尊敬的 微信汇率:1円 ≈ 0.046078 元 支付宝汇率:1円 ≈ 0.046168元 [退出登录]
SlideShare a Scribd company logo
Design of Weir
on River Cauvery near Thottilpatti Village
PROJECT BY-
VIJAY KR SINGH (13BCL0001)
CIVIL ENGINEERING
VIT UNIVERSITY
Email Id-
vijaykumar.singh2013@vit.ac.in
PREFATORY:
Vellore District comprises One Corporation (comprising of erstwhile 2
Municipalities, 6 Town Panchayats and 109 Habitations in 9 Village
Panchayats), 11 Municipalities, 16 Town Panchayats and 5,688 Rural
Habitations in 20 Panchayat Unions.
PRESENT WATER SUPPLY SCENARIO:
Palar and Ponnaiar are the two major Rivers traversing through Vellore
District. Even though, they are non-perennial, the sub surface water
potential fulfills the drinking water requirements.
NEED FOR THE PROPOSAL:
Due to discharge of Tannery effluent, sewage and sullage into Palar River
from urban areas, the existing Water Supply schemes to Urban Towns and
Rural Habitations are adversely affected.
Accordingly, TWAD Board took up Investigation works, to provide a
Combined Water Supply Scheme with River Cauvery as source to Vellore
Corporation & other local bodies, in Vellore District, as a permanent
remedial solution.
POPULATION & REQUIREMENT
The net demand now works out to 148 mld, 181 mld & 215 mld for the present
(2016), intermediate (2027) & ultimate (2042) stages respectively.
DESCRIPTION OF THE PROPOSAL:
It is proposed to tap the project ultimate requirement by providing barrage or weir
on River Cauvery near Thottilpatti Village, down stream of Mettur Dam & upstream
of Chekkanur Barrage. Collected Raw Water will be pumped (23 hours) to the
Treatment Plant of 181mld capacity, located at Thottilpatti Village at Head works
site owned by TWAD Board (10.50 acres).
DesignCriteria
 A canal (A) is divided into two branches (i & ii).The discharge of branch (i)=2Q of branch (ii) at
all times. Two weirs have to be constructed at the entrance of each canal .
 Data :-
 - Bed width of canals (i & ii ) = ( 23.0 & 8.0 ) m .
 - Flood discharge of canal (A) = 105 cum/sec .
 - Summer discharge of canal (A) = 45 cum/sec .
 - DSHWL in the two canals = ( 11.00 )
 - minimum water depth in the two canal branches = 4.0 m .
 - Difference between H.W.L & L.W.L in canal(A) = .7 m .
 - Submergence in canal (i) = 1/3
 - Bligh coeff. of percolation = 16
 - Bed level is constant in canal (A) and its branches .
 - Q = 2 B H1.5
 If a Board crested weir is constructed at the entrance of the two branches (i&ii) it is required to
:-

 1- Crest level of weirs ( i & ii ) .
 2- Length of each weir .
 3- HWL in canals (A) .
 4- LWL in canal (A) & (i) .
 5- Design of weir floor for canal
THE ABOVE WEIR IS DESIGNED USING BLIGH THEORY
Design of Weirs is divided to 3 parts:
I. Hydraulic Design (determination of
crest level and weir length according to head)
II. Structural Design (Empirical
Dimensioning – check of stability)
III – Detailed Drawings
Bligh Creep Theory
• The length of the seepage path transversed by the water is known as
the length of creep (percolation length).
• Bligh supposed that the dissipation of head per unit length of creep is
constant throughout the seepage path.
CB = Bligh coefficient of percolation C B = V/K
• Percolation length is the path length from (a) to (b)
LBligh = CBligh . H
L` = 2 t + L
If L` > LB (Design is safe, no possibility of undermining)
If L` < LB (Design is unsafe, undermining occurs, leads to failure)
L` = L + 2 t + 2 S1 + 2 S2
L` LB (design is safe, no possibility of undermining)
L` < LB (design is unsafe, undermining occurs, leads to failure)
QA = Qi + Qii & Qi = 2 Qii
QA = 2 Qii + Qii
At flood
QA = 105 = 3 Qii
Qii = 35 m3/s & Qi = 70 m3/s
At summer
QA = 45 = 3 Qii
Qii = 15 m3/s & Qi = 30 m3/s
For branch ( i )
Qmax /Qmin = (2 B H1
1.5) / (2 B H2
1.5) = H1
2/H2
2
H1/H2 = (Qmax /Qmin )2/3 = (70/30)2/3
H1/H2 = 1.527 & H1 = 1.76 H2 (1)
H1 - H2 = .7 (2)
From (1) & (2)
1.76 H2 - H2 = .7
H2 = .92 m
H1 = 1.62 m
h1/H1 = 1/3 h1 = 1.62/3
1- Crest level of weirs ( i & ii ) = 11 - .54 = ( 10.46 )
2- length of weir (i)
Qmax = 70 = 2 B (1.62)1.5 B = 17 m
Qmin = 30 = 2 B (.92)1.5 B = 17 m
B = 17 m
Length of weir (ii)
Qmax = 35 = 2 B (1.62)1.5 B = 8.5 m
Qmin = 15 = 2 B (.92)1.5 B = 8.5 m
B = 8.5 m
3- HWL in canals (A) = 10.46 + 1.62 = (12.08)
4- LWL in canal (A) = 10.46 + .92 = (11.38)
h2/H2 = 1/3 & h2 = .92/3 = .3
LWL in canal (i) = 10.46 + .3 = ( 10.76 )
Distance between successive sheet piles
Distance between sheet piles a-a and b-b d1 + d2
· Water percolation length takes the right path -----safe
• Distance between sheet piles a-a & b-b < d1 + d2;
• Water percolation length takes a short cut from a to b;
• Actual percolation length is smaller than designed
Unsafe
Design Head for Percolation
H = USHWL – DSHWL (1)
H = USLWL – DSLWL (2)
H = Crest level –DSBL (3)
Design head H is the biggest of (1), (2), and (3)
Determination of Floor Dimensions
t1 = 0.5 – 1.0 m assumed
t2 is taken 2.0 m or t2 = 0.8 (H)0.5
t3 = t2 / 2 1 m
and l1 is assumed (1-2) H
L2 = is determined according to weir type (3-8) m
LScour = Cs (Hs) 0.5
Or
LScour = 0.6 CB (Hs) 0.5
Hs = USHWL – DSBL – Yc
= Scour head; Yc = critical depth
& q = Q / B
where B is the weir length; q is the discharge per unit length
L` = l1 + l2 + ls + 2 t2
LB = CB . H if L` LB no need for sheet pile
If L` < LB unsafe; use sheet pile
Depth of sheet piles = (LB – L`) / 2
Sheet pile depth m
Determination of the uplift diagram
HD
h2 = H – t1/CB – l1 / CB
t2 = t / (γm) * Factor of safetyγ
t2 = F.S. [ h2 / (γm)] m.; γm = 2.2 t/m3
t2 = 1.3. [ h2 / (γm)]
then t3 = t2/2 ≥ 1 m.
t3 = F.S. [ h3 / (γm)] m then the head h3 which corresponds to
floor thickness t3
L3 = CB * h3 = x + t3 then get distance x
Design of weir floor for canal (i) by applying Bligh method
BED LEVEL = 10.76 – 4 = 6.76
HD = 12.08 - 11 = 1.08
HD = 11.38 - 10.76 = .62
HD = 10.46 - 6.76 = 3.7
take HD = 3.7 m
LB = CB * HD = 16 * 3.7 = 59.2
Assume L1 = 6 m L2 = 6 m
LS = CS (HS).5 CS = .6 CB
HS = 12.08 - 6.76 - Ycr & HS = 4.37 & LS = 20 m
Assume t2 = 2 m
L = 6 + 6 + 20 + 2 * 2 = 36
L < LB unsafe use sheet pile d = (59.2 – 36) / 2 = 11.6
Use two sheet pile d =7 m & d = 5 m
h2 = 3.7 - .5/16 – 6/16- (2*7)/16 = 2.9
t2 = 2.9 * (1.3/1.2) = 3.1 m
t3 = t2/2 = 1.6 m > 1
1.6 = 1.3 * h3/1.2 h3 = 1.47
L3 = 16 * 1.47 = X + 2*5 + 1.6 & X = 11.92 m
AUTO –CAD DESIGN OF WEIR
Design of weir on river cauvery near thottilpatti village

More Related Content

What's hot

Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
sarhad university peshawer
 
Spillways
SpillwaysSpillways
02 Types of Intake Structures
02 Types of Intake Structures02 Types of Intake Structures
02 Types of Intake Structures
akashpadole
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floor
Divya Vishnoi
 
design of weirs
design of weirsdesign of weirs
design of weirs
SANJEEV Wazir
 
Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...
Denish Jangid
 
Design of gravity dams
Design of gravity damsDesign of gravity dams
Design of gravity dams
VikramKesharwani1
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
Latif Hyder Wadho
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classification
GNANA PRAKASH
 
Reservior planning
Reservior    planningReservior    planning
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
Divya Vishnoi
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flow
Civil engeeneer
 
Kennedy's and laccy's theory
Kennedy's and laccy's theoryKennedy's and laccy's theory
Kennedy's and laccy's theory
amanraj20501920
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
saibabu48
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
Raj Daxini
 
Gravity dam
Gravity damGravity dam
Gravity dam
GAURAV. H .TANDON
 
CANAL REGULATIONS
CANAL REGULATIONSCANAL REGULATIONS
CANAL REGULATIONS
Karthick MK
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
bhalinder singh
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
Malla Reddy University
 
DESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTMLDESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTML
S.m. Kumar
 

What's hot (20)

Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Spillways
SpillwaysSpillways
Spillways
 
02 Types of Intake Structures
02 Types of Intake Structures02 Types of Intake Structures
02 Types of Intake Structures
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floor
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...
 
Design of gravity dams
Design of gravity damsDesign of gravity dams
Design of gravity dams
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classification
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flow
 
Kennedy's and laccy's theory
Kennedy's and laccy's theoryKennedy's and laccy's theory
Kennedy's and laccy's theory
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
CANAL REGULATIONS
CANAL REGULATIONSCANAL REGULATIONS
CANAL REGULATIONS
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
 
DESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTMLDESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTML
 

Viewers also liked

Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
India Water Portal
 
Diversion head works ajitha miss
Diversion head works ajitha missDiversion head works ajitha miss
Diversion head works ajitha miss
SHAMJITH KM
 
Building finishes
Building finishesBuilding finishes
Building finishes
kuntansourav
 
An Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesAn Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives Slides
Rotary International
 
Irrigation Enineering Introduction
Irrigation Enineering IntroductionIrrigation Enineering Introduction
Irrigation Enineering Introduction
Latif Hyder Wadho
 
Final project for haydroulic engginering
Final project for haydroulic enggineringFinal project for haydroulic engginering
Final project for haydroulic engginering
kindu melese
 
Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18
Ajjay Kumar Gupta
 
weirs
weirsweirs
weirs
Fahad Tk
 
Rating curve design,practice and problems
Rating curve design,practice and problemsRating curve design,practice and problems
Rating curve design,practice and problems
Tianjin University China
 
Menstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheMenstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas Chothe
Dr Vikas Chothe
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
Jimit Shah
 
Types of Irrigation
Types of IrrigationTypes of Irrigation
Types of Irrigation
Pranamesh Chakraborty
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in Architecture
Sneha Nagarajan
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
Gilbert Bautista
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
Vishal Jolaniya
 
Floor finish
Floor finishFloor finish
Floor finish
Manish Jain Luhadia
 
3 star hotel
3  star hotel3  star hotel
3 star hotel
usman6789
 
2. menstrual hygiene management
2. menstrual hygiene management2. menstrual hygiene management
Wall finishes
Wall finishesWall finishes
Wall finishes
Tabitha Fuentebella
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
Zairul Zaiky
 

Viewers also liked (20)

Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
 
Diversion head works ajitha miss
Diversion head works ajitha missDiversion head works ajitha miss
Diversion head works ajitha miss
 
Building finishes
Building finishesBuilding finishes
Building finishes
 
An Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesAn Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives Slides
 
Irrigation Enineering Introduction
Irrigation Enineering IntroductionIrrigation Enineering Introduction
Irrigation Enineering Introduction
 
Final project for haydroulic engginering
Final project for haydroulic enggineringFinal project for haydroulic engginering
Final project for haydroulic engginering
 
Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18
 
weirs
weirsweirs
weirs
 
Rating curve design,practice and problems
Rating curve design,practice and problemsRating curve design,practice and problems
Rating curve design,practice and problems
 
Menstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheMenstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas Chothe
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Types of Irrigation
Types of IrrigationTypes of Irrigation
Types of Irrigation
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in Architecture
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 
Floor finish
Floor finishFloor finish
Floor finish
 
3 star hotel
3  star hotel3  star hotel
3 star hotel
 
2. menstrual hygiene management
2. menstrual hygiene management2. menstrual hygiene management
2. menstrual hygiene management
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 

Similar to Design of weir on river cauvery near thottilpatti village

Design of Ocean Waswater Outfall Systems
Design of Ocean Waswater Outfall SystemsDesign of Ocean Waswater Outfall Systems
Design of Ocean Waswater Outfall Systems
robertorcov
 
Ch2.ppt
Ch2.pptCh2.ppt
Ch2.ppt
AliGlal
 
M.i tank
M.i  tankM.i  tank
M.i tank
beerappa143
 
Wave Transmission on Submerged Breakwater with Interlocking D-Block Armor
Wave Transmission on Submerged Breakwater with Interlocking D-Block ArmorWave Transmission on Submerged Breakwater with Interlocking D-Block Armor
Wave Transmission on Submerged Breakwater with Interlocking D-Block Armor
irjes
 
Design of Lined Channels.pptx
Design of Lined Channels.pptxDesign of Lined Channels.pptx
Design of Lined Channels.pptx
Tahseensanai
 
Culvertdesign
CulvertdesignCulvertdesign
Culvertdesign
ravi kumar
 
Hardycross method
Hardycross methodHardycross method
Hardycross method
Muhammad Nouman
 
Hydraulics of structures
Hydraulics of structuresHydraulics of structures
Hydraulics of structures
Zagazig University
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
sonukhan123
 
Gradvariedflow
GradvariedflowGradvariedflow
Gradvariedflow
goliad1978
 
Teoria bocatoma
Teoria bocatomaTeoria bocatoma
Teoria bocatoma
jaiffarivera1
 
Unit6 energy loss in pipelines
Unit6   energy loss in pipelinesUnit6   energy loss in pipelines
Unit6 energy loss in pipelines
Malaysia
 
Hydraulic jump location control
Hydraulic jump location control Hydraulic jump location control
Hydraulic jump location control
siddharth upadhyay
 
A109212102 mechanicsoffluids1
A109212102 mechanicsoffluids1A109212102 mechanicsoffluids1
A109212102 mechanicsoffluids1
jntuworld
 
14.pdf
14.pdf14.pdf
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcutures
Mohsin Siddique
 
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
Muhammad Irfan
 
guide banks.pptx
guide banks.pptxguide banks.pptx
guide banks.pptx
tameneaDemissie
 
Solved problems pipe flow final 1.doc
Solved problems pipe flow final 1.docSolved problems pipe flow final 1.doc
Solved problems pipe flow final 1.doc
Dr. Ezzat Elsayed Gomaa
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
Singareni Collieries Company Limited
 

Similar to Design of weir on river cauvery near thottilpatti village (20)

Design of Ocean Waswater Outfall Systems
Design of Ocean Waswater Outfall SystemsDesign of Ocean Waswater Outfall Systems
Design of Ocean Waswater Outfall Systems
 
Ch2.ppt
Ch2.pptCh2.ppt
Ch2.ppt
 
M.i tank
M.i  tankM.i  tank
M.i tank
 
Wave Transmission on Submerged Breakwater with Interlocking D-Block Armor
Wave Transmission on Submerged Breakwater with Interlocking D-Block ArmorWave Transmission on Submerged Breakwater with Interlocking D-Block Armor
Wave Transmission on Submerged Breakwater with Interlocking D-Block Armor
 
Design of Lined Channels.pptx
Design of Lined Channels.pptxDesign of Lined Channels.pptx
Design of Lined Channels.pptx
 
Culvertdesign
CulvertdesignCulvertdesign
Culvertdesign
 
Hardycross method
Hardycross methodHardycross method
Hardycross method
 
Hydraulics of structures
Hydraulics of structuresHydraulics of structures
Hydraulics of structures
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
 
Gradvariedflow
GradvariedflowGradvariedflow
Gradvariedflow
 
Teoria bocatoma
Teoria bocatomaTeoria bocatoma
Teoria bocatoma
 
Unit6 energy loss in pipelines
Unit6   energy loss in pipelinesUnit6   energy loss in pipelines
Unit6 energy loss in pipelines
 
Hydraulic jump location control
Hydraulic jump location control Hydraulic jump location control
Hydraulic jump location control
 
A109212102 mechanicsoffluids1
A109212102 mechanicsoffluids1A109212102 mechanicsoffluids1
A109212102 mechanicsoffluids1
 
14.pdf
14.pdf14.pdf
14.pdf
 
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcutures
 
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
Geotechnical Engineering-I [Lec #24: Soil Permeability - II]
 
guide banks.pptx
guide banks.pptxguide banks.pptx
guide banks.pptx
 
Solved problems pipe flow final 1.doc
Solved problems pipe flow final 1.docSolved problems pipe flow final 1.doc
Solved problems pipe flow final 1.doc
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 

Recently uploaded

Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
NaveenNaveen726446
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
dulbh kashyap
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
Guangdong Ctube Industry Co., Ltd.
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
Ak47 Ak47
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 
anatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptxanatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptx
ssusercf1619
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
Ak47
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
yogita singh$A17
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
yakranividhrini
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 

Recently uploaded (20)

Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 
anatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptxanatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptx
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort ServiceCuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
Cuttack Call Girls 💯Call Us 🔝 7374876321 🔝 💃 Independent Female Escort Service
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 

Design of weir on river cauvery near thottilpatti village

  • 1. Design of Weir on River Cauvery near Thottilpatti Village PROJECT BY- VIJAY KR SINGH (13BCL0001) CIVIL ENGINEERING VIT UNIVERSITY Email Id- vijaykumar.singh2013@vit.ac.in
  • 2.
  • 3.
  • 4. PREFATORY: Vellore District comprises One Corporation (comprising of erstwhile 2 Municipalities, 6 Town Panchayats and 109 Habitations in 9 Village Panchayats), 11 Municipalities, 16 Town Panchayats and 5,688 Rural Habitations in 20 Panchayat Unions. PRESENT WATER SUPPLY SCENARIO: Palar and Ponnaiar are the two major Rivers traversing through Vellore District. Even though, they are non-perennial, the sub surface water potential fulfills the drinking water requirements. NEED FOR THE PROPOSAL: Due to discharge of Tannery effluent, sewage and sullage into Palar River from urban areas, the existing Water Supply schemes to Urban Towns and Rural Habitations are adversely affected. Accordingly, TWAD Board took up Investigation works, to provide a Combined Water Supply Scheme with River Cauvery as source to Vellore Corporation & other local bodies, in Vellore District, as a permanent remedial solution.
  • 5. POPULATION & REQUIREMENT The net demand now works out to 148 mld, 181 mld & 215 mld for the present (2016), intermediate (2027) & ultimate (2042) stages respectively. DESCRIPTION OF THE PROPOSAL: It is proposed to tap the project ultimate requirement by providing barrage or weir on River Cauvery near Thottilpatti Village, down stream of Mettur Dam & upstream of Chekkanur Barrage. Collected Raw Water will be pumped (23 hours) to the Treatment Plant of 181mld capacity, located at Thottilpatti Village at Head works site owned by TWAD Board (10.50 acres).
  • 6. DesignCriteria  A canal (A) is divided into two branches (i & ii).The discharge of branch (i)=2Q of branch (ii) at all times. Two weirs have to be constructed at the entrance of each canal .  Data :-  - Bed width of canals (i & ii ) = ( 23.0 & 8.0 ) m .  - Flood discharge of canal (A) = 105 cum/sec .  - Summer discharge of canal (A) = 45 cum/sec .  - DSHWL in the two canals = ( 11.00 )  - minimum water depth in the two canal branches = 4.0 m .  - Difference between H.W.L & L.W.L in canal(A) = .7 m .  - Submergence in canal (i) = 1/3  - Bligh coeff. of percolation = 16  - Bed level is constant in canal (A) and its branches .  - Q = 2 B H1.5  If a Board crested weir is constructed at the entrance of the two branches (i&ii) it is required to :-   1- Crest level of weirs ( i & ii ) .  2- Length of each weir .  3- HWL in canals (A) .  4- LWL in canal (A) & (i) .  5- Design of weir floor for canal THE ABOVE WEIR IS DESIGNED USING BLIGH THEORY
  • 7. Design of Weirs is divided to 3 parts: I. Hydraulic Design (determination of crest level and weir length according to head) II. Structural Design (Empirical Dimensioning – check of stability) III – Detailed Drawings
  • 8. Bligh Creep Theory • The length of the seepage path transversed by the water is known as the length of creep (percolation length). • Bligh supposed that the dissipation of head per unit length of creep is constant throughout the seepage path. CB = Bligh coefficient of percolation C B = V/K • Percolation length is the path length from (a) to (b) LBligh = CBligh . H
  • 9. L` = 2 t + L If L` > LB (Design is safe, no possibility of undermining) If L` < LB (Design is unsafe, undermining occurs, leads to failure) L` = L + 2 t + 2 S1 + 2 S2 L` LB (design is safe, no possibility of undermining) L` < LB (design is unsafe, undermining occurs, leads to failure)
  • 10. QA = Qi + Qii & Qi = 2 Qii QA = 2 Qii + Qii At flood QA = 105 = 3 Qii Qii = 35 m3/s & Qi = 70 m3/s At summer QA = 45 = 3 Qii Qii = 15 m3/s & Qi = 30 m3/s For branch ( i )
  • 11. Qmax /Qmin = (2 B H1 1.5) / (2 B H2 1.5) = H1 2/H2 2 H1/H2 = (Qmax /Qmin )2/3 = (70/30)2/3 H1/H2 = 1.527 & H1 = 1.76 H2 (1) H1 - H2 = .7 (2) From (1) & (2) 1.76 H2 - H2 = .7 H2 = .92 m H1 = 1.62 m h1/H1 = 1/3 h1 = 1.62/3 1- Crest level of weirs ( i & ii ) = 11 - .54 = ( 10.46 ) 2- length of weir (i) Qmax = 70 = 2 B (1.62)1.5 B = 17 m Qmin = 30 = 2 B (.92)1.5 B = 17 m
  • 12. B = 17 m Length of weir (ii) Qmax = 35 = 2 B (1.62)1.5 B = 8.5 m Qmin = 15 = 2 B (.92)1.5 B = 8.5 m B = 8.5 m 3- HWL in canals (A) = 10.46 + 1.62 = (12.08) 4- LWL in canal (A) = 10.46 + .92 = (11.38) h2/H2 = 1/3 & h2 = .92/3 = .3 LWL in canal (i) = 10.46 + .3 = ( 10.76 )
  • 13. Distance between successive sheet piles Distance between sheet piles a-a and b-b d1 + d2 · Water percolation length takes the right path -----safe
  • 14. • Distance between sheet piles a-a & b-b < d1 + d2; • Water percolation length takes a short cut from a to b; • Actual percolation length is smaller than designed Unsafe
  • 15. Design Head for Percolation H = USHWL – DSHWL (1) H = USLWL – DSLWL (2) H = Crest level –DSBL (3) Design head H is the biggest of (1), (2), and (3)
  • 16. Determination of Floor Dimensions t1 = 0.5 – 1.0 m assumed t2 is taken 2.0 m or t2 = 0.8 (H)0.5 t3 = t2 / 2 1 m and l1 is assumed (1-2) H L2 = is determined according to weir type (3-8) m LScour = Cs (Hs) 0.5
  • 17. Or LScour = 0.6 CB (Hs) 0.5 Hs = USHWL – DSBL – Yc = Scour head; Yc = critical depth & q = Q / B where B is the weir length; q is the discharge per unit length L` = l1 + l2 + ls + 2 t2 LB = CB . H if L` LB no need for sheet pile If L` < LB unsafe; use sheet pile Depth of sheet piles = (LB – L`) / 2 Sheet pile depth m
  • 18. Determination of the uplift diagram
  • 19. HD h2 = H – t1/CB – l1 / CB t2 = t / (γm) * Factor of safetyγ t2 = F.S. [ h2 / (γm)] m.; γm = 2.2 t/m3 t2 = 1.3. [ h2 / (γm)] then t3 = t2/2 ≥ 1 m. t3 = F.S. [ h3 / (γm)] m then the head h3 which corresponds to floor thickness t3 L3 = CB * h3 = x + t3 then get distance x
  • 20. Design of weir floor for canal (i) by applying Bligh method BED LEVEL = 10.76 – 4 = 6.76 HD = 12.08 - 11 = 1.08 HD = 11.38 - 10.76 = .62 HD = 10.46 - 6.76 = 3.7 take HD = 3.7 m LB = CB * HD = 16 * 3.7 = 59.2 Assume L1 = 6 m L2 = 6 m LS = CS (HS).5 CS = .6 CB HS = 12.08 - 6.76 - Ycr & HS = 4.37 & LS = 20 m Assume t2 = 2 m L = 6 + 6 + 20 + 2 * 2 = 36 L < LB unsafe use sheet pile d = (59.2 – 36) / 2 = 11.6 Use two sheet pile d =7 m & d = 5 m
  • 21.
  • 22. h2 = 3.7 - .5/16 – 6/16- (2*7)/16 = 2.9 t2 = 2.9 * (1.3/1.2) = 3.1 m t3 = t2/2 = 1.6 m > 1 1.6 = 1.3 * h3/1.2 h3 = 1.47 L3 = 16 * 1.47 = X + 2*5 + 1.6 & X = 11.92 m