尊敬的 微信汇率:1円 ≈ 0.046239 元 支付宝汇率:1円 ≈ 0.04633元 [退出登录]
SlideShare a Scribd company logo
ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN.
EXPERIMENT NO: 03
THE DETERMINATION OF THE INITIAL AND FINAL SETTING
TIME OF THE CEMENT BY VICAT NEEDLE APPARATUS.
ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN.
INTRODUCTION:
Setting time of cement: When cement is mixed with water, it hydrates and makes cement
paste. This paste can be molded into any desired shape due to its plasticity. Within this time
cement continues with reacting water and slowly cement starts losing its plasticity and set
harden. This complete cycle is called Setting time of cement.
Initial Setting time of Cement: The time at which cement starts hardens and completely loses
its plasticity is called Initial setting time of cement.
Final setting time of Cement: The time at which cement completely loses its plasticity and
became hard is a final setting time of cement.
USE OF SETTING TIME OF CEMENT:
Initial setting time of cement is important, to know when the cement is starting to lose its
plasticity. It is helpful in determining the time needed for the concreting process, i.e.
transportation, placing and compaction of concrete.
Final setting time of cement is important to know when the cement would be set. This testing
of cement is helpful to determine safe removal time of side of form (not vertical support) or
scaffolding of concrete.
SCOPE & SIGNIFICANCE:
This test method is used to determine the time of setting of the hydraulic cement by VICAT
needle apparatus.
The knowledge of the setting time of the cement is always helpful in deciding the time duration
to mix, transport, place and compact the concrete effectively.
We always prefer a larger initial setting time so that we can mix, transport and place the
concrete easily. According to ASTM specifications, the initial setting time shall not be less
than 45 min but in the field we prefer an initial setting time not less than 90 min.
A smaller value of the final setting time is always preferred in order to avoid large expenditures
on the formwork. According to most of the specifications, the final setting time shall not be
greater than 10hrs and shall not be less than (90 + 1.2 x (initial setting time)) min.
FACTORS THAT AFFECT INITIAL AND FINAL SETTING TIME OF CEMENT: -
The fineness of cement, the presence of salts in sand, atmospheric conditions. For example,
cement requires a temperature of 27°c to complete Hydration, during winters the climate is low
which stops the hydration and takes a longer time to set harden.
ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN.
APPARATUS
VICAT apparatus
Needle of 1mm2 cross-section and
50mm length (for initial setting time)
Plunger with 1mm smaller needle
and 5mm outer diameter (for final
setting time)
Flat trowel
Graduated cylinders & Enamel tray
Stop watch
Balance
ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN.
TEST PROCEDURE
Initial Preparation
 Consistency test to be done before starting the test procedure to find out the water
required to give the paste normal consistency (P).
 Take 250 g of cement and prepare a neat cement paste with 0.85P of water by weight
of cement.
 Gauge time is kept between 3 to 5 minutes. Start the stop watch at the instant when the
water is added to the cement.
 Fill the Vicat mould, resting on a glass plate, with the cement paste gauged as above.
Fill the mould completely and smooth off the surface of the paste making it level with
the top of the mould. The cement block thus prepared is called test block.
 The mould may be slightly shaken for remove the air.
Initial Setting Time of Cement
 Place the mould under the rod bearing the needle. (needle for determining the initial
setting time)
 Lower the needle slightly until it comes in contact with the surface of the test block
and quickly release, allowing it to penetrate the test block.
 In the starting, the needle will completely penetrate the test block.
 Repeat this procedure until the needle fails to penetrate the block to the 5 to 7 mm
from the bottom of the mould.
 The period elapsing between the time when water is added to the cement and the
time at which the needle fails to penetrate the test block to the 5 to 7mm from the
bottom of the mould is called the initial setting time.
Final Setting Time of Cement
 To determine the final setting time, the first needle is replaced by the (needle for
determining the final setting time) needle with an annular attachment.
 When applying the needle gently to the surface of the mould, the needle makes an
impression thereon.
 Cement called as final set while the attachment fails to make an impression on the
surface of the test block.
 The period elapsing between the time when water is added to the cement and the
time at which the needle fails to make an impression on the surface of the test block
is called the final setting time.
ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN.
CALCULATIONS
Initial setting time:
Time when needle fails to penetrate 5 mm to 7 mm from bottom of the mould-Time at which water is first added
to cement.
Final setting time:
Time when the needle makes an impression but the attachment fails to do so - Time at which water is first added
to cement.
OBSERVATION:
Sample brand: Holcim Cement Room temperature :28°c
Normal Consistency: 33%
Weight of cement: 250gms
Water added: 70. 5 ML
Time when water is added to cement 10:35 am
Time at initial setting 12:30 pm
Initial setting time,(min) 115 min.
Time at final setting 2:20 pm
Final setting time,(min) 226 min
RESULTS:
Initial setting time: 115 min.
Final setting time: 226 min
The results of the initial and the final setting time should be reported to the nearest five minutes.
COMMENTS:
After performing the experiment, we have concluded the results that the initial setting time of
cement is 115 min and final setting time of cement paste is 226 min. The minimum initial
setting time is 30 minutes and maximum final setting time is 600min. As the Initial and Final
setting time is coming in between the prescribed range, it means that the experiment is
performed accurately.
SIGNATURE
ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN.
ACCEPTANCE CRITERIA:
Recommended result for various types of cement to their setting time gives by standard
guidelines are as follows:
If test value is not in a rage of the recommended result, there many reasons behind it, such that
some chemical composition may have changed during production (manufacturing defect), fault
in the testing apparatus, error in testing etc. In that case, have to take care of the timing of work
with it. If the initial setting time less than this value, all the process, i.e. mixing, transporting,
placing complete within the time otherwise cement paste/concrete/mortar starts to getting set.
If the final setting time is more than this value, will have to retain scaffolding and the sides of
the form, until the cement paste/concrete/mortar is completely rigid and will have to be careful
to start the curing time.

More Related Content

What's hot

Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Jameel Academy
 
Fineness of cement test
Fineness of cement testFineness of cement test
Fineness of cement test
Muhammad Saleem
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - Report
Sarchia Khursheed
 
Determination of Field Density Using Sand Cone Method | Jameel Academy
Determination of Field Density Using Sand Cone Method | Jameel AcademyDetermination of Field Density Using Sand Cone Method | Jameel Academy
Determination of Field Density Using Sand Cone Method | Jameel Academy
Jameel Academy
 
Field density method (sand replacing method)
Field density method (sand replacing method)Field density method (sand replacing method)
Field density method (sand replacing method)
Faizan Tanoli
 
workability test of concrete
workability test of concreteworkability test of concrete
workability test of concrete
Karan Patel
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPT
Latif Hyder Wadho
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration Test
Muftah Aljoat
 
Lecture 6 soil permeability
Lecture 6 soil permeabilityLecture 6 soil permeability
Lecture 6 soil permeability
Dr.Abdulmannan Orabi
 
Lecture 2 bearing capacity
Lecture 2 bearing capacityLecture 2 bearing capacity
Lecture 2 bearing capacity
Dr.Abdulmannan Orabi
 
Flow test of concrete
Flow test of concreteFlow test of concrete
Flow test of concrete
Muhammad Saleem
 
3 setting time of cement
3 setting time of cement3 setting time of cement
3 setting time of cement
University of Salahaddin-Erbil
 
CBR Test
CBR TestCBR Test
CBR Test
Priyansh Singh
 
Shrinkage Limit Test
Shrinkage Limit TestShrinkage Limit Test
Shrinkage Limit Test
SOURABH PAL
 
Specific Gravity of Cement
Specific Gravity of CementSpecific Gravity of Cement
Specific Gravity of Cement
Sarchia Khursheed
 
_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)
sharda university
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Muhammad Irfan
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete test
Selva Prakash
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
Hossam Shafiq I
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soil
Latif Hyder Wadho
 

What's hot (20)

Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
 
Fineness of cement test
Fineness of cement testFineness of cement test
Fineness of cement test
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - Report
 
Determination of Field Density Using Sand Cone Method | Jameel Academy
Determination of Field Density Using Sand Cone Method | Jameel AcademyDetermination of Field Density Using Sand Cone Method | Jameel Academy
Determination of Field Density Using Sand Cone Method | Jameel Academy
 
Field density method (sand replacing method)
Field density method (sand replacing method)Field density method (sand replacing method)
Field density method (sand replacing method)
 
workability test of concrete
workability test of concreteworkability test of concrete
workability test of concrete
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPT
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration Test
 
Lecture 6 soil permeability
Lecture 6 soil permeabilityLecture 6 soil permeability
Lecture 6 soil permeability
 
Lecture 2 bearing capacity
Lecture 2 bearing capacityLecture 2 bearing capacity
Lecture 2 bearing capacity
 
Flow test of concrete
Flow test of concreteFlow test of concrete
Flow test of concrete
 
3 setting time of cement
3 setting time of cement3 setting time of cement
3 setting time of cement
 
CBR Test
CBR TestCBR Test
CBR Test
 
Shrinkage Limit Test
Shrinkage Limit TestShrinkage Limit Test
Shrinkage Limit Test
 
Specific Gravity of Cement
Specific Gravity of CementSpecific Gravity of Cement
Specific Gravity of Cement
 
_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)_lateral_earth_pressure_(foundation engineering)
_lateral_earth_pressure_(foundation engineering)
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete test
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soil
 

Similar to Experiment no 03 setting time of cement.

Cement Test.pdf
Cement Test.pdfCement Test.pdf
Cement Test.pdf
Piyush609360
 
Properties of Concrete (cement)
Properties of Concrete (cement)Properties of Concrete (cement)
Properties of Concrete (cement)
Salman H. Sindhoo
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technology
Sunny Saha
 
Properties of concrete
Properties of concrete Properties of concrete
Properties of concrete
Salman H. Sindhoo
 
2. testing of cement ppt
2. testing of cement ppt2. testing of cement ppt
2. testing of cement ppt
Bhaswati Sharma
 
Ppt on test certificate-Amit Payal
Ppt on test certificate-Amit PayalPpt on test certificate-Amit Payal
Ppt on test certificate-Amit Payal
AMIT PAYAL
 
Tests on cement
Tests on cementTests on cement
Tests on cement
FAREED AHMAD
 
Is 456 codal provisions
Is 456 codal provisionsIs 456 codal provisions
Is 456 codal provisions
ErsoumyaTripathy
 
Properties of Cement
Properties of CementProperties of Cement
Properties of Cement
GAURAV. H .TANDON
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
Engr. Umair Razzaq
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
Vijay Patidar
 
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
Ijripublishers Ijri
 
How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?
Civil Insider
 
Concreate technology
Concreate technologyConcreate technology
Concreate technology
periyar maniammai university
 
Cement tests
Cement testsCement tests
Cement tests
Elijah Tasani
 
Testing of concrete materials
Testing of concrete materials Testing of concrete materials
Testing of concrete materials
Tushar Sonawane
 
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concrete
ARUNKUMARC39
 
Cement ppt by alpana
Cement ppt by alpanaCement ppt by alpana
Cement ppt by alpana
Alpana Gupta
 
Testing of cement
Testing of cementTesting of cement

Similar to Experiment no 03 setting time of cement. (20)

Cement Test.pdf
Cement Test.pdfCement Test.pdf
Cement Test.pdf
 
Properties of Concrete (cement)
Properties of Concrete (cement)Properties of Concrete (cement)
Properties of Concrete (cement)
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technology
 
Properties of concrete
Properties of concrete Properties of concrete
Properties of concrete
 
2. testing of cement ppt
2. testing of cement ppt2. testing of cement ppt
2. testing of cement ppt
 
Ppt on test certificate-Amit Payal
Ppt on test certificate-Amit PayalPpt on test certificate-Amit Payal
Ppt on test certificate-Amit Payal
 
Tests on cement
Tests on cementTests on cement
Tests on cement
 
Is 456 codal provisions
Is 456 codal provisionsIs 456 codal provisions
Is 456 codal provisions
 
Properties of Cement
Properties of CementProperties of Cement
Properties of Cement
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
 
How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?How to determine Initial and Final Setting Time of Cement?
How to determine Initial and Final Setting Time of Cement?
 
Concreate technology
Concreate technologyConcreate technology
Concreate technology
 
Cement tests
Cement testsCement tests
Cement tests
 
Testing of concrete materials
Testing of concrete materials Testing of concrete materials
Testing of concrete materials
 
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concrete
 
Cement ppt by alpana
Cement ppt by alpanaCement ppt by alpana
Cement ppt by alpana
 
Testing of cement
Testing of cementTesting of cement
Testing of cement
 

More from Sayed Sajid H.Zidani

PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.
Sayed Sajid H.Zidani
 
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
Sayed Sajid H.Zidani
 
Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...
Sayed Sajid H.Zidani
 
Experiment no 02 crushing value
Experiment no 02 crushing valueExperiment no 02 crushing value
Experiment no 02 crushing value
Sayed Sajid H.Zidani
 
Plastic Waste Management In Dhaka City
Plastic Waste Management In Dhaka CityPlastic Waste Management In Dhaka City
Plastic Waste Management In Dhaka City
Sayed Sajid H.Zidani
 
LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)
LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)
LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)
Sayed Sajid H.Zidani
 
DETERMINATION OF AGGREGATE IMPACT VALUE.
DETERMINATION OF AGGREGATE IMPACT VALUE.DETERMINATION OF AGGREGATE IMPACT VALUE.
DETERMINATION OF AGGREGATE IMPACT VALUE.
Sayed Sajid H.Zidani
 
Lightning Related Casualties in Bangladesh.
Lightning Related Casualties in Bangladesh.Lightning Related Casualties in Bangladesh.
Lightning Related Casualties in Bangladesh.
Sayed Sajid H.Zidani
 

More from Sayed Sajid H.Zidani (8)

PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.PENETRATION TEST ON BITUMINOUS MATERIALS.
PENETRATION TEST ON BITUMINOUS MATERIALS.
 
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
 
Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...Experiment no 03 Determination of the flakiness and the elongation index for ...
Experiment no 03 Determination of the flakiness and the elongation index for ...
 
Experiment no 02 crushing value
Experiment no 02 crushing valueExperiment no 02 crushing value
Experiment no 02 crushing value
 
Plastic Waste Management In Dhaka City
Plastic Waste Management In Dhaka CityPlastic Waste Management In Dhaka City
Plastic Waste Management In Dhaka City
 
LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)
LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)
LIGHTNING RELATED CAUSALITIES IN BANGLADESH (1990 TO 2018)
 
DETERMINATION OF AGGREGATE IMPACT VALUE.
DETERMINATION OF AGGREGATE IMPACT VALUE.DETERMINATION OF AGGREGATE IMPACT VALUE.
DETERMINATION OF AGGREGATE IMPACT VALUE.
 
Lightning Related Casualties in Bangladesh.
Lightning Related Casualties in Bangladesh.Lightning Related Casualties in Bangladesh.
Lightning Related Casualties in Bangladesh.
 

Recently uploaded

Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
SnehalChavan75
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
Geoffrey Wardle. MSc. MSc. Snr.MAIAA
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
Tsuyoshi Horigome
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
Lubi Valves
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
supriyaDicholkar1
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 

Recently uploaded (20)

Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
TENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineeringTENDERS and Contracts basic syllabus for engineering
TENDERS and Contracts basic syllabus for engineering
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
My Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdfMy Airframe Metallic Design Capability Studies..pdf
My Airframe Metallic Design Capability Studies..pdf
 
Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024Better Builder Magazine, Issue 49 / Spring 2024
Better Builder Magazine, Issue 49 / Spring 2024
 
SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )SPICE PARK JUL2024 ( 6,866 SPICE Models )
SPICE PARK JUL2024 ( 6,866 SPICE Models )
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 

Experiment no 03 setting time of cement.

  • 1. ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN. EXPERIMENT NO: 03 THE DETERMINATION OF THE INITIAL AND FINAL SETTING TIME OF THE CEMENT BY VICAT NEEDLE APPARATUS.
  • 2. ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN. INTRODUCTION: Setting time of cement: When cement is mixed with water, it hydrates and makes cement paste. This paste can be molded into any desired shape due to its plasticity. Within this time cement continues with reacting water and slowly cement starts losing its plasticity and set harden. This complete cycle is called Setting time of cement. Initial Setting time of Cement: The time at which cement starts hardens and completely loses its plasticity is called Initial setting time of cement. Final setting time of Cement: The time at which cement completely loses its plasticity and became hard is a final setting time of cement. USE OF SETTING TIME OF CEMENT: Initial setting time of cement is important, to know when the cement is starting to lose its plasticity. It is helpful in determining the time needed for the concreting process, i.e. transportation, placing and compaction of concrete. Final setting time of cement is important to know when the cement would be set. This testing of cement is helpful to determine safe removal time of side of form (not vertical support) or scaffolding of concrete. SCOPE & SIGNIFICANCE: This test method is used to determine the time of setting of the hydraulic cement by VICAT needle apparatus. The knowledge of the setting time of the cement is always helpful in deciding the time duration to mix, transport, place and compact the concrete effectively. We always prefer a larger initial setting time so that we can mix, transport and place the concrete easily. According to ASTM specifications, the initial setting time shall not be less than 45 min but in the field we prefer an initial setting time not less than 90 min. A smaller value of the final setting time is always preferred in order to avoid large expenditures on the formwork. According to most of the specifications, the final setting time shall not be greater than 10hrs and shall not be less than (90 + 1.2 x (initial setting time)) min. FACTORS THAT AFFECT INITIAL AND FINAL SETTING TIME OF CEMENT: - The fineness of cement, the presence of salts in sand, atmospheric conditions. For example, cement requires a temperature of 27°c to complete Hydration, during winters the climate is low which stops the hydration and takes a longer time to set harden.
  • 3. ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN. APPARATUS VICAT apparatus Needle of 1mm2 cross-section and 50mm length (for initial setting time) Plunger with 1mm smaller needle and 5mm outer diameter (for final setting time) Flat trowel Graduated cylinders & Enamel tray Stop watch Balance
  • 4. ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN. TEST PROCEDURE Initial Preparation  Consistency test to be done before starting the test procedure to find out the water required to give the paste normal consistency (P).  Take 250 g of cement and prepare a neat cement paste with 0.85P of water by weight of cement.  Gauge time is kept between 3 to 5 minutes. Start the stop watch at the instant when the water is added to the cement.  Fill the Vicat mould, resting on a glass plate, with the cement paste gauged as above. Fill the mould completely and smooth off the surface of the paste making it level with the top of the mould. The cement block thus prepared is called test block.  The mould may be slightly shaken for remove the air. Initial Setting Time of Cement  Place the mould under the rod bearing the needle. (needle for determining the initial setting time)  Lower the needle slightly until it comes in contact with the surface of the test block and quickly release, allowing it to penetrate the test block.  In the starting, the needle will completely penetrate the test block.  Repeat this procedure until the needle fails to penetrate the block to the 5 to 7 mm from the bottom of the mould.  The period elapsing between the time when water is added to the cement and the time at which the needle fails to penetrate the test block to the 5 to 7mm from the bottom of the mould is called the initial setting time. Final Setting Time of Cement  To determine the final setting time, the first needle is replaced by the (needle for determining the final setting time) needle with an annular attachment.  When applying the needle gently to the surface of the mould, the needle makes an impression thereon.  Cement called as final set while the attachment fails to make an impression on the surface of the test block.  The period elapsing between the time when water is added to the cement and the time at which the needle fails to make an impression on the surface of the test block is called the final setting time.
  • 5. ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN. CALCULATIONS Initial setting time: Time when needle fails to penetrate 5 mm to 7 mm from bottom of the mould-Time at which water is first added to cement. Final setting time: Time when the needle makes an impression but the attachment fails to do so - Time at which water is first added to cement. OBSERVATION: Sample brand: Holcim Cement Room temperature :28°c Normal Consistency: 33% Weight of cement: 250gms Water added: 70. 5 ML Time when water is added to cement 10:35 am Time at initial setting 12:30 pm Initial setting time,(min) 115 min. Time at final setting 2:20 pm Final setting time,(min) 226 min RESULTS: Initial setting time: 115 min. Final setting time: 226 min The results of the initial and the final setting time should be reported to the nearest five minutes. COMMENTS: After performing the experiment, we have concluded the results that the initial setting time of cement is 115 min and final setting time of cement paste is 226 min. The minimum initial setting time is 30 minutes and maximum final setting time is 600min. As the Initial and Final setting time is coming in between the prescribed range, it means that the experiment is performed accurately. SIGNATURE
  • 6. ENGINEERING MATERIALS LABORATORY ENGR.SAYED SHAJEDUL HASAN. ACCEPTANCE CRITERIA: Recommended result for various types of cement to their setting time gives by standard guidelines are as follows: If test value is not in a rage of the recommended result, there many reasons behind it, such that some chemical composition may have changed during production (manufacturing defect), fault in the testing apparatus, error in testing etc. In that case, have to take care of the timing of work with it. If the initial setting time less than this value, all the process, i.e. mixing, transporting, placing complete within the time otherwise cement paste/concrete/mortar starts to getting set. If the final setting time is more than this value, will have to retain scaffolding and the sides of the form, until the cement paste/concrete/mortar is completely rigid and will have to be careful to start the curing time.
  翻译: