Presented by YS Lin 2007-7-20 Observation Report
[object Object],[object Object],[object Object],[object Object],[object Object],Content
Visual evaluation of a good factory ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Visual evaluation of a good factory 5. Performance-information on the line per line per  workplace Information on . Quality (short loop) . Efficiency (output) 6. Number of indirects on the floor? How many people “hanging-around” for . Supervision? (why?) . Q-problems . Material supply 7. Contact pattern? . Management presence on the floor? . Open offices?
Visual evaluation of a good factory 8.  Is “production” the heart of the business? Are support departments really supporting? 9.  Housekeeping Is the place clinically clean? 10. Working atmosphere? Do we smell the “winning spirit” ? 11. Would you like your son or daughter to work here in the “production” ?
Quality Target/Plan Control 1.Current state 2.Observation .Improvement plan by PDCA cycle with 5W2H approach .Variance analysis by CAR .Control chart/Flag chart system for management
 
Control Plan 1. Current state 2. Observation . Used for new product . Sampling plan design/correlation- Outside in IQC   EPI gate    FE gate    FQC    Customer IQC . Identical specification or engineering spec . Process verification between Product and Process characteristics . Responsibility between production and QA Production: operation, parameters check, self-inspection QA: Sampling, gate control, process audit .Visual inspection/control: QA    Production, Source management . Control method: application of MSA, SPC, Fool-proof, etc . Control document enhancement . Abnormal: Effectiveness of failure report
3. Process check sheet design Ex: Prober by QA 4. ISO document review .Junior consultant? .Speak- Write – Doing    consistency? 5. Failure report review 異常報告單 .Design concept- open loop, sufficient analysis ability?  .Top- 3 QMT teams organized-  側蝕 ,  針痕 , 顏色異常 6. Reliability test- 恆溫恆濕  temperature, humidity? 7. Human resource: effective training, technical convention
Production Control M M+1 23 25 Sales forecast - Stock available =Net requirement Stagger table Production plan Production scheduling EPI FE BE PO Order Book Combined SO Shipping Instruction Bin table FQC Transaction Work order Closed SFM 驗證 Run Run card
1.Coding: Raw material, parts, WIP, Finished product, Grade, Stock, Run card, Wafer no, Tape no, dept code, machine no, document, A/C, etc 2.Heavy loading to review the stock by bin and SO by range 3.MOQ, Lot size, extra costs for special grade? 4.Production to max capacity- high inventory 5.Capacity review model, bottle-neck management 6.No run card for EPI and BE   FIFO, real time tracking? 7.Mixed EPI lot input for FE – Between lot variation 8.Material requisition    Issue 9. 驗證 run- Process verification run
10.Transaction stage: total 25 in FE    Main control stage 11.Manual tracking and expediting 12.Backlog issues: EPI, Quality, PM, single skill, 13.With 24 Hours full running: less flexibility to catch-up 14.Review mechanism: Sample run? Pilot run? New product? 15.Push    Pull, flow line, JIT, TPM? 16.Delivery performance indicators Throughput Yield Inventory Shipping quantity Loading OTD: on time delivery CLIP: cumulative line item  performance CVP: cumulative volume  performance Cycle time Inventory turns + σ ↓ Mean ↓
品質的發展 品質的歷史面 品質的觀念面 品質的制度面 作業員的品質管制 領班的品質管制 檢驗員的品質管制 統計的品質管制 品質保證 全面品質管制 全面品質保證 品質是“檢查”出來的 品質是“製造”出來的 品質是“設計”出來的 品質是“管理”出來的 品質是“習慣”出來的 全面品管 (TQC) 品檢 (QI) 品管 (QC) 品保 (QA) 全面品保 (TQA)
CONTINUOUS IMPROVEMENT-CONCEPT 日常管理 實力維持 方針管理 實力提昇 . 減少變異 . 提昇水準 願景 A C P D A C P D A C S D A C S D
 
The New Shop Floor Management Model □   Glass wall management □   Scoreboard □   Floor meeting □   Organization of a work station □   Suggestion □   Storyboard □   Mini-company (Mission,Objectives,Business  plan,PDCA) □   Improvement group □   Banker's meeting (Progress report,Monthly report ,Annual report) □   Study group □   Company awareness day □   Top management round table □   Sharing of progress (Display,Free lunch,Presentation ,Newsletter,Awards) □   Policy management □   Cross-functional management □   Management by exception □   Management by objectives □   Managing by wandering around □   Career planning □   5S  □  SOP □   JIT  □  TPM □   Flow lines □   Poka-yoke Continuous Improvement □ Core values □   Vision □   Roles & responsibilities □   Management process □   Genba □   Exposing problems □   5 Whys □   Empowerment □   Ownership □   Involvement of everybody □   Teamwork □   Collective wisdom □   Self-management □   Problem-solving tools □   Assessment □   Checklist □   Visual aids □   Benchmarking □   Upgrading skills □   Learning □   Recognition,Reward □   Communication □   Cross-training □   Job rotation Customer Need Customer-supplier relationship Thorough practice Adequate leadership Innovative culture Customer orientation Progressive organization People-oriented organization Increased capabilities Waste elimination Survival of the fittest Shop floor excellence CONCEPT/APPROACH ACTIVITIES GOALS
Management of Mini-Company ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Organize the meeting area Organize an efficient work station Practice
品保部
 
QC 問題解決的步驟及 QC 手法 找出問題點 現狀的把握及目標的設定 表示原因及結果的關係 要因的解析 柏拉圖 散佈圖 直方圖 查檢圖 管制圖 特性要因圖 A B C 1 2 3 4 5
QC 問題解決的步驟及 QC 手法 要因的解析 層別 有相關 有時間的變化 對策的檢討及實施 效果的確認 標準化 ( 制 / 修定 ) 效果的維持 * * * * * * * * * * * A B C D E A B C D E
 
QC. STORY SHEET ASEK Dept .:_______  Leader :_______ Action Group :_______________________  2. Why The Theme Selected  3. Analysis of Present Situation( Data Collection) 4. Cause & Effect Analysis Remark : 8.Remaining Problems / Future Plan 1 ._________________________________ 2 ._________________________________ 3 .___________ ______________________ 4 ._________________________________ 5 ._________________________________ 6 ._________________________________ 7.Standardization 1 .________________________________ 2 .________________________________ 3 ._________________ _______________ 4 .________________________________ 5 .________________________________ 6 .________________________________ 7 .________________________________ 8 .________________________________ A P 6. Results Confirmation C Remark : D 5. Action Plan / Implementation Remark : 1. Theme Schedule Plan Actual Item Corrective Action Action by Fi ni sh Evidence
 
C A D P Team name ( 圈名 ) : Dep’t ( 部門 ) : 1.Theme ( 主題 ) : 2.Why select this theme ( 選定理由 ) : 3. Current status ( 現況分析 ) : 4.Target Setting ( 目標設定 ) : 5. Cause-Effect Analysis ( 要因分析 ) : 6. Root Cause Verification ( 真因尋求 ) : 7.Action implementation  ( 對策實施 ) : 8. Result Confirmation ( 效果確認 )     9.Standardization ( 標準化 ) : 10.Future chance ( 改善機會 ) : ‧ 創意來源 ( 參考文獻 ) / Learning ‧ Solution ( 對策方法 ) : ‧ Sharing ( 經驗分享 ) : ‧ Learning ( 學習 ) : ‧ Reference   ( 參考文獻 ): One Page QC Story
Pad damage C A D P One Page QC Story -  QIT 53 rd   Team name: Dep’t: 1.Theme: 2.Why select this theme 3. Current status 4.Target Setting: 5. Cause-Effect Analysis 6. Root Cause Verification 7. Action implementation 8.Result Confirmation 9.Standardization 10.Future chance ‧ Learning ‧ Solution ‧ Sharing Dragon WTF Reduce fine pad damage rate  1.More competitive 2,High Quality and On Time Delivery 3.Capability Improvement 4.Utilization improvement  5. Short Through Put Time Pad damage from 230ppm to 50ppm Pad  damage  1.Cleaning travel is too long 2.Tip is too large for small pads 3.PCB expansion causes probe mark shift. Upper limit for tip 25um Large Tip Root Cause :  Cleaning travel is too long 1.  Needle Mis-alignment Improvement 2. Large probe mark improvement Tip Reduction Machine:PSK 2000 Root Cause :  Tip is too large for small pads Action-New needle spec. for small pad Tip size change slope: 0.1um/um Action: start Test from wafer center Root Cause : PCB expansion causes probe mark shift. 3. Probe Mark Shift improvement Learning: 1. Technology learning – HSM Use N2 gas to prevent AL from forming oxide 2. Benchmarking- MOTOROLA / STMicroelectronics Test temperature / Pad size / Needle clean method 3. Create idea : Pencil Sharpener Reference: 1. QIT-51,  Team : Crystal,  Subject :  First time pass yield  2. Engineering Report No:  EBV-3-10-62/88x   EBV-9-1-1/10x 3. Process development(TAC Sub-100nm Probing): . Set of < MAT20> TESTCHIPS . Platform Qualification <MAT30> 1.Probe card needles  specification change 2.Probe Card Quality Control 3.Product file for wafer test change EBV-3-10-62/883 EBV-9-1-1/101 EBV-3-10-62/883 Total saving:  1,410,000   USD §  Sharing the experience an best  practices with PSC, PST § Nijmegen and Caen for probing  fine pad product.  Action:Reduce needles cleaning path  ,[object Object],[object Object],[object Object],Saving Probe mark misalignment improvement Side wall crack improvement   Probe mark shift improvement Mis-alignment ,[object Object],[object Object],Side wall crack ,[object Object],Probe mark shift ,[object Object],[object Object],Large stress   small stress Large force 50um
 
 
 
 
品質保證措施檢討
異常報告之運用 異常處理 1.  管理  ,  控制基準 2.  異常發現  3.  異常處置  4.  執行追蹤   異常報告 彙總 整理 經常發生 根本問題解決 檢討報告書 檢討‧ 分析 效果確認 標準化 日常管理 報告書要項 1.  問題點 2.  影響評估 3. CAUSE 4.  改進對策層別 5.  相關單位 / 擔當者 6.  完成日期  (EST,ACT) 應急措施 再發防止 點 線 面 (  影響度  x  發生度  x 檢出度  =  重要度  ) 生產影響  ,  重要度 ●  維持活動 ●  HORIZONTAL DEPLOYMENT 推廣‧‧運用 擔當者  :  幹部  SUP.  SR SUP. Y

More Related Content

What's hot

CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
santhosh kumar
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
Bhargav Seeram
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
Kiran Kumar
 
Quality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water SystemsQuality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water Systems
Institute of Validation Technology
 
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
Tonatiuh Lozada Duarte
 
Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)
Kiran Walimbe
 
Process Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC FusionProcess Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC Fusion
GENEO
 
Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors
Kiran Walimbe
 
Q & QA design
Q & QA designQ & QA design
Q & QA design
arun kumar jain
 
8 D Report
8 D Report8 D Report
8 D Report
ASHISH KEKRE
 
Six Sigma & Process Capability
Six Sigma & Process CapabilitySix Sigma & Process Capability
Six Sigma & Process Capability
Eric Blumenfeld
 
Process Audit --VDA
Process Audit --VDAProcess Audit --VDA
Process Audit --VDA
Bill Yan
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
Scott Bryer, MBA, PMP, SSGB
 
Six sigma
Six sigmaSix sigma
Six sigma
Prakash Dev
 
Six sigma project (chihaoshen)
Six sigma project (chihaoshen)Six sigma project (chihaoshen)
Six sigma project (chihaoshen)
CH §Shen
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
Scott Bryer, MBA, PMP, SSGB
 
Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)
Kiran Walimbe
 
Testing & Quality Assurance
Testing & Quality AssuranceTesting & Quality Assurance
Testing & Quality Assurance
Anand Subramaniam
 
Entrepreneurship 101: Dancing in the Gap
Entrepreneurship 101: Dancing in the GapEntrepreneurship 101: Dancing in the Gap
Entrepreneurship 101: Dancing in the Gap
MaRS Discovery District
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
Matthew Clemens
 

What's hot (20)

CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
 
Quality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water SystemsQuality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water Systems
 
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...
 
Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)Summarized presentation vda 6.3 2016 (serial production)
Summarized presentation vda 6.3 2016 (serial production)
 
Process Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC FusionProcess Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC Fusion
 
Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors
 
Q & QA design
Q & QA designQ & QA design
Q & QA design
 
8 D Report
8 D Report8 D Report
8 D Report
 
Six Sigma & Process Capability
Six Sigma & Process CapabilitySix Sigma & Process Capability
Six Sigma & Process Capability
 
Process Audit --VDA
Process Audit --VDAProcess Audit --VDA
Process Audit --VDA
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six sigma project (chihaoshen)
Six sigma project (chihaoshen)Six sigma project (chihaoshen)
Six sigma project (chihaoshen)
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)
 
Testing & Quality Assurance
Testing & Quality AssuranceTesting & Quality Assurance
Testing & Quality Assurance
 
Entrepreneurship 101: Dancing in the Gap
Entrepreneurship 101: Dancing in the GapEntrepreneurship 101: Dancing in the Gap
Entrepreneurship 101: Dancing in the Gap
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 

Viewers also liked

5.全面交期管理
5.全面交期管理5.全面交期管理
5.全面交期管理營松 林
 
現場改善與管理寶典
現場改善與管理寶典現場改善與管理寶典
現場改善與管理寶典營松 林
 
1.tpm awareness information en
1.tpm awareness information en1.tpm awareness information en
1.tpm awareness information en
營松 林
 
2.ie培訓教材
2.ie培訓教材2.ie培訓教材
2.ie培訓教材營松 林
 
5 s book
5 s book5 s book
5 s book
營松 林
 

Viewers also liked (6)

5.全面交期管理
5.全面交期管理5.全面交期管理
5.全面交期管理
 
現場改善與管理寶典
現場改善與管理寶典現場改善與管理寶典
現場改善與管理寶典
 
1.tpm awareness information en
1.tpm awareness information en1.tpm awareness information en
1.tpm awareness information en
 
O&E
O&EO&E
O&E
 
2.ie培訓教材
2.ie培訓教材2.ie培訓教材
2.ie培訓教材
 
5 s book
5 s book5 s book
5 s book
 

Similar to Observation report 20070720

Project cycle
Project cycleProject cycle
Project cycle
Dema Dias
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
AJAL A J
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
Anand Subramaniam
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
Non Stop Portals
 
Global qa conference updated
Global qa conference updatedGlobal qa conference updated
Global qa conference updated
Johnny Chan
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
Arya Wirabhuana
 
LeanRPAForAuditEffectiveness
LeanRPAForAuditEffectivenessLeanRPAForAuditEffectiveness
LeanRPAForAuditEffectiveness
Kevin Posey, BS MBA RAC
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
Mansoor Ali Khan
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
TEST Huddle
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
Sidewinder2011
 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management
sharyarnawaz
 
Enhancing Software Quality
Enhancing Software QualityEnhancing Software Quality
Enhancing Software Quality
Anand Prabhala
 
OMTEC-2015_Mazzeo_BIQ.pdf
OMTEC-2015_Mazzeo_BIQ.pdfOMTEC-2015_Mazzeo_BIQ.pdf
OMTEC-2015_Mazzeo_BIQ.pdf
Carlos de Castro
 
Standard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdfStandard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdf
BrunoTrovalim
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
Harold van Heeringen
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
Anand Subramaniam
 
kka 110316
kka 110316kka 110316
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
Julian Kalac P.Eng
 
Wk8lect1.pptx
Wk8lect1.pptxWk8lect1.pptx
Wk8lect1.pptx
SharyarShoukat1
 

Similar to Observation report 20070720 (20)

Project cycle
Project cycleProject cycle
Project cycle
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
 
Global qa conference updated
Global qa conference updatedGlobal qa conference updated
Global qa conference updated
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
 
LeanRPAForAuditEffectiveness
LeanRPAForAuditEffectivenessLeanRPAForAuditEffectiveness
LeanRPAForAuditEffectiveness
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
SAP QM by Direct trainer
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management
 
Enhancing Software Quality
Enhancing Software QualityEnhancing Software Quality
Enhancing Software Quality
 
OMTEC-2015_Mazzeo_BIQ.pdf
OMTEC-2015_Mazzeo_BIQ.pdfOMTEC-2015_Mazzeo_BIQ.pdf
OMTEC-2015_Mazzeo_BIQ.pdf
 
Standard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdfStandard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdf
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
kka 110316
kka 110316kka 110316
kka 110316
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
 
Wk8lect1.pptx
Wk8lect1.pptxWk8lect1.pptx
Wk8lect1.pptx
 

More from 營松 林

全面品質管理 東吳王超弘
全面品質管理  東吳王超弘全面品質管理  東吳王超弘
全面品質管理 東吳王超弘營松 林
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material
營松 林
 
02training material for msa
02training material for msa02training material for msa
02training material for msa
營松 林
 
03 fmea表格使用說明
03 fmea表格使用說明03 fmea表格使用說明
03 fmea表格使用說明營松 林
 
02 fmea training
02 fmea training02 fmea training
02 fmea training營松 林
 
先期產品品質規劃 華宇
先期產品品質規劃  華宇先期產品品質規劃  華宇
先期產品品質規劃 華宇營松 林
 
Apqp-en
Apqp-enApqp-en
Apqp-en
營松 林
 
Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906營松 林
 

More from 營松 林 (9)

全面品質管理 東吳王超弘
全面品質管理  東吳王超弘全面品質管理  東吳王超弘
全面品質管理 東吳王超弘
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material
 
02training material for msa
02training material for msa02training material for msa
02training material for msa
 
03 fmea表格使用說明
03 fmea表格使用說明03 fmea表格使用說明
03 fmea表格使用說明
 
02 fmea training
02 fmea training02 fmea training
02 fmea training
 
01 fmea
01 fmea01 fmea
01 fmea
 
先期產品品質規劃 華宇
先期產品品質規劃  華宇先期產品品質規劃  華宇
先期產品品質規劃 華宇
 
Apqp-en
Apqp-enApqp-en
Apqp-en
 
Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906Zhiii skincare fe&r12(for media) 20110906
Zhiii skincare fe&r12(for media) 20110906
 

Recently uploaded

DPboss Indian Satta Matta Matka Result Fix Matka Number
DPboss Indian Satta Matta Matka Result Fix Matka NumberDPboss Indian Satta Matta Matka Result Fix Matka Number
DPboss Indian Satta Matta Matka Result Fix Matka Number
Satta Matka
 
Kanban Coaching Exchange with Dave White - Example SDR Report
Kanban Coaching Exchange with Dave White - Example SDR ReportKanban Coaching Exchange with Dave White - Example SDR Report
Kanban Coaching Exchange with Dave White - Example SDR Report
Helen Meek
 
TriStar Gold Corporate Presentation (Revised) - June 2024
TriStar Gold Corporate Presentation (Revised) - June 2024TriStar Gold Corporate Presentation (Revised) - June 2024
TriStar Gold Corporate Presentation (Revised) - June 2024
Adnet Communications
 
Leading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable ProductsLeading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable Products
Aggregage
 
The Key Summaries of Forum Gas 2024.pptx
The Key Summaries of Forum Gas 2024.pptxThe Key Summaries of Forum Gas 2024.pptx
The Key Summaries of Forum Gas 2024.pptx
Sampe Purba
 
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl KolkataCall Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Yukti Singh
 
➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
DefenceTech Meetup #1 - Lisbon, Portugal
DefenceTech Meetup #1 - Lisbon, PortugalDefenceTech Meetup #1 - Lisbon, Portugal
DefenceTech Meetup #1 - Lisbon, Portugal
Andre Marquet
 
RFHIC, IMS 2024, Washington D.C., tradeshow
RFHIC, IMS 2024, Washington D.C., tradeshowRFHIC, IMS 2024, Washington D.C., tradeshow
RFHIC, IMS 2024, Washington D.C., tradeshow
SeungyeonRyu2
 
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
taqyea
 
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call GirlCall Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Happy Singh
 
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...
Adani case
 
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
taqyea
 
Satta matka guessing Kalyan fxxjodi panna
Satta matka guessing Kalyan fxxjodi pannaSatta matka guessing Kalyan fxxjodi panna
Satta matka guessing Kalyan fxxjodi panna
➑➌➋➑➒➎➑➑➊➍
 
L'indice de performance des ports à conteneurs de l'année 2023
L'indice de performance des ports à conteneurs de l'année 2023L'indice de performance des ports à conteneurs de l'année 2023
L'indice de performance des ports à conteneurs de l'année 2023
SPATPortToamasina
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
DP Boss Satta Matka Kalyan Matka
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024
Hector Del Castillo, CPM, CPMM
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 

Recently uploaded (20)

DPboss Indian Satta Matta Matka Result Fix Matka Number
DPboss Indian Satta Matta Matka Result Fix Matka NumberDPboss Indian Satta Matta Matka Result Fix Matka Number
DPboss Indian Satta Matta Matka Result Fix Matka Number
 
Kanban Coaching Exchange with Dave White - Example SDR Report
Kanban Coaching Exchange with Dave White - Example SDR ReportKanban Coaching Exchange with Dave White - Example SDR Report
Kanban Coaching Exchange with Dave White - Example SDR Report
 
TriStar Gold Corporate Presentation (Revised) - June 2024
TriStar Gold Corporate Presentation (Revised) - June 2024TriStar Gold Corporate Presentation (Revised) - June 2024
TriStar Gold Corporate Presentation (Revised) - June 2024
 
Leading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable ProductsLeading the Development of Profitable and Sustainable Products
Leading the Development of Profitable and Sustainable Products
 
The Key Summaries of Forum Gas 2024.pptx
The Key Summaries of Forum Gas 2024.pptxThe Key Summaries of Forum Gas 2024.pptx
The Key Summaries of Forum Gas 2024.pptx
 
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl KolkataCall Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
Call Girls In Kolkata 🔥 +91-9079923931🔥High Profile Call Girl Kolkata
 
➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐ Indian Matka Dpboss Matka Guessing Kalyan panel Chart
 
DefenceTech Meetup #1 - Lisbon, Portugal
DefenceTech Meetup #1 - Lisbon, PortugalDefenceTech Meetup #1 - Lisbon, Portugal
DefenceTech Meetup #1 - Lisbon, Portugal
 
RFHIC, IMS 2024, Washington D.C., tradeshow
RFHIC, IMS 2024, Washington D.C., tradeshowRFHIC, IMS 2024, Washington D.C., tradeshow
RFHIC, IMS 2024, Washington D.C., tradeshow
 
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
一比一原版(UCSC毕业证)加州大学圣克鲁兹分校毕业证如何办理
 
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call GirlCall Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
Call Girls Bhubaneswar (india) ☎️ +91-74260 Bhubaneswar Call Girl
 
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...
 
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
 
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
一比一原版(Toledo毕业证)托莱多大学毕业证如何办理
 
Satta matka guessing Kalyan fxxjodi panna
Satta matka guessing Kalyan fxxjodi pannaSatta matka guessing Kalyan fxxjodi panna
Satta matka guessing Kalyan fxxjodi panna
 
L'indice de performance des ports à conteneurs de l'année 2023
L'indice de performance des ports à conteneurs de l'année 2023L'indice de performance des ports à conteneurs de l'année 2023
L'indice de performance des ports à conteneurs de l'année 2023
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024Intelligent Small Boat Security Solution - June 2024
Intelligent Small Boat Security Solution - June 2024
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 

Observation report 20070720

  • 1. Presented by YS Lin 2007-7-20 Observation Report
  • 2.
  • 3.
  • 4. Visual evaluation of a good factory 5. Performance-information on the line per line per workplace Information on . Quality (short loop) . Efficiency (output) 6. Number of indirects on the floor? How many people “hanging-around” for . Supervision? (why?) . Q-problems . Material supply 7. Contact pattern? . Management presence on the floor? . Open offices?
  • 5. Visual evaluation of a good factory 8. Is “production” the heart of the business? Are support departments really supporting? 9. Housekeeping Is the place clinically clean? 10. Working atmosphere? Do we smell the “winning spirit” ? 11. Would you like your son or daughter to work here in the “production” ?
  • 6. Quality Target/Plan Control 1.Current state 2.Observation .Improvement plan by PDCA cycle with 5W2H approach .Variance analysis by CAR .Control chart/Flag chart system for management
  • 7.  
  • 8. Control Plan 1. Current state 2. Observation . Used for new product . Sampling plan design/correlation- Outside in IQC  EPI gate  FE gate  FQC  Customer IQC . Identical specification or engineering spec . Process verification between Product and Process characteristics . Responsibility between production and QA Production: operation, parameters check, self-inspection QA: Sampling, gate control, process audit .Visual inspection/control: QA  Production, Source management . Control method: application of MSA, SPC, Fool-proof, etc . Control document enhancement . Abnormal: Effectiveness of failure report
  • 9. 3. Process check sheet design Ex: Prober by QA 4. ISO document review .Junior consultant? .Speak- Write – Doing  consistency? 5. Failure report review 異常報告單 .Design concept- open loop, sufficient analysis ability? .Top- 3 QMT teams organized- 側蝕 , 針痕 , 顏色異常 6. Reliability test- 恆溫恆濕 temperature, humidity? 7. Human resource: effective training, technical convention
  • 10. Production Control M M+1 23 25 Sales forecast - Stock available =Net requirement Stagger table Production plan Production scheduling EPI FE BE PO Order Book Combined SO Shipping Instruction Bin table FQC Transaction Work order Closed SFM 驗證 Run Run card
  • 11. 1.Coding: Raw material, parts, WIP, Finished product, Grade, Stock, Run card, Wafer no, Tape no, dept code, machine no, document, A/C, etc 2.Heavy loading to review the stock by bin and SO by range 3.MOQ, Lot size, extra costs for special grade? 4.Production to max capacity- high inventory 5.Capacity review model, bottle-neck management 6.No run card for EPI and BE  FIFO, real time tracking? 7.Mixed EPI lot input for FE – Between lot variation 8.Material requisition  Issue 9. 驗證 run- Process verification run
  • 12. 10.Transaction stage: total 25 in FE  Main control stage 11.Manual tracking and expediting 12.Backlog issues: EPI, Quality, PM, single skill, 13.With 24 Hours full running: less flexibility to catch-up 14.Review mechanism: Sample run? Pilot run? New product? 15.Push  Pull, flow line, JIT, TPM? 16.Delivery performance indicators Throughput Yield Inventory Shipping quantity Loading OTD: on time delivery CLIP: cumulative line item performance CVP: cumulative volume performance Cycle time Inventory turns + σ ↓ Mean ↓
  • 13. 品質的發展 品質的歷史面 品質的觀念面 品質的制度面 作業員的品質管制 領班的品質管制 檢驗員的品質管制 統計的品質管制 品質保證 全面品質管制 全面品質保證 品質是“檢查”出來的 品質是“製造”出來的 品質是“設計”出來的 品質是“管理”出來的 品質是“習慣”出來的 全面品管 (TQC) 品檢 (QI) 品管 (QC) 品保 (QA) 全面品保 (TQA)
  • 14. CONTINUOUS IMPROVEMENT-CONCEPT 日常管理 實力維持 方針管理 實力提昇 . 減少變異 . 提昇水準 願景 A C P D A C P D A C S D A C S D
  • 15.  
  • 16. The New Shop Floor Management Model □ Glass wall management □ Scoreboard □ Floor meeting □ Organization of a work station □ Suggestion □ Storyboard □ Mini-company (Mission,Objectives,Business plan,PDCA) □ Improvement group □ Banker's meeting (Progress report,Monthly report ,Annual report) □ Study group □ Company awareness day □ Top management round table □ Sharing of progress (Display,Free lunch,Presentation ,Newsletter,Awards) □ Policy management □ Cross-functional management □ Management by exception □ Management by objectives □ Managing by wandering around □ Career planning □ 5S □ SOP □ JIT □ TPM □ Flow lines □ Poka-yoke Continuous Improvement □ Core values □ Vision □ Roles & responsibilities □ Management process □ Genba □ Exposing problems □ 5 Whys □ Empowerment □ Ownership □ Involvement of everybody □ Teamwork □ Collective wisdom □ Self-management □ Problem-solving tools □ Assessment □ Checklist □ Visual aids □ Benchmarking □ Upgrading skills □ Learning □ Recognition,Reward □ Communication □ Cross-training □ Job rotation Customer Need Customer-supplier relationship Thorough practice Adequate leadership Innovative culture Customer orientation Progressive organization People-oriented organization Increased capabilities Waste elimination Survival of the fittest Shop floor excellence CONCEPT/APPROACH ACTIVITIES GOALS
  • 17.
  • 19.  
  • 20. QC 問題解決的步驟及 QC 手法 找出問題點 現狀的把握及目標的設定 表示原因及結果的關係 要因的解析 柏拉圖 散佈圖 直方圖 查檢圖 管制圖 特性要因圖 A B C 1 2 3 4 5
  • 21. QC 問題解決的步驟及 QC 手法 要因的解析 層別 有相關 有時間的變化 對策的檢討及實施 效果的確認 標準化 ( 制 / 修定 ) 效果的維持 * * * * * * * * * * * A B C D E A B C D E
  • 22.  
  • 23. QC. STORY SHEET ASEK Dept .:_______ Leader :_______ Action Group :_______________________ 2. Why The Theme Selected 3. Analysis of Present Situation( Data Collection) 4. Cause & Effect Analysis Remark : 8.Remaining Problems / Future Plan 1 ._________________________________ 2 ._________________________________ 3 .___________ ______________________ 4 ._________________________________ 5 ._________________________________ 6 ._________________________________ 7.Standardization 1 .________________________________ 2 .________________________________ 3 ._________________ _______________ 4 .________________________________ 5 .________________________________ 6 .________________________________ 7 .________________________________ 8 .________________________________ A P 6. Results Confirmation C Remark : D 5. Action Plan / Implementation Remark : 1. Theme Schedule Plan Actual Item Corrective Action Action by Fi ni sh Evidence
  • 24.  
  • 25. C A D P Team name ( 圈名 ) : Dep’t ( 部門 ) : 1.Theme ( 主題 ) : 2.Why select this theme ( 選定理由 ) : 3. Current status ( 現況分析 ) : 4.Target Setting ( 目標設定 ) : 5. Cause-Effect Analysis ( 要因分析 ) : 6. Root Cause Verification ( 真因尋求 ) : 7.Action implementation ( 對策實施 ) : 8. Result Confirmation ( 效果確認 )   9.Standardization ( 標準化 ) : 10.Future chance ( 改善機會 ) : ‧ 創意來源 ( 參考文獻 ) / Learning ‧ Solution ( 對策方法 ) : ‧ Sharing ( 經驗分享 ) : ‧ Learning ( 學習 ) : ‧ Reference ( 參考文獻 ): One Page QC Story
  • 26.
  • 27.  
  • 28.  
  • 29.  
  • 30.  
  • 32. 異常報告之運用 異常處理 1. 管理 , 控制基準 2. 異常發現 3. 異常處置 4. 執行追蹤 異常報告 彙總 整理 經常發生 根本問題解決 檢討報告書 檢討‧ 分析 效果確認 標準化 日常管理 報告書要項 1. 問題點 2. 影響評估 3. CAUSE 4. 改進對策層別 5. 相關單位 / 擔當者 6. 完成日期 (EST,ACT) 應急措施 再發防止 點 線 面 ( 影響度 x 發生度 x 檢出度 = 重要度 ) 生產影響 , 重要度 ● 維持活動 ● HORIZONTAL DEPLOYMENT 推廣‧‧運用 擔當者 : 幹部 SUP. SR SUP. Y
  翻译: