Carry Out General Demolition of Minor Building Structures
© Australian National Training Authority 50
Carrying Out General
Demolition of Minor
Building Structures
CPCCCA3001
Course Notes
© Australian National Training Authority 73
Site Investigation
An inspection of the site may also provide some valuable information when planning
ahead. You may find that a site investigation will confirm the information gathered in your
structure investigation and from plans/sketches and drawings initially consulted.
An investigation of the site should identify and or confirm:
(a) The type location and extent of underground services (eg. pipes, cables etc).
(b) Underground structures - tanks, basement, cellar, retaining structures.
(c) Soil/ground stability
Remember you may need to provide a stable base for some heavy machinery such
as a crane or excavator.
Site sketches/drawings, together with some history about the site from the client. may
help to identify where unstable areas are most likely to be located.
© Australian National Training Authority 74
(d) Location of hazardous materials
Example: Old waste disposal sites and leaking pipes or tanks, may contaminate the
soil
(e) The condition of neighboring buildings or structures.
Depending on the method of demolition chosen, adjacent buildings/structures may be
damaged due to the strong vibrational energy generated by some techniques.
© Australian National Training Authority 75
(f) The requirements for public protection and security.
(refer to Public Protection below)
Look out for any areas of the site which are near public footpaths, roads and bridges
and make sure that people cannot readily wander on to the site.
Public Protection
The site and building/structure investigations should have provided information in relation
to the degree of risk presented to the public and neighbouring building/roadways etc.
Therefore, necessitating the need for some type of protective measures to be put in place
to prevent them being injured.
Consider the following options:
(a) street closures
(b) security fences
(c) hoardings: must be at least 2.4m high and should be well covered with sheeting or lining boards to
DETOUR
© Australian National Training Authority 76
catch falling debris
(d) scaffolding
(e) barricades
(f) shields
(g) bunting
(h) restricted work
times
(i) warning signs - “DANGER - unauthorised entry not permitted” and ‘Danger Demolition
Work in Progress’
(j) other means of overhead protection (eg. protective fans)
Fire Protection
When planning to carry out demolition work, you must remember that it is still possible for
a fire to start on site and so you need to be prepared for a fire if one should occur. If a fire
hydrant service, fire hose reel system or sprinkler system are present in a building, they
should remain where they can easily be accessed and used if required.
Where it is not possible to have these particular fire protection systems in place, an
alternative means of fire protection should be made available, for example portable fire
extinguishers.
< Safe Work Procedures for Fire Protection
During renovation work all types of fire protection should be serviced and
maintained as appropriate so that you can be sure that they are always in good
working order.
© Australian National Training Authority 77
Apart from having fire protection systems in place, your work plan should specify
what safe work practices will be followed to prevent fire in the first instance. These
may include:
disconnection of power/electricity where not required;
disconnection of gas lines where not required;
clean out (purge) any pipes, tanks or vessels that contain flammable liquids or
gases;
ventilate confined spaces;
no fires to be lit on site; and
use spark proof tools/equipment/machinery.
Welding and metal cutting operations are a fire hazard. Precautions to take:
Spray the area with water
Use fireproof welding partitions
Keep a fire extinguisher handy
Spread damp sand
Do not accumulate combustible debris
Keep a fire blanket handy
First Aid
Steps should be taken to ensure that first aid facilities, equipment and personnel are
available should they be needed.
© Australian National Training Authority 79
Hazard Identification
WARNING
Other than physical hazards such as a collapsing wall or a falling object, demolition
workers may often be exposed to other potential hazards. You need to be aware of what
these may be so that you can prepare ahead to make sure that everything is protected.
Hazards should be identified during the planning stage and procedures to overcome
exposure to hazards should be included in the work plan.
CHEMICALS PHYSICAL BIOLOGICAL
dust
gases and fumes
solids and liquids
cold and heat
confined spaces
radiation
noise
vibration
vermin/rodents
insects
micro-organisms
MISCELLANEOUS
Manual Handling
© Australian National Training Authority 80
< Contributing Factors
Here are some contributing factors which could increase risk:
fatigue
alcohol
ill-health
inadequate training
stress
Hazards of Particular Concern
Asbestos and lead (as discussed above)
WARNING
Hazardous materials
should be removed by
suitably qualified persons
prior to demolition taking
place. This will need to be
included in your work
plan.

More Related Content

What's hot

Fixing mouldings Powerpoint
Fixing mouldings PowerpointFixing mouldings Powerpoint
Fixing mouldings Powerpoint
Canberra Institute of technology
 
Stegbar standard size and range brochure
Stegbar standard size and range brochureStegbar standard size and range brochure
Stegbar standard size and range brochure
Canberra Institute of technology
 
SmartJoist-Design-Guide-2021
SmartJoist-Design-Guide-2021SmartJoist-Design-Guide-2021
SmartJoist-Design-Guide-2021
Canberra Institute of technology
 
Fixing linings
Fixing liningsFixing linings
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
Canberra Institute of technology
 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
Canberra Institute of technology
 
ENDUROFLOOR Installation Manual
ENDUROFLOOR Installation ManualENDUROFLOOR Installation Manual
ENDUROFLOOR Installation Manual
Folk James
 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
Canberra Institute of technology
 
Set of Plans for Read and Interpret Plans.pdf
Set of Plans for Read and Interpret Plans.pdfSet of Plans for Read and Interpret Plans.pdf
Set of Plans for Read and Interpret Plans.pdf
Canberra Institute of technology
 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
Canberra Institute of technology
 
Stair Workbook.pdf
Stair Workbook.pdfStair Workbook.pdf
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
Canberra Institute of technology
 
Form Release Agent SDS
Form Release Agent SDSForm Release Agent SDS
Form Release Agent SDS
Canberra Institute of technology
 
Bonner House - Set.pdf
Bonner House - Set.pdfBonner House - Set.pdf
Bonner House - Set.pdf
Canberra Institute of technology
 
Gyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdfGyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdf
Canberra Institute of technology
 
Skillion roof with scotch valley
Skillion roof with scotch valleySkillion roof with scotch valley
Skillion roof with scotch valley
Folk James
 
Trench Mesh Quantities Calculations
Trench Mesh Quantities CalculationsTrench Mesh Quantities Calculations
Trench Mesh Quantities Calculations
Canberra Institute of technology
 
Hansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdfHansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdf
Folk James
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
Canberra Institute of technology
 
Scaffold safe work method statement
Scaffold safe work method statementScaffold safe work method statement
Scaffold safe work method statement
Patsifit Construction Sdn.Bhd
 

What's hot (20)

Fixing mouldings Powerpoint
Fixing mouldings PowerpointFixing mouldings Powerpoint
Fixing mouldings Powerpoint
 
Stegbar standard size and range brochure
Stegbar standard size and range brochureStegbar standard size and range brochure
Stegbar standard size and range brochure
 
SmartJoist-Design-Guide-2021
SmartJoist-Design-Guide-2021SmartJoist-Design-Guide-2021
SmartJoist-Design-Guide-2021
 
Fixing linings
Fixing liningsFixing linings
Fixing linings
 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
 
ENDUROFLOOR Installation Manual
ENDUROFLOOR Installation ManualENDUROFLOOR Installation Manual
ENDUROFLOOR Installation Manual
 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
 
Set of Plans for Read and Interpret Plans.pdf
Set of Plans for Read and Interpret Plans.pdfSet of Plans for Read and Interpret Plans.pdf
Set of Plans for Read and Interpret Plans.pdf
 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
 
Stair Workbook.pdf
Stair Workbook.pdfStair Workbook.pdf
Stair Workbook.pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Form Release Agent SDS
Form Release Agent SDSForm Release Agent SDS
Form Release Agent SDS
 
Bonner House - Set.pdf
Bonner House - Set.pdfBonner House - Set.pdf
Bonner House - Set.pdf
 
Gyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdfGyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdf
 
Skillion roof with scotch valley
Skillion roof with scotch valleySkillion roof with scotch valley
Skillion roof with scotch valley
 
Trench Mesh Quantities Calculations
Trench Mesh Quantities CalculationsTrench Mesh Quantities Calculations
Trench Mesh Quantities Calculations
 
Hansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdfHansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdf
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Scaffold safe work method statement
Scaffold safe work method statementScaffold safe work method statement
Scaffold safe work method statement
 

Similar to Dempolition notes Part 2.pdf

Igc 2 imp qa
Igc 2 imp qaIgc 2 imp qa
Igc 2 imp qa
Faizan Khan
 
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Muizz Anibire
 
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Muizz Anibire
 
Demolition Safety 2015
Demolition Safety 2015Demolition Safety 2015
Demolition Safety 2015
John Newquist
 
Construction safety session 1 (new)
Construction safety session 1 (new)Construction safety session 1 (new)
Construction safety session 1 (new)
VancityInstitute
 
OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolition
Hni Amiera
 
Excavation safety
Excavation safetyExcavation safety
DEMOLITION OF BUILDING
DEMOLITION OF BUILDINGDEMOLITION OF BUILDING
DEMOLITION OF BUILDING
shubhajitdua
 
