The settlement of pile caused by the load at pile point
[Se(2)]
The allowable working load on a prestressed
concrete pile 21 m long that has been driven
into sand is 502 kN. The pile is octagonal in
shape with D=0.356 m and Ap= 0.1045 m2,
and perimeter (p)= 1.168m. Skin resistance
carries 350 kN of the allowable load and point
bearing carries the rest. Use Ep=21x106
kN/m2, Es=25x103 kN/m2 µs=0.35 and ξ=0.62.
Determine the elastic settlement of the pile.
Settlement of piles
Settlement of piles
Settlement of piles
Settlement of piles
Settlement of piles
Settlement of piles
Settlement of piles
Settlement of piles

More Related Content

What's hot

Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
ABHISHEK SHARMA
 
Unit 1 sheet pile-converted
Unit 1   sheet pile-convertedUnit 1   sheet pile-converted
Unit 1 sheet pile-converted
Nigitha rajan
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow Foundation
Arbaz Kazi
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPT
Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
Latif Hyder Wadho
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
Mani Das
 
Pile foundation
Pile  foundation Pile  foundation
Pile foundation
Sherchandra Shrestha
 
Settlement of shallow foundation
Settlement of shallow foundationSettlement of shallow foundation
Settlement of shallow foundation
Latif Hyder Wadho
 
Consolidation settlement
Consolidation settlementConsolidation settlement
Consolidation settlement
Parth Joshi
 
Two way slab
Two way slabTwo way slab
Two way slab
Priodeep Chowdhury
 
Goetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedGoetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signed
Irfan Malik
 
Geo Technical Engineering (computing lateral earth pressure)
Geo Technical Engineering (computing lateral earth pressure)Geo Technical Engineering (computing lateral earth pressure)
Geo Technical Engineering (computing lateral earth pressure)
Latif Hyder Wadho
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
Lovepreet Guron
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing design
srinu_anduri
 
Lateral Earth Pressure
Lateral Earth PressureLateral Earth Pressure
Lateral Earth Pressure
Fast-NU Lahore
 
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Muhammad Irfan
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
Umer Farooq
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
PraveenKumar Shanmugam
 
Column Interaction Diagram construction
Column Interaction Diagram constructionColumn Interaction Diagram construction
Column Interaction Diagram construction
Pritesh Parmar
 
Lecture 2 bearing capacity
Lecture 2 bearing capacityLecture 2 bearing capacity
Lecture 2 bearing capacity
Dr.Abdulmannan Orabi
 

What's hot (20)

Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
Unit 1 sheet pile-converted
Unit 1   sheet pile-convertedUnit 1   sheet pile-converted
Unit 1 sheet pile-converted
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow Foundation
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPT
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
 
Pile foundation
Pile  foundation Pile  foundation
Pile foundation
 
Settlement of shallow foundation
Settlement of shallow foundationSettlement of shallow foundation
Settlement of shallow foundation
 
Consolidation settlement
Consolidation settlementConsolidation settlement
Consolidation settlement
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Goetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedGoetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signed
 
Geo Technical Engineering (computing lateral earth pressure)
Geo Technical Engineering (computing lateral earth pressure)Geo Technical Engineering (computing lateral earth pressure)
Geo Technical Engineering (computing lateral earth pressure)
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing design
 
Lateral Earth Pressure
Lateral Earth PressureLateral Earth Pressure
Lateral Earth Pressure
 
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
 
Column Interaction Diagram construction
Column Interaction Diagram constructionColumn Interaction Diagram construction
Column Interaction Diagram construction
 
Lecture 2 bearing capacity
Lecture 2 bearing capacityLecture 2 bearing capacity
Lecture 2 bearing capacity
 

More from Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Latif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
Latif Hyder Wadho
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
Latif Hyder Wadho
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
Latif Hyder Wadho
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
Latif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
Latif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
Latif Hyder Wadho
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
Latif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
Latif Hyder Wadho
 
Bricks
BricksBricks
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
Latif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
Latif Hyder Wadho
 
Plate load test
Plate load testPlate load test
Plate load test
Latif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
Latif Hyder Wadho
 
Review of soil mechanics
Review of soil mechanicsReview of soil mechanics
Review of soil mechanics
Latif Hyder Wadho
 
Subsurface exploration of soil
Subsurface exploration of soilSubsurface exploration of soil
Subsurface exploration of soil
Latif Hyder Wadho
 
Pile foundation
Pile foundationPile foundation
Pile foundation
Latif Hyder Wadho
 

More from Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 
Review of soil mechanics
Review of soil mechanicsReview of soil mechanics
Review of soil mechanics
 
Subsurface exploration of soil
Subsurface exploration of soilSubsurface exploration of soil
Subsurface exploration of soil
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 

Recently uploaded

Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
tanujaharish2
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
DharmaBanothu
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Dr.Costas Sachpazis
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
Geoffrey Wardle. MSc. MSc. Snr.MAIAA
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 

Recently uploaded (20)

Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
Technological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdfTechnological Innovation Management And Entrepreneurship-1.pdf
Technological Innovation Management And Entrepreneurship-1.pdf
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
Sachpazis_Consolidation Settlement Calculation Program-The Python Code and th...
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 

Settlement of piles

  • 1.
  • 2.
  • 3.
  • 4. The settlement of pile caused by the load at pile point [Se(2)]
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. The allowable working load on a prestressed concrete pile 21 m long that has been driven into sand is 502 kN. The pile is octagonal in shape with D=0.356 m and Ap= 0.1045 m2, and perimeter (p)= 1.168m. Skin resistance carries 350 kN of the allowable load and point bearing carries the rest. Use Ep=21x106 kN/m2, Es=25x103 kN/m2 µs=0.35 and ξ=0.62. Determine the elastic settlement of the pile.
  翻译: