Submitted By: Shailendra kumar (141) &
Siddharth mehra (152)
Presentation on Road Construction
CONTENTS
1. Introduction
2. Road
3. Earth work
4. Pavement
5. Types of pavement
6. Road types
7. Road construction
8. Equipment
9. Conclusion
INTRODUCTION
 Development of a country depends on the connectivity of various places with
adequate road network.
 Roads constitute the most important made of communication in areas where
railways and airways have not been developed much.
 India has one the largest roads networks in the world(over 3 million km at
present)
For the purpose of management and administration, roads
in India are divided into the following five categories:
National Highways(NH)
State Highways(SH)
Major District Roads(MDR)
Other district roads(ORD)
Village roads(VR)
Indian roads network-current status
National Highways 58,112
State Highways 1,37,119
Major Districts Roads 4,70,000
Village and Other Roads 26,50,000
Total Roads Length 33,15,231
NHs are less than 2% of network but carry 40%of total traffic.
Roads
 Roads are defined as routes or
paths that begin at one
destination and lead to another
 Road is an open, generally public
way for passage of vehicles
people, and animals.
Earth Work
 Soil filling
 Spreading and Levelling
 Compaction
Soil compaction is the process to increase the soil density in
order to make use the ground surface for development, i.e.,
building, road, etc.
COMPACTION
Pavements
pavement is finished with a
hard smooth surface. It helps to
make them durable and able to
withstand traffic and the
environment. They have a life
span of between 20-30 years
Types of pavements:
1. Flexible pavement
2. Rigid pavement
1. Flexible Pavement
 Flexible pavement are
those which are
surfaced with
bituminous or asphalt
materials. It’s flexible
since the total
pavement structure
bends or deflects due to
the traffic loads.
Generally this type of
pavement requires some
sort of maintenance or
restoration every 10-15
years.
2. Rigid Pavement
 A rigid pavement structure is
composed of a hydraulic
cement concrete surface
course and concealed base
and sub base courses. The
surface course is the rigid
layer and provides the
majority of strength.
 While in case of rigid
pavement most of the load
carries by slab itself and slight
load goes to the underlying
strata.
Road types
 Earth road and Gravel road
 Water bound macadam(WBM)
 Bituminous or Blacktop road
 Cement Concrete road
Road Construction
1. Preparation of the existing base course layer
The existing surface is prepared by removing the pot holes or rust if any. The
irregularities are filled in with premix existing pavement is extremely way, a
bituminous leveling course of adequate thickness is provided to lay a bituminous
concrete surface on a binder course instead of directly laying it on a WBM.
2. Application of truck coat
 It is desirable to lay AC layer over a bituminous base or binder course. A tack
coat of bitumen applied at 6.0 to 7.5 kg per 10 sq.m area, this quantity may
be increased to 7.5 to 10kg for non-bituminous base.
3. Preparation and placing of
premix
 The premix is prepared in a hot mix plant of a
required capacity with the desired quantity
control. The bitumen may be heated up to 150-
177 deg C and the aggregate temperature
should not differ by over 14 deg C from the
binder temperature.
 The hot mixed material is collected from the
mixture by the transporters, carried to the
location is spread by a mechanical paver at the
temperature of 121 to 163 deg C. The chamber
and the thickness of the layer are accurately
verified. The control of the temperature during
the mixing and he compaction are of great
significance in the strength of the resulting
pavement structure.
4. Rolling
 A mix after it is placed on the
base course is thoroughly
compacted by rolling at a speed
not more then 5km per hour.
 The initial or break down rolling
is done by 8 to 12 tones roller
and intermediate rolling is done
with a fixed wheel pneumatic
roller of 15 to 30 tones having a
tyre pressure of 7kg sq.cm.
5. Quality control of
bituminous concrete
construction
 The routine checks are carried out at site to
ensure the quantity of the resulting
pavement mixture and the pavement
surface. Periodical checks are made for:
1. Aggregate grading
2. Grade of bitumen
3. Temperature of aggregate
4. Temperature of a paving mix during mixing
and compaction
6. Finished surface
 The AC surface should be checked by a 3.0 m straight edge. The longitudinal
undulations should not exceed 8.0 mm and the number of undulation higher
not exceed 10 in a length of 300 m. the cross-traffic profile should nothave
undulations exceeding 4.0mm.
Equipment
 Compacting material (vibratory roller)
 Dozer and scraper
 Power shover, shovels
 Concrete mixer
 Watering devices
 Mild steel sections and blocks
 Barricading
 Signage board
Vibratory roller Dozer& Scraper
Power shover, shovels Concrete mixer
Watering devices Mild steel sections and blocks
Barricading Signage board
Conclusion
Fundamentals of road construction consists of the following
topics:
 Construction management overview
 Preliminary investigations
 Setting out
 Earthworks
 Pavements
 Drainage
 Roadsides
THANK YOU
SHAILENDRA KUMAR 2K10/CE/141
SIDDHARTH MEHRA 2K20/CE/152

More Related Content

Similar to EM-203 Final MTE PPT 141-152.pptx

presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
alamrintu
 
SUBMITTED TO -.pptx
SUBMITTED TO -.pptxSUBMITTED TO -.pptx
SUBMITTED TO -.pptx
PiyushKumar66034
 
Low cost road
Low cost roadLow cost road
Low cost road
pradip dangar
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
pradip dangar
 
Construction of Road
Construction of RoadConstruction of Road
Construction of Road
Aman Shakya
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
NIWASHISH VISWAS
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
mohammad danish anwar
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
JaySinghchib1
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
Senthamizhan M
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
chiranjeevulu chinthala
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
pradip dangar
 
INTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdfINTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdf
PrashantSingh854477
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
CE19KaushlendraKumar
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
pjainrahul
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
Naresh Ambesh
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
Rohan chansoriya
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
hitendra pendam
 
Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...
PrashannaKumar2
 
Road of construction
Road of construction Road of construction
Road of construction
ARJUNSINGHSURYAVANSH
 
ROAD CONSTRUCTION METHOD final
ROAD CONSTRUCTION METHOD finalROAD CONSTRUCTION METHOD final
ROAD CONSTRUCTION METHOD final
Avneet Grewall
 

Similar to EM-203 Final MTE PPT 141-152.pptx (20)

presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
SUBMITTED TO -.pptx
SUBMITTED TO -.pptxSUBMITTED TO -.pptx
SUBMITTED TO -.pptx
 
Low cost road
Low cost roadLow cost road
Low cost road
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Construction of Road
Construction of RoadConstruction of Road
Construction of Road
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
INTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdfINTERNSHIP REPORT 2021 pdf psr.pdf
INTERNSHIP REPORT 2021 pdf psr.pdf
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
 
Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...
 
Road of construction
Road of construction Road of construction
Road of construction
 
ROAD CONSTRUCTION METHOD final
ROAD CONSTRUCTION METHOD finalROAD CONSTRUCTION METHOD final
ROAD CONSTRUCTION METHOD final
 

Recently uploaded

❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
Ak47
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
Guangdong Ctube Industry Co., Ltd.
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
DharmaBanothu
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
sathishkumars808912
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE DelhiESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
AK47
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
Ak47 Ak47
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
anatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptxanatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptx
ssusercf1619
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
kamka4105
 
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book NowKandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
SONALI Batra $A12
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
BBOC407 Module 1.pptx Biology for Engineers
BBOC407  Module 1.pptx Biology for EngineersBBOC407  Module 1.pptx Biology for Engineers
BBOC407 Module 1.pptx Biology for Engineers
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE DelhiESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
ESCORT SERVICE FULL ENJOY - @9711199012, Mayur Vihar CALL GIRLS SERVICE Delhi
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
anatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptxanatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptx
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
 
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book NowKandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
Kandivali Call Girls ☑ +91-9967584737 ☑ Available Hot Girls Aunty Book Now
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 

EM-203 Final MTE PPT 141-152.pptx

  • 1. Submitted By: Shailendra kumar (141) & Siddharth mehra (152) Presentation on Road Construction
  • 2. CONTENTS 1. Introduction 2. Road 3. Earth work 4. Pavement 5. Types of pavement 6. Road types 7. Road construction 8. Equipment 9. Conclusion
  • 3. INTRODUCTION  Development of a country depends on the connectivity of various places with adequate road network.  Roads constitute the most important made of communication in areas where railways and airways have not been developed much.  India has one the largest roads networks in the world(over 3 million km at present)
  • 4. For the purpose of management and administration, roads in India are divided into the following five categories: National Highways(NH) State Highways(SH) Major District Roads(MDR) Other district roads(ORD) Village roads(VR)
  • 5. Indian roads network-current status National Highways 58,112 State Highways 1,37,119 Major Districts Roads 4,70,000 Village and Other Roads 26,50,000 Total Roads Length 33,15,231 NHs are less than 2% of network but carry 40%of total traffic.
  • 6. Roads  Roads are defined as routes or paths that begin at one destination and lead to another  Road is an open, generally public way for passage of vehicles people, and animals.
  • 7. Earth Work  Soil filling  Spreading and Levelling  Compaction
  • 8. Soil compaction is the process to increase the soil density in order to make use the ground surface for development, i.e., building, road, etc. COMPACTION
  • 9. Pavements pavement is finished with a hard smooth surface. It helps to make them durable and able to withstand traffic and the environment. They have a life span of between 20-30 years Types of pavements: 1. Flexible pavement 2. Rigid pavement
  • 10. 1. Flexible Pavement  Flexible pavement are those which are surfaced with bituminous or asphalt materials. It’s flexible since the total pavement structure bends or deflects due to the traffic loads. Generally this type of pavement requires some sort of maintenance or restoration every 10-15 years.
  • 11. 2. Rigid Pavement  A rigid pavement structure is composed of a hydraulic cement concrete surface course and concealed base and sub base courses. The surface course is the rigid layer and provides the majority of strength.  While in case of rigid pavement most of the load carries by slab itself and slight load goes to the underlying strata.
  • 12. Road types  Earth road and Gravel road  Water bound macadam(WBM)  Bituminous or Blacktop road  Cement Concrete road
  • 13. Road Construction 1. Preparation of the existing base course layer The existing surface is prepared by removing the pot holes or rust if any. The irregularities are filled in with premix existing pavement is extremely way, a bituminous leveling course of adequate thickness is provided to lay a bituminous concrete surface on a binder course instead of directly laying it on a WBM.
  • 14. 2. Application of truck coat  It is desirable to lay AC layer over a bituminous base or binder course. A tack coat of bitumen applied at 6.0 to 7.5 kg per 10 sq.m area, this quantity may be increased to 7.5 to 10kg for non-bituminous base.
  • 15. 3. Preparation and placing of premix  The premix is prepared in a hot mix plant of a required capacity with the desired quantity control. The bitumen may be heated up to 150- 177 deg C and the aggregate temperature should not differ by over 14 deg C from the binder temperature.  The hot mixed material is collected from the mixture by the transporters, carried to the location is spread by a mechanical paver at the temperature of 121 to 163 deg C. The chamber and the thickness of the layer are accurately verified. The control of the temperature during the mixing and he compaction are of great significance in the strength of the resulting pavement structure.
  • 16. 4. Rolling  A mix after it is placed on the base course is thoroughly compacted by rolling at a speed not more then 5km per hour.  The initial or break down rolling is done by 8 to 12 tones roller and intermediate rolling is done with a fixed wheel pneumatic roller of 15 to 30 tones having a tyre pressure of 7kg sq.cm.
  • 17. 5. Quality control of bituminous concrete construction  The routine checks are carried out at site to ensure the quantity of the resulting pavement mixture and the pavement surface. Periodical checks are made for: 1. Aggregate grading 2. Grade of bitumen 3. Temperature of aggregate 4. Temperature of a paving mix during mixing and compaction
  • 18. 6. Finished surface  The AC surface should be checked by a 3.0 m straight edge. The longitudinal undulations should not exceed 8.0 mm and the number of undulation higher not exceed 10 in a length of 300 m. the cross-traffic profile should nothave undulations exceeding 4.0mm.
  • 19. Equipment  Compacting material (vibratory roller)  Dozer and scraper  Power shover, shovels  Concrete mixer  Watering devices  Mild steel sections and blocks  Barricading  Signage board
  • 20. Vibratory roller Dozer& Scraper Power shover, shovels Concrete mixer
  • 21. Watering devices Mild steel sections and blocks Barricading Signage board
  • 22. Conclusion Fundamentals of road construction consists of the following topics:  Construction management overview  Preliminary investigations  Setting out  Earthworks  Pavements  Drainage  Roadsides
  • 23. THANK YOU SHAILENDRA KUMAR 2K10/CE/141 SIDDHARTH MEHRA 2K20/CE/152
  翻译: