尊敬的 微信汇率:1円 ≈ 0.046239 元 支付宝汇率:1円 ≈ 0.04633元 [退出登录]
SlideShare a Scribd company logo
STRUCTURAL & NON
STRUCTURAL MEASURES
Structural measures are any
physical construction to reduce or
avoid possible impacts of hazards,
or the application of engineering
techniques or technology to
achieve hazard resistance and
resilience in structures or systems.
What are non-structural measures in
disaster?
Non-structural measures are measures not
involving physical construction which use
knowledge, practice or agreement to
reduce disaster risks and impacts, in
particular through policies and laws, public
awareness raising, training and education.
STRUCTURAL MEASURES
FOR CYCLONE
STRUCTURAL MEASURES FOR CYCLONE
▪ Engineering measures such as cyclone shelter is one of the key cyclone
mitigation measure adapted
▪ For effective employment and management of cyclone shelters,
multipurpose versions have been built in carefully selected locations,
identifying uses for both normal and disaster periods.
▪ Cyclone shelters demonstrate an excellent dual purpose use during non-
disaster periods and cyclones.
▪ Retrofitting Non-engineered Structures
▪ Saline embankments and Raised embankment or levees
Non Structural measures for Cyclone
• Hazard mapping
• Land use planning
• Flood management
• Improving vegetation cover
• Mangrove plantation
DROUGHT RISK REDUCTION
MEASURES (STRUCTURAL)
DROUGHT RISK REDUCTION MEASURES
▪ Deep tube wells in the region to increase agriculturalproductivity.
▪ Irrigation is necessary for many types of crops, especially forrice
cultivation.
▪ There is a significant development of irrigation systems nowadays in
compared to 1980s.
▪ Construction of deep wells and bore wells and repair of those which
are defunct and continuous repair of hand pumps.
Non-Structural measures
Early warning;
Early response;
An efficient intelligence system;
Climate resilient crops
Timely maintenance of the irrigation system and adoption of
a crop stabilization strategy;
An effective programme of relief works by advance shelf of
projects of the works by different departments
Alternate arrangements for drinking-water supply;
Pre-positioning of adequate foodstuff and their delivery
EARTHQUAKE RISK
REDUCTION MEASURES
(NON-STRUCTURAL)
EARTHQUAKE RISK REDUCTION
MEASURES
▪ Adequate sustainable land use planning with seismic microzoning
mapping.
▪ The link between land use master planning for earthquake protection
and other urban planning protection measures and the control of
building quality are so interrelated.
▪ Very high resolution satellites are being used for the detection of
tectonic movement of the earth and earth’s fault zones
▪ Further to that, seismic vulnerability maps of the buildings and
earthquake prevention plan for urban areas are some other useful
measures for earthquake prevention.
Structural measures
• IS Codes – IS1893
• Seismic dampers
• Base isolation technique
• Diaphragm walls
• Plan/Shape of the building
• Urban development rules – DCR, CMDA,etc
FLOOD RISK REDUCTION
MEASURES (STRUCTURAL)
FLOOD RISK REDUCTION MEASURES
(STRUCTURAL)
▪ Structural measure refers to those disasters management or mitigation
tools which have physical entity such as embankment, flood or cyclone
shelter, dam etc.
▪ Structural measures aim at protecting an area up to certain level of
flooding. It can be divided into five categories:
▪ Storage reservoir or basins to restrict overflow.
▪ Retarding basins to lower the flow of flooding
▪ Levees and floodwalls to confine floodwaters
▪ Improvement of channel capacity
▪ Some structural measures such as Flood Embankment, Channel Improvement,
River Training, Coastal Embankment etc. to combat the flood sufferings.
▪ There are some options of structural measures-
▪ Dams and Reservoirs for impounding excess runoff.
▪ Detention basin, Retention Pond to lower the level of flooding downstream. (Not
feasible due to topographical limitation.)
▪ Embankment, Dyke, Polder,Levee, Bund, or Flood wall to block the movement of
water from rivers to floodplain. (most preferred option)
▪ Improvement of Conveyance Capacity (planned but not done due to cost element)
▪ Flood bye pass, flood diversion ( notfeasible)
▪ Watershed Management and afforestation (not practiced.)
FLOOD RISK REDUCTION MEASURES
(STRUCTURAL)
FLOOD RISK REDUCTION MEASURES
(STRUCTURAL)
▪ In India
▪ Flood Embankment,
▪ Channel Improvement,
▪ River Training,
▪ Coastal Embankment etc. to combat the flood sufferings.
▪ Among these structural measures, construction of embankment ismost
popular and very old practice. This is also a very cheap method
compared to other structural measures.
FLOOD RISK REDUCTION MEASURES
(STRUCTURAL)
▪ Since 1960s, India government is involved in large scale flood control
projects and by 1993 over 8,000km of embankments and other
structures had been built at a cost of over US$5bilion.
▪ Loop embankments have been built to protect major urban centres
and coastal agricultural land while submersible embankments have
been constructed for crop production and protection against flash
floods in certain areas.
FLOOD RISK REDUCTION MEASURES
(STRUCTURAL)
▪ Impacts of Structural measures
▪ With the experience over the last few decades, it was observedthat
the structural measures do not usually bring only blessings. They
also have adverse effect.
▪ The adverse effects always do not appear shortly after their
construction but become apparent with the elapse of time.
FLOOD RISK REDUCTION
MEASURES
(NON-STRUCTURAL)
FLOOD RISK REDUCTION MEASURES
(NON-STRUCTURAL)
▪ Non-Structural Measure to reduce loss or damage by administrative
measures. It does not control or affect the process ofinundation.
▪ Flood Plain Zoning &Management;
▪ Policies for infrastructure Planning and Development in the flood plains;
▪ Flood Proofing;
▪ Disaster Preparedness & Response Planning and
▪ Flood Forecasting and Warning.
▪ Flood fighting,
▪ Evacuation and shelter management,
▪ Flood insurance
FLOOD RISK REDUCTION MEASURES
(NON-STRUCTURAL)
▪ Non-Structural Measure
▪ Raised community areas with basic human needs.
▪ Home placed at higher elevations and built with flood resistant materials.
▪ Flood resistant infrastructure to continue critical services during floods.
▪ Floodplain zoning
▪ Changes in cropping pattern
▪ Training and Public Awareness
▪ Institutional Arrangements
▪ Flood Warning System
▪ Local Disaster Action Plans
▪ flood forecasting and warning were later incorporated as it was felt that
structural measures alone could not mitigate flood problems.
FLOOD RISK REDUCTION MEASURES
(NON-STRUCTURAL)
▪ Non-structural mitigation measures undertaken focus on preparedness
and possibilities for action to reduce risks and losses and better co-
ordination mechanisms between all actors involved (GO, NGO and
community people at grass- root level) during all phases of any disaster.
▪ Due to increased population pressure it is a typical scenario in
India that the human habitat is extending more and more towards
flood plains, which are vulnerable to recurrent flood.
▪ Moreover, more lands of the flood plains are being occupied and
converted to habitat and agricultural lands, which were mostly, back
swamp. Flood plains are generally regarded as the extended portion of
the main river channel.
FLOOD RISK REDUCTION MEASURES
(NON-STRUCTURAL)
▪ Flood plain zoning and management is the effective means of
regulating habitat construction and agricultural use with minimum
interference to the natural condition prevailing in the flood plains.
▪ Due to a swell in population in the flood plains, the governments are
bound to undertake more and more development projects in the flood
plains.
▪ Policy formulation should be on the basis of scientific studyand
research
FLOOD RISK REDUCTION MEASURES
(NON-STRUCTURAL)
▪ Flood proofing is a measure, which has been found to have less adverse
effects. In most of the flood prone areas in India, the people used to flood
proofing technique in such a way that people build their houses on the built-
up earthen mounds. This is being in practice for centuries. Community
participation and awareness are very important in the flood proofing
measures.
▪ Many of the damages of the floods can be reduced to a great extent through a
proper Disaster Preparedness and Response Planning. For the Disaster
Preparedness regarding the flood, the most important tool is the Flood
Forecasting and Warning System. With the current advancement in the
information technology and hydrological and hydraulic sciences, it is possible
to provide most accurate advance warning
▪ In this regard assessment of response of the people to the flood warning is
very important element in response planning. Disaster Preparedness program
cannot be made successful without proper response planning.

More Related Content

What's hot

floods
floodsfloods
Floods
FloodsFloods
Floods
94417
 
Floods
FloodsFloods
Floods
anwar sadath
 
Flood control
Flood controlFlood control
Flood control
tharamttc
 
1 introduction to hydrology
1   introduction to hydrology1   introduction to hydrology
1 introduction to hydrology
AboutHydrology Slides
 
Losses Resulting from a Disaster
Losses Resulting from a DisasterLosses Resulting from a Disaster
Losses Resulting from a Disaster
Anchit Garg
 
Flood risk assessment and management
Flood risk assessment and managementFlood risk assessment and management
Flood risk assessment and management
floodimpat project
 
Inclusive Disaster and Development
Inclusive Disaster and DevelopmentInclusive Disaster and Development
Inclusive Disaster and Development
Yeasir Arafat Alve
 
Flood forecasting presentation final
Flood forecasting presentation finalFlood forecasting presentation final
Flood forecasting presentation final
Abir Mohammad
 
Flood presentation with more media
Flood presentation with more mediaFlood presentation with more media
Flood presentation with more media
Gaurav Devnath
 
Integrated Water Resources Management (IWRM)
Integrated Water Resources  Management (IWRM)Integrated Water Resources  Management (IWRM)
Integrated Water Resources Management (IWRM)
Muhammad Hannan
 
Floods
FloodsFloods
Risk and Disaster - Challenge from a Global Perspective
Risk and Disaster - Challenge from a Global PerspectiveRisk and Disaster - Challenge from a Global Perspective
Risk and Disaster - Challenge from a Global Perspective
Global Risk Forum GRFDavos
 
Counter Disaster Planning, Response And Recovery
Counter  Disaster  Planning, Response And RecoveryCounter  Disaster  Planning, Response And Recovery
Counter Disaster Planning, Response And Recovery
Fe Angela Verzosa
 
Gallery in Concrete Gravity Dam
Gallery in Concrete Gravity DamGallery in Concrete Gravity Dam
Gallery in Concrete Gravity Dam
Manish Khandelwal
 
Disaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.pptDisaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.ppt
Dr.Prabu Mani
 
River engineering flood design
River engineering flood designRiver engineering flood design
River engineering flood design
Sharifah Ain
 
Drought management and water harvesting m5
Drought management and water harvesting m5Drought management and water harvesting m5
Drought management and water harvesting m5
Bibhabasu Mohanty
 
Design of Hydraulic Structure
Design of Hydraulic StructureDesign of Hydraulic Structure
Design of Hydraulic Structure
Vidhi Khokhani
 
Structural and non structural measures - Disaster Management
Structural and non structural measures - Disaster ManagementStructural and non structural measures - Disaster Management
Structural and non structural measures - Disaster Management
Leema Margret A
 

What's hot (20)

floods
floodsfloods
floods
 
Floods
FloodsFloods
Floods
 
Floods
FloodsFloods
Floods
 
Flood control
Flood controlFlood control
Flood control
 
1 introduction to hydrology
1   introduction to hydrology1   introduction to hydrology
1 introduction to hydrology
 
Losses Resulting from a Disaster
Losses Resulting from a DisasterLosses Resulting from a Disaster
Losses Resulting from a Disaster
 
Flood risk assessment and management
Flood risk assessment and managementFlood risk assessment and management
Flood risk assessment and management
 
Inclusive Disaster and Development
Inclusive Disaster and DevelopmentInclusive Disaster and Development
Inclusive Disaster and Development
 
Flood forecasting presentation final
Flood forecasting presentation finalFlood forecasting presentation final
Flood forecasting presentation final
 
Flood presentation with more media
Flood presentation with more mediaFlood presentation with more media
Flood presentation with more media
 
Integrated Water Resources Management (IWRM)
Integrated Water Resources  Management (IWRM)Integrated Water Resources  Management (IWRM)
Integrated Water Resources Management (IWRM)
 
Floods
FloodsFloods
Floods
 
Risk and Disaster - Challenge from a Global Perspective
Risk and Disaster - Challenge from a Global PerspectiveRisk and Disaster - Challenge from a Global Perspective
Risk and Disaster - Challenge from a Global Perspective
 
Counter Disaster Planning, Response And Recovery
Counter  Disaster  Planning, Response And RecoveryCounter  Disaster  Planning, Response And Recovery
Counter Disaster Planning, Response And Recovery
 
Gallery in Concrete Gravity Dam
Gallery in Concrete Gravity DamGallery in Concrete Gravity Dam
Gallery in Concrete Gravity Dam
 
Disaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.pptDisaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.ppt
 
River engineering flood design
River engineering flood designRiver engineering flood design
River engineering flood design
 
Drought management and water harvesting m5
Drought management and water harvesting m5Drought management and water harvesting m5
Drought management and water harvesting m5
 
Design of Hydraulic Structure
Design of Hydraulic StructureDesign of Hydraulic Structure
Design of Hydraulic Structure
 
Structural and non structural measures - Disaster Management
Structural and non structural measures - Disaster ManagementStructural and non structural measures - Disaster Management
Structural and non structural measures - Disaster Management
 

Similar to Structural and non-structural measure.pptx

Disaster Mitigation at National and Global level
Disaster Mitigation at National and Global levelDisaster Mitigation at National and Global level
Disaster Mitigation at National and Global level
Abdul Rehman
 
Coastal Urban Flood Risk Management
Coastal Urban Flood Risk ManagementCoastal Urban Flood Risk Management
Coastal Urban Flood Risk Management
REMYA PANICKER
 
Disaster resistant structure
Disaster resistant structure Disaster resistant structure
Disaster resistant structure
AlkaPrakash4
 
Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.
Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.
Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.
Rajesh Kolli
 
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...
piyush andani
 
Disaster management
Disaster managementDisaster management
Disaster management
ShivamMishra424
 
Disaster Management Flooding and Landslide
Disaster Management Flooding and LandslideDisaster Management Flooding and Landslide
Disaster Management Flooding and Landslide
sonika patel
 
Flood Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...
Flood  Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...Flood  Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...
Flood Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...
Adedoyin Lasisi
 
Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...
Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...
Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...
BuildBetterJamaica
 
Watershed management dr.chandan
Watershed management  dr.chandanWatershed management  dr.chandan
Watershed management dr.chandan
PresidencyUniversity
 
Front-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptxFront-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptx
IpsitaDutta13
 
Front-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptxFront-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptx
IpsitaDutta13
 
mitigation 2.pptx
mitigation 2.pptxmitigation 2.pptx
mitigation 2.pptx
PRana007
 
The Economics of Disaster: Reduction, Mitigation, and Mainstreaming
The Economics of Disaster: Reduction, Mitigation, and MainstreamingThe Economics of Disaster: Reduction, Mitigation, and Mainstreaming
The Economics of Disaster: Reduction, Mitigation, and Mainstreaming
Lynn Hammett
 
Disaster management and mitigation of disaster
Disaster management and mitigation of disasterDisaster management and mitigation of disaster
Disaster management and mitigation of disaster
ARUNKUMARC39
 
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATIONAPPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
Aditya Mistry
 
Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
ICEM - International Centre for Environmental Management
 
Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...
Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...
Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...
Independent Evaluation Group /World Bank Group
 
Stormwater-Management-Design.pptx
Stormwater-Management-Design.pptxStormwater-Management-Design.pptx
Stormwater-Management-Design.pptx
tanxtengineering
 
Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)
Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)
Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)
FAO
 

Similar to Structural and non-structural measure.pptx (20)

Disaster Mitigation at National and Global level
Disaster Mitigation at National and Global levelDisaster Mitigation at National and Global level
Disaster Mitigation at National and Global level
 
Coastal Urban Flood Risk Management
Coastal Urban Flood Risk ManagementCoastal Urban Flood Risk Management
Coastal Urban Flood Risk Management
 
Disaster resistant structure
Disaster resistant structure Disaster resistant structure
Disaster resistant structure
 
Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.
Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.
Construction for Disaster Management & Mitigation - A Case of Vijayawada, AP.
 
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION un...
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Disaster Management Flooding and Landslide
Disaster Management Flooding and LandslideDisaster Management Flooding and Landslide
Disaster Management Flooding and Landslide
 
Flood Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...
Flood  Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...Flood  Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...
Flood Disaster, Vulnerability and Flood Resilience_ Prevention and Disaster ...
 
Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...
Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...
Dr. Kwame Emmanuel Build Better Jamaica Presentation at Caribbean School of A...
 
Watershed management dr.chandan
Watershed management  dr.chandanWatershed management  dr.chandan
Watershed management dr.chandan
 
Front-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptxFront-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptx
 
Front-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptxFront-loading Urban Stormwater Management For Success.pptx
Front-loading Urban Stormwater Management For Success.pptx
 
mitigation 2.pptx
mitigation 2.pptxmitigation 2.pptx
mitigation 2.pptx
 
The Economics of Disaster: Reduction, Mitigation, and Mainstreaming
The Economics of Disaster: Reduction, Mitigation, and MainstreamingThe Economics of Disaster: Reduction, Mitigation, and Mainstreaming
The Economics of Disaster: Reduction, Mitigation, and Mainstreaming
 
Disaster management and mitigation of disaster
Disaster management and mitigation of disasterDisaster management and mitigation of disaster
Disaster management and mitigation of disaster
 
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATIONAPPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
 
Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
 
Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...
Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...
Adapting to Climate Change: Assessing World Bank Group Experienceadaptation f...
 
Stormwater-Management-Design.pptx
Stormwater-Management-Design.pptxStormwater-Management-Design.pptx
Stormwater-Management-Design.pptx
 
Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)
Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)
Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA)
 

Recently uploaded

Parabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position FeedbackParabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position Feedback
StevenPatrick17
 
一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理
一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理
一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理
lyurzi7r
 
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
uhynup
 
LinkedIn Strategic Guidelines for June 2024
LinkedIn Strategic Guidelines  for June 2024LinkedIn Strategic Guidelines  for June 2024
LinkedIn Strategic Guidelines for June 2024
Bruce Bennett
 
一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理
一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理
一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理
auagoh
 
Untitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohkUntitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohk
Excellence Tecnology
 
🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...
🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...
🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...
AK47
 
Salary Guide 2024 Report with respect to candidates perspective
Salary Guide 2024 Report with respect to candidates perspectiveSalary Guide 2024 Report with respect to candidates perspective
Salary Guide 2024 Report with respect to candidates perspective
abhinavsingh4u1
 
🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...
🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...
🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...
khushi sharman06
 
一比一原版加拿大多伦多大学毕业证如何办理
一比一原版加拿大多伦多大学毕业证如何办理一比一原版加拿大多伦多大学毕业证如何办理
一比一原版加拿大多伦多大学毕业证如何办理
ofogyhw
 
❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...
❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...
❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...
kumarilali919
 
BTech Admission 2024: Course, Fee, Eligibility, Entrance
BTech Admission 2024: Course, Fee, Eligibility, EntranceBTech Admission 2024: Course, Fee, Eligibility, Entrance
BTech Admission 2024: Course, Fee, Eligibility, Entrance
admissiontheory1
 
Pranali Pradip Sabale BCA student resume
Pranali Pradip Sabale BCA student resumePranali Pradip Sabale BCA student resume
Pranali Pradip Sabale BCA student resume
PranaliSabale2
 
Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...
Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...
Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...
uthkarshkumar987000
 
22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.
Manu Mitra
 
Indore ℂall Girl Book 00000000 ℂall Girl Service In Indore
Indore ℂall Girl Book 00000000 ℂall Girl Service In IndoreIndore ℂall Girl Book 00000000 ℂall Girl Service In Indore
Indore ℂall Girl Book 00000000 ℂall Girl Service In Indore
babesbookhot
 
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
zukou
 
Chapter 8 Negotiation.pptx Chapter 8 Negotiation.pptx
Chapter 8 Negotiation.pptx Chapter 8 Negotiation.pptxChapter 8 Negotiation.pptx Chapter 8 Negotiation.pptx
Chapter 8 Negotiation.pptx Chapter 8 Negotiation.pptx
Sheldon Byron
 
Biography and career of Gerry Falletta.pdf
Biography and career of Gerry Falletta.pdfBiography and career of Gerry Falletta.pdf
Biography and career of Gerry Falletta.pdf
Gerry Falletta
 
🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...
🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...
🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...
yuvishachadda
 

Recently uploaded (20)

Parabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position FeedbackParabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position Feedback
 
一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理
一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理
一比一原版美国罗格斯大学毕业证(rutgers学位证)如何办理
 
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
 
LinkedIn Strategic Guidelines for June 2024
LinkedIn Strategic Guidelines  for June 2024LinkedIn Strategic Guidelines  for June 2024
LinkedIn Strategic Guidelines for June 2024
 
一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理
一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理
一比一原版(isu学位证书)爱荷华州立大学毕业证如何办理
 
Untitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohkUntitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohk
 
🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...
🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...
🔥Newly Married Women Call Girls Lucknow 💯Call Us 🔝 6350257716 🔝💃Independent L...
 
Salary Guide 2024 Report with respect to candidates perspective
Salary Guide 2024 Report with respect to candidates perspectiveSalary Guide 2024 Report with respect to candidates perspective
Salary Guide 2024 Report with respect to candidates perspective
 
🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...
🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...
🔥Aligarh Call Girls 🫱 7023059433 🫲 High Class Independent Escorts Service Ava...
 
一比一原版加拿大多伦多大学毕业证如何办理
一比一原版加拿大多伦多大学毕业证如何办理一比一原版加拿大多伦多大学毕业证如何办理
一比一原版加拿大多伦多大学毕业证如何办理
 
❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...
❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...
❣VIP Call Girls Chennai 💯Call Us 🔝 7737669865 🔝💃Independent Chennai Escorts S...
 
BTech Admission 2024: Course, Fee, Eligibility, Entrance
BTech Admission 2024: Course, Fee, Eligibility, EntranceBTech Admission 2024: Course, Fee, Eligibility, Entrance
BTech Admission 2024: Course, Fee, Eligibility, Entrance
 
Pranali Pradip Sabale BCA student resume
Pranali Pradip Sabale BCA student resumePranali Pradip Sabale BCA student resume
Pranali Pradip Sabale BCA student resume
 
Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...
Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...
Cheap Rates Call Girls Bangalore 9024918724 Just CALL ME Book Beautiful Girls...
 
22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.
 
Indore ℂall Girl Book 00000000 ℂall Girl Service In Indore
Indore ℂall Girl Book 00000000 ℂall Girl Service In IndoreIndore ℂall Girl Book 00000000 ℂall Girl Service In Indore
Indore ℂall Girl Book 00000000 ℂall Girl Service In Indore
 
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
 
Chapter 8 Negotiation.pptx Chapter 8 Negotiation.pptx
Chapter 8 Negotiation.pptx Chapter 8 Negotiation.pptxChapter 8 Negotiation.pptx Chapter 8 Negotiation.pptx
Chapter 8 Negotiation.pptx Chapter 8 Negotiation.pptx
 
Biography and career of Gerry Falletta.pdf
Biography and career of Gerry Falletta.pdfBiography and career of Gerry Falletta.pdf
Biography and career of Gerry Falletta.pdf
 
🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...
🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...
🔥Foreigners Call Girls Pune 💯Call Us 🔝 7014168258 🔝💃Independent Pune Escorts ...
 

Structural and non-structural measure.pptx

  • 2. Structural measures are any physical construction to reduce or avoid possible impacts of hazards, or the application of engineering techniques or technology to achieve hazard resistance and resilience in structures or systems.
  • 3. What are non-structural measures in disaster? Non-structural measures are measures not involving physical construction which use knowledge, practice or agreement to reduce disaster risks and impacts, in particular through policies and laws, public awareness raising, training and education.
  • 5. STRUCTURAL MEASURES FOR CYCLONE ▪ Engineering measures such as cyclone shelter is one of the key cyclone mitigation measure adapted ▪ For effective employment and management of cyclone shelters, multipurpose versions have been built in carefully selected locations, identifying uses for both normal and disaster periods. ▪ Cyclone shelters demonstrate an excellent dual purpose use during non- disaster periods and cyclones. ▪ Retrofitting Non-engineered Structures ▪ Saline embankments and Raised embankment or levees
  • 6. Non Structural measures for Cyclone • Hazard mapping • Land use planning • Flood management • Improving vegetation cover • Mangrove plantation
  • 8. DROUGHT RISK REDUCTION MEASURES ▪ Deep tube wells in the region to increase agriculturalproductivity. ▪ Irrigation is necessary for many types of crops, especially forrice cultivation. ▪ There is a significant development of irrigation systems nowadays in compared to 1980s. ▪ Construction of deep wells and bore wells and repair of those which are defunct and continuous repair of hand pumps.
  • 9. Non-Structural measures Early warning; Early response; An efficient intelligence system; Climate resilient crops Timely maintenance of the irrigation system and adoption of a crop stabilization strategy; An effective programme of relief works by advance shelf of projects of the works by different departments Alternate arrangements for drinking-water supply; Pre-positioning of adequate foodstuff and their delivery
  • 11. EARTHQUAKE RISK REDUCTION MEASURES ▪ Adequate sustainable land use planning with seismic microzoning mapping. ▪ The link between land use master planning for earthquake protection and other urban planning protection measures and the control of building quality are so interrelated. ▪ Very high resolution satellites are being used for the detection of tectonic movement of the earth and earth’s fault zones ▪ Further to that, seismic vulnerability maps of the buildings and earthquake prevention plan for urban areas are some other useful measures for earthquake prevention.
  • 12. Structural measures • IS Codes – IS1893 • Seismic dampers • Base isolation technique • Diaphragm walls • Plan/Shape of the building • Urban development rules – DCR, CMDA,etc
  • 14. FLOOD RISK REDUCTION MEASURES (STRUCTURAL) ▪ Structural measure refers to those disasters management or mitigation tools which have physical entity such as embankment, flood or cyclone shelter, dam etc. ▪ Structural measures aim at protecting an area up to certain level of flooding. It can be divided into five categories: ▪ Storage reservoir or basins to restrict overflow. ▪ Retarding basins to lower the flow of flooding ▪ Levees and floodwalls to confine floodwaters ▪ Improvement of channel capacity ▪ Some structural measures such as Flood Embankment, Channel Improvement, River Training, Coastal Embankment etc. to combat the flood sufferings.
  • 15. ▪ There are some options of structural measures- ▪ Dams and Reservoirs for impounding excess runoff. ▪ Detention basin, Retention Pond to lower the level of flooding downstream. (Not feasible due to topographical limitation.) ▪ Embankment, Dyke, Polder,Levee, Bund, or Flood wall to block the movement of water from rivers to floodplain. (most preferred option) ▪ Improvement of Conveyance Capacity (planned but not done due to cost element) ▪ Flood bye pass, flood diversion ( notfeasible) ▪ Watershed Management and afforestation (not practiced.) FLOOD RISK REDUCTION MEASURES (STRUCTURAL)
  • 16. FLOOD RISK REDUCTION MEASURES (STRUCTURAL) ▪ In India ▪ Flood Embankment, ▪ Channel Improvement, ▪ River Training, ▪ Coastal Embankment etc. to combat the flood sufferings. ▪ Among these structural measures, construction of embankment ismost popular and very old practice. This is also a very cheap method compared to other structural measures.
  • 17. FLOOD RISK REDUCTION MEASURES (STRUCTURAL) ▪ Since 1960s, India government is involved in large scale flood control projects and by 1993 over 8,000km of embankments and other structures had been built at a cost of over US$5bilion. ▪ Loop embankments have been built to protect major urban centres and coastal agricultural land while submersible embankments have been constructed for crop production and protection against flash floods in certain areas.
  • 18. FLOOD RISK REDUCTION MEASURES (STRUCTURAL) ▪ Impacts of Structural measures ▪ With the experience over the last few decades, it was observedthat the structural measures do not usually bring only blessings. They also have adverse effect. ▪ The adverse effects always do not appear shortly after their construction but become apparent with the elapse of time.
  • 20. FLOOD RISK REDUCTION MEASURES (NON-STRUCTURAL) ▪ Non-Structural Measure to reduce loss or damage by administrative measures. It does not control or affect the process ofinundation. ▪ Flood Plain Zoning &Management; ▪ Policies for infrastructure Planning and Development in the flood plains; ▪ Flood Proofing; ▪ Disaster Preparedness & Response Planning and ▪ Flood Forecasting and Warning. ▪ Flood fighting, ▪ Evacuation and shelter management, ▪ Flood insurance
  • 21. FLOOD RISK REDUCTION MEASURES (NON-STRUCTURAL) ▪ Non-Structural Measure ▪ Raised community areas with basic human needs. ▪ Home placed at higher elevations and built with flood resistant materials. ▪ Flood resistant infrastructure to continue critical services during floods. ▪ Floodplain zoning ▪ Changes in cropping pattern ▪ Training and Public Awareness ▪ Institutional Arrangements ▪ Flood Warning System ▪ Local Disaster Action Plans ▪ flood forecasting and warning were later incorporated as it was felt that structural measures alone could not mitigate flood problems.
  • 22. FLOOD RISK REDUCTION MEASURES (NON-STRUCTURAL) ▪ Non-structural mitigation measures undertaken focus on preparedness and possibilities for action to reduce risks and losses and better co- ordination mechanisms between all actors involved (GO, NGO and community people at grass- root level) during all phases of any disaster. ▪ Due to increased population pressure it is a typical scenario in India that the human habitat is extending more and more towards flood plains, which are vulnerable to recurrent flood. ▪ Moreover, more lands of the flood plains are being occupied and converted to habitat and agricultural lands, which were mostly, back swamp. Flood plains are generally regarded as the extended portion of the main river channel.
  • 23. FLOOD RISK REDUCTION MEASURES (NON-STRUCTURAL) ▪ Flood plain zoning and management is the effective means of regulating habitat construction and agricultural use with minimum interference to the natural condition prevailing in the flood plains. ▪ Due to a swell in population in the flood plains, the governments are bound to undertake more and more development projects in the flood plains. ▪ Policy formulation should be on the basis of scientific studyand research
  • 24. FLOOD RISK REDUCTION MEASURES (NON-STRUCTURAL) ▪ Flood proofing is a measure, which has been found to have less adverse effects. In most of the flood prone areas in India, the people used to flood proofing technique in such a way that people build their houses on the built- up earthen mounds. This is being in practice for centuries. Community participation and awareness are very important in the flood proofing measures. ▪ Many of the damages of the floods can be reduced to a great extent through a proper Disaster Preparedness and Response Planning. For the Disaster Preparedness regarding the flood, the most important tool is the Flood Forecasting and Warning System. With the current advancement in the information technology and hydrological and hydraulic sciences, it is possible to provide most accurate advance warning ▪ In this regard assessment of response of the people to the flood warning is very important element in response planning. Disaster Preparedness program cannot be made successful without proper response planning.
  翻译: