This test measures the uniaxial compressive strength of concrete cubes which are
made, cured and tested to very specific requirements. It does not measure or
predict in any unique way the strength of the concrete in the structure. The test is
simply a quality control test which measures the consistency of the concrete in
terms of one particular property (“compressive strength”) using an arbitrary test
method. Testing the same concrete under different conditions, for example
specimen size, specimen shape, curing temperature, loading rate, etc. will give
different results.
INTRODUCTION :
OBJECTIVES
 Tests conducted to determine the strength of concrete.
 Compression strength test is carried out using cube test.
THEORY
 Two types of tests are carried out to determine whether
 the concrete produced does follow the specification given.
 They are compacting factor test, slump test and vebe
 consistometer test which are for wet concrete. Whereas for
 hardened concrete, they are cube compression test and
 flexibility compression beam test. Hardened concrete test is
 usually carried out when concrete is at age 3, 7, 14, 21, and 28.
 Concrete strength increases according to its age. In general,
 concrete would have acquired 70 % strength on the 7th day.
APPARATUS
 Concrete cube size 150mm × 150mm
 Compacting steel rod with size 25mm × 25mm
 Oil / Grease
 Compression test machine
 Trowel.
WORK PROCEDURE :
1. Concrete is prepared with the design mix of ( 1:2:4 ),weighed 26kg ( to make 3 concrete cubes ) and water
ratio pf 0.50 – 0.65.
2. Concrete cube mould was made from steel or cast iron with smooth inner surfaces. Every mould had steel
base plate to support and prevent leakage.
3. Mould and base plate was cleaned and applied with oil to prevent concrete from sticking to the sides of
the cube. Base plate was attached to the mould by using bolt and nut.
4. The cube was filled with concrete in three layers.
5. Every layer was compacted for 25 times. This process was carried out systematically and compaction done
uniformly to all surfaces of the concrete.
6. After the top layer has been compacted, a trowel should be used to finish off the surface level with the
top of the mould and the outside of the mould should be wiped clean.
7. The cubes was marked clearly after making the cubes immediately. The details of the cube was written in
ink on a small piece of paper and placed on the top of the concrete until it is demoulded.
8. Concrete cubes was left to harden for 24 before the moulds can be dismantled.
9. After remoulding, the concrete cubes was weighed before submerged in water for curing. The weight of
the cube was stated as ( M1 kg).
10. Compression strength test was carried out for concrete at age 7, 14, 21 and 28 days.
OPERATING PROCEDURE FOR THE UNIVERSAL
COMPRESSION MACHINE:
 The wet concrete was weighed and stated the weight as (M2 ).
 The volume of the cube was calculated as shown below :

 Volume of cube (V) = M2 – M1
1000
 The concrete cube sample was placed on the plate of the machine. The power
supply was switched on to operate the Control Box and the Universal
Compression Machine.
 Pressed “( star )” button and ‘Control SPA’ would appear on the screen. Wait
until the value of area appears. The standard cube area is 225.00 cm². Pressed
on to the same number and the date would appear. We did the same
procedure as for this area.
 After that, pressed “SET” button and “0 KN 000MPa” was appeared. “0 KN” would give
the value of loading and the “000 MPa” was converted value of loading to strength /
stress value.
 Switched on the Universal Compression Machine as showed above. Moved the first gear
from left to right follow by second gear from down to up. Wait until the “000 MPa”
increases to “999 MPa” then decreases back to “000 MPa” or until the cube failed or
when any form of destruction takes place.
 Then reversed the procedure for both gears and switched off the Universal Compression
Machine.
 The loadings reading was written down.
 Pressed the “SET” button followed by “ ” and the strength value in N/mm² could be
obtained. For the following test, just press on the “SET” button again followed by
 “ ” then “SET” again.
 Kept the workplace always cleaned.
RESULTS:
HARD CONCRETE
TEST
CUBE TEST DATE :
Experiment 8
No of cube
Cube
manufactured
date
Age
(Day
Cube
Weight
(M1)
Cube
Weight
(M2)
Volume (V) Compressio
n
Load (N)
Density Strength
(N/mm²)
Cube 1 13/8
20/8
7
7
7.786
7.843
7.324
7.740
-1.1×10−4
1.03×10−4
296.175
353.148
69.9×10³ 13.163
15.695
Cube 2 13/8 14 7.643 7.698 0.055 371.157 75.15×10³ 16.496
Cube 3
20/8 21 7.979 7.904 -0.134 395.201 10.54×10
17.564
Cube 4 13/8
20/8
28
28
7.846
7.845
7.905
7.795
0.059
-0.05
420.364
384.224
152.8×10
18.683
17.077
Concrete Average
Strength
( N/mm² )
46.942/6
=7.824
46.366/6
=7.728
-4.190/6
=0.698
2220.269/6
=370
163485050/4
=408712
98.678/6
=16.45
DISCUSSION
1. Why must the inner surfaces of the concrete mould greased with oil?
It prevent grease or dirt stick at the sides of cubes.
2. What is the meaning of characteristics strength of concrete and why it has to be
determine when the concrete age 28 days ?
Strength of the concrete below which is not more than 5% of the test results are
expected to fall and the proposed model has a good potential to predict concrete
strength at different age.
3. Why do concrete cubes need curing and how it is carried out in the
construction site ?
For concrete to develop strength, the chemical reactions need to proceed
continuously. Curing refers to procedures for the maintaining of a proper
environment for the hydration reactions to proceed and it is carried in places
where there is acute shortage of water.
4. State the important steps taken when testing concrete cubes.
The cubes are generally tested at 7 & 28 days unless specific early tests are
required, for example to remove a concrete shutter safely prior to 7 days.
Usually 1 cube will be tested at 7 days and 2 cubes at 28 days, however this
may vary depending of the requirements, check the design first. The cubes
are removed from the curing tank, dried and grit removed. The cubes are
tested using a calibrated compression machine. This can be carried out
internally by competent personnel or by a certified test house.
5. Discuss the result obtained from the experiment.
The strength of concrete increases with age.
STAGES ITEM VALUE/CALCULATION UNIT
Materials Cement : Fine aggregate : coarse
aggregate ratio.
1:2:4 g
Water : Cement ratio 0.50 – 0.65 Ɩ
a.Fine aggregate ( Sand )
Experiment 1 -Sand Fineness Modulus 7420 g
Experiment 2 -Sand cleanliness 7420 g
-Sand contents 7420 g
b.Coarse aggregate
Experiment 1 -Aggregate maximum nominal size 36 mm
Experiment 3 -Aggregate impact test 8464 g
-Aggregate contents 14870 g
c.Cement
-Ordinary Portland Cement contents 82.1 g
d.Water
-Water content 1:2:4 Ɩ
Wet concrete test a.Slump test
Experiment 4 -Slump types True slump test
-Slump height 12 mm
-Mixing consistency
Experiment 5 b.Compaction factor test
-Compacted factor 0.5091 g
-Mixing consistency
Experiment 6 c.Vebe consistometer test
CONCLUSION:
This report introduced Cube Compression Test. We presented
information and the procedures about the Cube Compression
Test. First of all we would like to thank our lecture who thought
us to do this experiment. Through this activity we were able to
cooperate and able to finish it in required time.

More Related Content

What's hot

Hand auger
Hand augerHand auger
Hand auger
Natalie Ulza
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
Kartina Sazali
 
Normal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement pasteNormal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement paste
Hafizullah Sadat
 
Sieve analysis test report
Sieve analysis test reportSieve analysis test report
Sieve analysis test report
Pavitrah Segaran
 
Atterberg
AtterbergAtterberg
Atterberg
Natalie Ulza
 
Determination of elongation index
Determination of elongation indexDetermination of elongation index
Determination of elongation index
YASMINE HASLAN
 
Laboratory soil compaction test
Laboratory soil compaction testLaboratory soil compaction test
Laboratory soil compaction test
Atul Hajong
 
Unconfined compression test
Unconfined compression testUnconfined compression test
Unconfined compression test
Natalie Ulza
 
Sand replacement
Sand replacementSand replacement
Sand replacement
Natalie Ulza
 
Shear box test
Shear box testShear box test
Shear box test
Natalie Ulza
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
YASMINE HASLAN
 
Jkr Probe Test
Jkr Probe TestJkr Probe Test
Jkr Probe Test
Hilmi Awaludin
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
MuhammadMuazzam16
 
Konkrit
KonkritKonkrit
Konkrit
Beskal Itam
 
Laboratory Vane Shear Test
Laboratory Vane Shear TestLaboratory Vane Shear Test
Laboratory Vane Shear Test
A K
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - Report
Sarchia Khursheed
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic eng
amira688
 
Sieve analysis of fine aggregates student experiment
Sieve analysis of fine aggregates student experimentSieve analysis of fine aggregates student experiment
Sieve analysis of fine aggregates student experiment
kolveasna
 
Softening point of bitumious
Softening point of bitumiousSoftening point of bitumious
Softening point of bitumious
Taha Samir
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 

What's hot (20)

Hand auger
Hand augerHand auger
Hand auger
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
Normal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement pasteNormal Consistency and Sitting times of cement paste
Normal Consistency and Sitting times of cement paste
 
Sieve analysis test report
Sieve analysis test reportSieve analysis test report
Sieve analysis test report
 
Atterberg
AtterbergAtterberg
Atterberg
 
Determination of elongation index
Determination of elongation indexDetermination of elongation index
Determination of elongation index
 
Laboratory soil compaction test
Laboratory soil compaction testLaboratory soil compaction test
Laboratory soil compaction test
 
Unconfined compression test
Unconfined compression testUnconfined compression test
Unconfined compression test
 
Sand replacement
Sand replacementSand replacement
Sand replacement
 
Shear box test
Shear box testShear box test
Shear box test
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Jkr Probe Test
Jkr Probe TestJkr Probe Test
Jkr Probe Test
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
 
Konkrit
KonkritKonkrit
Konkrit
 
Laboratory Vane Shear Test
Laboratory Vane Shear TestLaboratory Vane Shear Test
Laboratory Vane Shear Test
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - Report
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic eng
 
Sieve analysis of fine aggregates student experiment
Sieve analysis of fine aggregates student experimentSieve analysis of fine aggregates student experiment
Sieve analysis of fine aggregates student experiment
 
Softening point of bitumious
Softening point of bitumiousSoftening point of bitumious
Softening point of bitumious
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 

Similar to Cube test REPORT - DCC2042

Inovasi makmal (1)
Inovasi makmal (1)Inovasi makmal (1)
Inovasi makmal (1)
politeknik malaysia
 
Compression test
Compression testCompression test
Compression test
SHAMJITH KM
 
Compressive strength of concrete cubs
Compressive strength of concrete cubsCompressive strength of concrete cubs
Compressive strength of concrete cubs
Muhammad Saleem
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
Phurba Tamang
 
Compressive strength of cement concrete cubes
Compressive strength of cement concrete cubesCompressive strength of cement concrete cubes
Compressive strength of cement concrete cubes
Shubham Gautam
 
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Jameel Academy
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
Engr. Umair Razzaq
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
Vijay Patidar
 
4 effect of controlled temperature (27°c 42°c)
4 effect of controlled temperature (27°c  42°c)4 effect of controlled temperature (27°c  42°c)
4 effect of controlled temperature (27°c 42°c)
prjpublications
 
partial replacement of fine aggregate by glass powder in concrete
partial replacement of fine aggregate by glass powder in concretepartial replacement of fine aggregate by glass powder in concrete
partial replacement of fine aggregate by glass powder in concrete
Parthi Ban
 
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptxREPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
MonitMIstry1
 
CE244 LAB RAPORU
CE244 LAB RAPORUCE244 LAB RAPORU
CE244 LAB RAPORU
2001211020
 
parthaproppt-copy-150405131505-conversion-gate01.pptx
parthaproppt-copy-150405131505-conversion-gate01.pptxparthaproppt-copy-150405131505-conversion-gate01.pptx
parthaproppt-copy-150405131505-conversion-gate01.pptx
pakkurathikailashpav
 
COMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptx
COMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptxCOMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptx
COMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptx
RanjitKumar76249
 
Effect of controlled temperature (27°c 42°c)
Effect of controlled temperature (27°c  42°c)Effect of controlled temperature (27°c  42°c)
Effect of controlled temperature (27°c 42°c)
prjpublications
 
Factors Affecting The Bond Strength Between New and Old Concrete
Factors Affecting The Bond Strength Between New and Old ConcreteFactors Affecting The Bond Strength Between New and Old Concrete
Factors Affecting The Bond Strength Between New and Old Concrete
AshrafOraby3
 
Test of concrete
Test of concrete Test of concrete
Test of concrete
kuntansourav
 
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET Journal
 
Testing of dry/hardened concrete
Testing of dry/hardened concreteTesting of dry/hardened concrete
Testing of dry/hardened concrete
E. O. Ochieng'
 

Similar to Cube test REPORT - DCC2042 (20)

Inovasi makmal (1)
Inovasi makmal (1)Inovasi makmal (1)
Inovasi makmal (1)
 
Compression test
Compression testCompression test
Compression test
 
Compressive strength of concrete cubs
Compressive strength of concrete cubsCompressive strength of concrete cubs
Compressive strength of concrete cubs
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
 
Compressive strength of cement concrete cubes
Compressive strength of cement concrete cubesCompressive strength of cement concrete cubes
Compressive strength of cement concrete cubes
 
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
4 effect of controlled temperature (27°c 42°c)
4 effect of controlled temperature (27°c  42°c)4 effect of controlled temperature (27°c  42°c)
4 effect of controlled temperature (27°c 42°c)
 
partial replacement of fine aggregate by glass powder in concrete
partial replacement of fine aggregate by glass powder in concretepartial replacement of fine aggregate by glass powder in concrete
partial replacement of fine aggregate by glass powder in concrete
 
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptxREPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
 
CE244 LAB RAPORU
CE244 LAB RAPORUCE244 LAB RAPORU
CE244 LAB RAPORU
 
parthaproppt-copy-150405131505-conversion-gate01.pptx
parthaproppt-copy-150405131505-conversion-gate01.pptxparthaproppt-copy-150405131505-conversion-gate01.pptx
parthaproppt-copy-150405131505-conversion-gate01.pptx
 
COMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptx
COMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptxCOMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptx
COMPRESSIVE STRENGTH TEST OF DIFFERENT CEMENTS.pptx
 
Effect of controlled temperature (27°c 42°c)
Effect of controlled temperature (27°c  42°c)Effect of controlled temperature (27°c  42°c)
Effect of controlled temperature (27°c 42°c)
 
Factors Affecting The Bond Strength Between New and Old Concrete
Factors Affecting The Bond Strength Between New and Old ConcreteFactors Affecting The Bond Strength Between New and Old Concrete
Factors Affecting The Bond Strength Between New and Old Concrete
 
Test of concrete
Test of concrete Test of concrete
Test of concrete
 
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
 
Testing of dry/hardened concrete
Testing of dry/hardened concreteTesting of dry/hardened concrete
Testing of dry/hardened concrete
 

Recently uploaded

Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
sexytaniya455
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
Kamal Acharya
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Tsuyoshi Horigome
 
Basic principle and types Static Relays ppt
Basic principle and  types  Static Relays pptBasic principle and  types  Static Relays ppt
Basic principle and types Static Relays ppt
Sri Ramakrishna Institute of Technology
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Poonam Singh
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
yogita singh$A17
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
DharmaBanothu
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
ShivangMishra54
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
Guangdong Ctube Industry Co., Ltd.
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
Ak47
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
hotchicksescort
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
LokerXu2
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
sonamrawat5631
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
nonods
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
shourabjaat424
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
adhaniomprakash
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
Kamal Acharya
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
simrangupta87541
 

Recently uploaded (20)

Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
Call Girls Nagpur 8824825030 Escort In Nagpur service 24X7
 
Data Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdfData Communication and Computer Networks Management System Project Report.pdf
Data Communication and Computer Networks Management System Project Report.pdf
 
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
Update 40 models( Solar Cell ) in SPICE PARK(JUL2024)
 
Basic principle and types Static Relays ppt
Basic principle and  types  Static Relays pptBasic principle and  types  Static Relays ppt
Basic principle and types Static Relays ppt
 
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7Call Girls Madurai 8824825030 Escort In Madurai service 24X7
Call Girls Madurai 8824825030 Escort In Madurai service 24X7
 
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl LucknowCall Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
Call Girls In Lucknow 🔥 +91-7014168258🔥High Profile Call Girl Lucknow
 
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
An In-Depth Exploration of Natural Language Processing: Evolution, Applicatio...
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Intuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sdeIntuit CRAFT demonstration presentation for sde
Intuit CRAFT demonstration presentation for sde
 
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC ConduitThe Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
The Differences between Schedule 40 PVC Conduit Pipe and Schedule 80 PVC Conduit
 
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
College Call Girls Kolkata 🔥 7014168258 🔥 Real Fun With Sexual Girl Available...
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
❣Unsatisfied Bhabhi Call Girls Surat 💯Call Us 🔝 7014168258 🔝💃Independent Sura...
 
Literature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptxLiterature review for prompt engineering of ChatGPT.pptx
Literature review for prompt engineering of ChatGPT.pptx
 
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
🔥Young College Call Girls Chandigarh 💯Call Us 🔝 7737669865 🔝💃Independent Chan...
 
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
一比一原版(psu学位证书)美国匹兹堡州立大学毕业证如何办理
 
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
Call Girls Chandigarh 🔥 7014168258 🔥 Real Fun With Sexual Girl Available 24/7...
 
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
🔥LiploCk Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts Ser...
 
Online train ticket booking system project.pdf
Online train ticket booking system project.pdfOnline train ticket booking system project.pdf
Online train ticket booking system project.pdf
 
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
Mahipalpur Call Girls Delhi 🔥 9711199012 ❄- Pick Your Dream Call Girls with 1...
 

Cube test REPORT - DCC2042

  • 1.
  • 2. This test measures the uniaxial compressive strength of concrete cubes which are made, cured and tested to very specific requirements. It does not measure or predict in any unique way the strength of the concrete in the structure. The test is simply a quality control test which measures the consistency of the concrete in terms of one particular property (“compressive strength”) using an arbitrary test method. Testing the same concrete under different conditions, for example specimen size, specimen shape, curing temperature, loading rate, etc. will give different results. INTRODUCTION :
  • 3. OBJECTIVES  Tests conducted to determine the strength of concrete.  Compression strength test is carried out using cube test.
  • 4. THEORY  Two types of tests are carried out to determine whether  the concrete produced does follow the specification given.  They are compacting factor test, slump test and vebe  consistometer test which are for wet concrete. Whereas for  hardened concrete, they are cube compression test and  flexibility compression beam test. Hardened concrete test is  usually carried out when concrete is at age 3, 7, 14, 21, and 28.  Concrete strength increases according to its age. In general,  concrete would have acquired 70 % strength on the 7th day.
  • 5. APPARATUS  Concrete cube size 150mm × 150mm  Compacting steel rod with size 25mm × 25mm  Oil / Grease  Compression test machine  Trowel.
  • 6. WORK PROCEDURE : 1. Concrete is prepared with the design mix of ( 1:2:4 ),weighed 26kg ( to make 3 concrete cubes ) and water ratio pf 0.50 – 0.65. 2. Concrete cube mould was made from steel or cast iron with smooth inner surfaces. Every mould had steel base plate to support and prevent leakage. 3. Mould and base plate was cleaned and applied with oil to prevent concrete from sticking to the sides of the cube. Base plate was attached to the mould by using bolt and nut. 4. The cube was filled with concrete in three layers. 5. Every layer was compacted for 25 times. This process was carried out systematically and compaction done uniformly to all surfaces of the concrete. 6. After the top layer has been compacted, a trowel should be used to finish off the surface level with the top of the mould and the outside of the mould should be wiped clean. 7. The cubes was marked clearly after making the cubes immediately. The details of the cube was written in ink on a small piece of paper and placed on the top of the concrete until it is demoulded. 8. Concrete cubes was left to harden for 24 before the moulds can be dismantled. 9. After remoulding, the concrete cubes was weighed before submerged in water for curing. The weight of the cube was stated as ( M1 kg). 10. Compression strength test was carried out for concrete at age 7, 14, 21 and 28 days.
  • 7. OPERATING PROCEDURE FOR THE UNIVERSAL COMPRESSION MACHINE:  The wet concrete was weighed and stated the weight as (M2 ).  The volume of the cube was calculated as shown below :   Volume of cube (V) = M2 – M1 1000  The concrete cube sample was placed on the plate of the machine. The power supply was switched on to operate the Control Box and the Universal Compression Machine.  Pressed “( star )” button and ‘Control SPA’ would appear on the screen. Wait until the value of area appears. The standard cube area is 225.00 cm². Pressed on to the same number and the date would appear. We did the same procedure as for this area.
  • 8.  After that, pressed “SET” button and “0 KN 000MPa” was appeared. “0 KN” would give the value of loading and the “000 MPa” was converted value of loading to strength / stress value.  Switched on the Universal Compression Machine as showed above. Moved the first gear from left to right follow by second gear from down to up. Wait until the “000 MPa” increases to “999 MPa” then decreases back to “000 MPa” or until the cube failed or when any form of destruction takes place.  Then reversed the procedure for both gears and switched off the Universal Compression Machine.  The loadings reading was written down.  Pressed the “SET” button followed by “ ” and the strength value in N/mm² could be obtained. For the following test, just press on the “SET” button again followed by  “ ” then “SET” again.  Kept the workplace always cleaned.
  • 9. RESULTS: HARD CONCRETE TEST CUBE TEST DATE : Experiment 8 No of cube Cube manufactured date Age (Day Cube Weight (M1) Cube Weight (M2) Volume (V) Compressio n Load (N) Density Strength (N/mm²) Cube 1 13/8 20/8 7 7 7.786 7.843 7.324 7.740 -1.1×10−4 1.03×10−4 296.175 353.148 69.9×10³ 13.163 15.695 Cube 2 13/8 14 7.643 7.698 0.055 371.157 75.15×10³ 16.496 Cube 3 20/8 21 7.979 7.904 -0.134 395.201 10.54×10 17.564 Cube 4 13/8 20/8 28 28 7.846 7.845 7.905 7.795 0.059 -0.05 420.364 384.224 152.8×10 18.683 17.077 Concrete Average Strength ( N/mm² ) 46.942/6 =7.824 46.366/6 =7.728 -4.190/6 =0.698 2220.269/6 =370 163485050/4 =408712 98.678/6 =16.45
  • 10. DISCUSSION 1. Why must the inner surfaces of the concrete mould greased with oil? It prevent grease or dirt stick at the sides of cubes. 2. What is the meaning of characteristics strength of concrete and why it has to be determine when the concrete age 28 days ? Strength of the concrete below which is not more than 5% of the test results are expected to fall and the proposed model has a good potential to predict concrete strength at different age. 3. Why do concrete cubes need curing and how it is carried out in the construction site ? For concrete to develop strength, the chemical reactions need to proceed continuously. Curing refers to procedures for the maintaining of a proper environment for the hydration reactions to proceed and it is carried in places where there is acute shortage of water.
  • 11. 4. State the important steps taken when testing concrete cubes. The cubes are generally tested at 7 & 28 days unless specific early tests are required, for example to remove a concrete shutter safely prior to 7 days. Usually 1 cube will be tested at 7 days and 2 cubes at 28 days, however this may vary depending of the requirements, check the design first. The cubes are removed from the curing tank, dried and grit removed. The cubes are tested using a calibrated compression machine. This can be carried out internally by competent personnel or by a certified test house. 5. Discuss the result obtained from the experiment. The strength of concrete increases with age.
  • 12. STAGES ITEM VALUE/CALCULATION UNIT Materials Cement : Fine aggregate : coarse aggregate ratio. 1:2:4 g Water : Cement ratio 0.50 – 0.65 Ɩ a.Fine aggregate ( Sand ) Experiment 1 -Sand Fineness Modulus 7420 g Experiment 2 -Sand cleanliness 7420 g -Sand contents 7420 g b.Coarse aggregate Experiment 1 -Aggregate maximum nominal size 36 mm Experiment 3 -Aggregate impact test 8464 g -Aggregate contents 14870 g c.Cement -Ordinary Portland Cement contents 82.1 g d.Water -Water content 1:2:4 Ɩ Wet concrete test a.Slump test Experiment 4 -Slump types True slump test -Slump height 12 mm -Mixing consistency Experiment 5 b.Compaction factor test -Compacted factor 0.5091 g -Mixing consistency Experiment 6 c.Vebe consistometer test
  • 13. CONCLUSION: This report introduced Cube Compression Test. We presented information and the procedures about the Cube Compression Test. First of all we would like to thank our lecture who thought us to do this experiment. Through this activity we were able to cooperate and able to finish it in required time.