Design, Testing, and Use of an Innovative Prestress Concrete Pile Joint
Long Pile Handling  ,[object Object],[object Object],[object Object]
Driving Long Piles ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Up to 65 ft-long pile segments: (4 Fork-truck and spreader for unloading & staging Spliced-Pile Alternative
Spliced-Pile Alternative ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Emeca Pile Joint  Male Stud Female Socket Locking pin  hole Cover Plate Reinforcing
Emeca Pile Joint  Automated Robotic Fabrication
Tension  Limit States 3. & 7.:   Weld rupture at reinforcing/locking mechanism interface Note:  Welds are designed to develop reinforcing Butt-Joint at female socket Lap-Joint at Male Stud
Structural Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Compression  Compression is transferred  directly through bearing of faying  surfaces Assembly Diagram of Emeca Joint
Shear  ,[object Object],[object Object],Shear failure plane
Tension  Tensile Limit States 1.&9.  Transfer tensile force from  prestress to mild reinforcing  2.&8.  Tensile yield of mild reinforcing 3.  Weld rupture at female socket  4.  Tensile rupture of female socket 5.  Shear rupture of pin 6.  Tensile rupture male stud 7.  Weld rupture at male stud
Tension  Limit States 1 & 2: CASE 2:  L embed.  <   L d  for strand: * Bond Limit (Strand) OR Mild Reinforcing Steel Limit * Ref: ACI 12.9.1  CASE 1:  L embed.  ≥   L d  for strand: Rupture Limit (Strand) OR Mild Reinforcing Steel Limit
Tension  In General: ,[object Object],[object Object],[object Object],[object Object]
Auxiliary Reinforcing Auxiliary Reinforcing Auxiliary Reinforcing
Tension  Summary: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Bending Analysis at Joint Critical Sections: S2-Prestress Section S1-Section at Joint
Bending Analysis at Joint S1- Reinforced Section (12-in. pile)
Bending Analysis at Joint S1- Reinforced Section (12-in. pile) M n  = 41.7 ft-k
Bending Analysis at Joint max. stress in strand = f ps  = 173 ksi  S2- Prestress Section (12-in. pile)
Bending Analysis at Joint S2- Prestress Section (12-in. pile) PCI  Figure 4.12.4 (p. 4-122) 30 in. 173 ksi
Bending Analysis at Joint f ps  = 173 ksi M n  = 33.5 ft-k S2- Prestress Section (12-in. pile)
Analysis at Joint  Summary: Unreduced Capacities of Pile at Joint 12-in.  Pile Splice 14-in.  Pile Splice Limit Tension - T n 95.6 kips 150 kips Yield of Mild Reinforcing Bending  - M n 33.5 ft-kips 55.2 ft-kips Strand Slip reinforcing added -  M n 41.5 ft-kips 73.7 ft-kips Yield of Mild Reinforcing Shear - V n 19.0 kips 26.4 kips Shear Capacity of Pile
Interaction of 12-inch Piles vs. Emeca Joint Cross Section
Interaction of 14-inch Piles vs. Emeca Joint Cross Section
Bending Tests – University of South Carolina Test Set-up: Recorded Data: - Load - Displacement at ¼ points - Rotation at Joint Loading Protocol: - Quasi-static loading
Bending Tests – University of South Carolina Test Specimens (12 Total): I. Splice only (6) 28-ft. long piles, spliced at midpoint  (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) II. Splices with “Auxiliary Reinforcing” (6) 28-ft. long piles, spliced at midpoint  (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) Auxiliary reinforcing – (4) #5’s x 60”
Bending Tests Results: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Bending Tests  Moment Strength Results  (ft-kips): M n ′  –Calculated theoretical moment using tested material strength: F y  = 73 ksi  f c ′ = 7,000 psi Theoretical  Test Results Mean Low M n M n ′ Mean Low M n ′ M n ′ Splice Only 12 in. 37 47 53.6 52.7 114% 111% 14 in. 61 79 85.4 77 108% 97% Auxiliary Reinforcing Added 12 in. 37 53 63 59.7 119% 112% 14 in. 67 93 99.3 90.5 107% 97%
Recommendations for Use ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],General:
[object Object],[object Object],[object Object],[object Object],Emeca Pile Joint  PDCA  National Project of the Year, 2008
Casting Splices ,[object Object],[object Object],[object Object],[object Object],[object Object]
Casting Splices ,[object Object],[object Object],[object Object]
Casting Splices ,[object Object],[object Object],[object Object]
Casting Splices ,[object Object],[object Object],[object Object]
Installation  ,[object Object],[object Object],[object Object]
Installation  ,[object Object],[object Object],[object Object]
Projects  Owner:  Vitol Oil Company Contractor:  Sun Marine Project Status: Complete Emeca Product:  12-in. Pile Joints Notes:  6300, 100-ft-long piles installed Vitol Oil Tank Farm, Seaport Canaveral, FL
Projects  Owner:  Northrup Grumman Contractor:  Ford Pile Foundations Project Status: Active Emeca Product:  12-in. Pile Joints Notes:  Piles and splices designed to resist hydrostatic tension Northrup Grumman Naval Shipyard - Dry Dock Facility, Newport News, VA
Projects  Contractor:  Junttapojat Oy Emeca Product:  14-in. Pile Joints Notes:  -  8000 Emeca Pile Joints used on project -  656,000 total pile length  -  Up to 105 foot long piles driven in 3 sections -  Battered piles driven at 4V:1H Vousaari Harbor Project for the Port of Helsinki, Helsinki, Finland
Projects  Contractor:  Aarsleff Piling Status:  Complete Emeca Product:  16-in. Pile Joints Notes:  50 wind turbine foundations constructed  using 85-ft-long,16-in. spliced piles Wind Farm, Ransonmoor, Finland
Projects  Contractor:  Kiewit Construction Project Status:  Active Emeca Product:  14-in. Rock Points customized for 30-in.-square concrete piles  Notes:  Piles driven through concrete mooring anchors at approximately 30-ft. Brayton Point Cooling Tower, Summerset, MA
Projects  Anacostia Naval Station Drainage Phase IV, Washington, DC Owner: NAVFAC Project Status:  Completed August 2008 General Contractor:  Corinthian Contractors Pile Contractor:  Coastal Pile Driving, Inc. Property Manager:  Whiting-Turner Contracting Product:  12-in. Pile Joints Notes:  Up to 83-ft-long spliced piles

More Related Content

What's hot

Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
Yash Patel
 
Singly R.C beam
Singly R.C beamSingly R.C beam
Singly R.C beam
Darshil Vekaria
 
Flanged beams analysis - type 1
Flanged beams   analysis - type 1Flanged beams   analysis - type 1
Flanged beams analysis - type 1
Selvakumar Palanisamy
 
Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )
Digvijaysinh Gohil
 
Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHOD
yasir Khan
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system
9033124117
 
Cotter joint
Cotter jointCotter joint
Cotter joint
Digvijaysinh Gohil
 
Tension members
Tension membersTension members
Tension members
sky hawk
 
Structural engineering basics
Structural engineering basicsStructural engineering basics
Structural engineering basics
Ram N
 
Calculation of dead load
Calculation of dead loadCalculation of dead load
Calculation of dead load
Ridhdhi Gandhi
 
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
Hossam Shafiq II
 
Connections
Connections Connections
Connections
kamariya keyur
 
Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)
Vikas Kumar Kushwaha
 
Buckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structuresBuckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structures
Mahdi Damghani
 
Compression member
Compression memberCompression member
Compression member
kamariya keyur
 
Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )
Digvijaysinh Gohil
 
Design of short circular axially loaded column
Design of short circular axially loaded columnDesign of short circular axially loaded column
Design of short circular axially loaded column
gecnads
 
Beam buckling
Beam bucklingBeam buckling
Beam buckling
Mohanad Habh
 
design of knuckle joint may 2020
design of knuckle joint may 2020design of knuckle joint may 2020
design of knuckle joint may 2020
Gaurav Mistry
 
DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020
Gaurav Mistry
 

What's hot (20)

Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Singly R.C beam
Singly R.C beamSingly R.C beam
Singly R.C beam
 
Flanged beams analysis - type 1
Flanged beams   analysis - type 1Flanged beams   analysis - type 1
Flanged beams analysis - type 1
 
Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )Welded joints (machine design & industrial drafting )
Welded joints (machine design & industrial drafting )
 
Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHOD
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system
 
Cotter joint
Cotter jointCotter joint
Cotter joint
 
Tension members
Tension membersTension members
Tension members
 
Structural engineering basics
Structural engineering basicsStructural engineering basics
Structural engineering basics
 
Calculation of dead load
Calculation of dead loadCalculation of dead load
Calculation of dead load
 
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
07-Strength of Bolted Connections (Steel Structural Design & Prof. Shehab Mou...
 
Connections
Connections Connections
Connections
 
Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)
 
Buckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structuresBuckling and tension field beam for aerospace structures
Buckling and tension field beam for aerospace structures
 
Compression member
Compression memberCompression member
Compression member
 
Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )Design of knuckle joint (machine design & industrial drafting )
Design of knuckle joint (machine design & industrial drafting )
 
Design of short circular axially loaded column
Design of short circular axially loaded columnDesign of short circular axially loaded column
Design of short circular axially loaded column
 
Beam buckling
Beam bucklingBeam buckling
Beam buckling
 
design of knuckle joint may 2020
design of knuckle joint may 2020design of knuckle joint may 2020
design of knuckle joint may 2020
 
DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020DME intro and design of cotter joint may 2020
DME intro and design of cotter joint may 2020
 

Similar to Emeca SPE-USA Pile Joint Product

IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET Journal
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)
RAHMATULLAH MERCY FEAT
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
 
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET Journal
 
Multi-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener DesignMulti-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener Design
Mark Brooks
 
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOADBriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
michael mabrouk
 
Design of Simple Machine Parts
Design of Simple Machine PartsDesign of Simple Machine Parts
Design of Simple Machine Parts
Mahesh Shinde
 
Design mini-project for TY mechanical students
Design mini-project for TY mechanical studentsDesign mini-project for TY mechanical students
Design mini-project for TY mechanical students
Ravindra Shinde
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Rajesh Prasad
 
Deaton aci-fall2010
Deaton aci-fall2010Deaton aci-fall2010
Deaton aci-fall2010
bendeaton
 
UPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical InvestigationsUPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical Investigations
Petrus Cristian
 
Screw piles
Screw pilesScrew piles
Screw piles
Rizwan Khurram
 
Caeser II manual
Caeser II manualCaeser II manual
Caeser II manual
Somesh Angle
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure Accumulator
IRJET Journal
 
9-24-CX-Rev-ASME presentation-final
9-24-CX-Rev-ASME presentation-final9-24-CX-Rev-ASME presentation-final
9-24-CX-Rev-ASME presentation-final
Xiao CHEN
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog
Latifs Chile
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog
Latifs Chile
 
Prestressed pipes,tanks,poles
Prestressed pipes,tanks,polesPrestressed pipes,tanks,poles
Prestressed pipes,tanks,poles
PraveenKumar Shanmugam
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
Path Marketing Inc.
 
Coupling and flange coupling and its design
Coupling and flange coupling and its designCoupling and flange coupling and its design
Coupling and flange coupling and its design
Rupesh Kumar
 

Similar to Emeca SPE-USA Pile Joint Product (20)

IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
 
Multi-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener DesignMulti-StageSheet Metal Fromed Bolted Fastener Design
Multi-StageSheet Metal Fromed Bolted Fastener Design
 
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOADBriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
BriefTHE EFFECT OF CREATED OPENING UNDER WORKING LOAD
 
Design of Simple Machine Parts
Design of Simple Machine PartsDesign of Simple Machine Parts
Design of Simple Machine Parts
 
Design mini-project for TY mechanical students
Design mini-project for TY mechanical studentsDesign mini-project for TY mechanical students
Design mini-project for TY mechanical students
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
Deaton aci-fall2010
Deaton aci-fall2010Deaton aci-fall2010
Deaton aci-fall2010
 
UPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical InvestigationsUPT - Cristian PETRUS - Analytical and Numerical Investigations
UPT - Cristian PETRUS - Analytical and Numerical Investigations
 
Screw piles
Screw pilesScrew piles
Screw piles
 
Caeser II manual
Caeser II manualCaeser II manual
Caeser II manual
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure Accumulator
 
9-24-CX-Rev-ASME presentation-final
9-24-CX-Rev-ASME presentation-final9-24-CX-Rev-ASME presentation-final
9-24-CX-Rev-ASME presentation-final
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog
 
1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog 1.4 latifs 17 dramix sog
1.4 latifs 17 dramix sog
 
Prestressed pipes,tanks,poles
Prestressed pipes,tanks,polesPrestressed pipes,tanks,poles
Prestressed pipes,tanks,poles
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
 
Coupling and flange coupling and its design
Coupling and flange coupling and its designCoupling and flange coupling and its design
Coupling and flange coupling and its design
 

Recently uploaded

QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
zjhamm304
 
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdfLee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
leebarnesutopia
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
UiPathCommunity
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving
 
So You've Lost Quorum: Lessons From Accidental Downtime
So You've Lost Quorum: Lessons From Accidental DowntimeSo You've Lost Quorum: Lessons From Accidental Downtime
So You've Lost Quorum: Lessons From Accidental Downtime
ScyllaDB
 
Cyber Recovery Wargame
Cyber Recovery WargameCyber Recovery Wargame
Cyber Recovery Wargame
Databarracks
 
From NCSA to the National Research Platform
From NCSA to the National Research PlatformFrom NCSA to the National Research Platform
From NCSA to the National Research Platform
Larry Smarr
 
Tracking Millions of Heartbeats on Zee's OTT Platform
Tracking Millions of Heartbeats on Zee's OTT PlatformTracking Millions of Heartbeats on Zee's OTT Platform
Tracking Millions of Heartbeats on Zee's OTT Platform
ScyllaDB
 
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham HillinQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
LizaNolte
 
From Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMsFrom Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMs
Sease
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
ScyllaDB
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
Mydbops
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
christinelarrosa
 
Introduction to ThousandEyes AMER Webinar
Introduction  to ThousandEyes AMER WebinarIntroduction  to ThousandEyes AMER Webinar
Introduction to ThousandEyes AMER Webinar
ThousandEyes
 
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google CloudRadically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
ScyllaDB
 
A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
ScyllaDB
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
christinelarrosa
 
Multivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back againMultivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back again
Kieran Kunhya
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
UiPathCommunity
 

Recently uploaded (20)

QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
 
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdfLee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
 
So You've Lost Quorum: Lessons From Accidental Downtime
So You've Lost Quorum: Lessons From Accidental DowntimeSo You've Lost Quorum: Lessons From Accidental Downtime
So You've Lost Quorum: Lessons From Accidental Downtime
 
Cyber Recovery Wargame
Cyber Recovery WargameCyber Recovery Wargame
Cyber Recovery Wargame
 
From NCSA to the National Research Platform
From NCSA to the National Research PlatformFrom NCSA to the National Research Platform
From NCSA to the National Research Platform
 
Tracking Millions of Heartbeats on Zee's OTT Platform
Tracking Millions of Heartbeats on Zee's OTT PlatformTracking Millions of Heartbeats on Zee's OTT Platform
Tracking Millions of Heartbeats on Zee's OTT Platform
 
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham HillinQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
 
From Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMsFrom Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMs
 
CTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database MigrationCTO Insights: Steering a High-Stakes Database Migration
CTO Insights: Steering a High-Stakes Database Migration
 
ScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDCScyllaDB Real-Time Event Processing with CDC
ScyllaDB Real-Time Event Processing with CDC
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
 
Introduction to ThousandEyes AMER Webinar
Introduction  to ThousandEyes AMER WebinarIntroduction  to ThousandEyes AMER Webinar
Introduction to ThousandEyes AMER Webinar
 
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google CloudRadically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
Radically Outperforming DynamoDB @ Digital Turbine with SADA and Google Cloud
 
A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
 
Multivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back againMultivendor cloud production with VSF TR-11 - there and back again
Multivendor cloud production with VSF TR-11 - there and back again
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
 

Emeca SPE-USA Pile Joint Product

  • 1. Design, Testing, and Use of an Innovative Prestress Concrete Pile Joint
  • 2.
  • 3.
  • 4. Up to 65 ft-long pile segments: (4 Fork-truck and spreader for unloading & staging Spliced-Pile Alternative
  • 5.
  • 6. Emeca Pile Joint Male Stud Female Socket Locking pin hole Cover Plate Reinforcing
  • 7. Emeca Pile Joint Automated Robotic Fabrication
  • 8. Tension Limit States 3. & 7.: Weld rupture at reinforcing/locking mechanism interface Note: Welds are designed to develop reinforcing Butt-Joint at female socket Lap-Joint at Male Stud
  • 9.
  • 10. Compression Compression is transferred directly through bearing of faying surfaces Assembly Diagram of Emeca Joint
  • 11.
  • 12. Tension Tensile Limit States 1.&9. Transfer tensile force from prestress to mild reinforcing 2.&8. Tensile yield of mild reinforcing 3. Weld rupture at female socket 4. Tensile rupture of female socket 5. Shear rupture of pin 6. Tensile rupture male stud 7. Weld rupture at male stud
  • 13. Tension Limit States 1 & 2: CASE 2: L embed. < L d for strand: * Bond Limit (Strand) OR Mild Reinforcing Steel Limit * Ref: ACI 12.9.1 CASE 1: L embed. ≥ L d for strand: Rupture Limit (Strand) OR Mild Reinforcing Steel Limit
  • 14.
  • 15. Auxiliary Reinforcing Auxiliary Reinforcing Auxiliary Reinforcing
  • 16.
  • 17. Bending Analysis at Joint Critical Sections: S2-Prestress Section S1-Section at Joint
  • 18. Bending Analysis at Joint S1- Reinforced Section (12-in. pile)
  • 19. Bending Analysis at Joint S1- Reinforced Section (12-in. pile) M n = 41.7 ft-k
  • 20. Bending Analysis at Joint max. stress in strand = f ps = 173 ksi S2- Prestress Section (12-in. pile)
  • 21. Bending Analysis at Joint S2- Prestress Section (12-in. pile) PCI Figure 4.12.4 (p. 4-122) 30 in. 173 ksi
  • 22. Bending Analysis at Joint f ps = 173 ksi M n = 33.5 ft-k S2- Prestress Section (12-in. pile)
  • 23. Analysis at Joint Summary: Unreduced Capacities of Pile at Joint 12-in. Pile Splice 14-in. Pile Splice Limit Tension - T n 95.6 kips 150 kips Yield of Mild Reinforcing Bending - M n 33.5 ft-kips 55.2 ft-kips Strand Slip reinforcing added - M n 41.5 ft-kips 73.7 ft-kips Yield of Mild Reinforcing Shear - V n 19.0 kips 26.4 kips Shear Capacity of Pile
  • 24. Interaction of 12-inch Piles vs. Emeca Joint Cross Section
  • 25. Interaction of 14-inch Piles vs. Emeca Joint Cross Section
  • 26. Bending Tests – University of South Carolina Test Set-up: Recorded Data: - Load - Displacement at ¼ points - Rotation at Joint Loading Protocol: - Quasi-static loading
  • 27. Bending Tests – University of South Carolina Test Specimens (12 Total): I. Splice only (6) 28-ft. long piles, spliced at midpoint (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) II. Splices with “Auxiliary Reinforcing” (6) 28-ft. long piles, spliced at midpoint (3) 14-in. Specimens (6 strand) (3) 12-in. Specimens (4 strand) Auxiliary reinforcing – (4) #5’s x 60”
  • 28.
  • 29. Bending Tests Moment Strength Results (ft-kips): M n ′ –Calculated theoretical moment using tested material strength: F y = 73 ksi f c ′ = 7,000 psi Theoretical Test Results Mean Low M n M n ′ Mean Low M n ′ M n ′ Splice Only 12 in. 37 47 53.6 52.7 114% 111% 14 in. 61 79 85.4 77 108% 97% Auxiliary Reinforcing Added 12 in. 37 53 63 59.7 119% 112% 14 in. 67 93 99.3 90.5 107% 97%
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. Projects Owner: Vitol Oil Company Contractor: Sun Marine Project Status: Complete Emeca Product: 12-in. Pile Joints Notes: 6300, 100-ft-long piles installed Vitol Oil Tank Farm, Seaport Canaveral, FL
  • 39. Projects Owner: Northrup Grumman Contractor: Ford Pile Foundations Project Status: Active Emeca Product: 12-in. Pile Joints Notes: Piles and splices designed to resist hydrostatic tension Northrup Grumman Naval Shipyard - Dry Dock Facility, Newport News, VA
  • 40. Projects Contractor: Junttapojat Oy Emeca Product: 14-in. Pile Joints Notes: - 8000 Emeca Pile Joints used on project - 656,000 total pile length - Up to 105 foot long piles driven in 3 sections - Battered piles driven at 4V:1H Vousaari Harbor Project for the Port of Helsinki, Helsinki, Finland
  • 41. Projects Contractor: Aarsleff Piling Status: Complete Emeca Product: 16-in. Pile Joints Notes: 50 wind turbine foundations constructed using 85-ft-long,16-in. spliced piles Wind Farm, Ransonmoor, Finland
  • 42. Projects Contractor: Kiewit Construction Project Status: Active Emeca Product: 14-in. Rock Points customized for 30-in.-square concrete piles Notes: Piles driven through concrete mooring anchors at approximately 30-ft. Brayton Point Cooling Tower, Summerset, MA
  • 43. Projects Anacostia Naval Station Drainage Phase IV, Washington, DC Owner: NAVFAC Project Status: Completed August 2008 General Contractor: Corinthian Contractors Pile Contractor: Coastal Pile Driving, Inc. Property Manager: Whiting-Turner Contracting Product: 12-in. Pile Joints Notes: Up to 83-ft-long spliced piles

Editor's Notes

  1. Photo of piles segments being joined in Finland The splice component is identical: -simplifies casting and storage of piles Discuss anatomy of splice
  2. Photo of piles segments being joined in Finland The splice component is identical: -simplifies casting and storage of piles Discuss anatomy of splice
  翻译: