尊敬的 微信汇率:1円 ≈ 0.046166 元 支付宝汇率:1円 ≈ 0.046257元 [退出登录]
SlideShare a Scribd company logo
Our journey implementing Aras
Need, Plan, Implement
SUCCESS!
Agenda
• Who is Dedicated Computing?
• What drove our need for a Product Lifecycle Management
(PLM) Solution?
• Search for a PLM Platform
• Planning the Aras Implementation
• Executing the Aras Implementation
• Where are we now?
 Process/Tools Summary
 Deep Dive on Projects
• What’s Next?
• Implementation - What worked well?
• Implementation - What challenges did we encounter?
• User Feedback
• Summary of benefits seen using the Aras platform
• Questions
2
Who is Dedicated Computing?
An innovative technology company dedicated to
creating value for our customers through the
application of connected, secure and complete
technical computing solutions.
339 associates at three Wisconsin locations
Operations
Sales & Marketing
Technical Engineering
43
142
154
OUR EXPERTISE
Products & Services:
Embedded Computing
Remote Monitoring
Networking Solutions
Engineering Design
Quality Processes
Supply Chain Management
Life Cycle Management
Program Management
Our Technical Computing Solutions
Connected. Secure. Complete.
Engineering Services
includes unique purpose built
hardware feature design &
development, software and
driver development, life cycle
management and
professional services
Advanced Servers
application & network ready
embedded computing
solutions optimized to deliver
the right balance of power
and
performance, security, netwo
rk connectivity and
manageability
Secure Service System
provides secure remote
field device
monitoring, software
stack management, data
center access and system
optimization
Our Market Focus
Military
Flight Training
& Simulation
Systems
Radar &
Sensor
Systems
Unmanned
Systems
Healthcare
Imaging
Systems
Lab
Diagnostic &
Patient
Monitoring
Computer
Assisted
Surgery
Systems
Oil & Gas
Engineering
Control Systems
Seismic Imaging
Systems
Industrial
Automation
Industrial
Automation
Building
Control
Security
Physical
Security
Intrusion
Detection
What drove our need for a
Product Lifecycle Management (PLM) solution?
• Many custom tools used to manage multiple Bills Of Material
(BOMs)
• Lack of part/product searchability
• Tools do not support ability to view BOM Revision History
• “Projects” within the business were managed in many
different ways using custom tools and forms
• Business processes managed using a combination of custom
tools, “word of mouth” and e-mail
6
Search for a PLM Platform – road to Aras
We first looked at 4-6 other PLM platforms including:
• TeamCenter
• Oracle Agile
• Omnify
• Arena
Each of these solutions had a significant Total Cost of Ownership
(TCO) to evaluate which led us to Aras
7
Search for a PLM Platform – road to Aras
Why Aras?
• Instant use
• Configurability
• High Value / Low Total Cost of Ownership (TCO)
• Support
• Roles & Workflows
• Searching Options
• Revision Control & History
8
Planning the Aras Implementation (Q4 2011 & Q1 2012)
• Initial review and investigation by a small team
• Prepare Project Charter and gain executive buy-in and
approval
• Project Planning
• Determine which business processes to transfer from existing
tools to Aras platform
• Form Project Core Team
 Business Project Manager
 IT Project Manager
 2 IT resources to code and configure Aras
• Attended 2012 ACE conference
• Determine business process owners
 Process owners responsible for definition of processes to
be configured in Aras
• Decision to use a phased process implementation approach as
opposed to a “big bang”
• Complete and maintain project schedule
 Activity Analysis (Work Breakdown Structure)
9
Planning the Aras Implementation
• WBS (Work Breakdown Structure)
10
Aras Implementation Project Plan –
Phases & Milestones
Phase 1 - Project Kickoff and Aras Platform Installation/Training
(January – March 2012)
• Creation of project core team
• Identify Business Process Owners
• Aras subscription purchase, installation and training for project core team
Phase 2 – Aras Process Configuration / Validation & User Training & Implementation
(April 2012 – June 2013)
• Business process definition
• Aras process configuration
• Custom software modifications and integrations coded
• Aras process testing
• Aras and modified systems software validations
• Data mapping and migration
• Process documentation updates
• Classroom user training
 Walk through of execution of Aras processes
• Aras Implementation
 Phased process launches in Q4 2012 /Q1 & Q2 2013
Phase 3 – Manufactured Parts Implementation
(July 2013 – December 2013)
• Manufactured parts process definition
• ERP modifications and integrations coded
• Launch of manufactured parts
Confidential 11
Executing the Aras Implementation (Q2 2012 – Q2 2013)
• Weekly Project Core Team meetings
• Work with Business Process owners and other stakeholders to
identify current processes, improve as needed and define
Aras configuration
• Configure business processes in Aras
• Migration of existing data to Aras
• Aras process review sessions with stakeholders to update as
needed
• Software validation of Aras processes
• Update of Quality documentation to reflect new processes
and use of Aras
• Aras Training
• General (all users)
• Process Specific (affected users of process)
• Launch of processes in Aras and retirement of old tools
12
Where are we now?
• 16 business processes now implemented on the Aras
platform
• Engineering
 Pre-production orders
 Hardware design
 Software development
 Hardware validation
• Engineering and Project Management
 Projects
• Quality
 CAPA (Corrective Action / Preventive Action)
 Customer escalations
• Sourcing
 Qualified supplier list
 New part creation
 Part change notices
• Manufacturing
 Continuous improvement ideas
13
Where are we now?
How many tools and forms have been eliminated so far as a
result of implementation of processes in Aras?
• 16 Tools
• SharePoint
• Webspeck (Custom Tool)
• 5 Forms
• Excel spreadsheets
 Checklists for various processes
 Spreadsheet trackers
14
Deep Dive - Projects
“Before”:
• Many tools/forms used during the execution of a project
 Many “checklists” existed to ensure project activities were
completed
• Processes were defined but were managed in different ways and
project activities/ownership were not readily apparent
• Difficult to see aggregate view of project progress and status
15
NPI Tool
Product
Brief Tool
3 SharePoint
Tools
3 Excel
Forms
Aras
Deep Dive - Projects
• Currently using for mostly Engineering projects
• Central view of project owners and status
• Use of project templates to drive lead roles and standard sets of activities
• Easy stoplight status visibility for management to take actions as needed
• Calculation of Engineering hours worked per project
• Data is exported and feeds into Engineering Resource Model
16
Deep Dive - Projects
• Use of project
classifications to
drive specific
attributes per
project
• Use of “Core
Teams” for quick
and easy
assignment of
Lead Roles for
project activities
17
Deep Dive - Projects
• Use of project relationships for easy access to other Aras items
connected to the project
18
Deep Dive - Projects
19
“After”:
• Consolidation of project forms and tools into central area
• Standard view of project activities and deliverables required to
execute project plan
• Notification and accountability for project activities through
Aras InBasket
• Visibility to project progress and Engineering hours worked for
management
• Standardized process for executing projects that can be
reviewed and improved
What’s Next?
• Complete implementation of remainder of business processes per
project plan by end of Q2 2013
• Parts
 Component
 Platform (hardware)
– Link of data to product offerings on our website
• Assembly parts
• Engineering Change Order (ECO)
• Deviations
• Complete implementation of Manufactured Parts by end of 2013
 Significant tie to ERP system that will require updates
• Maintenance/enhancement of current Aras processes
• 30+ requests so far for updates to workflows and other Aras
items after process launches
• Implementation of Strategic Project process
• Review and prioritization of other forms/processes to put into Aras
in 2014 and beyond
• Potential options:
– Utilize Aras document control for Quality Manual documents
– Review Requirements management module and apply to project
process
– Customer/Supplier interaction
20
Implementation - What worked well?
• Having the business process owners engaged throughout the
implementation process
• Ownership of definition of their processes in Aras
• Collaborative approach to process definition
 Led to user buy-in for use of Aras platform
• Validation of the configured processes in Aras
• Training the affected groups
• Combination of workflow/lifecycle reviews and Aras hands-on
for process training
• Using a phased process implementation approach
• Iterative “learning” with each process launch
21
Implementation - What challenges did we encounter?
• Training people on Aras is 20% of learning - actual Aras usage
is 80%
• Despite the training “On the job” assistance required once
processes were launched
• It is difficult to get people to remember to Save/Unlock/Close
Aras items so others can edit them
• Be prepared for an immediate round of process
enhancements after launch
• Retired tool interactions/dependencies on other tools
• Perception that executing Aras workflows is “more work”
• “I have noticed that while all the checks and balances to
move on to the next step in the workflow are good, they also
make work more tedious.”
• Resistance to workflows due to increased visibility and
accountability
• Departure of IT project manager in November 2012
22
User Feedback
• Project Management
• “For projects, it is very nice to have everything in one place. Any
requirements, design or sustaining requests, new
parts, documents, orders, etc. are all right there for you.”
• “The ease of centralized activity tracking, workflow
management, and overall visibility brings a great advantage to
project management.”
• “The ability to utilize digital signatures for cross functional reviews
within projects and workflows decreased our whitespace and
helped move us away from the paper and pen signatures of the
past.”
• “Activity management from one InBasket provides associates with
a great outlook to their current and future workdays.”
• “Dynamic work breakdown structures have increased our
connectivity across project core team members and provide great
benefits in portfolio management.”
23
User Feedback
• Engineering
• “The project manager views exactly the same thing that I
do. Everything is real-time and there aren’t multiple revisions of
project plans stored in different places.”
• “You can assign a work package to someone’s Inbasket so the
members of the project team know what they are responsible
for. Prior to Aras there was no good visibility as to who was
assigned to what.”
• “After implementing Aras for management of our Engineering
projects, we saw a drastic reduction of our activity durations and
signoffs were gathered a lot quicker as people saw the activities in
their inbaskets. Activities are being completed quicker because of
the status colors since people do not like to see red boxes tied to
their activities.”
• “Having every signoff and document in one location makes finding
and updating reports so much easier.”
24
User Feedback
• Information Technology (IT)
• “One of the biggest benefits from an IT perspective is that it
gives us a single platform to replace many internally developed
tools that are often heavy on maintenance.”
• “The configuration options are very robust. One does not need
to be a software developer to configure Aras items.”
• “It has amazing flexibility, especially when coupled with the
ability to create custom methods.”
• “Security is worry free.”
• Sourcing
• “With Aras, we are able to execute the work in the proper order
and delegate tasks when necessary. It is much more efficient
and easier to understand the status and progress.”
• Quality/Compliance
• “There has been a significant uptick in compliance to response
time for CAPAs since moving to the Aras platform.”
• “We have much better visibility of CAPA items in Aras than we
did in the old system.”
• “From an auditing standpoint the linkage between systems in
Aras is very advantageous.”
• “My efficiency has improved as we replace our old tools with
more functionality in Aras.”
25
Summary of benefits seen using Aras
• Reduction in tools used in the business
• Centralization of project and engineering information and
activities
• Better visibility of projects (status, progress) to organization
• Product/part attribute searchability
• System controlled workflows for business processes
26
Questions?
27

More Related Content

What's hot

SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracleSOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
Getting value from IoT, Integration and Data Analytics
 
Why Project Management with Primavera?
Why Project Management with Primavera?Why Project Management with Primavera?
Why Project Management with Primavera?
Abhi Kalyan
 
Primavera AIA Integration with PIPs
Primavera AIA Integration with PIPsPrimavera AIA Integration with PIPs
Primavera AIA Integration with PIPs
Mark Kromer
 
Primavera unifier in action - Oracle Primavera Collaborate 14
Primavera unifier in action - Oracle Primavera Collaborate 14Primavera unifier in action - Oracle Primavera Collaborate 14
Primavera unifier in action - Oracle Primavera Collaborate 14
p6academy
 
Best Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation ProjectBest Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation Project
SAPinsider Events
 
REALTECH SmartChange solutions ppt
REALTECH SmartChange solutions pptREALTECH SmartChange solutions ppt
REALTECH SmartChange solutions ppt
David Milano
 
Testing the brave new world of saa s applications quest 2018 v1
Testing the brave new world of saa s applications quest 2018 v1Testing the brave new world of saa s applications quest 2018 v1
Testing the brave new world of saa s applications quest 2018 v1
GerieOwen
 
Oracle Fusion HCM Adoption Workshop
Oracle Fusion HCM Adoption WorkshopOracle Fusion HCM Adoption Workshop
Oracle Fusion HCM Adoption Workshop
AppLearn Ltd
 
Primavera roadmap
Primavera roadmapPrimavera roadmap
Primavera roadmap
Vladimir Ivanov
 
Oracle primavera and bpm the power of integration ppt
Oracle primavera and bpm   the power of integration pptOracle primavera and bpm   the power of integration ppt
Oracle primavera and bpm the power of integration ppt
p6academy
 
Rajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_ConsultantRajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_Consultant
RAJESH REDDI
 
Primavera Unifier Tips and Tricks
Primavera Unifier Tips and TricksPrimavera Unifier Tips and Tricks
Primavera Unifier Tips and Tricks
p6academy
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricks
p6academy
 
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe GeneraleSociete Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Cedar Consulting
 
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
BDO IT Solutions
 
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Cedar Consulting
 
Gavin Murray CV M&G Investments
Gavin Murray CV M&G InvestmentsGavin Murray CV M&G Investments
Gavin Murray CV M&G Investments
★ Gavin Murray ★
 
Using bpm to automate project workflows with primavera
Using bpm to automate project workflows with primaveraUsing bpm to automate project workflows with primavera
Using bpm to automate project workflows with primavera
p6academy
 
Use of unifier with primavera
Use of unifier with primaveraUse of unifier with primavera
Use of unifier with primavera
gjmstleonards
 
Arkin_Presentation_V10
Arkin_Presentation_V10Arkin_Presentation_V10
Arkin_Presentation_V10
Karan Mangat
 

What's hot (20)

SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracleSOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
 
Why Project Management with Primavera?
Why Project Management with Primavera?Why Project Management with Primavera?
Why Project Management with Primavera?
 
Primavera AIA Integration with PIPs
Primavera AIA Integration with PIPsPrimavera AIA Integration with PIPs
Primavera AIA Integration with PIPs
 
Primavera unifier in action - Oracle Primavera Collaborate 14
Primavera unifier in action - Oracle Primavera Collaborate 14Primavera unifier in action - Oracle Primavera Collaborate 14
Primavera unifier in action - Oracle Primavera Collaborate 14
 
Best Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation ProjectBest Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation Project
 
REALTECH SmartChange solutions ppt
REALTECH SmartChange solutions pptREALTECH SmartChange solutions ppt
REALTECH SmartChange solutions ppt
 
Testing the brave new world of saa s applications quest 2018 v1
Testing the brave new world of saa s applications quest 2018 v1Testing the brave new world of saa s applications quest 2018 v1
Testing the brave new world of saa s applications quest 2018 v1
 
Oracle Fusion HCM Adoption Workshop
Oracle Fusion HCM Adoption WorkshopOracle Fusion HCM Adoption Workshop
Oracle Fusion HCM Adoption Workshop
 
Primavera roadmap
Primavera roadmapPrimavera roadmap
Primavera roadmap
 
Oracle primavera and bpm the power of integration ppt
Oracle primavera and bpm   the power of integration pptOracle primavera and bpm   the power of integration ppt
Oracle primavera and bpm the power of integration ppt
 
Rajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_ConsultantRajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_Consultant
 
Primavera Unifier Tips and Tricks
Primavera Unifier Tips and TricksPrimavera Unifier Tips and Tricks
Primavera Unifier Tips and Tricks
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricks
 
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe GeneraleSociete Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
Societe Generale - The Clock is Ticking - Duncan Hartree, Societe Generale
 
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
 
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
 
Gavin Murray CV M&G Investments
Gavin Murray CV M&G InvestmentsGavin Murray CV M&G Investments
Gavin Murray CV M&G Investments
 
Using bpm to automate project workflows with primavera
Using bpm to automate project workflows with primaveraUsing bpm to automate project workflows with primavera
Using bpm to automate project workflows with primavera
 
Use of unifier with primavera
Use of unifier with primaveraUse of unifier with primavera
Use of unifier with primavera
 
Arkin_Presentation_V10
Arkin_Presentation_V10Arkin_Presentation_V10
Arkin_Presentation_V10
 

Viewers also liked

IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMASIV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
Fernando Cabo Díaz
 
Advertising in social networks
Advertising in social networksAdvertising in social networks
Advertising in social networks
Coldbeans Software
 
Light
LightLight
Social Media and Marketing Strategies
Social Media and Marketing StrategiesSocial Media and Marketing Strategies
Social Media and Marketing Strategies
Sarah Eisen
 
Kashmir Musk Deer Thought Extinct Rediscovered in Afghanistan
Kashmir Musk Deer Thought Extinct Rediscovered in AfghanistanKashmir Musk Deer Thought Extinct Rediscovered in Afghanistan
Kashmir Musk Deer Thought Extinct Rediscovered in Afghanistan
Dr. Ehsan Bayat
 
Musk deer стародумова анастасия 8 класс
Musk deer стародумова анастасия 8 классMusk deer стародумова анастасия 8 класс
Musk deer стародумова анастасия 8 класс
Victorushka
 
Moving the Light Out from Under the Bushel
Moving the Light Out from Under the BushelMoving the Light Out from Under the Bushel
Moving the Light Out from Under the Bushel
ARTILLERY LLC
 
20110327 systems of_typed_lambda_calculi_moskvin_lecture08
20110327 systems of_typed_lambda_calculi_moskvin_lecture0820110327 systems of_typed_lambda_calculi_moskvin_lecture08
20110327 systems of_typed_lambda_calculi_moskvin_lecture08Computer Science Club
 

Viewers also liked (8)

IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMASIV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
IV FORO METAL ASTURIAS - ROUNDTABLE MATERIAS PRIMAS
 
Advertising in social networks
Advertising in social networksAdvertising in social networks
Advertising in social networks
 
Light
LightLight
Light
 
Social Media and Marketing Strategies
Social Media and Marketing StrategiesSocial Media and Marketing Strategies
Social Media and Marketing Strategies
 
Kashmir Musk Deer Thought Extinct Rediscovered in Afghanistan
Kashmir Musk Deer Thought Extinct Rediscovered in AfghanistanKashmir Musk Deer Thought Extinct Rediscovered in Afghanistan
Kashmir Musk Deer Thought Extinct Rediscovered in Afghanistan
 
Musk deer стародумова анастасия 8 класс
Musk deer стародумова анастасия 8 классMusk deer стародумова анастасия 8 класс
Musk deer стародумова анастасия 8 класс
 
Moving the Light Out from Under the Bushel
Moving the Light Out from Under the BushelMoving the Light Out from Under the Bushel
Moving the Light Out from Under the Bushel
 
20110327 systems of_typed_lambda_calculi_moskvin_lecture08
20110327 systems of_typed_lambda_calculi_moskvin_lecture0820110327 systems of_typed_lambda_calculi_moskvin_lecture08
20110327 systems of_typed_lambda_calculi_moskvin_lecture08
 

Similar to Dedicated Computing Implmenting Aras

Training on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.pptTraining on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.ppt
AshwaniKumar207236
 
Training on ASAP Methodology.ppt
Training on ASAP Methodology.pptTraining on ASAP Methodology.ppt
Training on ASAP Methodology.ppt
AshwaniKumar207236
 
ASAP_Methodology.pptx
ASAP_Methodology.pptxASAP_Methodology.pptx
ASAP_Methodology.pptx
SridharSridhar314797
 
Agile methodology in cloud computing
Agile methodology in cloud computingAgile methodology in cloud computing
Agile methodology in cloud computing
Ahmed M. Abed
 
Performing a successful technical debt assessment in Salesforce
Performing a successful technical debt assessment in SalesforcePerforming a successful technical debt assessment in Salesforce
Performing a successful technical debt assessment in Salesforce
Coforge (Erstwhile WHISHWORKS)
 
Aim PPT For Oracle HRMS
Aim PPT For Oracle HRMSAim PPT For Oracle HRMS
Aim PPT For Oracle HRMS
Rajiv reddy
 
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
ghaeltailyn
 
Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design  Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design
Sutharshan Sharma
 
Oracle AIM Methodology
Oracle AIM MethodologyOracle AIM Methodology
Oracle AIM Methodology
Feras Ahmad
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
ssuser835d1a
 
Extending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management SolutionExtending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management Solution
Michelle Manimtim
 
Rup
RupRup
PMO and Project Server 2013 main features
PMO and Project Server 2013 main features PMO and Project Server 2013 main features
PMO and Project Server 2013 main features
Ahmad Hammoud,CPM,IBA,MSE,NLP
 
Soa 1 7.ppsx
Soa 1 7.ppsxSoa 1 7.ppsx
Soa 1 7.ppsx
ssuser3a47cb
 
Scrum for Global-Scale Development
Scrum for Global-Scale DevelopmentScrum for Global-Scale Development
Scrum for Global-Scale Development
TechWell
 
Are processes masquerading as projects hurting your business
Are processes masquerading as projects hurting your businessAre processes masquerading as projects hurting your business
Are processes masquerading as projects hurting your business
Ben Bradley
 
Agile at scale
Agile at scaleAgile at scale
Agile at scale
Eric Cattoir
 
ALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the CloudALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the Cloud
Jeremy Likness
 
Leaflet14 1
Leaflet14 1Leaflet14 1
Leaflet14 1
Curtis Tsang
 
Visual paradigm-leaflet
Visual paradigm-leafletVisual paradigm-leaflet
Visual paradigm-leaflet
Curtis Tsang
 

Similar to Dedicated Computing Implmenting Aras (20)

Training on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.pptTraining on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.ppt
 
Training on ASAP Methodology.ppt
Training on ASAP Methodology.pptTraining on ASAP Methodology.ppt
Training on ASAP Methodology.ppt
 
ASAP_Methodology.pptx
ASAP_Methodology.pptxASAP_Methodology.pptx
ASAP_Methodology.pptx
 
Agile methodology in cloud computing
Agile methodology in cloud computingAgile methodology in cloud computing
Agile methodology in cloud computing
 
Performing a successful technical debt assessment in Salesforce
Performing a successful technical debt assessment in SalesforcePerforming a successful technical debt assessment in Salesforce
Performing a successful technical debt assessment in Salesforce
 
Aim PPT For Oracle HRMS
Aim PPT For Oracle HRMSAim PPT For Oracle HRMS
Aim PPT For Oracle HRMS
 
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
9 ASUG82967 - Successful implementation of SAP Product Lifecycle Management a...
 
Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design  Selection of methodology - System Analysis and Design
Selection of methodology - System Analysis and Design
 
Oracle AIM Methodology
Oracle AIM MethodologyOracle AIM Methodology
Oracle AIM Methodology
 
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
 
Extending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management SolutionExtending Microsoft Project into a Unified Work Management Solution
Extending Microsoft Project into a Unified Work Management Solution
 
Rup
RupRup
Rup
 
PMO and Project Server 2013 main features
PMO and Project Server 2013 main features PMO and Project Server 2013 main features
PMO and Project Server 2013 main features
 
Soa 1 7.ppsx
Soa 1 7.ppsxSoa 1 7.ppsx
Soa 1 7.ppsx
 
Scrum for Global-Scale Development
Scrum for Global-Scale DevelopmentScrum for Global-Scale Development
Scrum for Global-Scale Development
 
Are processes masquerading as projects hurting your business
Are processes masquerading as projects hurting your businessAre processes masquerading as projects hurting your business
Are processes masquerading as projects hurting your business
 
Agile at scale
Agile at scaleAgile at scale
Agile at scale
 
ALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the CloudALM with TFS: From the Drawing Board to the Cloud
ALM with TFS: From the Drawing Board to the Cloud
 
Leaflet14 1
Leaflet14 1Leaflet14 1
Leaflet14 1
 
Visual paradigm-leaflet
Visual paradigm-leafletVisual paradigm-leaflet
Visual paradigm-leaflet
 

More from Aras

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Aras
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM Management
Aras
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology Directions
Aras
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016
Aras
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016
Aras
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of Engineering
Aras
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD Connectors
Aras
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic Vision
Aras
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product Design
Aras
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile Deployment
Aras
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next Level
Aras
 
Quality Systems
Quality SystemsQuality Systems
Quality Systems
Aras
 
Variant Management
Variant ManagementVariant Management
Variant Management
Aras
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service Reporting
Aras
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise Search
Aras
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling Framework
Aras
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical Publications
Aras
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange Portal
Aras
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk Management
Aras
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech Docs
Aras
 

More from Aras (20)

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM Management
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology Directions
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of Engineering
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD Connectors
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic Vision
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product Design
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile Deployment
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next Level
 
Quality Systems
Quality SystemsQuality Systems
Quality Systems
 
Variant Management
Variant ManagementVariant Management
Variant Management
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service Reporting
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise Search
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling Framework
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical Publications
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange Portal
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk Management
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech Docs
 

Recently uploaded

Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
manji sharman06
 
An Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise IntegrationAn Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise Integration
Safe Software
 
Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...
Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...
Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...
dipikamodels1
 
Building a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data PlatformBuilding a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data Platform
Enterprise Knowledge
 
Brightwell ILC Futures workshop David Sinclair presentation
Brightwell ILC Futures workshop David Sinclair presentationBrightwell ILC Futures workshop David Sinclair presentation
Brightwell ILC Futures workshop David Sinclair presentation
ILC- UK
 
ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes
 
The "Zen" of Python Exemplars - OTel Community Day
The "Zen" of Python Exemplars - OTel Community DayThe "Zen" of Python Exemplars - OTel Community Day
The "Zen" of Python Exemplars - OTel Community Day
Paige Cruz
 
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc
 
Fuxnet [EN] .pdf
Fuxnet [EN]                                   .pdfFuxnet [EN]                                   .pdf
Fuxnet [EN] .pdf
Overkill Security
 
Corporate Open Source Anti-Patterns: A Decade Later
Corporate Open Source Anti-Patterns: A Decade LaterCorporate Open Source Anti-Patterns: A Decade Later
Corporate Open Source Anti-Patterns: A Decade Later
ScyllaDB
 
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State StoreElasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
ScyllaDB
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
Mydbops
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
UiPathCommunity
 
Cyber Recovery Wargame
Cyber Recovery WargameCyber Recovery Wargame
Cyber Recovery Wargame
Databarracks
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
UiPathCommunity
 
intra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_Enintra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_En
NTTDATA INTRAMART
 
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time MLMongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
ScyllaDB
 
From NCSA to the National Research Platform
From NCSA to the National Research PlatformFrom NCSA to the National Research Platform
From NCSA to the National Research Platform
Larry Smarr
 
Supplier Sourcing Presentation - Gay De La Cruz.pdf
Supplier Sourcing Presentation - Gay De La Cruz.pdfSupplier Sourcing Presentation - Gay De La Cruz.pdf
Supplier Sourcing Presentation - Gay De La Cruz.pdf
gaydlc2513
 
EverHost AI Review: Empowering Websites with Limitless Possibilities through ...
EverHost AI Review: Empowering Websites with Limitless Possibilities through ...EverHost AI Review: Empowering Websites with Limitless Possibilities through ...
EverHost AI Review: Empowering Websites with Limitless Possibilities through ...
SOFTTECHHUB
 

Recently uploaded (20)

Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
Call Girls Chandigarh🔥7023059433🔥Agency Profile Escorts in Chandigarh Availab...
 
An Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise IntegrationAn Introduction to All Data Enterprise Integration
An Introduction to All Data Enterprise Integration
 
Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...
Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...
Call Girls Kochi 💯Call Us 🔝 7426014248 🔝 Independent Kochi Escorts Service Av...
 
Building a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data PlatformBuilding a Semantic Layer of your Data Platform
Building a Semantic Layer of your Data Platform
 
Brightwell ILC Futures workshop David Sinclair presentation
Brightwell ILC Futures workshop David Sinclair presentationBrightwell ILC Futures workshop David Sinclair presentation
Brightwell ILC Futures workshop David Sinclair presentation
 
ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024ThousandEyes New Product Features and Release Highlights: June 2024
ThousandEyes New Product Features and Release Highlights: June 2024
 
The "Zen" of Python Exemplars - OTel Community Day
The "Zen" of Python Exemplars - OTel Community DayThe "Zen" of Python Exemplars - OTel Community Day
The "Zen" of Python Exemplars - OTel Community Day
 
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
TrustArc Webinar - Your Guide for Smooth Cross-Border Data Transfers and Glob...
 
Fuxnet [EN] .pdf
Fuxnet [EN]                                   .pdfFuxnet [EN]                                   .pdf
Fuxnet [EN] .pdf
 
Corporate Open Source Anti-Patterns: A Decade Later
Corporate Open Source Anti-Patterns: A Decade LaterCorporate Open Source Anti-Patterns: A Decade Later
Corporate Open Source Anti-Patterns: A Decade Later
 
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State StoreElasticity vs. State? Exploring Kafka Streams Cassandra State Store
Elasticity vs. State? Exploring Kafka Streams Cassandra State Store
 
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - MydbopsMySQL InnoDB Storage Engine: Deep Dive - Mydbops
MySQL InnoDB Storage Engine: Deep Dive - Mydbops
 
Day 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data ManipulationDay 4 - Excel Automation and Data Manipulation
Day 4 - Excel Automation and Data Manipulation
 
Cyber Recovery Wargame
Cyber Recovery WargameCyber Recovery Wargame
Cyber Recovery Wargame
 
Automation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI AutomationAutomation Student Developers Session 3: Introduction to UI Automation
Automation Student Developers Session 3: Introduction to UI Automation
 
intra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_Enintra-mart Accel series 2024 Spring updates_En
intra-mart Accel series 2024 Spring updates_En
 
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time MLMongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
MongoDB vs ScyllaDB: Tractian’s Experience with Real-Time ML
 
From NCSA to the National Research Platform
From NCSA to the National Research PlatformFrom NCSA to the National Research Platform
From NCSA to the National Research Platform
 
Supplier Sourcing Presentation - Gay De La Cruz.pdf
Supplier Sourcing Presentation - Gay De La Cruz.pdfSupplier Sourcing Presentation - Gay De La Cruz.pdf
Supplier Sourcing Presentation - Gay De La Cruz.pdf
 
EverHost AI Review: Empowering Websites with Limitless Possibilities through ...
EverHost AI Review: Empowering Websites with Limitless Possibilities through ...EverHost AI Review: Empowering Websites with Limitless Possibilities through ...
EverHost AI Review: Empowering Websites with Limitless Possibilities through ...
 

Dedicated Computing Implmenting Aras

  • 1. Our journey implementing Aras Need, Plan, Implement SUCCESS!
  • 2. Agenda • Who is Dedicated Computing? • What drove our need for a Product Lifecycle Management (PLM) Solution? • Search for a PLM Platform • Planning the Aras Implementation • Executing the Aras Implementation • Where are we now?  Process/Tools Summary  Deep Dive on Projects • What’s Next? • Implementation - What worked well? • Implementation - What challenges did we encounter? • User Feedback • Summary of benefits seen using the Aras platform • Questions 2
  • 3. Who is Dedicated Computing? An innovative technology company dedicated to creating value for our customers through the application of connected, secure and complete technical computing solutions. 339 associates at three Wisconsin locations Operations Sales & Marketing Technical Engineering 43 142 154 OUR EXPERTISE Products & Services: Embedded Computing Remote Monitoring Networking Solutions Engineering Design Quality Processes Supply Chain Management Life Cycle Management Program Management
  • 4. Our Technical Computing Solutions Connected. Secure. Complete. Engineering Services includes unique purpose built hardware feature design & development, software and driver development, life cycle management and professional services Advanced Servers application & network ready embedded computing solutions optimized to deliver the right balance of power and performance, security, netwo rk connectivity and manageability Secure Service System provides secure remote field device monitoring, software stack management, data center access and system optimization
  • 5. Our Market Focus Military Flight Training & Simulation Systems Radar & Sensor Systems Unmanned Systems Healthcare Imaging Systems Lab Diagnostic & Patient Monitoring Computer Assisted Surgery Systems Oil & Gas Engineering Control Systems Seismic Imaging Systems Industrial Automation Industrial Automation Building Control Security Physical Security Intrusion Detection
  • 6. What drove our need for a Product Lifecycle Management (PLM) solution? • Many custom tools used to manage multiple Bills Of Material (BOMs) • Lack of part/product searchability • Tools do not support ability to view BOM Revision History • “Projects” within the business were managed in many different ways using custom tools and forms • Business processes managed using a combination of custom tools, “word of mouth” and e-mail 6
  • 7. Search for a PLM Platform – road to Aras We first looked at 4-6 other PLM platforms including: • TeamCenter • Oracle Agile • Omnify • Arena Each of these solutions had a significant Total Cost of Ownership (TCO) to evaluate which led us to Aras 7
  • 8. Search for a PLM Platform – road to Aras Why Aras? • Instant use • Configurability • High Value / Low Total Cost of Ownership (TCO) • Support • Roles & Workflows • Searching Options • Revision Control & History 8
  • 9. Planning the Aras Implementation (Q4 2011 & Q1 2012) • Initial review and investigation by a small team • Prepare Project Charter and gain executive buy-in and approval • Project Planning • Determine which business processes to transfer from existing tools to Aras platform • Form Project Core Team  Business Project Manager  IT Project Manager  2 IT resources to code and configure Aras • Attended 2012 ACE conference • Determine business process owners  Process owners responsible for definition of processes to be configured in Aras • Decision to use a phased process implementation approach as opposed to a “big bang” • Complete and maintain project schedule  Activity Analysis (Work Breakdown Structure) 9
  • 10. Planning the Aras Implementation • WBS (Work Breakdown Structure) 10
  • 11. Aras Implementation Project Plan – Phases & Milestones Phase 1 - Project Kickoff and Aras Platform Installation/Training (January – March 2012) • Creation of project core team • Identify Business Process Owners • Aras subscription purchase, installation and training for project core team Phase 2 – Aras Process Configuration / Validation & User Training & Implementation (April 2012 – June 2013) • Business process definition • Aras process configuration • Custom software modifications and integrations coded • Aras process testing • Aras and modified systems software validations • Data mapping and migration • Process documentation updates • Classroom user training  Walk through of execution of Aras processes • Aras Implementation  Phased process launches in Q4 2012 /Q1 & Q2 2013 Phase 3 – Manufactured Parts Implementation (July 2013 – December 2013) • Manufactured parts process definition • ERP modifications and integrations coded • Launch of manufactured parts Confidential 11
  • 12. Executing the Aras Implementation (Q2 2012 – Q2 2013) • Weekly Project Core Team meetings • Work with Business Process owners and other stakeholders to identify current processes, improve as needed and define Aras configuration • Configure business processes in Aras • Migration of existing data to Aras • Aras process review sessions with stakeholders to update as needed • Software validation of Aras processes • Update of Quality documentation to reflect new processes and use of Aras • Aras Training • General (all users) • Process Specific (affected users of process) • Launch of processes in Aras and retirement of old tools 12
  • 13. Where are we now? • 16 business processes now implemented on the Aras platform • Engineering  Pre-production orders  Hardware design  Software development  Hardware validation • Engineering and Project Management  Projects • Quality  CAPA (Corrective Action / Preventive Action)  Customer escalations • Sourcing  Qualified supplier list  New part creation  Part change notices • Manufacturing  Continuous improvement ideas 13
  • 14. Where are we now? How many tools and forms have been eliminated so far as a result of implementation of processes in Aras? • 16 Tools • SharePoint • Webspeck (Custom Tool) • 5 Forms • Excel spreadsheets  Checklists for various processes  Spreadsheet trackers 14
  • 15. Deep Dive - Projects “Before”: • Many tools/forms used during the execution of a project  Many “checklists” existed to ensure project activities were completed • Processes were defined but were managed in different ways and project activities/ownership were not readily apparent • Difficult to see aggregate view of project progress and status 15 NPI Tool Product Brief Tool 3 SharePoint Tools 3 Excel Forms Aras
  • 16. Deep Dive - Projects • Currently using for mostly Engineering projects • Central view of project owners and status • Use of project templates to drive lead roles and standard sets of activities • Easy stoplight status visibility for management to take actions as needed • Calculation of Engineering hours worked per project • Data is exported and feeds into Engineering Resource Model 16
  • 17. Deep Dive - Projects • Use of project classifications to drive specific attributes per project • Use of “Core Teams” for quick and easy assignment of Lead Roles for project activities 17
  • 18. Deep Dive - Projects • Use of project relationships for easy access to other Aras items connected to the project 18
  • 19. Deep Dive - Projects 19 “After”: • Consolidation of project forms and tools into central area • Standard view of project activities and deliverables required to execute project plan • Notification and accountability for project activities through Aras InBasket • Visibility to project progress and Engineering hours worked for management • Standardized process for executing projects that can be reviewed and improved
  • 20. What’s Next? • Complete implementation of remainder of business processes per project plan by end of Q2 2013 • Parts  Component  Platform (hardware) – Link of data to product offerings on our website • Assembly parts • Engineering Change Order (ECO) • Deviations • Complete implementation of Manufactured Parts by end of 2013  Significant tie to ERP system that will require updates • Maintenance/enhancement of current Aras processes • 30+ requests so far for updates to workflows and other Aras items after process launches • Implementation of Strategic Project process • Review and prioritization of other forms/processes to put into Aras in 2014 and beyond • Potential options: – Utilize Aras document control for Quality Manual documents – Review Requirements management module and apply to project process – Customer/Supplier interaction 20
  • 21. Implementation - What worked well? • Having the business process owners engaged throughout the implementation process • Ownership of definition of their processes in Aras • Collaborative approach to process definition  Led to user buy-in for use of Aras platform • Validation of the configured processes in Aras • Training the affected groups • Combination of workflow/lifecycle reviews and Aras hands-on for process training • Using a phased process implementation approach • Iterative “learning” with each process launch 21
  • 22. Implementation - What challenges did we encounter? • Training people on Aras is 20% of learning - actual Aras usage is 80% • Despite the training “On the job” assistance required once processes were launched • It is difficult to get people to remember to Save/Unlock/Close Aras items so others can edit them • Be prepared for an immediate round of process enhancements after launch • Retired tool interactions/dependencies on other tools • Perception that executing Aras workflows is “more work” • “I have noticed that while all the checks and balances to move on to the next step in the workflow are good, they also make work more tedious.” • Resistance to workflows due to increased visibility and accountability • Departure of IT project manager in November 2012 22
  • 23. User Feedback • Project Management • “For projects, it is very nice to have everything in one place. Any requirements, design or sustaining requests, new parts, documents, orders, etc. are all right there for you.” • “The ease of centralized activity tracking, workflow management, and overall visibility brings a great advantage to project management.” • “The ability to utilize digital signatures for cross functional reviews within projects and workflows decreased our whitespace and helped move us away from the paper and pen signatures of the past.” • “Activity management from one InBasket provides associates with a great outlook to their current and future workdays.” • “Dynamic work breakdown structures have increased our connectivity across project core team members and provide great benefits in portfolio management.” 23
  • 24. User Feedback • Engineering • “The project manager views exactly the same thing that I do. Everything is real-time and there aren’t multiple revisions of project plans stored in different places.” • “You can assign a work package to someone’s Inbasket so the members of the project team know what they are responsible for. Prior to Aras there was no good visibility as to who was assigned to what.” • “After implementing Aras for management of our Engineering projects, we saw a drastic reduction of our activity durations and signoffs were gathered a lot quicker as people saw the activities in their inbaskets. Activities are being completed quicker because of the status colors since people do not like to see red boxes tied to their activities.” • “Having every signoff and document in one location makes finding and updating reports so much easier.” 24
  • 25. User Feedback • Information Technology (IT) • “One of the biggest benefits from an IT perspective is that it gives us a single platform to replace many internally developed tools that are often heavy on maintenance.” • “The configuration options are very robust. One does not need to be a software developer to configure Aras items.” • “It has amazing flexibility, especially when coupled with the ability to create custom methods.” • “Security is worry free.” • Sourcing • “With Aras, we are able to execute the work in the proper order and delegate tasks when necessary. It is much more efficient and easier to understand the status and progress.” • Quality/Compliance • “There has been a significant uptick in compliance to response time for CAPAs since moving to the Aras platform.” • “We have much better visibility of CAPA items in Aras than we did in the old system.” • “From an auditing standpoint the linkage between systems in Aras is very advantageous.” • “My efficiency has improved as we replace our old tools with more functionality in Aras.” 25
  • 26. Summary of benefits seen using Aras • Reduction in tools used in the business • Centralization of project and engineering information and activities • Better visibility of projects (status, progress) to organization • Product/part attribute searchability • System controlled workflows for business processes 26
  翻译: