尊敬的 微信汇率:1円 ≈ 0.046078 元 支付宝汇率:1円 ≈ 0.046168元 [退出登录]
SlideShare a Scribd company logo
Well control
 Well-control means methods used to minimize the potential for
the well to flow or kick and to maintain control of the well in
the event of flow or a kick. Well-control applies to drilling, well-
completion, well-workover.
IWCF
International Well Control Forum
Kick and
blowout
A kick is defined as any undesirable flow of formation
fluids from the reservoir to the wellbore, which occurs
as a result of a negative pressure differential across the
formation face . Its called (influx_gain_flow)
a blowout is the uncontrolled release of the fluid or gas,
gained through the kick
Among the most likely and recurring are:
 Low Density Drilling Fluid
 Abnormal Reservoir Pressure
 Swabbing
 Not Keeping the Hole Full on Trips
 Lost Circulation
1. Hydrostatic Pressure
All vertical columns of fluid exert hydrostatic pressure.
HP = MW x 0.052 x TVD
2. Formation pressure
is the pressure contained inside the rock pore spaces.
3. Fracture pressure
is the amount of borehole pressure that it takes to split
or fail a formation and it can find it by (leak off test)
Bottomhole Pressure
Bottomhole pressure is equal to the sum of all pressures acting in a
well.
BHP= HP + SP + APL
o Bottomhole pressure at static (Pump off )
BHP=HP
o Bottomhole pressure at dynamic (Pump on)
BHP=HP+APL
Equivalent Circulating Density (ECD)
ECD=
𝑨𝑷𝑳
𝟎.𝟎𝟓𝟐∗𝑻𝑽𝑫
+MW
Swab and Surge Pressures
 Swab pressure is the temporary
reduction in the bottomhole
pressure that results from the
upward movement of pipe in the
hole.
 Surge pressure is the opposite
effect,
whereby wellbore pressure is
temporarily increased as pipe is
run into the well.
Warning signs of kicks
1. Flow rate increase
2 . Pit volume increase
3. Flowing well with pumps off
4. Pump pressure decrease and pump stroke increase
5 . Improper hole fill - up on trips
6 . String weight change
7. Drilling break
8. Cut mud weight
9.Increased penetration rate
Flow check procedure
At the first indication of a kick
1. Stop drilling
2. Raise the bit off the bottom of the well ( to shut in the well )
3. Stop the pumps and check to see if there is a flow from the well
4. If the well does flow , close the BOP and shut in the well
5. Readings are taken to stabilize shut in drill pipe and casing pressures
6. Calculation are made to determine the density of the mud that will
be used to kill the well
7. Calculations are also made to determine the kick out , and to fill the
hole with new mud
If well flow confirmed , the well should be
closed in quickly after a kick has been detected
in order to : Or reasons for shutting in the well
.
a . Minimize the size of the influx into the wellbore .
b . Minimize the SICP .
c . Minimize the casing shoe pressure
d . Minimize chances of losses
The difference between the formation
pressure at the bottom of the well and the
hydrostatic pressure in the drillpipe.
Recorded when a well is shut in on a kick.
From the SIDPP, one can calculate the
increase in mud weight needed to kill the well.
1-Shut-in drillpipe pressure (SIDPP)
Shut-in pipe pressure
2-The shut-in casing pressure (SICP)
is a measure of the difference between the
formation pressure and the HSP in the
annulus when a kick occurs.
Well control system
Type of shut in well
1-Soft shut in mathod:
the choke line valves are opened to allow the well to flow through
the surface choke. After the preventers are sealed, the choke is
then closed to stop the flow. The ‘soft shut-in’ procedure gives the
well additional time to flow before shut-in
2-hard shut in mathod:the choke line valves on the drilling
spool are in the closed position while drilling and remain closed
until after the preventer is sealed and well shut-in.
1. Shut-in Procedure while Drilling
 SPACE OUT Pick up drill string and spot tool joint.
 SHUT DOWN Stop the mud pumps.
 SHUT IN Close the annular preventer or uppermost
pipe ram preventer. Confirm that the well is shut in
and flow has stopped. Open HCR valve.
2. Shut-In Procedure while Tripping
 Stab valve Install Full-Open Safety Valve (open position)
in drill string.Close Safety Valve.
 space out Spot tool joint.
 shut-in Close the annular preventer or uppermost pipe
ram preventer. Confirm that the well is shut-in and flow has
stopped. Open HCR valve.
Kill Weight Mud or Kill Drilling Fluid Density is the mud weight required to
balance formation pressure. The kill weight mud may be pumped into the well
at different time depending on kill methods (Driller’s method, Wait and
Weight)
Kill Weight Mud (KWM) = Current Mud Weight + (
SIDPP
0.052∗TVD
)
Kill mud
Driller’s mathod
 FIRST CIRCULATION
1. taken slow circulating rate pressure then calculate the pressure required on the Drill Pipe for
the first circulation of the well. (ICP = SCR + SIDPP)
2. Open the choke about one quarter, start the pump and break circulation; then bring the
pump up to the KILL RATE.
3. While the Driller is bringing the mud pump up to the KILL RATE, the choke operator should
operate the choke so as to keep the casing pressure at or near the SICP reading.
4. Once the pump is up to the KILL RATE, the choke operator should transfer his attention to the
Drill Pipe pressure gauge and adjust the choke to maintain the ICP on the drill pipe pressure
gauge.
5. The last step on well control driller’s method is helding the the ICP constant on the Drill Pipe
pressure gauge by adjusting the choke throughout the whole of the first circulation, until all
of the Kick fluid has been circulated out of the well. The pump rate must also be held
constant at the KILL RATE throughout this period.
6. Once the Kick is out of the hole, Shut the well in and mix up the kill mud weight required.
 Second Circulation
7. Once the Kill mud is ready, open the choke about one quarter, start the pump and break
circulation. Then bring the pump up to the Kill rate.
8. While the Driller is bringing the pump up to the Kill rate, the choke operator should operate
the choke so as to keep the casing pressure steady at the same pressure as when closed in.
9. While the Drill Pipe is being filled with heavy mud there are two options for keeping B.H.P.
constant, either keep the casing pressure constant or make out a graph going from I.C.P. to
F.C.P.
well control (IWCF)

More Related Content

What's hot

Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
AFATous
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
Mohamed Abdelshafy Abozeima
 
Well intervention
Well  interventionWell  intervention
Well intervention
Mohammed Ismail
 
Well control during drilling operations
Well control during drilling operationsWell control during drilling operations
Well control during drilling operations
ENOBAKHARE OSARUGUE
 
Well Control
Well ControlWell Control
Well Control
AAPG SU SC
 
well control (1)
 well control (1) well control (1)
well control (1)
Dr. Arzu Javadova
 
Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting
Bailey LeRoux
 
Production optimization using gas lift technique
Production optimization using gas lift techniqueProduction optimization using gas lift technique
Production optimization using gas lift technique
Jarjis Mohammed
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
amrhaggag
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling Operations
Tarek Saati
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
Dr. Arzu Javadova
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
Ogbarode Napoleon Ogbon
 
Tubing string
Tubing stringTubing string
Tubing string
Elsayed Amer
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
Elsayed Amer
 
04 gas lift_equipment
04 gas lift_equipment04 gas lift_equipment
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
Elsayed Amer
 
Well control system
Well control systemWell control system
Well control system
AshwaniSinha11
 
Casing design
Casing designCasing design
Casing design
SYED NAWAZ
 
One day gas lift system course
One day gas lift system course One day gas lift system course
One day gas lift system course
Giuseppe Moricca
 
12.6 Well Control.ppt
12.6 Well Control.ppt12.6 Well Control.ppt
12.6 Well Control.ppt
MustafaAbdelWahab3
 

What's hot (20)

Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
Well control during drilling operations
Well control during drilling operationsWell control during drilling operations
Well control during drilling operations
 
Well Control
Well ControlWell Control
Well Control
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting
 
Production optimization using gas lift technique
Production optimization using gas lift techniqueProduction optimization using gas lift technique
Production optimization using gas lift technique
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling Operations
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Tubing string
Tubing stringTubing string
Tubing string
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
04 gas lift_equipment
04 gas lift_equipment04 gas lift_equipment
04 gas lift_equipment
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Well control system
Well control systemWell control system
Well control system
 
Casing design
Casing designCasing design
Casing design
 
One day gas lift system course
One day gas lift system course One day gas lift system course
One day gas lift system course
 
12.6 Well Control.ppt
12.6 Well Control.ppt12.6 Well Control.ppt
12.6 Well Control.ppt
 

Similar to well control (IWCF)

عرض تقديمي1.pptx
عرض تقديمي1.pptxعرض تقديمي1.pptx
عرض تقديمي1.pptx
ssuser9a04f8
 
Well control and kicks presentation.pptx
Well control and kicks presentation.pptxWell control and kicks presentation.pptx
Well control and kicks presentation.pptx
OKORIE1
 
Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)
MEA. BENLARBI بن العربي محمد الأمين
 
Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)
MEA. BENLARBI بن العربي محمد الأمين
 
Control principles and procedures
Control principles and proceduresControl principles and procedures
Control principles and procedures
Raja Mohan Murugiah
 
Pressurized mud-balance2
Pressurized mud-balance2Pressurized mud-balance2
Pressurized mud-balance2
MohammedFouadAmeen
 
Well control 1)
Well control 1)Well control 1)
Well control 1)
AhmedQanbar
 
Programming in Petroleum Engineering Graduation Project 2020
Programming in Petroleum Engineering Graduation Project 2020Programming in Petroleum Engineering Graduation Project 2020
Programming in Petroleum Engineering Graduation Project 2020
Mahmoud Morsy
 
Well Control.pdf
Well Control.pdfWell Control.pdf
Well Control.pdf
FazalHamdan
 
Well Test Analysis
Well  Test AnalysisWell  Test Analysis
Well Test Analysis
MamunUrRashid909773
 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down Test
Mubarik Rao
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
Mubarik Rao
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
Htet Naing Htoo
 
B-Kick cause (2).ppt....well dreiling p R
B-Kick cause (2).ppt....well dreiling p RB-Kick cause (2).ppt....well dreiling p R
B-Kick cause (2).ppt....well dreiling p R
alshaterhussein788
 
How a Well is Drilled.pdf
How a Well is Drilled.pdfHow a Well is Drilled.pdf
How a Well is Drilled.pdf
AbdallahTayea99
 
Stuck up– packing and bridging dd
Stuck up– packing and bridging   ddStuck up– packing and bridging   dd
Stuck up– packing and bridging dd
Mohan Doshi
 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
Kamal Abdurahman
 
Kick t1
Kick t1Kick t1
Kick t1
Seham Jalal
 
Reservoir Rock Properties Laboratory Manual Exp (#4)
Reservoir Rock Properties Laboratory Manual Exp (#4)Reservoir Rock Properties Laboratory Manual Exp (#4)
Reservoir Rock Properties Laboratory Manual Exp (#4)
Muhammed Fuad Al-Barznji
 
Assignment 1 SOP (1)
Assignment 1 SOP (1)Assignment 1 SOP (1)
Assignment 1 SOP (1)
John Schnettler
 

Similar to well control (IWCF) (20)

عرض تقديمي1.pptx
عرض تقديمي1.pptxعرض تقديمي1.pptx
عرض تقديمي1.pptx
 
Well control and kicks presentation.pptx
Well control and kicks presentation.pptxWell control and kicks presentation.pptx
Well control and kicks presentation.pptx
 
Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)
 
Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)
 
Control principles and procedures
Control principles and proceduresControl principles and procedures
Control principles and procedures
 
Pressurized mud-balance2
Pressurized mud-balance2Pressurized mud-balance2
Pressurized mud-balance2
 
Well control 1)
Well control 1)Well control 1)
Well control 1)
 
Programming in Petroleum Engineering Graduation Project 2020
Programming in Petroleum Engineering Graduation Project 2020Programming in Petroleum Engineering Graduation Project 2020
Programming in Petroleum Engineering Graduation Project 2020
 
Well Control.pdf
Well Control.pdfWell Control.pdf
Well Control.pdf
 
Well Test Analysis
Well  Test AnalysisWell  Test Analysis
Well Test Analysis
 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down Test
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
 
B-Kick cause (2).ppt....well dreiling p R
B-Kick cause (2).ppt....well dreiling p RB-Kick cause (2).ppt....well dreiling p R
B-Kick cause (2).ppt....well dreiling p R
 
How a Well is Drilled.pdf
How a Well is Drilled.pdfHow a Well is Drilled.pdf
How a Well is Drilled.pdf
 
Stuck up– packing and bridging dd
Stuck up– packing and bridging   ddStuck up– packing and bridging   dd
Stuck up– packing and bridging dd
 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
 
Kick t1
Kick t1Kick t1
Kick t1
 
Reservoir Rock Properties Laboratory Manual Exp (#4)
Reservoir Rock Properties Laboratory Manual Exp (#4)Reservoir Rock Properties Laboratory Manual Exp (#4)
Reservoir Rock Properties Laboratory Manual Exp (#4)
 
Assignment 1 SOP (1)
Assignment 1 SOP (1)Assignment 1 SOP (1)
Assignment 1 SOP (1)
 

Recently uploaded

Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
yogita singh$A17
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
shourabjaat424
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
DharmaBanothu
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
AK47
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
kamka4105
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
nainakaoornoida
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
Ismail Sultan
 
Standards Method of Detailing Structural Concrete.pdf
Standards Method of Detailing Structural Concrete.pdfStandards Method of Detailing Structural Concrete.pdf
Standards Method of Detailing Structural Concrete.pdf
baoancons14
 
anatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptxanatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptx
ssusercf1619
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Poonam Singh
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
NaveenNaveen726446
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
Kamal Acharya
 
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
Ak47 Ak47
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
Guangdong Ctube Industry Co., Ltd.
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 

Recently uploaded (20)

Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
 
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
🔥Photo Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent Lucknow Escorts...
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 MinutesCall Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
Call Girls In Tiruppur 👯‍♀️ 7339748667 🔥 Free Home Delivery Within 30 Minutes
 
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
❣Independent Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai E...
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
CSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdfCSP_Study - Notes (Paul McNeill) 2017.pdf
CSP_Study - Notes (Paul McNeill) 2017.pdf
 
Standards Method of Detailing Structural Concrete.pdf
Standards Method of Detailing Structural Concrete.pdfStandards Method of Detailing Structural Concrete.pdf
Standards Method of Detailing Structural Concrete.pdf
 
anatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptxanatomy of space vehicle and aerospace structures.pptx
anatomy of space vehicle and aerospace structures.pptx
 
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
 
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptxMODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
MODULE 5 BIOLOGY FOR ENGINEERS TRENDS IN BIO ENGINEERING.pptx
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
Cricket management system ptoject report.pdf
Cricket management system ptoject report.pdfCricket management system ptoject report.pdf
Cricket management system ptoject report.pdf
 
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
High Profile Call Girls Ahmedabad 🔥 7737669865 🔥 Real Fun With Sexual Girl Av...
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 

well control (IWCF)

  • 1.
  • 2. Well control  Well-control means methods used to minimize the potential for the well to flow or kick and to maintain control of the well in the event of flow or a kick. Well-control applies to drilling, well- completion, well-workover. IWCF International Well Control Forum
  • 3. Kick and blowout A kick is defined as any undesirable flow of formation fluids from the reservoir to the wellbore, which occurs as a result of a negative pressure differential across the formation face . Its called (influx_gain_flow) a blowout is the uncontrolled release of the fluid or gas, gained through the kick Among the most likely and recurring are:  Low Density Drilling Fluid  Abnormal Reservoir Pressure  Swabbing  Not Keeping the Hole Full on Trips  Lost Circulation
  • 4. 1. Hydrostatic Pressure All vertical columns of fluid exert hydrostatic pressure. HP = MW x 0.052 x TVD 2. Formation pressure is the pressure contained inside the rock pore spaces. 3. Fracture pressure is the amount of borehole pressure that it takes to split or fail a formation and it can find it by (leak off test)
  • 5. Bottomhole Pressure Bottomhole pressure is equal to the sum of all pressures acting in a well. BHP= HP + SP + APL o Bottomhole pressure at static (Pump off ) BHP=HP o Bottomhole pressure at dynamic (Pump on) BHP=HP+APL Equivalent Circulating Density (ECD) ECD= 𝑨𝑷𝑳 𝟎.𝟎𝟓𝟐∗𝑻𝑽𝑫 +MW
  • 6. Swab and Surge Pressures  Swab pressure is the temporary reduction in the bottomhole pressure that results from the upward movement of pipe in the hole.  Surge pressure is the opposite effect, whereby wellbore pressure is temporarily increased as pipe is run into the well.
  • 7. Warning signs of kicks 1. Flow rate increase 2 . Pit volume increase 3. Flowing well with pumps off 4. Pump pressure decrease and pump stroke increase 5 . Improper hole fill - up on trips 6 . String weight change 7. Drilling break 8. Cut mud weight 9.Increased penetration rate
  • 8. Flow check procedure At the first indication of a kick 1. Stop drilling 2. Raise the bit off the bottom of the well ( to shut in the well ) 3. Stop the pumps and check to see if there is a flow from the well 4. If the well does flow , close the BOP and shut in the well 5. Readings are taken to stabilize shut in drill pipe and casing pressures 6. Calculation are made to determine the density of the mud that will be used to kill the well 7. Calculations are also made to determine the kick out , and to fill the hole with new mud
  • 9. If well flow confirmed , the well should be closed in quickly after a kick has been detected in order to : Or reasons for shutting in the well . a . Minimize the size of the influx into the wellbore . b . Minimize the SICP . c . Minimize the casing shoe pressure d . Minimize chances of losses
  • 10. The difference between the formation pressure at the bottom of the well and the hydrostatic pressure in the drillpipe. Recorded when a well is shut in on a kick. From the SIDPP, one can calculate the increase in mud weight needed to kill the well. 1-Shut-in drillpipe pressure (SIDPP) Shut-in pipe pressure 2-The shut-in casing pressure (SICP) is a measure of the difference between the formation pressure and the HSP in the annulus when a kick occurs.
  • 12. Type of shut in well 1-Soft shut in mathod: the choke line valves are opened to allow the well to flow through the surface choke. After the preventers are sealed, the choke is then closed to stop the flow. The ‘soft shut-in’ procedure gives the well additional time to flow before shut-in 2-hard shut in mathod:the choke line valves on the drilling spool are in the closed position while drilling and remain closed until after the preventer is sealed and well shut-in.
  • 13. 1. Shut-in Procedure while Drilling  SPACE OUT Pick up drill string and spot tool joint.  SHUT DOWN Stop the mud pumps.  SHUT IN Close the annular preventer or uppermost pipe ram preventer. Confirm that the well is shut in and flow has stopped. Open HCR valve. 2. Shut-In Procedure while Tripping  Stab valve Install Full-Open Safety Valve (open position) in drill string.Close Safety Valve.  space out Spot tool joint.  shut-in Close the annular preventer or uppermost pipe ram preventer. Confirm that the well is shut-in and flow has stopped. Open HCR valve.
  • 14. Kill Weight Mud or Kill Drilling Fluid Density is the mud weight required to balance formation pressure. The kill weight mud may be pumped into the well at different time depending on kill methods (Driller’s method, Wait and Weight) Kill Weight Mud (KWM) = Current Mud Weight + ( SIDPP 0.052∗TVD ) Kill mud
  • 15. Driller’s mathod  FIRST CIRCULATION 1. taken slow circulating rate pressure then calculate the pressure required on the Drill Pipe for the first circulation of the well. (ICP = SCR + SIDPP) 2. Open the choke about one quarter, start the pump and break circulation; then bring the pump up to the KILL RATE. 3. While the Driller is bringing the mud pump up to the KILL RATE, the choke operator should operate the choke so as to keep the casing pressure at or near the SICP reading. 4. Once the pump is up to the KILL RATE, the choke operator should transfer his attention to the Drill Pipe pressure gauge and adjust the choke to maintain the ICP on the drill pipe pressure gauge. 5. The last step on well control driller’s method is helding the the ICP constant on the Drill Pipe pressure gauge by adjusting the choke throughout the whole of the first circulation, until all of the Kick fluid has been circulated out of the well. The pump rate must also be held constant at the KILL RATE throughout this period. 6. Once the Kick is out of the hole, Shut the well in and mix up the kill mud weight required.  Second Circulation 7. Once the Kill mud is ready, open the choke about one quarter, start the pump and break circulation. Then bring the pump up to the Kill rate. 8. While the Driller is bringing the pump up to the Kill rate, the choke operator should operate the choke so as to keep the casing pressure steady at the same pressure as when closed in. 9. While the Drill Pipe is being filled with heavy mud there are two options for keeping B.H.P. constant, either keep the casing pressure constant or make out a graph going from I.C.P. to F.C.P.
  翻译: