尊敬的 微信汇率:1円 ≈ 0.046089 元 支付宝汇率:1円 ≈ 0.04618元 [退出登录]
SlideShare a Scribd company logo
Traffic Survey Procedure for Construction of
Grade Separators
Ms.A.V.Vinoshri Mr.R.Thirumalai Raja
M.E. IInd Year Assistant Professor
Dr. Pauls Engineering College Dr.Pauls Engineering College
Tamil Nadu,INDIA Tamil Nadu,INDIA
Email ID: avvinoshri@gmail.com Email ID: malai_gtsri@yahoo.in
Abstract: This project deals with construction of Grade Separator so it need traffic data for design
and drafting. The location site is Rajiv Gandhi Square in Puducherry which is 5 arm junction of
connecting NH 66 and ECR Chennai. Traffic surveys are conducted as per Indian Standards which
show the traffic movement In each five arm in junction. This project aim is to reduce traffic
congestion in appropriate junction with available area which gives remedy through construction of
Grade Separators.
Key words : Grade Separators, Rajiv Gandhi Square, Traffic congestion, Traffic separation.
----------------------------------------------------------------------------------------------------------------------------------------------------------------
1.0 INTRODUCTION
Transportation contributes to the economic, industrial,
social and cultural development of any country.
Puducherry is a city, an urban agglomeration and a
municipality in Puducherry district in the Indian union
territory of Puducherry. Rajiv Gandhi Square is one of
the major intersections in Puducherry City. The
National Highway - 66 (Tindivanam – Puducherry)
and East Cost Road (Chennai – Cuddalore) are
crossing each other almost perpendicularly. The
Puducherry – Vazhudavur Road join with NH-66
Tindivanam arm within 75m from the junction. Both
the junctions are signalized and signal co-ordination is
in place for control the traffic movements. The project
junction is in a plain terrain, within the built up areas. It
is observed that the major roads in the project
location predominantly has a straight alignment and
traverses through plain terrain. The horizontal curves
in general conform to acceptable geometric standards
in terms of horizontal curve, radius and sight distance.
Objectives of traffic survey are to construction of
grade separator and allow traffic to move freely. April
to early June, when maximum temperatures
frequently hit the 41o C mark. The average maximum
temperature is 36o C. Minimum temperatures are in
the order of 28 - 32 o C. This is followed by a period of
high humidity and occasional thundershowers from
June till September.
2.0 LITERATURE REVIEW
Kavitha, Jaya kumari, Jeeva, Bavithra,
Kokila.Bharathiyar Institute of Engineering for
Women, Deviyakurichi, Analysis and design of
grade separator done by salem college students
traffic survey was conducted to know the hourly
Passenger Car Unit (HPCU) at four road
Intersection, salem From survey the value of HPCU
of the intersection is 6547 taking the design period
of 30 years, the value of HPCU is found 65273.
3.0 MATERIALS AND METHODS
Methodology for carrying out the works is in line with
the requirements of the project. The methodology
adopted is described in subsequent section of this
chapter.
3.1 RECONNAISSANCE SURVEY
The detailed ground reconnaissance was
undertaken after a preliminary reconnaissance
survey.
3.2 TOPOGRAPHICAL SURVEY
The Topographic survey was carried out for the
project area as per ToR, based on the IRC
guidelines. The survey was undertaken by Total
Station and GPS to develop a Digital Terrain Model
(DTM). The basic objective of the topographic
survey is to capture the essential ground features
along the road in order to workout Grade Separator
alignment, at grade improvements and for working
out detailed design All the Survey Data are
processed to generate DTM (Digital Terrain Model)
in MX compatible format and Civil 3D. Processed
data is submitted in AutoCAD 3D format using layer
systems.
3.3 ROAD INVENTORY SURVEY
After having a detailed reconnaissance survey, a
field inventory of the project roads was carried out.
The objective of the road inventory survey was to
assess the potential capacity of the project roads.
Road inventory was done by physical measurement
and visual evaluation. The data collected were right
of way, carriageway, surface type, abutting land use,
drainage condition, etc. The existing ROW of the
roads was measured in the field. Due to absence of
ROW stones and markings on the ground, the land
width between properties on either side of the road
was considered as available ROW of the particular
road. The Footpath is existing on either side of
Chennai arm. The Strom Water Drain of 0.8m to
1.5m size is existing in all the direction of project
junction.
3.4 PAVEMENT CONDITION SURVEY
The condition of the pavement is assessed as per
IRC: 82 – 1982 by walking along the project roads
for a close inspection. The assessment survey
determines the pavement condition, shoulder
condition and condition of other road features.
Pavement Condition Survey was carried out to
identify the type of distress and to estimate the
extent of distress indicators. Generally the East Cost
Road (Chennai - Cuddalore) has a good BT surface
of six lane configuration with central median, but the
footpath over drain is in poor condition. NH-66
(Puducherry – Tindivanam) has a good BT surface
of four lane configuration with central median.
Vazhudavur road has a fair BT surface of two lane
configuration.
3.5 TRAFFIC SURVEY
Traffic surveys are intended to understand the
exising traffic scenario on the project area and to
identify the improvements required for upgrading
them to have better facilities. The following primary
traffic surveys were conducted on the project roads.
3.6 PEAK HOURS TRAFFIC VOLUME
The peak hour traffic volume recorded between
08:45 to 09:45 hrs and the peak hour volume
accounts for 8.97 percent of the total 16 hour
volume. The highest intersection service volume for
one hour was 12434 PCUs
Cuddalore arm of ECR : 5810 PCU
Chennai arm of ECR : 5341 PCU
Puducherry arm of NH 66 : 5052 PCU
Vazhudavur Road arm : 4713 PCU
Tindivanam arm of NH 66 : 3951 PCU
3.7 PAVEMENT COMPOSITION
Existing road has been built over the span of several
years. No clear history and composition of the
existing pavement may be available. In order to
assess the composition of the existing pavement
and to determine the strength of existing sub grade
soil, trial pit investigations conducted on the existing
road. Existing road has been built over the span of
several years. No clear history and composition of
the existing pavement may be available. In order to
assess the composition of the existing pavement
and to determine the strength of existing sub grade
soil, trial pit investigations conducted on the existing
road.
3.8. SOIL CHARACTERISTICS
The soil type on project junction is varies from Silty
to Gravelly soil. The CBR of existing sub-grade soil
is varies from 7% to 8.5%. The pavement crust for
project junction is different in composition and
thickness at various arms. The project road
consisting about 250mm Granular Sub Base layer
followed with 200mm to 300mm Water Bound
Macadam layer. Over that, a 200 mm thick
bituminous course layers are observed.
4.0 RESULTS AND DISCUSSION
The above mentioned surveys are give clear traffic
inflow and outflow of junction and result are given
below as picture representation
Table 1- Details Average Daily Traffic
5. CONCLUSION
The traffic survey procedure are done to construct a
Grade Separator and this data can be utilized for
future traffic forecaste. Through this study the Daily
Average Traffic is more in chennai, cuddalore and
puducherry arm. The Rajiv Gandhi Square in
puducherry is a gateway to other cities hence it need
grade separator on consideration with space
restriction around the site and traffic care is needed.
ACKNOWLEDGEMENT
The authors would like to thank Dr.Pauls
Engineering college, villupuram for their support in
carrying out this work. I am very much obliged to our
HOD Mrs.J.P.Annie Sweetlin,M.Tech.,(Ph.D) for her
guidance and supported to carry out the work
effectively. I would like to extend my gratitude and
thanks to our beloved parents for their constant
support and encouragement to complete this project.
REFERENCES
[1] Kavitha, Jaya kumari, Jeeva, Bavithra,
Kokila.Bharathiyar Institute of Engineering for
Women, Deviyakurichi, in National Conference
on Research Advances in Communication,
Computation, Electrical Science and Structures
(NCRACCESS-2015)
[2] IRC Sp:090 Manual for Grade Separators and
elevated
[3] IRC-SP-41-1994 Guidelines for design of graded
intersection.
[4] S.K.Khanna and C.E.G Justo Highway
Engineering Eighth Edition.
[5] Mathew, (2014) in Times journals Interchanges

More Related Content

Similar to vino journal.docx

" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
Nishant Pandey
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
Pronob Ghosh
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)
IJERA Editor
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
Bharadwaj B
 
Performance Evaluation of Rigid Pavements
Performance Evaluation of Rigid PavementsPerformance Evaluation of Rigid Pavements
Performance Evaluation of Rigid Pavements
IRJET Journal
 
Paper
PaperPaper
Evaluation of Flexible Pavement: Reviews
Evaluation of Flexible Pavement:  ReviewsEvaluation of Flexible Pavement:  Reviews
Evaluation of Flexible Pavement: Reviews
IRJET Journal
 
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
IRJET Journal
 
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
IRJET Journal
 
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IRJET Journal
 
Development of road network
Development of road networkDevelopment of road network
Development of road network
kishan korat
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)
Ahmed Ferdous Ankon
 
V35119123
V35119123V35119123
V35119123
IJERA Editor
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition survey
mruemran
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
Bharadwaj B
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
IRJET Journal
 
TRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdfTRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdf
Dr. BASWESHWAR JIRWANKAR
 
Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...
Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...
Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...
IJMTST Journal
 
Case Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayCase Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane Highway
IRJET Journal
 
“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”
IRJET Journal
 

Similar to vino journal.docx (20)

" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
 
Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)Design & Construction of B.I.T. Driveway (As per rural specification)
Design & Construction of B.I.T. Driveway (As per rural specification)
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
Performance Evaluation of Rigid Pavements
Performance Evaluation of Rigid PavementsPerformance Evaluation of Rigid Pavements
Performance Evaluation of Rigid Pavements
 
Paper
PaperPaper
Paper
 
Evaluation of Flexible Pavement: Reviews
Evaluation of Flexible Pavement:  ReviewsEvaluation of Flexible Pavement:  Reviews
Evaluation of Flexible Pavement: Reviews
 
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
 
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
MEASURE EFFECTIVENESS OF ROUNDABOUTS IN URBAN AREAS AND THEIR COMPARISON WITH...
 
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
 
Development of road network
Development of road networkDevelopment of road network
Development of road network
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)
 
V35119123
V35119123V35119123
V35119123
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition survey
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
TRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdfTRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdf
 
Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...
Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...
Effectiveness of using Geotextiles in Flexible Pavements and Life-Cycle Cost ...
 
Case Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayCase Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane Highway
 
“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”“ANALYSIS AND DESIGN OF MDR-34”
“ANALYSIS AND DESIGN OF MDR-34”
 

Recently uploaded

World trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORT
World trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORTWorld trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORT
World trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORT
deekshithmaroli666
 
Call Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls Jaipur
Call Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls JaipurCall Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls Jaipur
Call Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls Jaipur
reena tandan
 
Call Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra Escort
Call Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra EscortCall Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra Escort
Call Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra Escort
devkumar5467878
 
Call Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur Rajasthan
Call Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur RajasthanCall Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur Rajasthan
Call Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur Rajasthan
ishu38418
 
Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...
Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...
Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...
ishu38418
 
🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...
🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...
🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...
Ak47$A19
 
Call Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl Ahmedabad
Call Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl AhmedabadCall Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl Ahmedabad
Call Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl Ahmedabad
babesbookhot
 
🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours
🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours
🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours
bookkdreambebe
 
Ways to keep strategy alive throughout a project, in the smaller moments
Ways to keep strategy alive throughout a project, in the smaller momentsWays to keep strategy alive throughout a project, in the smaller moments
Ways to keep strategy alive throughout a project, in the smaller moments
Ariana Koblitz
 
v1-replaced– AI Explanations as Two-Way Experiences
v1-replaced– AI Explanations as Two-Way Experiencesv1-replaced– AI Explanations as Two-Way Experiences
v1-replaced– AI Explanations as Two-Way Experiences
Design for Context
 
Call Girls Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls Jaipur
Call Girls  Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls JaipurCall Girls  Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls Jaipur
Call Girls Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls Jaipur
shardda patel
 
Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...
Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...
Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...
deepakvermat423724
 
Call Girls Jaipur Aaradhya 8445551418 Independent Escort Service Jaipur
Call Girls Jaipur Aaradhya 8445551418 Independent Escort Service JaipurCall Girls Jaipur Aaradhya 8445551418 Independent Escort Service Jaipur
Call Girls Jaipur Aaradhya 8445551418 Independent Escort Service Jaipur
TanyaAhuja34 $S2
 
Pune Call Girls ♠ 9352988975 ♠ Beautiful Call Girls In Pune
Pune Call Girls  ♠ 9352988975 ♠ Beautiful Call Girls In PunePune Call Girls  ♠ 9352988975 ♠ Beautiful Call Girls In Pune
Pune Call Girls ♠ 9352988975 ♠ Beautiful Call Girls In Pune
meenusingh4354543
 
Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7
Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7
Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7
sexytaniya455
 
Value based approach to heritae conservation -.docx
Value based approach to heritae conservation -.docxValue based approach to heritae conservation -.docx
Value based approach to heritae conservation -.docx
JIT KUMAR GUPTA
 
VIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service Jaipur
VIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service JaipurVIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service Jaipur
VIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service Jaipur
vipgirlschennai
 
AR 232 - TRENDS IN SOLID WASTE MANAGEMENT
AR 232 - TRENDS IN SOLID WASTE MANAGEMENTAR 232 - TRENDS IN SOLID WASTE MANAGEMENT
AR 232 - TRENDS IN SOLID WASTE MANAGEMENT
mpramos8
 
Call Girls Jaipur Aaradhya 8445551418 Night Call Girls Jaipur
Call Girls  Jaipur Aaradhya 8445551418 Night Call Girls JaipurCall Girls  Jaipur Aaradhya 8445551418 Night Call Girls Jaipur
Call Girls Jaipur Aaradhya 8445551418 Night Call Girls Jaipur
vipgirlschennai
 
💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...
💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...
💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...
radika pandey
 

Recently uploaded (20)

World trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORT
World trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORTWorld trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORT
World trade center in kerala proposal- AR. DEEKSHITH MAROLI 724519251008 REPORT
 
Call Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls Jaipur
Call Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls JaipurCall Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls Jaipur
Call Girl Jaipur Aashi WhatsApp 👉☎️8445551418 VIP Call Girls Jaipur
 
Call Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra Escort
Call Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra EscortCall Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra Escort
Call Girls Agra ☎️ +91-7426014248 😍 Agra Call Girl Beauty Girls Agra Escort
 
Call Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur Rajasthan
Call Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur RajasthanCall Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur Rajasthan
Call Girls In Jaipur {8445551418} ❤️VVIP JIYA Call Girl in Jaipur Rajasthan
 
Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...
Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...
Call Girls Service Jaipur {8445551418} ❤️BHAWNA VIP Jaipur Call Girl UKHBET E...
 
🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...
🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...
🔥Call Girl Contact Number Chandigarh 💯Call Us 🔝 70230594 🔝💃Independent Chandi...
 
Call Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl Ahmedabad
Call Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl AhmedabadCall Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl Ahmedabad
Call Girls Ahmedabad( 🤑 7488326553 🤑) Vip Call Girl Ahmedabad
 
🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours
🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours
🚐Packers and Movers In Gurgaon 📞0000000000 📦ShiftingExpert Available 24 hours
 
Ways to keep strategy alive throughout a project, in the smaller moments
Ways to keep strategy alive throughout a project, in the smaller momentsWays to keep strategy alive throughout a project, in the smaller moments
Ways to keep strategy alive throughout a project, in the smaller moments
 
v1-replaced– AI Explanations as Two-Way Experiences
v1-replaced– AI Explanations as Two-Way Experiencesv1-replaced– AI Explanations as Two-Way Experiences
v1-replaced– AI Explanations as Two-Way Experiences
 
Call Girls Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls Jaipur
Call Girls  Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls JaipurCall Girls  Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls Jaipur
Call Girls Jaipur Diya 👉 ☎️ 8445551418 Night Call Girls Jaipur
 
Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...
Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...
Premium Call Girls In Mahipalpur ( Delhi ) 🔥 9711199012 ❄- Pick Your Dream Ca...
 
Call Girls Jaipur Aaradhya 8445551418 Independent Escort Service Jaipur
Call Girls Jaipur Aaradhya 8445551418 Independent Escort Service JaipurCall Girls Jaipur Aaradhya 8445551418 Independent Escort Service Jaipur
Call Girls Jaipur Aaradhya 8445551418 Independent Escort Service Jaipur
 
Pune Call Girls ♠ 9352988975 ♠ Beautiful Call Girls In Pune
Pune Call Girls  ♠ 9352988975 ♠ Beautiful Call Girls In PunePune Call Girls  ♠ 9352988975 ♠ Beautiful Call Girls In Pune
Pune Call Girls ♠ 9352988975 ♠ Beautiful Call Girls In Pune
 
Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7
Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7
Call Girls Varanasi 8824825030 Escort In Varanasi service 24X7
 
Value based approach to heritae conservation -.docx
Value based approach to heritae conservation -.docxValue based approach to heritae conservation -.docx
Value based approach to heritae conservation -.docx
 
VIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service Jaipur
VIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service JaipurVIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service Jaipur
VIP Call Girls Jaipur Riddhi 8445551418 Independent Escort Service Jaipur
 
AR 232 - TRENDS IN SOLID WASTE MANAGEMENT
AR 232 - TRENDS IN SOLID WASTE MANAGEMENTAR 232 - TRENDS IN SOLID WASTE MANAGEMENT
AR 232 - TRENDS IN SOLID WASTE MANAGEMENT
 
Call Girls Jaipur Aaradhya 8445551418 Night Call Girls Jaipur
Call Girls  Jaipur Aaradhya 8445551418 Night Call Girls JaipurCall Girls  Jaipur Aaradhya 8445551418 Night Call Girls Jaipur
Call Girls Jaipur Aaradhya 8445551418 Night Call Girls Jaipur
 
💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...
💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...
💕SIMRAN VARMA💕Book Call Girls Jaipur ↘️8445551418↙️One Night Stand With Lonel...
 

vino journal.docx

  • 1. Traffic Survey Procedure for Construction of Grade Separators Ms.A.V.Vinoshri Mr.R.Thirumalai Raja M.E. IInd Year Assistant Professor Dr. Pauls Engineering College Dr.Pauls Engineering College Tamil Nadu,INDIA Tamil Nadu,INDIA Email ID: avvinoshri@gmail.com Email ID: malai_gtsri@yahoo.in Abstract: This project deals with construction of Grade Separator so it need traffic data for design and drafting. The location site is Rajiv Gandhi Square in Puducherry which is 5 arm junction of connecting NH 66 and ECR Chennai. Traffic surveys are conducted as per Indian Standards which show the traffic movement In each five arm in junction. This project aim is to reduce traffic congestion in appropriate junction with available area which gives remedy through construction of Grade Separators. Key words : Grade Separators, Rajiv Gandhi Square, Traffic congestion, Traffic separation. ---------------------------------------------------------------------------------------------------------------------------------------------------------------- 1.0 INTRODUCTION Transportation contributes to the economic, industrial, social and cultural development of any country. Puducherry is a city, an urban agglomeration and a municipality in Puducherry district in the Indian union territory of Puducherry. Rajiv Gandhi Square is one of the major intersections in Puducherry City. The National Highway - 66 (Tindivanam – Puducherry) and East Cost Road (Chennai – Cuddalore) are crossing each other almost perpendicularly. The Puducherry – Vazhudavur Road join with NH-66 Tindivanam arm within 75m from the junction. Both the junctions are signalized and signal co-ordination is in place for control the traffic movements. The project junction is in a plain terrain, within the built up areas. It is observed that the major roads in the project location predominantly has a straight alignment and traverses through plain terrain. The horizontal curves in general conform to acceptable geometric standards in terms of horizontal curve, radius and sight distance. Objectives of traffic survey are to construction of grade separator and allow traffic to move freely. April to early June, when maximum temperatures frequently hit the 41o C mark. The average maximum temperature is 36o C. Minimum temperatures are in the order of 28 - 32 o C. This is followed by a period of high humidity and occasional thundershowers from June till September. 2.0 LITERATURE REVIEW Kavitha, Jaya kumari, Jeeva, Bavithra, Kokila.Bharathiyar Institute of Engineering for Women, Deviyakurichi, Analysis and design of grade separator done by salem college students traffic survey was conducted to know the hourly Passenger Car Unit (HPCU) at four road Intersection, salem From survey the value of HPCU of the intersection is 6547 taking the design period of 30 years, the value of HPCU is found 65273. 3.0 MATERIALS AND METHODS Methodology for carrying out the works is in line with the requirements of the project. The methodology adopted is described in subsequent section of this chapter. 3.1 RECONNAISSANCE SURVEY The detailed ground reconnaissance was undertaken after a preliminary reconnaissance survey. 3.2 TOPOGRAPHICAL SURVEY The Topographic survey was carried out for the project area as per ToR, based on the IRC guidelines. The survey was undertaken by Total Station and GPS to develop a Digital Terrain Model (DTM). The basic objective of the topographic survey is to capture the essential ground features along the road in order to workout Grade Separator alignment, at grade improvements and for working out detailed design All the Survey Data are processed to generate DTM (Digital Terrain Model) in MX compatible format and Civil 3D. Processed data is submitted in AutoCAD 3D format using layer systems. 3.3 ROAD INVENTORY SURVEY After having a detailed reconnaissance survey, a field inventory of the project roads was carried out. The objective of the road inventory survey was to assess the potential capacity of the project roads. Road inventory was done by physical measurement
  • 2. and visual evaluation. The data collected were right of way, carriageway, surface type, abutting land use, drainage condition, etc. The existing ROW of the roads was measured in the field. Due to absence of ROW stones and markings on the ground, the land width between properties on either side of the road was considered as available ROW of the particular road. The Footpath is existing on either side of Chennai arm. The Strom Water Drain of 0.8m to 1.5m size is existing in all the direction of project junction. 3.4 PAVEMENT CONDITION SURVEY The condition of the pavement is assessed as per IRC: 82 – 1982 by walking along the project roads for a close inspection. The assessment survey determines the pavement condition, shoulder condition and condition of other road features. Pavement Condition Survey was carried out to identify the type of distress and to estimate the extent of distress indicators. Generally the East Cost Road (Chennai - Cuddalore) has a good BT surface of six lane configuration with central median, but the footpath over drain is in poor condition. NH-66 (Puducherry – Tindivanam) has a good BT surface of four lane configuration with central median. Vazhudavur road has a fair BT surface of two lane configuration. 3.5 TRAFFIC SURVEY Traffic surveys are intended to understand the exising traffic scenario on the project area and to identify the improvements required for upgrading them to have better facilities. The following primary traffic surveys were conducted on the project roads. 3.6 PEAK HOURS TRAFFIC VOLUME The peak hour traffic volume recorded between 08:45 to 09:45 hrs and the peak hour volume accounts for 8.97 percent of the total 16 hour volume. The highest intersection service volume for one hour was 12434 PCUs Cuddalore arm of ECR : 5810 PCU Chennai arm of ECR : 5341 PCU Puducherry arm of NH 66 : 5052 PCU Vazhudavur Road arm : 4713 PCU Tindivanam arm of NH 66 : 3951 PCU 3.7 PAVEMENT COMPOSITION Existing road has been built over the span of several years. No clear history and composition of the existing pavement may be available. In order to assess the composition of the existing pavement and to determine the strength of existing sub grade soil, trial pit investigations conducted on the existing road. Existing road has been built over the span of several years. No clear history and composition of the existing pavement may be available. In order to assess the composition of the existing pavement and to determine the strength of existing sub grade soil, trial pit investigations conducted on the existing road. 3.8. SOIL CHARACTERISTICS The soil type on project junction is varies from Silty to Gravelly soil. The CBR of existing sub-grade soil is varies from 7% to 8.5%. The pavement crust for project junction is different in composition and thickness at various arms. The project road consisting about 250mm Granular Sub Base layer followed with 200mm to 300mm Water Bound Macadam layer. Over that, a 200 mm thick bituminous course layers are observed. 4.0 RESULTS AND DISCUSSION The above mentioned surveys are give clear traffic inflow and outflow of junction and result are given below as picture representation
  • 3. Table 1- Details Average Daily Traffic
  • 4. 5. CONCLUSION The traffic survey procedure are done to construct a Grade Separator and this data can be utilized for future traffic forecaste. Through this study the Daily Average Traffic is more in chennai, cuddalore and puducherry arm. The Rajiv Gandhi Square in puducherry is a gateway to other cities hence it need grade separator on consideration with space restriction around the site and traffic care is needed. ACKNOWLEDGEMENT The authors would like to thank Dr.Pauls Engineering college, villupuram for their support in carrying out this work. I am very much obliged to our HOD Mrs.J.P.Annie Sweetlin,M.Tech.,(Ph.D) for her guidance and supported to carry out the work effectively. I would like to extend my gratitude and thanks to our beloved parents for their constant support and encouragement to complete this project. REFERENCES [1] Kavitha, Jaya kumari, Jeeva, Bavithra, Kokila.Bharathiyar Institute of Engineering for Women, Deviyakurichi, in National Conference on Research Advances in Communication, Computation, Electrical Science and Structures (NCRACCESS-2015) [2] IRC Sp:090 Manual for Grade Separators and elevated [3] IRC-SP-41-1994 Guidelines for design of graded intersection. [4] S.K.Khanna and C.E.G Justo Highway Engineering Eighth Edition. [5] Mathew, (2014) in Times journals Interchanges
  翻译: