尊敬的 微信汇率:1円 ≈ 0.046166 元 支付宝汇率:1円 ≈ 0.046257元 [退出登录]
SlideShare a Scribd company logo
BCE Proposal Defence
Damage Study of 3 Bridges and
recommendation of retrofitting
Submitted by: Roll no:
Ankit Wasti THA076BCE09
Ashok Bhurtel THA076BCE19
Balkishun Kewat THA076BCE24
Bimal Bhusal THA076BCE31
Bishal Lamsal THA076BCE35
Diwakar Khatiwada THA076BCE40
Supervisor:
Date: 2080/03/08
Tribhuvan University
Institute of Engineering
Thapathali campus
Department of Civil Engineering
ABSTRACT:
The project begins with a thorough
review of existing literature on bridge
damage. Field investigations are
carried out to gather data on bridge
conditions. The collected data is
then processed and analyzed using
data analytics techniques and
structural engineering
principles.Based on the damage
assessment results, an appropriate
re-strengthening strategy is
formulated for each bridge.
INTRODUCTION
A
LITERATURE
REVIEW
B
SPECIFIC
OBJECTIVE
D
METHODOLOGY
E
EXPECTED
OUTCOMES
F
TABLE OF CONTENT
OBJECTIVES
c
WORK PLAN
G
INTRODUCTION
• Bridges are lifelines of a Nation’s
road infrastructure
• Bridges form the vital link of any
road/highway network.
• Nepal of going to build it’s 10,000th
bridge this year
• Bridge construction is also going to
be rapid in this decade
• Maintaining safety and
serviceability of bridges during their
lifetime deserves highest priority
• Periodic and insightful inspection of
highway bridges is essential input for any
effective bridge mangement system
• There are 3 types of inspections in
practice: Periodic, Fracture-
Critical,Damage Inspection
• Primarily, visual obervation suplemented
by assesment of varius distresses, using
Non-Distructive Tests, will be used. 
• Various challenges such as traffic
obstruction, accidental chances,
pedestrian walking can slow down the
inspection part of the insepection.
INSPECTION IPSUM DOLOR
Proper bridge inspection in Minnesota, USA.
• Maintenance of bridges is equally
important to that of construction
• However, maintenance of bridges
generally gets neglected because of the
prevailing misconception that the bridges
once constructed do not need any
substantial maintenance
• In the absence of reguar inspection and
systematic approach, presently, ad-hoc
decisions are taken as a sort of fire-
fighting operation or crisis management.
• Lack of proper regular inspection and
maintenance, has lead to deterioration
and collapse of bridges rather early in
their life.
Maintenance
A view of Dudhaura Bridge, which has caved in, along the Pathlaiya-Nijgad
road, in Bara.
• 1.Addition of new structural elements,
such as steel or reinforced concrete
members, to increase load-carrying
capacity.
• 2.External post-tensioning to provide
additional strength and improve the
bridge's resistance to bending and shear
forces.
• 3.Replacement or repair of structural
elements
• 4.Retrofitting for seismic resilience
REPAIRING IPSUM DOLOR
Bridge Repairing Services in Zirakpur India.
Series of IRC Codes
1
Parke, G., & Hewson, N. (2008). ICE manual
of bridge engineering.
2
Bridge Deck Quality Indexing based on Non-Destructive
Tests: (Umesh Pant and Jagdish Shrestha)
3
Nepal Bridge Standard 2067
4
LITERATURE
REVIEW
The general objectives of this project are as follow:
1.Surface study of bridges
2.To develop a comprehensive framework for bridge damage assessment and
re-strengthening in the Kathmandu Valley, with the aim of enhancing the
resilience and safety of transportation networks in the region
OBJECTIVES
review and analyze
existing literature
on bridge damage
assessment
methodologies
A
propose an
integrated
approach for
bridge damage
assessment
B
assess the
damage inflicted
on bridges in the
Kathmandu
Valley
C
develop a
methodology for
prioritizing
retrofitting efforts
D
propose
retrofitting
strategies for
damaged
bridges
E
evaluate the
feasibility and cost-
effectiveness of
proposed
retrofitting
measures
F
SPECIFIC OBJECTIVES
Availability of Bridge Data
Accessibility to Bridge Sites
Stereotypical behaviour of Selected Bridges
Adequate Resources and Timeframe
ASSUMPTIONS
ASSUMPTIONS
Lack of comprehensive and up-to-date data
Heavy Traffic
Inaccessibility of Sub Structures
Lack of proper management system
PROBLEM STATEMENTS:
Problem
Statements
01
METHODOLOGY
Selection of Study Area:
For the study area, 3 bridges in Kathmandu
valley are selected that represents not only the 3
different districts but also the different types of
bridges that are to be studied for more versatility.
1.Bagmati bridge
joining Kupandole
and Thapathali:
2.Manohara bridge
joining Lokanthali
and Judibuti:
3.Tinkune Bagmati
Bridge:
2 3 4 5 6
Visual inspection
Conduct a visual inspection
of the bridges to identify
visible signs of damage
NDT
Utilize non-destructive testing techniques
to assess the structural integrity of bridges
without causing damage using rebound
hammer.
Structural analysis
Perform structural analysis
using computer modeling and
simulation software.
Data collection
Analyze the collected data,
including inspection
reports, NDT results
Risk Assessment
Develop a risk assessment framework
to evaluate the risks associated with
each bridge based on its condition,
location, usage, and potential
consequences of failure.
The retrofitting methods used in this case study demonstrate the importance of adopting new technologies
and techniques to maintain and improve the safety of existing bridge structures. retrofitting methods used
included the following:
1. Expanded Seismic Joints:
The structure’s seismic joints were extended to allow more movement during an earthquake
2. Enhanced Deck Durability:
The bridge deck was resurfaced with a new, more durable material
3. Expansion Joints:
The old expansion joints were replaced with new ones that can handle greater movement and provide
better support to the bridge
Retrofitting/Strengthening:
EXPECTED OUTCOMES:
• Identification of any structural issues of deficiency
• Load analysis
• Recommendation for maintenance or repairment
• Assessment of remaining service life
20-May 30-May 9-Jun 19-Jun 29-Jun 9-Jul 19-Jul 29-Jul 8-Aug 18-Aug
Group Formation
Project Selection
Site Selection
Proposal Writing
Proposal Amendment
Presentation Preaparation
Proposal Defense
Site Survey
NDT
Mid term defense preparation
Mid term defense
Literature Review
Gantt Chart
Axis
Title
Start Date
Days to complete
THANKS

More Related Content

Similar to Bridge damage assessment proposal

IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted Structure
IRJET Journal
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptx
Spidra1
 
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala BridgeIRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET Journal
 
Case study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsCase study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutions
IRJET Journal
 
Analysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’s
Analysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’sAnalysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’s
Analysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’s
IRJET Journal
 
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
GLA University
 
Structural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of BridgesStructural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of Bridges
Editor IJCATR
 
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Editor IJCATR
 
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic HybridIntelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
TELKOMNIKA JOURNAL
 
Sem5
Sem5Sem5
Concrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compressionConcrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compression
eSAT Journals
 
Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...
eSAT Publishing House
 
K04402070075
K04402070075K04402070075
K04402070075
ijceronline
 
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube StructureIRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET Journal
 
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET Journal
 
Non-Linear Static Analysis of Reinforced Concrete Bridge
Non-Linear Static Analysis of Reinforced Concrete BridgeNon-Linear Static Analysis of Reinforced Concrete Bridge
Non-Linear Static Analysis of Reinforced Concrete Bridge
IRJET Journal
 
IRJET- Health Monitoring of Mundhwa Bridge
IRJET- Health Monitoring of Mundhwa BridgeIRJET- Health Monitoring of Mundhwa Bridge
IRJET- Health Monitoring of Mundhwa Bridge
IRJET Journal
 
Analysis and Design of Reinforced Concrete Solid Slab Bridge
Analysis and Design of Reinforced Concrete Solid Slab BridgeAnalysis and Design of Reinforced Concrete Solid Slab Bridge
Analysis and Design of Reinforced Concrete Solid Slab Bridge
ijtsrd
 
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
Dr. Amarjeet Singh
 
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
International Journal of Technical Research & Application
 

Similar to Bridge damage assessment proposal (20)

IRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted StructureIRJET- Performance Analysis of Retrofitted Structure
IRJET- Performance Analysis of Retrofitted Structure
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptx
 
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala BridgeIRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
 
Case study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsCase study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutions
 
Analysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’s
Analysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’sAnalysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’s
Analysis For Retrofitting Of An Existing Failed RC Column Using FEM Software’s
 
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
 
Structural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of BridgesStructural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of Bridges
 
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
 
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic HybridIntelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
 
Sem5
Sem5Sem5
Sem5
 
Concrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compressionConcrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compression
 
Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...Investigation of practical life line rcc multistoried building structure & it...
Investigation of practical life line rcc multistoried building structure & it...
 
K04402070075
K04402070075K04402070075
K04402070075
 
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube StructureIRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
 
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
 
Non-Linear Static Analysis of Reinforced Concrete Bridge
Non-Linear Static Analysis of Reinforced Concrete BridgeNon-Linear Static Analysis of Reinforced Concrete Bridge
Non-Linear Static Analysis of Reinforced Concrete Bridge
 
IRJET- Health Monitoring of Mundhwa Bridge
IRJET- Health Monitoring of Mundhwa BridgeIRJET- Health Monitoring of Mundhwa Bridge
IRJET- Health Monitoring of Mundhwa Bridge
 
Analysis and Design of Reinforced Concrete Solid Slab Bridge
Analysis and Design of Reinforced Concrete Solid Slab BridgeAnalysis and Design of Reinforced Concrete Solid Slab Bridge
Analysis and Design of Reinforced Concrete Solid Slab Bridge
 
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
 
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
TECHNOLOGY RESEARCH FOR MAIN ARCH ON STONE ARCH BRIDGE REINFORCEMENT ENGINEER...
 

Recently uploaded

Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
DebendraDevKhanal1
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
Kamal Acharya
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
GOKULKANNANMMECLECTC
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
yogita singh$A17
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Banerescorts
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
dulbh kashyap
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
Microsoft Azure AD architecture and features
Microsoft Azure AD architecture and featuresMicrosoft Azure AD architecture and features
Microsoft Azure AD architecture and features
ssuser381403
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
Ak47
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
sapna sharmap11
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
shourabjaat424
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
AK47
 

Recently uploaded (20)

Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
Lateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptxLateral load-resisting systems in buildings.pptx
Lateral load-resisting systems in buildings.pptx
 
Covid Management System Project Report.pdf
Covid Management System Project Report.pdfCovid Management System Project Report.pdf
Covid Management System Project Report.pdf
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASICINTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
INTRODUCTION TO ARTIFICIAL INTELLIGENCE BASIC
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
 
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
Hot Call Girls In Bangalore ✔ 9079923931 ✔ Hi I Am Divya Vip Call Girl Servic...
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
🚺ANJALI MEHTA High Profile Call Girls Ahmedabad 💯Call Us 🔝 9352988975 🔝💃Top C...
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
Microsoft Azure AD architecture and features
Microsoft Azure AD architecture and featuresMicrosoft Azure AD architecture and features
Microsoft Azure AD architecture and features
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
 
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call GirlCall Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
Call Girls Goa (india) ☎️ +91-7426014248 Goa Call Girl
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
 
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
🔥Independent Call Girls In Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Esco...
 

Bridge damage assessment proposal

  • 1. BCE Proposal Defence Damage Study of 3 Bridges and recommendation of retrofitting Submitted by: Roll no: Ankit Wasti THA076BCE09 Ashok Bhurtel THA076BCE19 Balkishun Kewat THA076BCE24 Bimal Bhusal THA076BCE31 Bishal Lamsal THA076BCE35 Diwakar Khatiwada THA076BCE40 Supervisor: Date: 2080/03/08 Tribhuvan University Institute of Engineering Thapathali campus Department of Civil Engineering
  • 2. ABSTRACT: The project begins with a thorough review of existing literature on bridge damage. Field investigations are carried out to gather data on bridge conditions. The collected data is then processed and analyzed using data analytics techniques and structural engineering principles.Based on the damage assessment results, an appropriate re-strengthening strategy is formulated for each bridge.
  • 4. INTRODUCTION • Bridges are lifelines of a Nation’s road infrastructure • Bridges form the vital link of any road/highway network. • Nepal of going to build it’s 10,000th bridge this year • Bridge construction is also going to be rapid in this decade • Maintaining safety and serviceability of bridges during their lifetime deserves highest priority
  • 5. • Periodic and insightful inspection of highway bridges is essential input for any effective bridge mangement system • There are 3 types of inspections in practice: Periodic, Fracture- Critical,Damage Inspection • Primarily, visual obervation suplemented by assesment of varius distresses, using Non-Distructive Tests, will be used. • Various challenges such as traffic obstruction, accidental chances, pedestrian walking can slow down the inspection part of the insepection. INSPECTION IPSUM DOLOR Proper bridge inspection in Minnesota, USA.
  • 6. • Maintenance of bridges is equally important to that of construction • However, maintenance of bridges generally gets neglected because of the prevailing misconception that the bridges once constructed do not need any substantial maintenance • In the absence of reguar inspection and systematic approach, presently, ad-hoc decisions are taken as a sort of fire- fighting operation or crisis management. • Lack of proper regular inspection and maintenance, has lead to deterioration and collapse of bridges rather early in their life. Maintenance A view of Dudhaura Bridge, which has caved in, along the Pathlaiya-Nijgad road, in Bara.
  • 7. • 1.Addition of new structural elements, such as steel or reinforced concrete members, to increase load-carrying capacity. • 2.External post-tensioning to provide additional strength and improve the bridge's resistance to bending and shear forces. • 3.Replacement or repair of structural elements • 4.Retrofitting for seismic resilience REPAIRING IPSUM DOLOR Bridge Repairing Services in Zirakpur India.
  • 8. Series of IRC Codes 1 Parke, G., & Hewson, N. (2008). ICE manual of bridge engineering. 2 Bridge Deck Quality Indexing based on Non-Destructive Tests: (Umesh Pant and Jagdish Shrestha) 3 Nepal Bridge Standard 2067 4 LITERATURE REVIEW
  • 9. The general objectives of this project are as follow: 1.Surface study of bridges 2.To develop a comprehensive framework for bridge damage assessment and re-strengthening in the Kathmandu Valley, with the aim of enhancing the resilience and safety of transportation networks in the region OBJECTIVES
  • 10. review and analyze existing literature on bridge damage assessment methodologies A propose an integrated approach for bridge damage assessment B assess the damage inflicted on bridges in the Kathmandu Valley C develop a methodology for prioritizing retrofitting efforts D propose retrofitting strategies for damaged bridges E evaluate the feasibility and cost- effectiveness of proposed retrofitting measures F SPECIFIC OBJECTIVES
  • 11. Availability of Bridge Data Accessibility to Bridge Sites Stereotypical behaviour of Selected Bridges Adequate Resources and Timeframe ASSUMPTIONS ASSUMPTIONS
  • 12. Lack of comprehensive and up-to-date data Heavy Traffic Inaccessibility of Sub Structures Lack of proper management system PROBLEM STATEMENTS: Problem Statements
  • 14. Selection of Study Area: For the study area, 3 bridges in Kathmandu valley are selected that represents not only the 3 different districts but also the different types of bridges that are to be studied for more versatility.
  • 15. 1.Bagmati bridge joining Kupandole and Thapathali: 2.Manohara bridge joining Lokanthali and Judibuti: 3.Tinkune Bagmati Bridge:
  • 16. 2 3 4 5 6 Visual inspection Conduct a visual inspection of the bridges to identify visible signs of damage NDT Utilize non-destructive testing techniques to assess the structural integrity of bridges without causing damage using rebound hammer. Structural analysis Perform structural analysis using computer modeling and simulation software. Data collection Analyze the collected data, including inspection reports, NDT results Risk Assessment Develop a risk assessment framework to evaluate the risks associated with each bridge based on its condition, location, usage, and potential consequences of failure.
  • 17. The retrofitting methods used in this case study demonstrate the importance of adopting new technologies and techniques to maintain and improve the safety of existing bridge structures. retrofitting methods used included the following: 1. Expanded Seismic Joints: The structure’s seismic joints were extended to allow more movement during an earthquake 2. Enhanced Deck Durability: The bridge deck was resurfaced with a new, more durable material 3. Expansion Joints: The old expansion joints were replaced with new ones that can handle greater movement and provide better support to the bridge Retrofitting/Strengthening:
  • 18. EXPECTED OUTCOMES: • Identification of any structural issues of deficiency • Load analysis • Recommendation for maintenance or repairment • Assessment of remaining service life
  • 19. 20-May 30-May 9-Jun 19-Jun 29-Jun 9-Jul 19-Jul 29-Jul 8-Aug 18-Aug Group Formation Project Selection Site Selection Proposal Writing Proposal Amendment Presentation Preaparation Proposal Defense Site Survey NDT Mid term defense preparation Mid term defense Literature Review Gantt Chart Axis Title Start Date Days to complete
  翻译: