The document discusses the design and construction of a 4-lane 90m railway over bridge in Chand Sarai, Lucknow. Key steps in the construction process include surveying, engineering design, laying pile foundations, installing bearings and girders, shuttering, and concreting. Tests were conducted on materials and foundations to ensure quality. The bridge was designed to allow road traffic to safely pass over the railway line.