• Why Time Value
• Future Value of a Single Amount
• Future Value of an Annuity
• Present Value of a Single Amount
• Present Value of an Annuity
OUTLINE
Why Time Value
A rupee today is more valuable than a rupee a year hence. Why ?
• Preference for current consumption over future consumption
• Productivity of capital
• Inflation
Many financial projects involve cash flows occurring at different
points of time. For evaluating such cash flows, an explicit
consideration of time value of money is required
Part A
0 1 2 3 4 5
12% 12% 12% 12% 12%
10,000 10,000 10,000 10,000 10,000
Part B
0 1 2 3 4 5
12% 12% 12% 12% 12%
10,000 10,000 10,000 10,000 10,000
Time Line
PV : Present value
FVn : Future value n years hence
Ct : Cash flow occurring at the end of year t
A : A stream of constant periodic cash flow over a
given time
r : Interest rate or discount rate
g : Expected growth rate in cash flows
n : Number of periods over which the cash flows occur
Notation
Future Value of a Single Amount
Rs
First year: Principal at the beginning 1,000
Interest for the year
(Rs.1,000 x 0.10) 100
Principal at the end 1,100
Second year: Principal at the beginning 1,100
Interest for the year
(Rs.1,100 x 0.10) 110
Principal at the end 1,210
Third year: Principal at the beginning 1,210
Interest for the year
(Rs.1,210 x 0.10) 121
Principal at the end 1,331
FORMULA
FUTURE VALUE = PRESENT VALUE (1+r)n
n/r 6 % 8 % 10 % 12 % 14 %
2 1.124 1.166 1.210 1.254 1.300
4 1.262 1.361 1.464 1.574 1.689
6 1.419 1.587 1.772 1.974 2.195
8 1.594 1.851 2.144 2.476 2.853
10 1.791 2.518 2.594 3.106 3.707
Value of FVIFr,n for various Combinations of r and n
Doubling Period
Thumb Rule : Rule of 72
72
Interest rate
Interest rate : 15 percent
72
15
A more accurate thumb rule : Rule of 69
69
Interest rate
Interest rate : 15 percent
69
15
Doubling period =
= 4.8 yearsDoubling period =
Doubling period = 0.35 +
Doubling period = 0.35 + = 4.95 years
Present Value of a Single Amount
PVIF = FVIFn [1/ (1 + r)n]
n/r 6% 8% 10% 12% 14%
2 0.890 0.857 0.826 0.797 0.770
4 0.792 0.735 0.683 0.636 0.592
6 0.705 0.630 0.565 0.507 0.456
8 0.626 0.540 0.467 0.404 0.351
10 0.558 0.463 0.386 0.322 0.270
12 0.497 0.397 0.319 0.257 0.208
Present Value of an Uneven Series
A1 A2 An
PVn = + + …… +
(1 + r) (1 + r)2 (1 + r)n
n At
= 
t =1 (1 + r)t
Year Cash Flow PVIF12%,n Present Value of
Rs. Individual Cash Flow
1 1,000 0.893 893
2 2,000 0.797 1,594
3 2,000 0.712 1,424
4 3,000 0.636 1,908
5 3,000 0.567 1,701
6 4,000 0.507 2,028
7 4,000 0.452 1,808
8 5,000 0.404 2,020
Present Value of the Cash Flow Stream 13,376
Future Value of an Annuity
 An annuity is a series of periodic cash flows (payments or
receipts ) of equal amounts
1 2 3 4 5
1,000 1,000 1,000 1,000 1,000
+
1,100
+
1,210
+
1,331
+
1,464
Rs.6,105
 Future value of an annuity = A [(1+r)n-1]
r
What Lies in Store for You
Suppose you have decided to deposit Rs.30,000 per year in your Public
Provident Fund Account for 30 years. What will be the accumulated
amount in your Public Provident Fund Account at the end of 30 years if
the interest rate is 11 percent ?
The accumulated sum will be :
Rs.30,000 (FVIFA11%,30yrs)
= Rs.30,000 (1.11)30 - 1
.11
= Rs.30,000 [ 199.02]
= Rs.5,970,600
How much should you save Annually
You want to buy a house after 5 years when it is expected to cost Rs.2
million. How much should you save annually if your savings earn a
compound return of 12 percent ?
The future value interest factor for a 5 year annuity, given an interest
rate of 12 percent, is :
(1+0.12)5 - 1
FVIFA n=5, r =12% = = 6.353
0.12
The annual savings should be :
Rs. 2000,000 = Rs.314,812
6.353
Annual Deposit in a Sinking Fund
Futura Limited has an obligation to redeem Rs.500 million bonds
6 years hence. How much should the company deposit annually
in a sinking fund account wherein it earns 14 percent interest to
cumulate Rs.500 million in 6 years time ?
The future value interest factor for a 5 year annuity, given an
interest rate of 14 percent is :
FVIFAn=6, r=14% = (1+0.14)6 – 1 = 8.536
0.14
The annual sinking fund deposit should be :
Rs. 500 million = Rs.58.575 million
8.536
Finding the Interest Rate
A finance company advertises that it will pay a lump sum of Rs.8,000 at the
end of 6 years to investors who deposit annually Rs.1,000 for 6 years. What
interest rate is implicit in this offer?
The interest rate may be calculated in two steps :
1. Find the FVIFAr,6 for this contract as follows :
Rs.8,000 = Rs.1,000 x FVIFAr,6
FVIFAr,6 = Rs.8,000 = 8.000
Rs.1,000
2. Look at the FVIFAr,n table and read the row corresponding to 6
years until you find a value close to 8.000. Doing so, we find that
FVIFA12%,6 is 8.115. So, we conclude that the interest rate is slightly
below 12 percent.
How Long should you Wait
You want to take up a trip to the moon which costs Rs.1,000,000 . The cost is
expected to remain unchanged in nominal terms. You can save annually Rs.50,000 to
fulfill your desire. How long will you have to wait if your savings earn an interest of
12 percent ?
The future value of an annuity of Rs.50,000 that earns 12 percent is equated to
Rs.1,000,000.
50,000 x FVIFAn=?,12% = 1,000,000
50,000 x 1.12n – 1 = 1,000,000
0.12
1.12n - 1 = 1,000,000 x 0.12 = 2.4
50,000
1.12n = 2.4 + 1 = 3.4
n log 1.12 = log 3.4
n x 0.0492 = 0.5315. Therefore n = 0.5315 / 0.0492 = 10.8 years
You will have to wait for about 11 years.
 Centre for Financial Management , Bangalore
Present Value of an Annuity
1
(1+r)n
r
Value of PVIFAr,n for Various Combinations of r and n
n/r 6 % 8 % 10 % 12 % 14 %
2 1.833 1.783 1.737 1.690 1.647
4 3.465 3.312 3.170 3.037 2.914
6 4.917 4.623 4.355 4.111 3.889
8 6.210 5.747 5.335 4.968 4.639
10 7.360 6.710 6.145 5.650 5.216
12 8.384 7.536 6.814 6.194 5.660
1 -Present value of an annuity = A
Loan Amortisation Schedule
Loan : 1,000,000 r = 15%, n = 5 years
1,000,000 = A x PVIFAn =5, r =15%
= A x 3.3522
A = 298,312
Year Beginning Annual Interest Principal Remaining
Amount Instalment Repayment Balance
(1) (2) (3) (2)-(3) = (4) (1)-(4) = (5)
1 1,000,000 298,312 150,000 148,312 851,688
2 851,688 298,312 127,753 170,559 681,129
3 681,129 298,312 102,169 196,143 484,986
4 484,986 298,312 72,748 225,564 259,422
5 259,422 298,312 38,913 259,399 23*
a Interest is calculated by multiplying the beginning loan balance by the interest rate.
b. Principal repayment is equal to annual instalment minus interest.
* Due to rounding off error a small balance is shown
Equated Monthly Instalment
Loan = 1,000,000, Interest = 1% p.m,
Repayment period = 180 months
A x 1-1/(0.01)180
0.01
A = Rs.12,002
1,000,000 =
Present Value of a Growing Annuity
A cash flow that grows at a constant rate for a specified period of time is a growing
annuity. The time line of a growing annuity is shown below:
A(1 + g) A(1 + g)2 A(1 + g)n
0 1 2 3 n
The present value of a growing annuity can be determined using the following formula :
(1 + g)n
(1 + r)n
PV of a Growing Annuity = A (1 + g)
r – g
The above formula can be used when the growth rate is less than the discount rate (g <
r) as well as when the growth rate is more than the discount rate (g > r). However, it
does not work when the growth rate is equal to the discount rate (g = r) – in this case,
the present value is simply equal to n A.
1 –
Present Value of a Growing Annuity
For example, suppose you have the right to harvest a teak plantation
for the next 20 years over which you expect to get 100,000 cubic feet
of teak per year. The current price per cubic foot of teak is Rs 500, but
it is expected to increase at a rate of 8 percent per year. The discount
rate is 15 percent. The present value of the teak that you can harvest
from the teak forest can be determined as follows:
1.0820
1 –
1.1520
PV of teak = Rs 500 x 100,000 (1.08)
0.15 – 0.08
= Rs.551,736,683
Annuity DUE
A A … A A
0 1 2 n – 1 n
A A A … A
0 1 2 n – 1 n
Thus,
Annuity due value = Ordinary annuity value (1 + r)
This applies to both present and future values
Ordinary
annuity
Annuity
due
Present Value of Perpetuity
A
Present value of perpetuity =
r
Shorter Compounding Period
Future value = Present value r mxn
m
Where r = nominal annual interest rate
m = number of times compounding is done in a
year
n = number of years over which compounding is
done
Example : Rs.5000, 12 percent, 4 times a year, 6 years
5000(1+ 0.12/4)4x6 = 5000 (1.03)24
= Rs.10,164`
1+
Effective Versus Nominal Rate
r = (1+k/m)m –1
r = effective rate of interest
k = nominal rate of interest
m = frequency of compounding per year
Example : k = 8 percent, m=4
r = (1+.08/4)4 – 1 = 0.0824
= 8.24 percent
Nominal and Effective Rates of Interest
Effective Rate %
Nominal Annual Semi-annual Quarterly Monthly
Rate % Compounding Compounding Compounding Compounding
8 8.00 8.16 8.24 8.30
12 12.00 12.36 12.55 12.68
SUMMING UP
 Money has time value. A rupee today is more valuable than a rupee a
year hence.
 The general formula for the future value of a single amount is :
Future value = Present value (1+r)n
 The value of the compounding factor, (1+r)n, depends on the interest rate
(r) and the life of the investment (n).
 According to the rule of 72, the doubling period is obtained by dividing
72 by the interest rate.
 The general formula for the future value of a single cash amount when
compounding is done more frequently than annually is:
Future value = Present value [1+r/m]m*n
 An annuity is a series of periodic cash flows (payments or receipts) of
equal amounts. The future value of an annuity is:
Future value of an annuity
= Constant periodic flow [(1+r)n – 1)/r]
 The process of discounting, used for calculating the present value, is
simply the inverse of compounding. The present value of a single
amount is:
Present value = Future value x 1/(1+r)n
 The present value of an annuity is:
Present value of an annuity
= Constant periodic flow [1 – 1/ (1+r)n] /r
 A perpetuity is an annuity of infinite duration. In general terms:
Present value of a perpetuity = Constant periodic flow [1/r]
 Centre for Financial Management , Bangalore

More Related Content

What's hot

Regulatory framework for financial services in INDIA
Regulatory framework for financial services in INDIARegulatory framework for financial services in INDIA
Regulatory framework for financial services in INDIA
ayushmaan singh
 
ICICI Bank
ICICI BankICICI Bank
ICICI Bank
MohammedSharif46
 
A project report on SBI bank
A project report on SBI bankA project report on SBI bank
A project report on SBI bank
Bhavik Parmar
 
Strategic analysis of hdfc bank
Strategic analysis of hdfc bankStrategic analysis of hdfc bank
Strategic analysis of hdfc bank
Pradeep Kumar Tiwari
 
Icici bank
Icici bank Icici bank
Icici bank
ShankarNayak4
 
Survey questionnaire regarding usage and benefits of e
Survey questionnaire regarding usage and benefits of eSurvey questionnaire regarding usage and benefits of e
Survey questionnaire regarding usage and benefits of e
Pankaj Verma
 
Risk adjusted performance
Risk adjusted performanceRisk adjusted performance
Risk adjusted performance
gpiiflw
 
Financial services in india- DIPTANU SUTRADHAR
Financial services in india- DIPTANU SUTRADHARFinancial services in india- DIPTANU SUTRADHAR
Financial services in india- DIPTANU SUTRADHAR
DIPTANU SUTRADHAR
 
Financial inclusion
Financial inclusion Financial inclusion
Financial inclusion
Antaj Katheria
 
Yes bank crisis
Yes bank crisisYes bank crisis
Yes bank crisis
Hemanth
 
Business studies project
Business studies projectBusiness studies project
Business studies project
Ni234
 
Marketing strategy of icici bank
Marketing strategy of icici bankMarketing strategy of icici bank
Marketing strategy of icici bank
Rishav Sarkar
 
CRED
CREDCRED
100 marks topics for banking and insurance projects
100 marks topics for banking and insurance projects100 marks topics for banking and insurance projects
100 marks topics for banking and insurance projects
banking-insurance
 
HDFC Financial Analysis
HDFC Financial Analysis HDFC Financial Analysis
HDFC Financial Analysis
Rishabh Chowdhry
 
Finance projects topics
Finance projects topicsFinance projects topics
Finance projects topics
Babasab Patil
 
CIBIL
CIBILCIBIL
Summer internship project on home loans
Summer internship project on home loansSummer internship project on home loans
Summer internship project on home loans
Somendra Singh
 
Hdfc bank ppt
Hdfc bank pptHdfc bank ppt
Hdfc bank ppt
Abhishek Tanna
 
CONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOAN
CONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOANCONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOAN
CONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOAN
Bhavesh Patel
 

What's hot (20)

Regulatory framework for financial services in INDIA
Regulatory framework for financial services in INDIARegulatory framework for financial services in INDIA
Regulatory framework for financial services in INDIA
 
ICICI Bank
ICICI BankICICI Bank
ICICI Bank
 
A project report on SBI bank
A project report on SBI bankA project report on SBI bank
A project report on SBI bank
 
Strategic analysis of hdfc bank
Strategic analysis of hdfc bankStrategic analysis of hdfc bank
Strategic analysis of hdfc bank
 
Icici bank
Icici bank Icici bank
Icici bank
 
Survey questionnaire regarding usage and benefits of e
Survey questionnaire regarding usage and benefits of eSurvey questionnaire regarding usage and benefits of e
Survey questionnaire regarding usage and benefits of e
 
Risk adjusted performance
Risk adjusted performanceRisk adjusted performance
Risk adjusted performance
 
Financial services in india- DIPTANU SUTRADHAR
Financial services in india- DIPTANU SUTRADHARFinancial services in india- DIPTANU SUTRADHAR
Financial services in india- DIPTANU SUTRADHAR
 
Financial inclusion
Financial inclusion Financial inclusion
Financial inclusion
 
Yes bank crisis
Yes bank crisisYes bank crisis
Yes bank crisis
 
Business studies project
Business studies projectBusiness studies project
Business studies project
 
Marketing strategy of icici bank
Marketing strategy of icici bankMarketing strategy of icici bank
Marketing strategy of icici bank
 
CRED
CREDCRED
CRED
 
100 marks topics for banking and insurance projects
100 marks topics for banking and insurance projects100 marks topics for banking and insurance projects
100 marks topics for banking and insurance projects
 
HDFC Financial Analysis
HDFC Financial Analysis HDFC Financial Analysis
HDFC Financial Analysis
 
Finance projects topics
Finance projects topicsFinance projects topics
Finance projects topics
 
CIBIL
CIBILCIBIL
CIBIL
 
Summer internship project on home loans
Summer internship project on home loansSummer internship project on home loans
Summer internship project on home loans
 
Hdfc bank ppt
Hdfc bank pptHdfc bank ppt
Hdfc bank ppt
 
CONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOAN
CONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOANCONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOAN
CONSUMER AWARENESS & PERCEPTION TOWARDS HOME LOAN
 

Similar to Chapter7 thetimevalueofmoney

FM_Chapter6.pdf
FM_Chapter6.pdfFM_Chapter6.pdf
FM_Chapter6.pdf
Sunny429247
 
Time Value of Money I.pdf
Time Value of Money I.pdfTime Value of Money I.pdf
Time Value of Money I.pdf
swati23502
 
Fin 2732 sec b time value of money
Fin 2732 sec b   time value of moneyFin 2732 sec b   time value of money
Fin 2732 sec b time value of money
YashGupta744
 
Chapter 5 Time Value of Money.pptx
Chapter 5 Time Value of Money.pptxChapter 5 Time Value of Money.pptx
Chapter 5 Time Value of Money.pptx
Hazlina Hussein
 
Chapter 6: The Time Value of Money
Chapter 6: The Time Value of MoneyChapter 6: The Time Value of Money
Chapter 6: The Time Value of Money
Nada G.Youssef
 
Lecture 06
Lecture 06Lecture 06
Lecture 06
Bhavanams Rao
 
A introdu ction to financial management topic time value of money
A introdu ction to financial management topic time value of moneyA introdu ction to financial management topic time value of money
A introdu ction to financial management topic time value of money
VishalMotwani15
 
Tvmbim2
Tvmbim2Tvmbim2
Tvmbim2
Kapil Chhabra
 
ACCA F9 Investment appraisal-Discounted Cash Flow Techniques
ACCA F9 Investment appraisal-Discounted Cash Flow TechniquesACCA F9 Investment appraisal-Discounted Cash Flow Techniques
ACCA F9 Investment appraisal-Discounted Cash Flow Techniques
Saraf Academy
 
Stock Valuation
Stock Valuation Stock Valuation
Stock Valuation
halimsarkar
 
Time value of money
Time value of moneyTime value of money
Time value of money
Visakhapatnam
 
4th Lecture- discounted cash flows (1).pptx
4th Lecture- discounted cash flows (1).pptx4th Lecture- discounted cash flows (1).pptx
4th Lecture- discounted cash flows (1).pptx
abdelhameedibrahim4
 
199776069-prasanna-chandra-financial-management.pdf
199776069-prasanna-chandra-financial-management.pdf199776069-prasanna-chandra-financial-management.pdf
199776069-prasanna-chandra-financial-management.pdf
ssusercbd35c
 
Present value lecture 3
Present value lecture 3Present value lecture 3
Present value lecture 3
University of Balochistan
 
Iii A Time Value Of Money
Iii  A Time Value Of MoneyIii  A Time Value Of Money
Iii A Time Value Of Money
rajeevgupta
 
Chap005
Chap005Chap005
unit three.pdf
unit three.pdfunit three.pdf
unit three.pdf
SagarChaulagai
 
Time value of money
Time value of moneyTime value of money
Time value of money
Manohar Boda
 
Iii A Time Value Of Money
Iii  A Time Value Of MoneyIii  A Time Value Of Money
Iii A Time Value Of Money
rajeevgupta
 
Iii A Time Value Of Money
Iii  A Time Value Of MoneyIii  A Time Value Of Money
Iii A Time Value Of Money
rajeevgupta
 

Similar to Chapter7 thetimevalueofmoney (20)

FM_Chapter6.pdf
FM_Chapter6.pdfFM_Chapter6.pdf
FM_Chapter6.pdf
 
Time Value of Money I.pdf
Time Value of Money I.pdfTime Value of Money I.pdf
Time Value of Money I.pdf
 
Fin 2732 sec b time value of money
Fin 2732 sec b   time value of moneyFin 2732 sec b   time value of money
Fin 2732 sec b time value of money
 
Chapter 5 Time Value of Money.pptx
Chapter 5 Time Value of Money.pptxChapter 5 Time Value of Money.pptx
Chapter 5 Time Value of Money.pptx
 
Chapter 6: The Time Value of Money
Chapter 6: The Time Value of MoneyChapter 6: The Time Value of Money
Chapter 6: The Time Value of Money
 
Lecture 06
Lecture 06Lecture 06
Lecture 06
 
A introdu ction to financial management topic time value of money
A introdu ction to financial management topic time value of moneyA introdu ction to financial management topic time value of money
A introdu ction to financial management topic time value of money
 
Tvmbim2
Tvmbim2Tvmbim2
Tvmbim2
 
ACCA F9 Investment appraisal-Discounted Cash Flow Techniques
ACCA F9 Investment appraisal-Discounted Cash Flow TechniquesACCA F9 Investment appraisal-Discounted Cash Flow Techniques
ACCA F9 Investment appraisal-Discounted Cash Flow Techniques
 
Stock Valuation
Stock Valuation Stock Valuation
Stock Valuation
 
Time value of money
Time value of moneyTime value of money
Time value of money
 
4th Lecture- discounted cash flows (1).pptx
4th Lecture- discounted cash flows (1).pptx4th Lecture- discounted cash flows (1).pptx
4th Lecture- discounted cash flows (1).pptx
 
199776069-prasanna-chandra-financial-management.pdf
199776069-prasanna-chandra-financial-management.pdf199776069-prasanna-chandra-financial-management.pdf
199776069-prasanna-chandra-financial-management.pdf
 
Present value lecture 3
Present value lecture 3Present value lecture 3
Present value lecture 3
 
Iii A Time Value Of Money
Iii  A Time Value Of MoneyIii  A Time Value Of Money
Iii A Time Value Of Money
 
Chap005
Chap005Chap005
Chap005
 
unit three.pdf
unit three.pdfunit three.pdf
unit three.pdf
 
Time value of money
Time value of moneyTime value of money
Time value of money
 
Iii A Time Value Of Money
Iii  A Time Value Of MoneyIii  A Time Value Of Money
Iii A Time Value Of Money
 
Iii A Time Value Of Money
Iii  A Time Value Of MoneyIii  A Time Value Of Money
Iii A Time Value Of Money
 

More from AKSHAYA0000

Swoc
SwocSwoc
Pm
Pm Pm
Npa
NpaNpa
Chapter23 projectreviewandadministrativeaspects
Chapter23 projectreviewandadministrativeaspectsChapter23 projectreviewandadministrativeaspects
Chapter23 projectreviewandadministrativeaspects
AKSHAYA0000
 
Chapter22 networktechniquesforprojectmanagement
Chapter22 networktechniquesforprojectmanagementChapter22 networktechniquesforprojectmanagement
Chapter22 networktechniquesforprojectmanagement
AKSHAYA0000
 
Chapter21 projectmanagement
Chapter21 projectmanagementChapter21 projectmanagement
Chapter21 projectmanagement
AKSHAYA0000
 
Chapter20 venturecapitalandprivateequity
Chapter20 venturecapitalandprivateequityChapter20 venturecapitalandprivateequity
Chapter20 venturecapitalandprivateequity
AKSHAYA0000
 
Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojects
AKSHAYA0000
 
Chapter18 financingofprojects
Chapter18 financingofprojectsChapter18 financingofprojects
Chapter18 financingofprojects
AKSHAYA0000
 
Chapter17 judgmentalbehavioural
Chapter17 judgmentalbehaviouralChapter17 judgmentalbehavioural
Chapter17 judgmentalbehavioural
AKSHAYA0000
 
Chapter16 valuationofrealoptions
Chapter16 valuationofrealoptionsChapter16 valuationofrealoptions
Chapter16 valuationofrealoptions
AKSHAYA0000
 
Chapter15 multipleprojectsandconstraints
Chapter15 multipleprojectsandconstraintsChapter15 multipleprojectsandconstraints
Chapter15 multipleprojectsandconstraints
AKSHAYA0000
 
Chapter14 socialcostbenefitanalysis
Chapter14 socialcostbenefitanalysisChapter14 socialcostbenefitanalysis
Chapter14 socialcostbenefitanalysis
AKSHAYA0000
 
Chapter13 specialdecisionsituations
Chapter13 specialdecisionsituationsChapter13 specialdecisionsituations
Chapter13 specialdecisionsituations
AKSHAYA0000
 
Chapter12 projectrateofreturn
Chapter12 projectrateofreturnChapter12 projectrateofreturn
Chapter12 projectrateofreturn
AKSHAYA0000
 
Chapter11 projectriskanalysis
Chapter11 projectriskanalysisChapter11 projectriskanalysis
Chapter11 projectriskanalysis
AKSHAYA0000
 
Chapter10 thecostofcapital
Chapter10 thecostofcapitalChapter10 thecostofcapital
Chapter10 thecostofcapital
AKSHAYA0000
 
Chapter9 projectcashflows
Chapter9 projectcashflowsChapter9 projectcashflows
Chapter9 projectcashflows
AKSHAYA0000
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
AKSHAYA0000
 
Chapter6 financialestimatesandprojections
Chapter6 financialestimatesandprojectionsChapter6 financialestimatesandprojections
Chapter6 financialestimatesandprojections
AKSHAYA0000
 

More from AKSHAYA0000 (20)

Swoc
SwocSwoc
Swoc
 
Pm
Pm Pm
Pm
 
Npa
NpaNpa
Npa
 
Chapter23 projectreviewandadministrativeaspects
Chapter23 projectreviewandadministrativeaspectsChapter23 projectreviewandadministrativeaspects
Chapter23 projectreviewandadministrativeaspects
 
Chapter22 networktechniquesforprojectmanagement
Chapter22 networktechniquesforprojectmanagementChapter22 networktechniquesforprojectmanagement
Chapter22 networktechniquesforprojectmanagement
 
Chapter21 projectmanagement
Chapter21 projectmanagementChapter21 projectmanagement
Chapter21 projectmanagement
 
Chapter20 venturecapitalandprivateequity
Chapter20 venturecapitalandprivateequityChapter20 venturecapitalandprivateequity
Chapter20 venturecapitalandprivateequity
 
Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojects
 
Chapter18 financingofprojects
Chapter18 financingofprojectsChapter18 financingofprojects
Chapter18 financingofprojects
 
Chapter17 judgmentalbehavioural
Chapter17 judgmentalbehaviouralChapter17 judgmentalbehavioural
Chapter17 judgmentalbehavioural
 
Chapter16 valuationofrealoptions
Chapter16 valuationofrealoptionsChapter16 valuationofrealoptions
Chapter16 valuationofrealoptions
 
Chapter15 multipleprojectsandconstraints
Chapter15 multipleprojectsandconstraintsChapter15 multipleprojectsandconstraints
Chapter15 multipleprojectsandconstraints
 
Chapter14 socialcostbenefitanalysis
Chapter14 socialcostbenefitanalysisChapter14 socialcostbenefitanalysis
Chapter14 socialcostbenefitanalysis
 
Chapter13 specialdecisionsituations
Chapter13 specialdecisionsituationsChapter13 specialdecisionsituations
Chapter13 specialdecisionsituations
 
Chapter12 projectrateofreturn
Chapter12 projectrateofreturnChapter12 projectrateofreturn
Chapter12 projectrateofreturn
 
Chapter11 projectriskanalysis
Chapter11 projectriskanalysisChapter11 projectriskanalysis
Chapter11 projectriskanalysis
 
Chapter10 thecostofcapital
Chapter10 thecostofcapitalChapter10 thecostofcapital
Chapter10 thecostofcapital
 
Chapter9 projectcashflows
Chapter9 projectcashflowsChapter9 projectcashflows
Chapter9 projectcashflows
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
 
Chapter6 financialestimatesandprojections
Chapter6 financialestimatesandprojectionsChapter6 financialestimatesandprojections
Chapter6 financialestimatesandprojections
 

Recently uploaded

Decolonizing Universal Design for Learning
Decolonizing Universal Design for LearningDecolonizing Universal Design for Learning
Decolonizing Universal Design for Learning
Frederic Fovet
 
Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024
Friends of African Village Libraries
 
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
220711130100 udita Chakraborty  Aims and objectives of national policy on inf...220711130100 udita Chakraborty  Aims and objectives of national policy on inf...
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
Kalna College
 
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
Kalna College
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
Kalna College
 
The basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptxThe basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptx
heathfieldcps1
 
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT KanpurDiversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Quiz Club IIT Kanpur
 
220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx
Kalna College
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
khabri85
 
Creating Images and Videos through AI.pptx
Creating Images and Videos through AI.pptxCreating Images and Videos through AI.pptx
Creating Images and Videos through AI.pptx
Forum of Blended Learning
 
managing Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptxmanaging Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptx
nabaegha
 
Non-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech ProfessionalsNon-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech Professionals
MattVassar1
 
The Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptxThe Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptx
PriyaKumari928991
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
Derek Wenmoth
 
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptxAngle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
siddhimeena3
 
Post init hook in the odoo 17 ERP Module
Post init hook in the  odoo 17 ERP ModulePost init hook in the  odoo 17 ERP Module
Post init hook in the odoo 17 ERP Module
Celine George
 
pol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdfpol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdf
BiplabHalder13
 
Talking Tech through Compelling Visual Aids
Talking Tech through Compelling Visual AidsTalking Tech through Compelling Visual Aids
Talking Tech through Compelling Visual Aids
MattVassar1
 
Environmental science 1.What is environmental science and components of envir...
Environmental science 1.What is environmental science and components of envir...Environmental science 1.What is environmental science and components of envir...
Environmental science 1.What is environmental science and components of envir...
Deepika
 
Slides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptxSlides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptx
shabeluno
 

Recently uploaded (20)

Decolonizing Universal Design for Learning
Decolonizing Universal Design for LearningDecolonizing Universal Design for Learning
Decolonizing Universal Design for Learning
 
Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024Library news letter Kitengesa Uganda June 2024
Library news letter Kitengesa Uganda June 2024
 
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
220711130100 udita Chakraborty  Aims and objectives of national policy on inf...220711130100 udita Chakraborty  Aims and objectives of national policy on inf...
220711130100 udita Chakraborty Aims and objectives of national policy on inf...
 
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
220711130086 Sukanta Singh E learning and mobile learning EPC 3 Internal Asse...
 
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...220711130095 Tanu Pandey message currency, communication speed & control EPC ...
220711130095 Tanu Pandey message currency, communication speed & control EPC ...
 
The basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptxThe basics of sentences session 8pptx.pptx
The basics of sentences session 8pptx.pptx
 
Diversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT KanpurDiversity Quiz Finals by Quiz Club, IIT Kanpur
Diversity Quiz Finals by Quiz Club, IIT Kanpur
 
220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx220711130088 Sumi Basak Virtual University EPC 3.pptx
220711130088 Sumi Basak Virtual University EPC 3.pptx
 
Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024Brand Guideline of Bashundhara A4 Paper - 2024
Brand Guideline of Bashundhara A4 Paper - 2024
 
Creating Images and Videos through AI.pptx
Creating Images and Videos through AI.pptxCreating Images and Videos through AI.pptx
Creating Images and Videos through AI.pptx
 
managing Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptxmanaging Behaviour in early childhood education.pptx
managing Behaviour in early childhood education.pptx
 
Non-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech ProfessionalsNon-Verbal Communication for Tech Professionals
Non-Verbal Communication for Tech Professionals
 
The Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptxThe Rise of the Digital Telecommunication Marketplace.pptx
The Rise of the Digital Telecommunication Marketplace.pptx
 
The Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teachingThe Science of Learning: implications for modern teaching
The Science of Learning: implications for modern teaching
 
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptxAngle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
Angle-or,,,,,-Pull-of-Muscleexercise therapy.pptx
 
Post init hook in the odoo 17 ERP Module
Post init hook in the  odoo 17 ERP ModulePost init hook in the  odoo 17 ERP Module
Post init hook in the odoo 17 ERP Module
 
pol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdfpol sci Election and Representation Class 11 Notes.pdf
pol sci Election and Representation Class 11 Notes.pdf
 
Talking Tech through Compelling Visual Aids
Talking Tech through Compelling Visual AidsTalking Tech through Compelling Visual Aids
Talking Tech through Compelling Visual Aids
 
Environmental science 1.What is environmental science and components of envir...
Environmental science 1.What is environmental science and components of envir...Environmental science 1.What is environmental science and components of envir...
Environmental science 1.What is environmental science and components of envir...
 
Slides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptxSlides Peluncuran Amalan Pemakanan Sihat.pptx
Slides Peluncuran Amalan Pemakanan Sihat.pptx
 

Chapter7 thetimevalueofmoney

  • 1. CHAPTER 7 THE TIME VALUE OF MONEY  Centre for Financial Management , Bangalore
  • 2. • Why Time Value • Future Value of a Single Amount • Future Value of an Annuity • Present Value of a Single Amount • Present Value of an Annuity OUTLINE
  • 3. Why Time Value A rupee today is more valuable than a rupee a year hence. Why ? • Preference for current consumption over future consumption • Productivity of capital • Inflation Many financial projects involve cash flows occurring at different points of time. For evaluating such cash flows, an explicit consideration of time value of money is required
  • 4. Part A 0 1 2 3 4 5 12% 12% 12% 12% 12% 10,000 10,000 10,000 10,000 10,000 Part B 0 1 2 3 4 5 12% 12% 12% 12% 12% 10,000 10,000 10,000 10,000 10,000 Time Line
  • 5. PV : Present value FVn : Future value n years hence Ct : Cash flow occurring at the end of year t A : A stream of constant periodic cash flow over a given time r : Interest rate or discount rate g : Expected growth rate in cash flows n : Number of periods over which the cash flows occur Notation
  • 6. Future Value of a Single Amount Rs First year: Principal at the beginning 1,000 Interest for the year (Rs.1,000 x 0.10) 100 Principal at the end 1,100 Second year: Principal at the beginning 1,100 Interest for the year (Rs.1,100 x 0.10) 110 Principal at the end 1,210 Third year: Principal at the beginning 1,210 Interest for the year (Rs.1,210 x 0.10) 121 Principal at the end 1,331 FORMULA FUTURE VALUE = PRESENT VALUE (1+r)n
  • 7. n/r 6 % 8 % 10 % 12 % 14 % 2 1.124 1.166 1.210 1.254 1.300 4 1.262 1.361 1.464 1.574 1.689 6 1.419 1.587 1.772 1.974 2.195 8 1.594 1.851 2.144 2.476 2.853 10 1.791 2.518 2.594 3.106 3.707 Value of FVIFr,n for various Combinations of r and n
  • 8. Doubling Period Thumb Rule : Rule of 72 72 Interest rate Interest rate : 15 percent 72 15 A more accurate thumb rule : Rule of 69 69 Interest rate Interest rate : 15 percent 69 15 Doubling period = = 4.8 yearsDoubling period = Doubling period = 0.35 + Doubling period = 0.35 + = 4.95 years
  • 9. Present Value of a Single Amount PVIF = FVIFn [1/ (1 + r)n] n/r 6% 8% 10% 12% 14% 2 0.890 0.857 0.826 0.797 0.770 4 0.792 0.735 0.683 0.636 0.592 6 0.705 0.630 0.565 0.507 0.456 8 0.626 0.540 0.467 0.404 0.351 10 0.558 0.463 0.386 0.322 0.270 12 0.497 0.397 0.319 0.257 0.208
  • 10. Present Value of an Uneven Series A1 A2 An PVn = + + …… + (1 + r) (1 + r)2 (1 + r)n n At =  t =1 (1 + r)t Year Cash Flow PVIF12%,n Present Value of Rs. Individual Cash Flow 1 1,000 0.893 893 2 2,000 0.797 1,594 3 2,000 0.712 1,424 4 3,000 0.636 1,908 5 3,000 0.567 1,701 6 4,000 0.507 2,028 7 4,000 0.452 1,808 8 5,000 0.404 2,020 Present Value of the Cash Flow Stream 13,376
  • 11. Future Value of an Annuity  An annuity is a series of periodic cash flows (payments or receipts ) of equal amounts 1 2 3 4 5 1,000 1,000 1,000 1,000 1,000 + 1,100 + 1,210 + 1,331 + 1,464 Rs.6,105  Future value of an annuity = A [(1+r)n-1] r
  • 12. What Lies in Store for You Suppose you have decided to deposit Rs.30,000 per year in your Public Provident Fund Account for 30 years. What will be the accumulated amount in your Public Provident Fund Account at the end of 30 years if the interest rate is 11 percent ? The accumulated sum will be : Rs.30,000 (FVIFA11%,30yrs) = Rs.30,000 (1.11)30 - 1 .11 = Rs.30,000 [ 199.02] = Rs.5,970,600
  • 13. How much should you save Annually You want to buy a house after 5 years when it is expected to cost Rs.2 million. How much should you save annually if your savings earn a compound return of 12 percent ? The future value interest factor for a 5 year annuity, given an interest rate of 12 percent, is : (1+0.12)5 - 1 FVIFA n=5, r =12% = = 6.353 0.12 The annual savings should be : Rs. 2000,000 = Rs.314,812 6.353
  • 14. Annual Deposit in a Sinking Fund Futura Limited has an obligation to redeem Rs.500 million bonds 6 years hence. How much should the company deposit annually in a sinking fund account wherein it earns 14 percent interest to cumulate Rs.500 million in 6 years time ? The future value interest factor for a 5 year annuity, given an interest rate of 14 percent is : FVIFAn=6, r=14% = (1+0.14)6 – 1 = 8.536 0.14 The annual sinking fund deposit should be : Rs. 500 million = Rs.58.575 million 8.536
  • 15. Finding the Interest Rate A finance company advertises that it will pay a lump sum of Rs.8,000 at the end of 6 years to investors who deposit annually Rs.1,000 for 6 years. What interest rate is implicit in this offer? The interest rate may be calculated in two steps : 1. Find the FVIFAr,6 for this contract as follows : Rs.8,000 = Rs.1,000 x FVIFAr,6 FVIFAr,6 = Rs.8,000 = 8.000 Rs.1,000 2. Look at the FVIFAr,n table and read the row corresponding to 6 years until you find a value close to 8.000. Doing so, we find that FVIFA12%,6 is 8.115. So, we conclude that the interest rate is slightly below 12 percent.
  • 16. How Long should you Wait You want to take up a trip to the moon which costs Rs.1,000,000 . The cost is expected to remain unchanged in nominal terms. You can save annually Rs.50,000 to fulfill your desire. How long will you have to wait if your savings earn an interest of 12 percent ? The future value of an annuity of Rs.50,000 that earns 12 percent is equated to Rs.1,000,000. 50,000 x FVIFAn=?,12% = 1,000,000 50,000 x 1.12n – 1 = 1,000,000 0.12 1.12n - 1 = 1,000,000 x 0.12 = 2.4 50,000 1.12n = 2.4 + 1 = 3.4 n log 1.12 = log 3.4 n x 0.0492 = 0.5315. Therefore n = 0.5315 / 0.0492 = 10.8 years You will have to wait for about 11 years.
  • 17.  Centre for Financial Management , Bangalore Present Value of an Annuity 1 (1+r)n r Value of PVIFAr,n for Various Combinations of r and n n/r 6 % 8 % 10 % 12 % 14 % 2 1.833 1.783 1.737 1.690 1.647 4 3.465 3.312 3.170 3.037 2.914 6 4.917 4.623 4.355 4.111 3.889 8 6.210 5.747 5.335 4.968 4.639 10 7.360 6.710 6.145 5.650 5.216 12 8.384 7.536 6.814 6.194 5.660 1 -Present value of an annuity = A
  • 18. Loan Amortisation Schedule Loan : 1,000,000 r = 15%, n = 5 years 1,000,000 = A x PVIFAn =5, r =15% = A x 3.3522 A = 298,312 Year Beginning Annual Interest Principal Remaining Amount Instalment Repayment Balance (1) (2) (3) (2)-(3) = (4) (1)-(4) = (5) 1 1,000,000 298,312 150,000 148,312 851,688 2 851,688 298,312 127,753 170,559 681,129 3 681,129 298,312 102,169 196,143 484,986 4 484,986 298,312 72,748 225,564 259,422 5 259,422 298,312 38,913 259,399 23* a Interest is calculated by multiplying the beginning loan balance by the interest rate. b. Principal repayment is equal to annual instalment minus interest. * Due to rounding off error a small balance is shown
  • 19. Equated Monthly Instalment Loan = 1,000,000, Interest = 1% p.m, Repayment period = 180 months A x 1-1/(0.01)180 0.01 A = Rs.12,002 1,000,000 =
  • 20. Present Value of a Growing Annuity A cash flow that grows at a constant rate for a specified period of time is a growing annuity. The time line of a growing annuity is shown below: A(1 + g) A(1 + g)2 A(1 + g)n 0 1 2 3 n The present value of a growing annuity can be determined using the following formula : (1 + g)n (1 + r)n PV of a Growing Annuity = A (1 + g) r – g The above formula can be used when the growth rate is less than the discount rate (g < r) as well as when the growth rate is more than the discount rate (g > r). However, it does not work when the growth rate is equal to the discount rate (g = r) – in this case, the present value is simply equal to n A. 1 –
  • 21. Present Value of a Growing Annuity For example, suppose you have the right to harvest a teak plantation for the next 20 years over which you expect to get 100,000 cubic feet of teak per year. The current price per cubic foot of teak is Rs 500, but it is expected to increase at a rate of 8 percent per year. The discount rate is 15 percent. The present value of the teak that you can harvest from the teak forest can be determined as follows: 1.0820 1 – 1.1520 PV of teak = Rs 500 x 100,000 (1.08) 0.15 – 0.08 = Rs.551,736,683
  • 22. Annuity DUE A A … A A 0 1 2 n – 1 n A A A … A 0 1 2 n – 1 n Thus, Annuity due value = Ordinary annuity value (1 + r) This applies to both present and future values Ordinary annuity Annuity due
  • 23. Present Value of Perpetuity A Present value of perpetuity = r
  • 24. Shorter Compounding Period Future value = Present value r mxn m Where r = nominal annual interest rate m = number of times compounding is done in a year n = number of years over which compounding is done Example : Rs.5000, 12 percent, 4 times a year, 6 years 5000(1+ 0.12/4)4x6 = 5000 (1.03)24 = Rs.10,164` 1+
  • 25. Effective Versus Nominal Rate r = (1+k/m)m –1 r = effective rate of interest k = nominal rate of interest m = frequency of compounding per year Example : k = 8 percent, m=4 r = (1+.08/4)4 – 1 = 0.0824 = 8.24 percent Nominal and Effective Rates of Interest Effective Rate % Nominal Annual Semi-annual Quarterly Monthly Rate % Compounding Compounding Compounding Compounding 8 8.00 8.16 8.24 8.30 12 12.00 12.36 12.55 12.68
  • 26. SUMMING UP  Money has time value. A rupee today is more valuable than a rupee a year hence.  The general formula for the future value of a single amount is : Future value = Present value (1+r)n  The value of the compounding factor, (1+r)n, depends on the interest rate (r) and the life of the investment (n).  According to the rule of 72, the doubling period is obtained by dividing 72 by the interest rate.  The general formula for the future value of a single cash amount when compounding is done more frequently than annually is: Future value = Present value [1+r/m]m*n
  • 27.  An annuity is a series of periodic cash flows (payments or receipts) of equal amounts. The future value of an annuity is: Future value of an annuity = Constant periodic flow [(1+r)n – 1)/r]  The process of discounting, used for calculating the present value, is simply the inverse of compounding. The present value of a single amount is: Present value = Future value x 1/(1+r)n  The present value of an annuity is: Present value of an annuity = Constant periodic flow [1 – 1/ (1+r)n] /r  A perpetuity is an annuity of infinite duration. In general terms: Present value of a perpetuity = Constant periodic flow [1/r]  Centre for Financial Management , Bangalore