Under supervision of
Dr . Mohamed Nabil
This report has been prepared by :
 Mohamed Mohsen Mohamed Hussein
 Mohamed Nabil Ali Kamel
 Mohamed Youssef Mahmoud Youssef
 Ahmed Hamdy Mohamed Hassan
Hollow block & Ribbed slabs
Outlines
■ Introduction.
■ Comparison between different codes.
■ Solved example by different codes.
■ One & two way slab solved example.
■ Effect of cross ribs on deflection.
■ Modeling.
■ Case study.
3
Introduction
 Hollow block and Ribbed slabs are formed by placing blocks on the slab
and concrete ribs.
 In case of hollow block slab voided blocks are placed to reduce the total
weight of the slab .
 In case of ribbed slab the blocks are not permanent.
 The blocks are considered as non-structural element as they do not
contribute to strength of the slab.
 Blocks may be made concrete with lightweight aggregate or other material
as polystyrene ( foam ).
 Types hollow block slab are one way and two way slabs .
4
Introduction
The advantages of Ribbed and Hollow block slabs are as follows:
■ They provide an economical, versatile lightweight monolithic slab system and
this its main advantage reduction of weight by removing the part of the concrete
below the neutral axis.
■ Components are relatively light and no mechanical handling is necessary there
is ease of construction.
 Economic for spans more than 5m with light or moderate live loads, such as
hospitals, office or residential buildings.
5
ACI 318 ECP 203
BS 8110 Euro code 2
Comparison between different codes
6
7
■ Net distance between ribs "e"
shall not exceed 700 mm.
■ Web width "b" shall not be less
than 100 mm or one the third of
depth "t", whichever is greater.
■ Compression slab thickness "ts"
shall not be less than 50 mm or
one Tenth 1/10 of distance "e",
whichever is greater.
Comparison between different codes
Egyptian code (ECP 203)
 Limitations of Hollow block slabs :
8
■ The minimum value of rib width (b) isn't less than 1/4 slab thickness
(t) or 100 mm whichever greater, with taking into account
requirements of concrete cover, distance between bars and fire
requirements
Egyptian code (ECP 203)
■ Distance between ribs axes can be increased up to 1.5 m .
■ Thickness of upper slab is determined by a value not less than e/12 or
50 mm whichever greater.
 Limitations of Ribbed slabs:
9
Comparison between different codes
British code (BS 8110)
 Limitations of Hollow block slabs :
■ Clear distance between ribs (e) not more than 500 mm , jointed
in cement : sand mortar ts is 25 mm.
■ Clear distance between ribs (e) not more than 500 mm not
jointed in cement : sand mortar ts is 30 mm.
■ All other slabs with permanent blocks ts is 40 or one-tenth
1/10 of clear distance between ribs, whichever is great
 Limitations of Ribbed slabs:
Clear distance between ribs not more than 1.5 m ts is 50 mm or one-
tenth of clear distance between ribs, whichever is greater.
t b
e
b
t
b ≤ t/4
Euro code (En2)
■ The rib spacing does not exceed 1500 mm.
■ The depth of the rib below the flange does
not exceed 4 times its width.
■ The depth of the flange is at least 1/10 of
the clear distance between ribs or 50 mm,
whichever is the greater.
■ Transverse ribs are provided at a clear
spacing not exceeding 10 times the overall
depth of the slab.
10
Comparison between different codes
 Limitations of Hollow block slabs :
 Limitations of Ribbed slabs:
■ One limitation will change from ribbed slab The minimum flange
thickness of 50 mm may be reduced to 40 mm.
11
American Concrete Institute (ACI)
■ When permanent filling material
having a unit compressive strength at
least equal to fc′ in the joists are used ts
shall be not less than 1/12 the clear
distance between ribs, nor less than 40
mm.
■ Otherwise ts is not to be less than 1/12
the clear distance between ribs, nor less
than 5.0 cm
■ Ribs are not to be less than 10 cm in
width, and a depth of not more than 3.5
times the minimum web width.
■ Clear spacing between ribs is not to
exceed 75.0 cm
Comparison between different codes
 Limitations of Hollow block slabs & Ribbed slab:
12
Simply sup. L/20 L/20
-----------
L/16
1 end cont. L/25 L/20.8 L/18.5
2 end cont. L/28 ----- L/21
cantilever L/8 L/5.6 L/8
e ≤ 700 mm e ≤ 1500 mm e ≤ 1500 mm e ≤ 750 mm
b ≤ t/4 b ≤ t/4 b ≥ 100 mm
L.L ≤ 3
KN/m2 , Ls>
5
L.L > 3
KN/m2
, Ls→(4:7)
L.L >
7m.
------- If L ≥ 10th.b -------
One X rib One X rib 3 X ribs
Comparison between different codes
13
14
Fcu= 25 N/mm2
Fy= 360 N/mm2
F.C= 1.5 KN/m2
L.L= 3.0 KN/m2
Solved examples by different codes
15
th.b 250 mm 250 mm 250 mm 300
tS 50 mm 50 mm 50 mm 50 mm
h 200 200 200 250
Mu (Kn.m/rib)
19.187 19.187 17.75 23.5
AS 293.30 mm2 255.72 mm2 322.005 mm2 226.67 mm2
Main ribs dim. 100 × 200 mm 100 × 200 mm 100 × 200 mm 100 × 250 mm
Cross ribs No cross ribs No cross ribs One cross rib No cross ribs
Solid part
Short dir. long dir. Short dir. long dir. Short dir. long dir. Short dir. long dir.
0.3 m. 0.3 m. 0.3 m. 0.3 m. 0.25 m. 0.3 m. 0.3 m. 0.3 m.
Conc.
Quantities
2.806 m3 2.806 m3 2.934 m3 3.07 m3
Solved examples by different codes
16
One & two way slab Solved examples
One way
slab
Two way
slab
Fcu= 25 N/mm2
Fy= 360 N/mm2
F.C= 1.5 KN/m2
L.L= 3.0 KN/m2
17
th.b. 320 mm 250 mm
h 250 mm 200 mm
ts 70 mm 50 mm
Mu (KN.m/rib) 45.64
α dir. β dir.
15.68 15.68
As 529.255 mm2/ rib
239.68 mm2/ rib. For α dir.
And 251.09 mm2/ rib. for β dir.
Ribs dim. 0.12 * 0.25 m 0.1 * 0.2 m
NO. of main ribs 11 12
No. of cross ribs 1 12
Conc. quantities 5.6854 m3 5.234 m3
RFT 1017.79 mm2 /m 981.54 mm2/m
One & two way slab Solved examples
It is obvious that the RFT and concrete quantities in the two way hollow
block slab is more economic however the execution of the two way hollow
block slab is harder than the one way hollow block slab.
Effect of cross ribs on deflection
 In The previous example the effect of cross ribs on deflection will be
discussed on sap program.
 At first one cross rib is put in the mid span of the slab.
 Then two cross ribs are put at 1/3 of the span from each side.
18
19
■ Case of one cross rib:
Effect of cross ribs
20
■ Case of two cross rib:
Effect of cross ribs
The two cases have the same deflection value so it is more economic to use one
cross rib at mid span
Modeling

21
22
Modeling
■ Model 1
The ribs are frame elements with cross section as T-section and connected
together with a virtual slab with very small thickness.
23
The moment on the ribs=19.3675 KN.m
24
Modeling
■ Model 2
The ribs are frame elements with cross section as T-section and connected
together with frame elements with cross section as rectangular section .
The moment on the ribs= 19.1793 KN.m
25
Modeling
■ Model 3
The ribs are converted to a thickness on the whole slab and use virtual slab to
connect between elements with very small thickness.
26
The moment on the ribs= 19.0767 KN.m
27
Modeling
■ Model 4
The ribs are represented as frame elements with rectangle section and the
connecting element is frame element with rectangle section.
The moment on the ribs= 19.1555 KN.m
 This table shows the differences between the models and the manual
solution .
28
Manual4321Model
19.187519.155519.076719.179319.3675M (ultimate)
KN .m
Rectangular
section
Rectangular
section
T-sectionT-sectionCross section
of ribs
FramesVirtual slabFramesVirtual slabConnecting
elements
W (rib)On slabW (rib)On slabLoads
0101Self weight
multiplier
Modeling
Case study
 Introduction:
Different case study for hollow block slabs and ribbed slabs.
■ Case 1
29
Ordinary one way hollow block slab
30
Case study
.
31
Case study
■ Case 2
Cantilever hollow block slabs
32
Case study
■ Case 3
Two way hollow block slabs
Ribbed slabs one way and two way ( waffle ) and how the blocks are
placed .
33
Case study
■ Case 4
34
Case study
35
Case study
■ Case 5
In this case foam blocks are used
Clay blocks are used in this case.
36
Case study
■ Case 6
Questions
37
38

More Related Content

What's hot

Tube structures
Tube structuresTube structures
Tube structures
Aglaia Connect
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
Kiruthika Selvi K J
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
Moussa Rili
 
Hollow Block
Hollow Block Hollow Block
Hollow Block
Ahmad Baalbaky
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
Hanzlahakhlaq
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
Husen Khorajiya
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab design
Satish Narayan
 
Design of beams
Design of beamsDesign of beams
Design of beams
Sabna Thilakan
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
Suhailkhan204
 
Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code
Sandeep Yadav
 
The shell structure system
The shell structure systemThe shell structure system
The shell structure system
Mazin Elbashkatib
 
Ferrocement
FerrocementFerrocement
Ferrocement
Prabhat chhirolya
 
slab concrete
slab concreteslab concrete
slab concrete
srwsh ahmad
 
Waffle or ribbed slab
Waffle or ribbed slabWaffle or ribbed slab
Waffle or ribbed slab
Pritesh Parmar
 
Tube structures and its type with comparison .
Tube structures and its type with comparison .Tube structures and its type with comparison .
Tube structures and its type with comparison .
Udayram Patil
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
Rajat Nainwal
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
Ar. Aakansha
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1
Est
 
Expansion joints
Expansion jointsExpansion joints
Expansion joints
namePPS
 
CONSTRUCTION OF DOMES
CONSTRUCTION OF DOMESCONSTRUCTION OF DOMES
CONSTRUCTION OF DOMES
Samiksha Choudhary
 

What's hot (20)

Tube structures
Tube structuresTube structures
Tube structures
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
Hollow Block
Hollow Block Hollow Block
Hollow Block
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab design
 
Design of beams
Design of beamsDesign of beams
Design of beams
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code Designing and drawing of flat slab with the help of i.s code
Designing and drawing of flat slab with the help of i.s code
 
The shell structure system
The shell structure systemThe shell structure system
The shell structure system
 
Ferrocement
FerrocementFerrocement
Ferrocement
 
slab concrete
slab concreteslab concrete
slab concrete
 
Waffle or ribbed slab
Waffle or ribbed slabWaffle or ribbed slab
Waffle or ribbed slab
 
Tube structures and its type with comparison .
Tube structures and its type with comparison .Tube structures and its type with comparison .
Tube structures and its type with comparison .
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1
 
Expansion joints
Expansion jointsExpansion joints
Expansion joints
 
CONSTRUCTION OF DOMES
CONSTRUCTION OF DOMESCONSTRUCTION OF DOMES
CONSTRUCTION OF DOMES
 

Similar to Hollow block and ribbed slabs

slab-design.ppt
slab-design.pptslab-design.ppt
slab-design.ppt
sitinimatul2321038
 
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Hossam Shafiq II
 
Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)
Malika khalil
 
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxLecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
AbelMulugeta8
 
0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
Golu Singh
 
Lecture chapter 1u
Lecture chapter 1uLecture chapter 1u
Lecture chapter 1u
rgo-amo
 
Composite slab
Composite slabComposite slab
Composite slab
Sandipan Sinha
 
gov.bd.bnbc.2012.06.08.pdf
gov.bd.bnbc.2012.06.08.pdfgov.bd.bnbc.2012.06.08.pdf
Top civil engineering Interview questions and Answers
Top civil engineering Interview questions and AnswersTop civil engineering Interview questions and Answers
Top civil engineering Interview questions and Answers
Ram N
 
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Hossam Shafiq II
 
9793339.ppt
9793339.ppt9793339.ppt
9793339.ppt
Chandu794921
 
design of steel flyover
design of steel flyoverdesign of steel flyover
design of steel flyover
Peer Mohideen
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
JayswalShashank1
 
Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000
Vikas Mehta
 
Design of concrete structure.
Design of concrete structure.Design of concrete structure.
Design of concrete structure.
M M ALAMGIR HOSSAIN
 
Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)
Ab van den Bos
 
Design of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdfDesign of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdf
mohamed abdo
 
Unit 5.1 Riveted joints
Unit 5.1 Riveted jointsUnit 5.1 Riveted joints
Unit 5.1 Riveted joints
Yugal Kishor Sahu
 
Design and Manufacturing Homework Help
Design and Manufacturing Homework HelpDesign and Manufacturing Homework Help
Design and Manufacturing Homework Help
Matlab Assignment Experts
 

Similar to Hollow block and ribbed slabs (20)

slab-design.ppt
slab-design.pptslab-design.ppt
slab-design.ppt
 
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
 
Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)
 
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxLecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
 
0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
 
Lecture chapter 1u
Lecture chapter 1uLecture chapter 1u
Lecture chapter 1u
 
Composite slab
Composite slabComposite slab
Composite slab
 
gov.bd.bnbc.2012.06.08.pdf
gov.bd.bnbc.2012.06.08.pdfgov.bd.bnbc.2012.06.08.pdf
gov.bd.bnbc.2012.06.08.pdf
 
Top civil engineering Interview questions and Answers
Top civil engineering Interview questions and AnswersTop civil engineering Interview questions and Answers
Top civil engineering Interview questions and Answers
 
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
 
9793339.ppt
9793339.ppt9793339.ppt
9793339.ppt
 
design of steel flyover
design of steel flyoverdesign of steel flyover
design of steel flyover
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000
 
Design of concrete structure.
Design of concrete structure.Design of concrete structure.
Design of concrete structure.
 
Formwork
FormworkFormwork
Formwork
 
Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)
 
Design of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdfDesign of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdf
 
Unit 5.1 Riveted joints
Unit 5.1 Riveted jointsUnit 5.1 Riveted joints
Unit 5.1 Riveted joints
 
Design and Manufacturing Homework Help
Design and Manufacturing Homework HelpDesign and Manufacturing Homework Help
Design and Manufacturing Homework Help
 

Recently uploaded

inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham HillinQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
LizaNolte
 
Cyber Recovery Wargame
Cyber Recovery WargameCyber Recovery Wargame
Cyber Recovery Wargame
Databarracks
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
christinelarrosa
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
christinelarrosa
 
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDBScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB
 
From Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMsFrom Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMs
Sease
 
Multivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back againMultivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back again
Kieran Kunhya
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
UiPathCommunity
 
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
anilsa9823
 
APJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes WebinarAPJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes Webinar
ThousandEyes
 
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to SuccessMongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
ScyllaDB
 
Guidelines for Effective Data Visualization
Guidelines for Effective Data VisualizationGuidelines for Effective Data Visualization
Guidelines for Effective Data Visualization
UmmeSalmaM1
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
DanBrown980551
 
Day 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio FundamentalsDay 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio Fundamentals
UiPathCommunity
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
ScyllaDB
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
Mydbops
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
UiPathCommunity
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
Ortus Solutions, Corp
 

Recently uploaded (20)

inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham HillinQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
 
Cyber Recovery Wargame
Cyber Recovery WargameCyber Recovery Wargame
Cyber Recovery Wargame
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
 
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDBScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
ScyllaDB Leaps Forward with Dor Laor, CEO of ScyllaDB
 
From Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMsFrom Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMs
 
Multivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back againMultivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back again
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
 
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
Call Girls Chennai ☎️ +91-7426014248 😍 Chennai Call Girl Beauty Girls Chennai...
 
APJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes WebinarAPJC Introduction to ThousandEyes Webinar
APJC Introduction to ThousandEyes Webinar
 
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to SuccessMongoDB to ScyllaDB: Technical Comparison and the Path to Success
MongoDB to ScyllaDB: Technical Comparison and the Path to Success
 
Guidelines for Effective Data Visualization
Guidelines for Effective Data VisualizationGuidelines for Effective Data Visualization
Guidelines for Effective Data Visualization
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
 
Day 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio FundamentalsDay 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio Fundamentals
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
 

Hollow block and ribbed slabs

  • 1. 1
  • 2. 2 Under supervision of Dr . Mohamed Nabil This report has been prepared by :  Mohamed Mohsen Mohamed Hussein  Mohamed Nabil Ali Kamel  Mohamed Youssef Mahmoud Youssef  Ahmed Hamdy Mohamed Hassan Hollow block & Ribbed slabs
  • 3. Outlines ■ Introduction. ■ Comparison between different codes. ■ Solved example by different codes. ■ One & two way slab solved example. ■ Effect of cross ribs on deflection. ■ Modeling. ■ Case study. 3
  • 4. Introduction  Hollow block and Ribbed slabs are formed by placing blocks on the slab and concrete ribs.  In case of hollow block slab voided blocks are placed to reduce the total weight of the slab .  In case of ribbed slab the blocks are not permanent.  The blocks are considered as non-structural element as they do not contribute to strength of the slab.  Blocks may be made concrete with lightweight aggregate or other material as polystyrene ( foam ).  Types hollow block slab are one way and two way slabs . 4
  • 5. Introduction The advantages of Ribbed and Hollow block slabs are as follows: ■ They provide an economical, versatile lightweight monolithic slab system and this its main advantage reduction of weight by removing the part of the concrete below the neutral axis. ■ Components are relatively light and no mechanical handling is necessary there is ease of construction.  Economic for spans more than 5m with light or moderate live loads, such as hospitals, office or residential buildings. 5
  • 6. ACI 318 ECP 203 BS 8110 Euro code 2 Comparison between different codes 6
  • 7. 7 ■ Net distance between ribs "e" shall not exceed 700 mm. ■ Web width "b" shall not be less than 100 mm or one the third of depth "t", whichever is greater. ■ Compression slab thickness "ts" shall not be less than 50 mm or one Tenth 1/10 of distance "e", whichever is greater. Comparison between different codes Egyptian code (ECP 203)  Limitations of Hollow block slabs :
  • 8. 8 ■ The minimum value of rib width (b) isn't less than 1/4 slab thickness (t) or 100 mm whichever greater, with taking into account requirements of concrete cover, distance between bars and fire requirements Egyptian code (ECP 203) ■ Distance between ribs axes can be increased up to 1.5 m . ■ Thickness of upper slab is determined by a value not less than e/12 or 50 mm whichever greater.  Limitations of Ribbed slabs:
  • 9. 9 Comparison between different codes British code (BS 8110)  Limitations of Hollow block slabs : ■ Clear distance between ribs (e) not more than 500 mm , jointed in cement : sand mortar ts is 25 mm. ■ Clear distance between ribs (e) not more than 500 mm not jointed in cement : sand mortar ts is 30 mm. ■ All other slabs with permanent blocks ts is 40 or one-tenth 1/10 of clear distance between ribs, whichever is great  Limitations of Ribbed slabs: Clear distance between ribs not more than 1.5 m ts is 50 mm or one- tenth of clear distance between ribs, whichever is greater. t b e b t b ≤ t/4
  • 10. Euro code (En2) ■ The rib spacing does not exceed 1500 mm. ■ The depth of the rib below the flange does not exceed 4 times its width. ■ The depth of the flange is at least 1/10 of the clear distance between ribs or 50 mm, whichever is the greater. ■ Transverse ribs are provided at a clear spacing not exceeding 10 times the overall depth of the slab. 10 Comparison between different codes  Limitations of Hollow block slabs :  Limitations of Ribbed slabs: ■ One limitation will change from ribbed slab The minimum flange thickness of 50 mm may be reduced to 40 mm.
  • 11. 11 American Concrete Institute (ACI) ■ When permanent filling material having a unit compressive strength at least equal to fc′ in the joists are used ts shall be not less than 1/12 the clear distance between ribs, nor less than 40 mm. ■ Otherwise ts is not to be less than 1/12 the clear distance between ribs, nor less than 5.0 cm ■ Ribs are not to be less than 10 cm in width, and a depth of not more than 3.5 times the minimum web width. ■ Clear spacing between ribs is not to exceed 75.0 cm Comparison between different codes  Limitations of Hollow block slabs & Ribbed slab:
  • 12. 12 Simply sup. L/20 L/20 ----------- L/16 1 end cont. L/25 L/20.8 L/18.5 2 end cont. L/28 ----- L/21 cantilever L/8 L/5.6 L/8 e ≤ 700 mm e ≤ 1500 mm e ≤ 1500 mm e ≤ 750 mm b ≤ t/4 b ≤ t/4 b ≥ 100 mm L.L ≤ 3 KN/m2 , Ls> 5 L.L > 3 KN/m2 , Ls→(4:7) L.L > 7m. ------- If L ≥ 10th.b ------- One X rib One X rib 3 X ribs Comparison between different codes
  • 13. 13
  • 14. 14 Fcu= 25 N/mm2 Fy= 360 N/mm2 F.C= 1.5 KN/m2 L.L= 3.0 KN/m2 Solved examples by different codes
  • 15. 15 th.b 250 mm 250 mm 250 mm 300 tS 50 mm 50 mm 50 mm 50 mm h 200 200 200 250 Mu (Kn.m/rib) 19.187 19.187 17.75 23.5 AS 293.30 mm2 255.72 mm2 322.005 mm2 226.67 mm2 Main ribs dim. 100 × 200 mm 100 × 200 mm 100 × 200 mm 100 × 250 mm Cross ribs No cross ribs No cross ribs One cross rib No cross ribs Solid part Short dir. long dir. Short dir. long dir. Short dir. long dir. Short dir. long dir. 0.3 m. 0.3 m. 0.3 m. 0.3 m. 0.25 m. 0.3 m. 0.3 m. 0.3 m. Conc. Quantities 2.806 m3 2.806 m3 2.934 m3 3.07 m3 Solved examples by different codes
  • 16. 16 One & two way slab Solved examples One way slab Two way slab Fcu= 25 N/mm2 Fy= 360 N/mm2 F.C= 1.5 KN/m2 L.L= 3.0 KN/m2
  • 17. 17 th.b. 320 mm 250 mm h 250 mm 200 mm ts 70 mm 50 mm Mu (KN.m/rib) 45.64 α dir. β dir. 15.68 15.68 As 529.255 mm2/ rib 239.68 mm2/ rib. For α dir. And 251.09 mm2/ rib. for β dir. Ribs dim. 0.12 * 0.25 m 0.1 * 0.2 m NO. of main ribs 11 12 No. of cross ribs 1 12 Conc. quantities 5.6854 m3 5.234 m3 RFT 1017.79 mm2 /m 981.54 mm2/m One & two way slab Solved examples It is obvious that the RFT and concrete quantities in the two way hollow block slab is more economic however the execution of the two way hollow block slab is harder than the one way hollow block slab.
  • 18. Effect of cross ribs on deflection  In The previous example the effect of cross ribs on deflection will be discussed on sap program.  At first one cross rib is put in the mid span of the slab.  Then two cross ribs are put at 1/3 of the span from each side. 18
  • 19. 19 ■ Case of one cross rib: Effect of cross ribs
  • 20. 20 ■ Case of two cross rib: Effect of cross ribs The two cases have the same deflection value so it is more economic to use one cross rib at mid span
  • 22. 22 Modeling ■ Model 1 The ribs are frame elements with cross section as T-section and connected together with a virtual slab with very small thickness.
  • 23. 23 The moment on the ribs=19.3675 KN.m
  • 24. 24 Modeling ■ Model 2 The ribs are frame elements with cross section as T-section and connected together with frame elements with cross section as rectangular section . The moment on the ribs= 19.1793 KN.m
  • 25. 25 Modeling ■ Model 3 The ribs are converted to a thickness on the whole slab and use virtual slab to connect between elements with very small thickness.
  • 26. 26 The moment on the ribs= 19.0767 KN.m
  • 27. 27 Modeling ■ Model 4 The ribs are represented as frame elements with rectangle section and the connecting element is frame element with rectangle section. The moment on the ribs= 19.1555 KN.m
  • 28.  This table shows the differences between the models and the manual solution . 28 Manual4321Model 19.187519.155519.076719.179319.3675M (ultimate) KN .m Rectangular section Rectangular section T-sectionT-sectionCross section of ribs FramesVirtual slabFramesVirtual slabConnecting elements W (rib)On slabW (rib)On slabLoads 0101Self weight multiplier Modeling
  • 29. Case study  Introduction: Different case study for hollow block slabs and ribbed slabs. ■ Case 1 29 Ordinary one way hollow block slab
  • 31. . 31 Case study ■ Case 2 Cantilever hollow block slabs
  • 32. 32 Case study ■ Case 3 Two way hollow block slabs
  • 33. Ribbed slabs one way and two way ( waffle ) and how the blocks are placed . 33 Case study ■ Case 4
  • 35. 35 Case study ■ Case 5 In this case foam blocks are used
  • 36. Clay blocks are used in this case. 36 Case study ■ Case 6
  • 38. 38