EXCAVATION AND PREVENTION OF HAZARDS.pptx
EXCAVATION AND PREVENTION OF HAZARDS.pptxEXCAVATION AND PREVENTION OF HAZARDS.pptx
EXCAVATION AND PREVENTION OF HAZARDS.pptx
EricShawd
 
Techniques behind demolition of structures
Techniques behind demolition of structuresTechniques behind demolition of structures
Techniques behind demolition of structures
Saintgits College of Engineering
 
s1
s1s1
Safety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanizationSafety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanization
sneha tiwari
 
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfUNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
PinakRay1
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
ijceronline
 
NIOSH - Preventing Worker Deaths from Trench Cave-ins
NIOSH - Preventing Worker Deaths from Trench Cave-ins NIOSH - Preventing Worker Deaths from Trench Cave-ins
NIOSH - Preventing Worker Deaths from Trench Cave-ins
Robson Peixoto
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
jaimin1702
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 
sci.pptx
sci.pptxsci.pptx
sci.pptx
Krishna Yadav
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
zul husni
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
AnatoliZ
 

Similar to Dempolition notes Part 2.pdf (20)

Igc 2 imp qa
Igc 2 imp qaIgc 2 imp qa
Igc 2 imp qa
 
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
 
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
 
Demolition Safety 2015
Demolition Safety 2015Demolition Safety 2015
Demolition Safety 2015
 
Construction safety session 1 (new)
Construction safety session 1 (new)Construction safety session 1 (new)
Construction safety session 1 (new)
 
OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolition
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
DEMOLITION OF BUILDING
DEMOLITION OF BUILDINGDEMOLITION OF BUILDING
DEMOLITION OF BUILDING
 
EXCAVATION AND PREVENTION OF HAZARDS.pptx
EXCAVATION AND PREVENTION OF HAZARDS.pptxEXCAVATION AND PREVENTION OF HAZARDS.pptx
EXCAVATION AND PREVENTION OF HAZARDS.pptx
 
Techniques behind demolition of structures
Techniques behind demolition of structuresTechniques behind demolition of structures
Techniques behind demolition of structures
 
s1
s1s1
s1
 
Safety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanizationSafety and envirnomental issues in mechanization
Safety and envirnomental issues in mechanization
 
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfUNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
 
NIOSH - Preventing Worker Deaths from Trench Cave-ins
NIOSH - Preventing Worker Deaths from Trench Cave-ins NIOSH - Preventing Worker Deaths from Trench Cave-ins
NIOSH - Preventing Worker Deaths from Trench Cave-ins
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
sci.pptx
sci.pptxsci.pptx
sci.pptx
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
 

More from Canberra Institute of technology

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Canberra Institute of technology
 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
Canberra Institute of technology
 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
Canberra Institute of technology
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
Canberra Institute of technology
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
Canberra Institute of technology
 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
Canberra Institute of technology
 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
Canberra Institute of technology
 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
Canberra Institute of technology
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Canberra Institute of technology
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
Canberra Institute of technology
 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
Canberra Institute of technology
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
Canberra Institute of technology
 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
Canberra Institute of technology
 
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
Canberra Institute of technology
 
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docxPractical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
Canberra Institute of technology
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
Canberra Institute of technology
 
Practical Assessment 2- Reinforcement
Practical Assessment 2- ReinforcementPractical Assessment 2- Reinforcement
Practical Assessment 2- Reinforcement
Canberra Institute of technology
 
Practical Assessment 1 - Reinforcement
Practical Assessment 1 - ReinforcementPractical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
Canberra Institute of technology
 
Code of practice - Construction work- Appendix C
Code of practice - Construction work- Appendix CCode of practice - Construction work- Appendix C
Code of practice - Construction work- Appendix C
Canberra Institute of technology
 
MSDS- Fibreglass composite reinforcement bar
MSDS- Fibreglass composite reinforcement barMSDS- Fibreglass composite reinforcement bar
MSDS- Fibreglass composite reinforcement bar
Canberra Institute of technology
 

More from Canberra Institute of technology (20)

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
 
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
 
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docxPractical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
 
Practical Assessment 2- Reinforcement
Practical Assessment 2- ReinforcementPractical Assessment 2- Reinforcement
Practical Assessment 2- Reinforcement
 
Practical Assessment 1 - Reinforcement
Practical Assessment 1 - ReinforcementPractical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
 
Code of practice - Construction work- Appendix C
Code of practice - Construction work- Appendix CCode of practice - Construction work- Appendix C
Code of practice - Construction work- Appendix C
 
MSDS- Fibreglass composite reinforcement bar
MSDS- Fibreglass composite reinforcement barMSDS- Fibreglass composite reinforcement bar
MSDS- Fibreglass composite reinforcement bar
 

Recently uploaded

What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17
Celine George
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
Kalna College
 
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
Kalna College
 
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
220711130100 udita Chakraborty  Aims and objectives of national policy on inf...220711130100 udita Chakraborty  Aims and objectives of national policy on inf...
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
Kalna College
 
(T.L.E.) Agriculture: "Ornamental Plants"
(T.L.E.) Agriculture: "Ornamental Plants"(T.L.E.) Agriculture: "Ornamental Plants"
(T.L.E.) Agriculture: "Ornamental Plants"
MJDuyan
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
Derek Wenmoth
 
India Quiz (Prelims and Finals) by Quiz Club, IIT Kanpur
India Quiz (Prelims and Finals) by Quiz Club, IIT KanpurIndia Quiz (Prelims and Finals) by Quiz Club, IIT Kanpur
India Quiz (Prelims and Finals) by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
Celine George
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
khabri85
 
Opportunity scholarships and the schools that receive them
Opportunity scholarships and the schools that receive themOpportunity scholarships and the schools that receive them
Opportunity scholarships and the schools that receive them
EducationNC
 
Decolonizing Universal Design for Learning
Decolonizing Universal Design for LearningDecolonizing Universal Design for Learning
Decolonizing Universal Design for Learning
Frederic Fovet
 
Art Integrated Project between Maharashtra and Sikkim
Art Integrated Project between Maharashtra and SikkimArt Integrated Project between Maharashtra and Sikkim
Art Integrated Project between Maharashtra and Sikkim
pranavsawarbandhe24
 
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT KanpurDiversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
Ben Aldrich
 
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptxScience-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Catherine Dela Cruz
 
Keynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse CityKeynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse City
PJ Caposey
 
Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024
Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024
Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024
yarusun
 
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptxAngle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
siddhimeena3
 
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
Images as attribute values in the Odoo 17
Images as attribute values in the Odoo 17Images as attribute values in the Odoo 17
Images as attribute values in the Odoo 17
Celine George
 

Recently uploaded (20)

What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17What are the new features in the Fleet Odoo 17
What are the new features in the Fleet Odoo 17
 
220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science220711130082 Srabanti Bag Internet Resources For Natural Science
220711130082 Srabanti Bag Internet Resources For Natural Science
 
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
 
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
220711130100 udita Chakraborty  Aims and objectives of national policy on inf...220711130100 udita Chakraborty  Aims and objectives of national policy on inf...
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
 
(T.L.E.) Agriculture: "Ornamental Plants"
(T.L.E.) Agriculture: "Ornamental Plants"(T.L.E.) Agriculture: "Ornamental Plants"
(T.L.E.) Agriculture: "Ornamental Plants"
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
 
India Quiz (Prelims and Finals) by Quiz Club, IIT Kanpur
India Quiz (Prelims and Finals) by Quiz Club, IIT KanpurIndia Quiz (Prelims and Finals) by Quiz Club, IIT Kanpur
India Quiz (Prelims and Finals) by Quiz Club, IIT Kanpur
 
How to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRMHow to Create a Stage or a Pipeline in Odoo 17 CRM
How to Create a Stage or a Pipeline in Odoo 17 CRM
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
 
Opportunity scholarships and the schools that receive them
Opportunity scholarships and the schools that receive themOpportunity scholarships and the schools that receive them
Opportunity scholarships and the schools that receive them
 
Decolonizing Universal Design for Learning
Decolonizing Universal Design for LearningDecolonizing Universal Design for Learning
Decolonizing Universal Design for Learning
 
Art Integrated Project between Maharashtra and Sikkim
Art Integrated Project between Maharashtra and SikkimArt Integrated Project between Maharashtra and Sikkim
Art Integrated Project between Maharashtra and Sikkim
 
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT KanpurDiversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT Kanpur
 
Interprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdfInterprofessional Education Platform Introduction.pdf
Interprofessional Education Platform Introduction.pdf
 
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptxScience-9-Lesson-1-The Bohr Model-NLC.pptx pptx
Science-9-Lesson-1-The Bohr Model-NLC.pptx pptx
 
Keynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse CityKeynote given on June 24 for MASSP at Grand Traverse City
Keynote given on June 24 for MASSP at Grand Traverse City
 
Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024
Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024
Get Success with the Latest UiPath UIPATH-ADPV1 Exam Dumps (V11.02) 2024
 
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptxAngle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
 
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT KanpurDiversity Quiz Prelims by Quiz Club, IIT Kanpur
Diversity Quiz Prelims by Quiz Club, IIT Kanpur
 
Images as attribute values in the Odoo 17
Images as attribute values in the Odoo 17Images as attribute values in the Odoo 17
Images as attribute values in the Odoo 17
 

Dempolition notes Part 2.pdf

  • 1. Carry Out General Demolition of Minor Building Structures © Australian National Training Authority 50 Carrying Out General Demolition of Minor Building Structures CPCCCA3001 Course Notes
  • 2. © Australian National Training Authority 73 Site Investigation An inspection of the site may also provide some valuable information when planning ahead. You may find that a site investigation will confirm the information gathered in your structure investigation and from plans/sketches and drawings initially consulted. An investigation of the site should identify and or confirm: (a) The type location and extent of underground services (eg. pipes, cables etc). (b) Underground structures - tanks, basement, cellar, retaining structures. (c) Soil/ground stability Remember you may need to provide a stable base for some heavy machinery such as a crane or excavator. Site sketches/drawings, together with some history about the site from the client. may help to identify where unstable areas are most likely to be located.
  • 3. © Australian National Training Authority 74 (d) Location of hazardous materials Example: Old waste disposal sites and leaking pipes or tanks, may contaminate the soil (e) The condition of neighboring buildings or structures. Depending on the method of demolition chosen, adjacent buildings/structures may be damaged due to the strong vibrational energy generated by some techniques.
  • 4. © Australian National Training Authority 75 (f) The requirements for public protection and security. (refer to Public Protection below) Look out for any areas of the site which are near public footpaths, roads and bridges and make sure that people cannot readily wander on to the site. Public Protection The site and building/structure investigations should have provided information in relation to the degree of risk presented to the public and neighbouring building/roadways etc. Therefore, necessitating the need for some type of protective measures to be put in place to prevent them being injured. Consider the following options: (a) street closures (b) security fences (c) hoardings: must be at least 2.4m high and should be well covered with sheeting or lining boards to DETOUR
  • 5. © Australian National Training Authority 76 catch falling debris (d) scaffolding (e) barricades (f) shields (g) bunting (h) restricted work times (i) warning signs - “DANGER - unauthorised entry not permitted” and ‘Danger Demolition Work in Progress’ (j) other means of overhead protection (eg. protective fans) Fire Protection When planning to carry out demolition work, you must remember that it is still possible for a fire to start on site and so you need to be prepared for a fire if one should occur. If a fire hydrant service, fire hose reel system or sprinkler system are present in a building, they should remain where they can easily be accessed and used if required. Where it is not possible to have these particular fire protection systems in place, an alternative means of fire protection should be made available, for example portable fire extinguishers. < Safe Work Procedures for Fire Protection During renovation work all types of fire protection should be serviced and maintained as appropriate so that you can be sure that they are always in good working order.
  • 6. © Australian National Training Authority 77 Apart from having fire protection systems in place, your work plan should specify what safe work practices will be followed to prevent fire in the first instance. These may include: disconnection of power/electricity where not required; disconnection of gas lines where not required; clean out (purge) any pipes, tanks or vessels that contain flammable liquids or gases; ventilate confined spaces; no fires to be lit on site; and use spark proof tools/equipment/machinery. Welding and metal cutting operations are a fire hazard. Precautions to take: Spray the area with water Use fireproof welding partitions Keep a fire extinguisher handy Spread damp sand Do not accumulate combustible debris Keep a fire blanket handy First Aid Steps should be taken to ensure that first aid facilities, equipment and personnel are available should they be needed.
  • 7. © Australian National Training Authority 79 Hazard Identification WARNING Other than physical hazards such as a collapsing wall or a falling object, demolition workers may often be exposed to other potential hazards. You need to be aware of what these may be so that you can prepare ahead to make sure that everything is protected. Hazards should be identified during the planning stage and procedures to overcome exposure to hazards should be included in the work plan. CHEMICALS PHYSICAL BIOLOGICAL dust gases and fumes solids and liquids cold and heat confined spaces radiation noise vibration vermin/rodents insects micro-organisms MISCELLANEOUS Manual Handling
  • 8. © Australian National Training Authority 80 < Contributing Factors Here are some contributing factors which could increase risk: fatigue alcohol ill-health inadequate training stress Hazards of Particular Concern Asbestos and lead (as discussed above) WARNING Hazardous materials should be removed by suitably qualified persons prior to demolition taking place. This will need to be included in your work plan.
  翻译: