engineering ppt
Software Engineering pptSoftware Engineering ppt
Software Engineering ppt
 
software engineering notes for cse/it fifth semester
software engineering notes for cse/it fifth semestersoftware engineering notes for cse/it fifth semester
software engineering notes for cse/it fifth semester
 
Software requirements specification of Library Management System
Software requirements specification of Library Management SystemSoftware requirements specification of Library Management System
Software requirements specification of Library Management System
 
All Database Design Tuts V1.3
All Database Design Tuts V1.3All Database Design Tuts V1.3
All Database Design Tuts V1.3
 
Dynamic analysis in Software Testing
Dynamic analysis in Software TestingDynamic analysis in Software Testing
Dynamic analysis in Software Testing
 
Aula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanAula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger Pressman
 
Software re engineering
Software re engineeringSoftware re engineering
Software re engineering
 
Use Case diagram-UML diagram-2
Use Case diagram-UML diagram-2Use Case diagram-UML diagram-2
Use Case diagram-UML diagram-2
 
Software engineering lecture notes
Software engineering   lecture notesSoftware engineering   lecture notes
Software engineering lecture notes
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentation
 
Notes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNotes of Software engineering and Project Management
Notes of Software engineering and Project Management
 

Similar to Software Engineering Assignment

Sdpl1
Sdpl1Sdpl1
Ch 02 s.e software process models 1
Ch 02 s.e software process models   1Ch 02 s.e software process models   1
Ch 02 s.e software process models 1
Badar Waseer
 
Alveena Assignment.docx
Alveena Assignment.docxAlveena Assignment.docx
Alveena Assignment.docx
ShahZaman82
 
Slcm sharbani bhattacharya
Slcm sharbani bhattacharyaSlcm sharbani bhattacharya
Slcm sharbani bhattacharya
Sharbani Bhattacharya
 
SE-Lecture-4.pptx
SE-Lecture-4.pptxSE-Lecture-4.pptx
SE-Lecture-4.pptx
vishal choudhary
 
Ch17
Ch17Ch17
Ch17
phanleson
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
Dilip Prajapati
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
Dilip Prajapati
 
Software Process Model in software engineering
Software Process Model in software engineeringSoftware Process Model in software engineering
Software Process Model in software engineering
MuhammadTalha436
 
Mi0033 software engineering
Mi0033  software engineeringMi0033  software engineering
Mi0033 software engineering
smumbahelp
 
Chapter 3 Software Process Model.ppt
Chapter 3 Software Process Model.pptChapter 3 Software Process Model.ppt
Chapter 3 Software Process Model.ppt
RayonJ1
 
Presentation of waterfall model
Presentation of waterfall modelPresentation of waterfall model
Presentation of waterfall model
Rohitkumar3723
 
SYSTEM DEVELOPMENT LIFE CYCLE
SYSTEM DEVELOPMENT LIFE CYCLESYSTEM DEVELOPMENT LIFE CYCLE
SYSTEM DEVELOPMENT LIFE CYCLE
ayushisingh190
 
Software development process models
Software development process modelsSoftware development process models
Software development process models
Muhammed Afsal Villan
 
Lecture 19,20 Software Development Process Models.pptx
Lecture 19,20 Software Development Process Models.pptxLecture 19,20 Software Development Process Models.pptx
Lecture 19,20 Software Development Process Models.pptx
SeniorUsama
 
GSPM (General Software Process Model)
GSPM (General Software Process Model)GSPM (General Software Process Model)
GSPM (General Software Process Model)
muhammad naeem
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
SE-Lecture-2.pptx
SE-Lecture-2.pptxSE-Lecture-2.pptx
SE-Lecture-2.pptx
vishal choudhary
 
Basics of software engineering
Basics of software engineeringBasics of software engineering
Basics of software engineering
Madhav Suratkar
 
Chapter 2.pptx
Chapter 2.pptxChapter 2.pptx
Chapter 2.pptx
AmnaAhsaan1
 

Similar to Software Engineering Assignment (20)

Sdpl1
Sdpl1Sdpl1
Sdpl1
 
Ch 02 s.e software process models 1
Ch 02 s.e software process models   1Ch 02 s.e software process models   1
Ch 02 s.e software process models 1
 
Alveena Assignment.docx
Alveena Assignment.docxAlveena Assignment.docx
Alveena Assignment.docx
 
Slcm sharbani bhattacharya
Slcm sharbani bhattacharyaSlcm sharbani bhattacharya
Slcm sharbani bhattacharya
 
SE-Lecture-4.pptx
SE-Lecture-4.pptxSE-Lecture-4.pptx
SE-Lecture-4.pptx
 
Ch17
Ch17Ch17
Ch17
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
 
Software Process Model in software engineering
Software Process Model in software engineeringSoftware Process Model in software engineering
Software Process Model in software engineering
 
Mi0033 software engineering
Mi0033  software engineeringMi0033  software engineering
Mi0033 software engineering
 
Chapter 3 Software Process Model.ppt
Chapter 3 Software Process Model.pptChapter 3 Software Process Model.ppt
Chapter 3 Software Process Model.ppt
 
Presentation of waterfall model
Presentation of waterfall modelPresentation of waterfall model
Presentation of waterfall model
 
SYSTEM DEVELOPMENT LIFE CYCLE
SYSTEM DEVELOPMENT LIFE CYCLESYSTEM DEVELOPMENT LIFE CYCLE
SYSTEM DEVELOPMENT LIFE CYCLE
 
Software development process models
Software development process modelsSoftware development process models
Software development process models
 
Lecture 19,20 Software Development Process Models.pptx
Lecture 19,20 Software Development Process Models.pptxLecture 19,20 Software Development Process Models.pptx
Lecture 19,20 Software Development Process Models.pptx
 
GSPM (General Software Process Model)
GSPM (General Software Process Model)GSPM (General Software Process Model)
GSPM (General Software Process Model)
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
SE-Lecture-2.pptx
SE-Lecture-2.pptxSE-Lecture-2.pptx
SE-Lecture-2.pptx
 
Basics of software engineering
Basics of software engineeringBasics of software engineering
Basics of software engineering
 
Chapter 2.pptx
Chapter 2.pptxChapter 2.pptx
Chapter 2.pptx
 

Recently uploaded

Fuxnet [EN] .pdf
Fuxnet [EN]                                   .pdfFuxnet [EN]                                   .pdf
Fuxnet [EN] .pdf
Overkill Security
 
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State StoreElasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
ScyllaDB
 
CNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My Identity
CNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My IdentityCNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My Identity
CNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My Identity
Cynthia Thomas
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
FilipTomaszewski5
 
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
Pablo Gómez Abajo
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
Enterprise Knowledge
 
Session 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdfSession 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdf
UiPathCommunity
 
APJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes WebinarAPJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes Webinar
ThousandEyes
 
Facilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptxFacilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptx
Knoldus Inc.
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
Mydbops
 
ScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking ReplicationScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking Replication
ScyllaDB
 
ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes
 
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google CloudRadically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
ScyllaDB
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
Ortus Solutions, Corp
 
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
manji sharman06
 
Building a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data PlatformBuilding a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data Platform
Enterprise Knowledge
 
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
anilsa9823
 
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
AlexanderRichford
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
UiPathCommunity
 

Recently uploaded (20)

Fuxnet [EN] .pdf
Fuxnet [EN]                                   .pdfFuxnet [EN]                                   .pdf
Fuxnet [EN] .pdf
 
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State StoreElasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
 
CNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My Identity
CNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My IdentityCNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My Identity
CNSCon 2024 Lightning Talk: Don’t Make Me Impersonate My Identity
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
 
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
 
Session 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdfSession 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdf
 
APJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes WebinarAPJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes Webinar
 
Facilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptxFacilitation Skills - When to Use and Why.pptx
Facilitation Skills - When to Use and Why.pptx
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
 
ScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking ReplicationScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking Replication
 
ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024
 
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google CloudRadically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
 
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
 
Building a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data PlatformBuilding a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data Platform
 
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
 
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
QR Secure: A Hybrid Approach Using Machine Learning and Security Validation F...
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
 

Software Engineering Assignment

  • 1. Question #1 You have been appointed a project manager within an information systems organization. Your job is to build an application that is quite similar to others your team has built, although this one is larger and more complex. Requirements have been thoroughly documented by the customer. What software process model(s) would you choose and why? Explain in detail. Answer: As the information system already exists in which some development is to be made and released. Now Developer just need to make some addition in the previous application because Customer requirements are documented, which mean requirements are well understood and have no need to modified requirement. Process Selected:. Prototype model will be used in development of this application. In prototype model application or project is made in series of increment throughout project. In prototype model we first make a prototype and give to the customer and make changes in it accordingly as required by the customer. Further increment made after previous ones. Large systems are particularly suitable for prototype model. Prototype model is a strategy that allows system to be developed in pieces. Prototype model allows the additions in process as per requirements, process change can be implemented. To make this application we have to use the already existing application and make increments in it and made new more complex and large application Requirements are fulfilled already for this application. Question# 2 University of Gujrat is currently running through different departments like Administration, Accounts, Examination, Admission, Library, Computer Labs, Faculty Management, and Student Management etc. Every department has its own specific processes and each department is using computer-based system to some extent but not complete computer based solutions. There is also inter-departmental communication for the smooth running of all functions in respective departments. It is decided by the higher management that all the departments should be integrated under one system and that system should accommodate all the processes existing in all departments. It is also decided that if this system is implemented successfully then it will also be used in other departments of University of Gujrat independently after configuring it according to their needs. Higher Management wants to see this system within this year. Risks, which can arise, should be accommodated implicitly keeping the time factor in mind. As the system will be used in public sector, so verification and validation factors must be administered accordingly. What software process model(s) would you choose and why? Explain in detail
  • 2. System need modification and integration .System is large and use in public sector .University of Gujrat all department use this system according to their needs, which mean departments have some same function and some different function. Risks analysis is also important factor which should be resolve in given time frame. As system use in public sector, so verification and validation factors must be administered accordingly. Selected Process Model: Selected process model is “Component Model” use to develop this system. In the majority of software projects, there is some software reuse. This often happens informally when people working on the project know of designs or code that are similar to what is required. They look for these, modify them as needed, and incorporate them into their system. A general process model for reuse-based development. Although the initial requirements specification stage and the validation stage are comparable with other software processes, the intermediate stages in a reuse oriented process are different. These stages are: 1. Component analysis given the requirements specification, a search is made for components to implement that specification. Usually, there is no exact match and the components that may be used only provide some of the functionality required. 2. Requirements modification during this stage, the requirements are analyzed using information about the components that have been discovered. They are then modified to reflect the available components. Where modifications are impossible, the component analysis activity may be re-entered to search for alternative solutions. 3. System design with reuse during this phase, the framework of the system is designed or an existing framework is reused. The designers take into account the components that are reused and organize the framework to cater for this. Some new software may have to be designed if reusable components are not available. 4. Development and integration Software that cannot be externally procured is developed, and the components and COTS systems are integrated to create the new system. System integration, in this model, may be part of the development process rather than a separate activity. Component software engineering has the obvious advantage of reducing the amount of software to be developed and so reducing cost and risks. It usually also leads to faster delivery of the software.System boundaries should be defined and clearly specified in a component- based approach requirement analysis also implies that it is necessary to analyze whether requirements can be fulfilled with available components. System is use in public sector. All departments have some same function and some different function .We use component base approach to reuse the same component in this way we reduce our code and save time. This becomes important as we complete project in this year. The risk is analysis in every component by doing this risk is reducing and project become more accurate and efficient. This project approach is as useful when we need to modifier the some component we do not need to modify all project we just modify that component. Another reason for using this approach is to save time and complete this project in given time frame, risk is also reduce by this approach. Validation and verification also made on each component.
  • 3. Question #3 You have been appointed a project manager for a major software products company. Your job is to manage the development of the next generation version of its widely used word-processing software. Because competition is intense, tight deadlines have been established and announced. What software process model(s) would you choose and why? Assumptions We have to use that process model which meets the requirements to make the version in the given time limit because the deadline has been defined already. Selected Process Model We will use the RAD (Rapid Application Development) model because tight deadline has been announced for project completion. We need to modify the previous version of word-processing software. As Rapid Application Development is a linear sequential software development process model that emphasises an extremely short development cycle. A component-based construction approach is used. There can be several teams working on different components during this time limit announced. Reason for selection: The main reason for choosing Question# 4 You have been asked to develop a small application that analyzes each course offered by a university and reports the average grade obtained in the course (for a given term). What software model(s) would you choose and why? As the requirements are simply known and understood that we have to just develop a small application that analyzes each course offered by a university and reports the average grade obtained in the course Selected Process Model: The sequential/Waterfall Model is better for this application. Because water fall model is used when the requirements are well understood for the start and no changes are needed in that so as the requirements of the application is well understood for the start so waterfall model is suitable for this.
  翻译: