尊敬的 微信汇率:1円 ≈ 0.046078 元 支付宝汇率:1円 ≈ 0.046168元 [退出登录]
SlideShare a Scribd company logo
Page 1 of  5 
 
 
CURRICULUM VITAE 
 
Personal Data :
Name : Dermawan Lumban Gaol, ST
Place & Date of Birth : Tapanuli Utara, June 1, 1974
Garder : Male
Religion : Protestan
Marital Status : Married with three daughter
Height : 177 Cm
Weight : 79 Kg
Nationality : Indonesia
Address : Perumahan Simprug Diporis, Blok D1/36
Batu Ceper, Tangerang – Banten 15122. Indonesia
Phone : +62 813 4493 5304 / +62 812 4589 8746
E-mail : dermawanlg@yahoo.com
Career Objective :
Manager of Development/Plant/Project/Production operational with a 15-year record of
success overseeing all phases of Tender Committe, multimillion-dollar construction, EPC for Oil &
gas plant, Tank terminal, Palm oil rafinery, Chemical plant, Power plant for government and
private-sector clients. Experience includes managing crews of up to planning and constructing
expertise. Able to lead owners’ team and interface with all internal groups. Effectively partners
and manages contracts with design, engineering firms, specialty consultants, contractors, and
vendors. Familiar with all aspects of a project lineage. Skilled at executing production
equipment de-installation, shipment and re-installation. Backed by strong credentials and a
proven history of on-time, on-budget and high-quality project completions. Also to set
objectives, plan, implement and complete the project within the stipulated time-frame and
ideally without cost overruns. Further, must be able to optimally utilize all available resources
and effectively coordinate the activities of all project stake holders, team members, external
agencies and consultants throughout the project’s tenure.
Key Skills :
 INTEGRATE scope, time, resources and cost management into a dynamic, manageable
plan.
 DEVELOP project network diagram for CPM and advanced PERT calculations to identify
schedule and cost risks.
 MAINTAIN continuous project performance and delivery control.
Page 2 of  5 
 
 MEASURE, forecast and control project performance by employing earned value
techniques.
 COMPRESS or accelerate the schedule when required by adverse circumstances.
 IDENTIFY project-specific risks and uncertainties.
 USE qualitative and quantitative methods to assess the exposure of the project to
particular risk in real and measurable terms.
 MANAGE and MITIGATE schedule, cost, scop, and resource risk associated with the
project.
 EVECTIVE how to schedule and plan for recurring activities.
 Prepared and review of SOP, QA/QC, ITP, Standard code, Owner/Client Standard.
 Preparation data sheet, Design Calculation, Drawing (lay out, general assesment, detail)
and Tecknical qualification any standard (API 650; API 2000; API 653; ASME Sec. I-VII;
ASME Sec. VIII Div.1&2; ASME Sec.IX; ASTM; ANSI) Etc. And any sorfware Design (Coade
Tank; E-Tank; SAP-2000; PV Elite).
 Look carefully at SHE/OSHA complience, Goverment regulation and Related parties.
 Lead of for Subcontractor / Crew Supervision, Change Order Management.
 Review of Equipment / Tools, Facility and Accomodation.
Work Experience and Skill : 
I. PT. Bangun Bejana Baja – Jakarta, Since February 2011 ~ Up to Now
As Position : Project Manager / Project Management
Project :
a. Relokasi Depot LPG Berikut Sarfas Penunjangnya, PT. Pertamina Tj.Priok-Jakarta,
Spherical Tank Cap. 2500MT x 4 Unit. 2011
b. ICA Alumina Plant, Antam-TSK-WIKA, Tayan – Kalimantan Barat, Tank Process Any
Type x 130 Unit. 2011
c. Repare Bottom & Accessories 42-T303B x ID. 56.000 x H.18.000 mm, Pertamina
Balongan – Jawa Barat. 2011
d. Repare Shell 42-T301B x ID. 48.000 x H.18.000 mm, Pertamina Balongan – Jawa
Barat. 2012
e. P & C Benar GS Upgrade Project C871283, PT. Chevron Pacific Indonesia, Duri –
Riau. 2012
f. Pembangunan LPG Terminal Makassar, Bosowa Duta Energasindo - Makassar,
Spherical Tank Cap. 2500MT x 4 Unit. 2013
g. Tank Senoro Gas Development Project, 16 Unit Storage Tank Any Type Cone and
EFR, JOB Pertamina-Medco E&p Tomori Sulawesi, Tripatra Samsung Consortium,
2013
h. Tank Storage Terminal Oiltanking At Karimun, 19 Unit Tank Alumunium Dome Roof
+ CB Steel Internal Floating Roof Dia. 20; 30; 36; 39,3m x H.22m, FTZ Tanjung Balai
Karimun – KEPRI, 2014
Job description :
- Continuing the company vision and mission objectives as field service
engineering, procrutment and Construction (EPC).
- Lead at Kick of meeting and other meeting, Coordinates with planning section
for review, take-offs estimates and establishing construction time lines.
- As a planner, organizing, coordinating, and controlling resources to achieve the
objectives (goals) effectively and efficiently.
- Representing the company in the control of management, implementing,
managing, directing and controlling the activities of the employees. with
Planning, Scop, Cost, Quality, Organizing, directing, Time Schedule and Progress.
- Conduct and coordinates site surveys (Pre-bid and Post award) for construction
projects.
Page 3 of  5 
 
- Review and finalize bid and proposal documents.
- Coordinate procurement, shipping, construction schedules, travel requirements
to include appropriate country clearances.
- Provide schedule updates prior and during construction phase.
- Maintain, facilitate and coordinated communication with Contracting Officers
and Contracting Officer Technical Representative during project implementation
and completion.
- Establish, manage and submit change orders.
- Keep track of all expenditures and conduct periodic budget reviews.
- Manage and evaluate personnel and sub-contractor performance.
- Evaluation project-specific risks and uncertainties, lost time. Preparetion and
determain Action method
II. PT. Shinnetsko Prima - Jakarta, Since August 2001 ~ December 2010
1. Site Manager, to Project :
a. Project Linc Terminal Phase 3 Ciwandan – Banten, Storage Tank 10 Unit, Pipe
Intalition & Instrument, Period : Feb’10 ~ Dec’10.
b. 20 MW MFO Storage Tank & Acessories CDE Karang Joang – Kalimantan Timur,
Period : Oct’09 ~ Jan’10. EPC.
c. Tank Terminal & Jetty Top Sides Project – Oiltanking-Rotary-SSP – Merak-BANTEN,
Period : May’08 ~ Sep‘09. Sub-Fabricasion & Erection Dome-Floater Roof Tank
Farm 1 (9 Unit), Farm 2 (7 Unit) & Farm 3 (5 Unit)
d. Tank Terminal BBM – AKR Pelabuhan Stagen-Kota Baru, Period : Dec’07 ~ Apl’08.
Fabricasion & Erection Tank (8 Unit Kap.5.000 KL, Dia. 23,200 x H. 13,750 m).
e. Service Tank – PetroChina International (Bermuda), Ltd – Irian Jaya Barat-PAPUA,
Period : Nov’06 ~ Nov’07. Repare Storage Tank Floating Roof D-101-5 (1 Unit
Kap.313.000 BBLS, Dia. 200’ x H. 56’).
f. SWS Unit 24 Kilang – PT. Pertamina (Persero) UP-VI Balongan-JABAR, Period :
March’06 ~ Sep’06. Fabrication & Erection Storage Tank 24-T-102 (1 Unit Kap.
5.000 KL), Pondation, Pipe Intalation & Instrument.
g. 740 MW CCPP PLN - Mitsubishi Corporation-Truba Jurong Engineering – Cilegon-
BANTEN, Period : Nov'04 ~ Jan’06. Sub-Erection Storage Tank (1 Unit Kap.17.800
KL), (1 Unit Kap. 6.300 KL), (1 Unit Kap. 2.790 KL), (2 Unit Kap. 2.000 KL), (1 Unit Kap.
338 KL), (1 Unit Kap. 236 KL) & Pipe Intalation.
Job description : - Committe Tender, Manager the supervising every activities in
the Site and Coordination to Management HO, Monitoring &
Coordination to subcontractor, all more now such as : Project
Activity Fabrication, Erection, Repare, Safe condition works or
Comitment at HSE and quality, on schedule, effeciency
menpower, equipment tolls, commissioning, cost operational,
etc.
- Planning of work actifity.
- Contact, discuss & presentasion job order with Client.
- Prepare Standard Operating Procedure (SOP) and ITP for
every kind of work's and process.
- Monitoring actifity works and quality.
2. Project Engineer & PPC, to Project :
a. Pembangunan Depot BBM Pertamina – PT. Konsorsium Truba dan Indokomas -
UPDN III PERTAMINA Cikampek-JABAR, Period : Ags'03 ~ Okt'04. Sub-Fabrication &
Erection Storage Tank (3 Unit Kap. 11.500 KL), (3 Unit Kap. 5.000 KL), (3 Unit Kap.
10.000 KL), (2 Unit Kap. 500 KL) and Intalation Pipe, Pump, Instrument, Etc
Page 4 of  5 
 
b. Werehouse & Facility – PT. Putra Mahatiti – Kawasan Bandra Cingkareng-
JAKARTA, Period : Dec'03 ~ Jul'03. Design, Calculation, Fabrication and
Construction Building (Pergudangan Blok. E, 236 Unit).
c. Chemical Plan – PT. Bina Karya Prima – Bekasi-JABAR, Period : Mar'02 ~ Jan'03.
Chemical Safonificasion Pland, Building of Construction, Reactor & Mixer
Instalation, Steam boiler, Pipe, Pump, Instrument and Fabrication and Erection
Storage Tank.
Job description : - Team succes of technical committe tender.
- Design calculation of Pondation, construction, Pump, Piping &
Intalation. With familiar any Sofware Program.
- Supervising design and shop drawing.
- Make shop drawing and as- build drawing.
- Prepare Standard Operating Procedure (SOP) and ITP for
every kind of work's and process, with complete standard API
650 / 653, ASMI SEC VIII Div 1&2, ASTM, AWS & ANSI.
- Make schedule, progress report, menpower, equipments and
materials usage and report them to Client and Managent.
- Contact and discuss with Clients all scop work and drawing
and working.
- Supervise the welder sertificate and quality.
- Check daily production reports and make monthly reports to
Cliend and Management, evaluate progress of production
and note down step to be taken to solve problem that arose.
- Prepare metode action plan if works progress activity behind.
- Direction, control, plan and supervise all technical activities or
Fabrication such as : marking, cutting, rolling, banding,
welding, grinding, sandblasting and assambling process.
- Supervise the daily maintenance of machine and other
equipment, make sure all machine troubles and breakdowns
are reported to Maintenance department.
- Supervise of installation of reactor, stem boiler, pipe,
instrument and erection storage tank.
- Estimate production cost and offer the quotation to clients.
- Prepared of invoice progress performance.
- Assist site supervisor in fabrication and erection problem.
3. QA/QC Official
a. Unit of Gas Industries – PT. Titis Sampurna – Limau Timur, Palembang-SUMSEL,
Period: Jul’01 ~ Jan’02. Fabrication & Erection LPG Tank (3 Unit), Oil Water Tank (3
Unit), Storage Tank (3 Unit).
b. Unit of Gas Industries – PT. Budi Artaprima Cemerlang – Pertamina DOH
Prabumulih-SUMSEL, Period : Ags’01 ~ Feb’02. Fabrication & Erection Separator (3
Unit), Peco Filter Vessel (1 Unit), Slug Catcher (1 Unit).
Job description : - Contact and discuss job order with Client.
- Control design suitable with ASME VIII, Sec 1.
- Inspection / testing, Prepared report & Document.
- Sertificatation with third Party Inspector & Migas.
- Monitoring and team commissioning plan.
- Make shop drawing and as- build drawing.
- Inspect quality of job are met shop drawing and specification
in contract document.
Page 5 of  5 
 
III. PT. Sinar Antjol (Mar'01 ~ Jul'01)
As Position : As Supervisior and Foreman Project.
Project : Chemical Safonificasion Pland, Building of Construction, Intalation
Reactor, Pipe, Pump, Instrument & Electrical.
Location : Pluit Selatan - Jakarta Utara.
Job description : - Coordination action plan and evaluation scop work.
- Leader for works process the plan.
- Quality Control.
- Commissioning Team.
- Support part sales engineer for his market.
- Experience and Design calculation for lay out production.
IV. PT. Jawa Barat Textile (JABATEX) (Feb'00 ~ Jan'01)
As Position : As Chief Utility Maintenance.
Location : Tangerang, Banten.
Job description : - Leader and instructor for preventive maintenance of heavy duty
equipment.
- Planning and Evaluation Maintenance of Machine, Heavy
Equipment, Building and Accessories.
- Instal or Setting New Engine.
- Evaluation & Control Waste Water Treatment.
- Support part sales engineer for his market.
- Design suitable warehouse for spare parts.
- Team for Audit ISO Programe.
Course and Training : 
 Training of Organization for System Orientated HSE Management Methot - PLN Project,
by Mitsubishi Heavy Industries Ltd (Takasago Machinery Works), Cilegon (2005)
 K3LL Safety Training PERTAMINA - Depot BBM Proyek Cikampek (2003).
 Training for Welding & Inspection API/AWS, by Lincoline, Jakarta (2003).
 Training of Introduction and Documentation of ISO-9001, PT.Jabatex, by SI (2000).
 NDE & Non NDE Inspection & Interpretation Course BATAN (1998 ~ 1999).
 Hydraulic and Pneumatic for Industrial Machinery Training-Zerman Hamburg Sub
Consultant, Universitas Trisakti Jakarta (1998).
 Computer Course, Sarana Informatika Tangerang (1997 ~ 1998).
 English Course, KING'S Tangerang (1994 ~ 1997).
Education Background : 
Institut Teknologi Indonesia ( ITI ), Fakultan Teknologi Industri Teknik Mesin (Strata1) - Bachelor
Degree of Mechanical Engineer, Serpong-Tangerang (1995 ~ 2000).
 

More Related Content

What's hot

CV Civil Eng..
CV Civil Eng..CV Civil Eng..
CV Civil Eng..
rana zubair
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
WasimIqbal28
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
karthikeyan ramamoorthy
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
Nadeer Khan
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mech
Mohammed Maqsood
 
COMPANY PROFILE TCB INTERIOR
COMPANY PROFILE TCB INTERIORCOMPANY PROFILE TCB INTERIOR
COMPANY PROFILE TCB INTERIOR
Hendry Setiadi Wibowo
 
RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
RATHEESH VALLOLIMADAM
 
PABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMANPABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMAN
pabitra kumar sahu
 
Civil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cvCivil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cv
Ahmed Salem
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document Controller
Anil Parmar
 
CV SERTIFIKAT KOMPETENSI KERJA PEMBORAN
CV SERTIFIKAT KOMPETENSI KERJA PEMBORANCV SERTIFIKAT KOMPETENSI KERJA PEMBORAN
CV SERTIFIKAT KOMPETENSI KERJA PEMBORAN
adi sumirta
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
iftekhar Ahmad Baig
 
CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)
Abdul Mannan Sajeed
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
kiran kumar Reddy
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant
 

What's hot (20)

CV Civil Eng..
CV Civil Eng..CV Civil Eng..
CV Civil Eng..
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mech
 
COMPANY PROFILE TCB INTERIOR
COMPANY PROFILE TCB INTERIORCOMPANY PROFILE TCB INTERIOR
COMPANY PROFILE TCB INTERIOR
 
RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
 
PABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMANPABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMAN
 
Civil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cvCivil engineer moustafa.elsisy-cv
Civil engineer moustafa.elsisy-cv
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document Controller
 
CV SERTIFIKAT KOMPETENSI KERJA PEMBORAN
CV SERTIFIKAT KOMPETENSI KERJA PEMBORANCV SERTIFIKAT KOMPETENSI KERJA PEMBORAN
CV SERTIFIKAT KOMPETENSI KERJA PEMBORAN
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 

Viewers also liked

MOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATEST
MOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATESTMOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATEST
MOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATEST
Mohd Shahrul Nazarin Shaharuddin
 
General resume Azneen Shah
General resume Azneen ShahGeneral resume Azneen Shah
General resume Azneen Shah
Azneen Shah Ramli
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
Ramanuja R
 
Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016
Jayakailash Menon
 
CV-Updated March
CV-Updated MarchCV-Updated March
CV-Updated March
Keith Lim
 
CV siti azizah
CV siti azizahCV siti azizah
CV siti azizah
Ps Siti
 
Pbahnisch cv 2017 0
Pbahnisch cv 2017 0Pbahnisch cv 2017 0
Pbahnisch cv 2017 0
Paul Bahnisch
 
Ossama ismail cv for linkedin
Ossama  ismail cv for linkedin Ossama  ismail cv for linkedin
Ossama ismail cv for linkedin
Ossama Ismail
 

Viewers also liked (8)

MOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATEST
MOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATESTMOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATEST
MOHD SHAHRUL NAZARIN BIN SHAHARUDDIN - resume 2016 LATEST
 
General resume Azneen Shah
General resume Azneen ShahGeneral resume Azneen Shah
General resume Azneen Shah
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016
 
CV-Updated March
CV-Updated MarchCV-Updated March
CV-Updated March
 
CV siti azizah
CV siti azizahCV siti azizah
CV siti azizah
 
Pbahnisch cv 2017 0
Pbahnisch cv 2017 0Pbahnisch cv 2017 0
Pbahnisch cv 2017 0
 
Ossama ismail cv for linkedin
Ossama  ismail cv for linkedin Ossama  ismail cv for linkedin
Ossama ismail cv for linkedin
 

Similar to Curriculum Vitae Dermawan LG - Project Manager

CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
ilham_dragon1
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
Pinak Biswas
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
Fikruddien YusoF
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
Srinivas Sirigineedi
 
RAMESH_Resume
RAMESH_ResumeRAMESH_Resume
RAMESH_Resume
Kurupati Ramesh Babu
 
updated CV
updated CVupdated CV
updated CV
sahadevan pillai
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
Patrick Soria Muga (psmuga9@gmail.com)
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
Pradeep Raja A
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
Pradeep Raja A
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
Saif kharal
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
gobinath gobinath
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
Mochammad Anis
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
psmuga9
 
Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1
Yuthasil Pipatnawakit
 
Yuthasil-CV-June-2016-pp-1
Yuthasil-CV-June-2016-pp-1Yuthasil-CV-June-2016-pp-1
Yuthasil-CV-June-2016-pp-1
Yuthasil Pipatnawakit
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
psmuga9
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
psmuga9
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
Guhan Visagan
 

Similar to Curriculum Vitae Dermawan LG - Project Manager (20)

CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
RAMESH_Resume
RAMESH_ResumeRAMESH_Resume
RAMESH_Resume
 
updated CV
updated CVupdated CV
updated CV
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1
 
Yuthasil-CV-June-2016-pp-1
Yuthasil-CV-June-2016-pp-1Yuthasil-CV-June-2016-pp-1
Yuthasil-CV-June-2016-pp-1
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 

Curriculum Vitae Dermawan LG - Project Manager

  • 1. Page 1 of  5      CURRICULUM VITAE    Personal Data : Name : Dermawan Lumban Gaol, ST Place & Date of Birth : Tapanuli Utara, June 1, 1974 Garder : Male Religion : Protestan Marital Status : Married with three daughter Height : 177 Cm Weight : 79 Kg Nationality : Indonesia Address : Perumahan Simprug Diporis, Blok D1/36 Batu Ceper, Tangerang – Banten 15122. Indonesia Phone : +62 813 4493 5304 / +62 812 4589 8746 E-mail : dermawanlg@yahoo.com Career Objective : Manager of Development/Plant/Project/Production operational with a 15-year record of success overseeing all phases of Tender Committe, multimillion-dollar construction, EPC for Oil & gas plant, Tank terminal, Palm oil rafinery, Chemical plant, Power plant for government and private-sector clients. Experience includes managing crews of up to planning and constructing expertise. Able to lead owners’ team and interface with all internal groups. Effectively partners and manages contracts with design, engineering firms, specialty consultants, contractors, and vendors. Familiar with all aspects of a project lineage. Skilled at executing production equipment de-installation, shipment and re-installation. Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions. Also to set objectives, plan, implement and complete the project within the stipulated time-frame and ideally without cost overruns. Further, must be able to optimally utilize all available resources and effectively coordinate the activities of all project stake holders, team members, external agencies and consultants throughout the project’s tenure. Key Skills :  INTEGRATE scope, time, resources and cost management into a dynamic, manageable plan.  DEVELOP project network diagram for CPM and advanced PERT calculations to identify schedule and cost risks.  MAINTAIN continuous project performance and delivery control.
  • 2. Page 2 of  5     MEASURE, forecast and control project performance by employing earned value techniques.  COMPRESS or accelerate the schedule when required by adverse circumstances.  IDENTIFY project-specific risks and uncertainties.  USE qualitative and quantitative methods to assess the exposure of the project to particular risk in real and measurable terms.  MANAGE and MITIGATE schedule, cost, scop, and resource risk associated with the project.  EVECTIVE how to schedule and plan for recurring activities.  Prepared and review of SOP, QA/QC, ITP, Standard code, Owner/Client Standard.  Preparation data sheet, Design Calculation, Drawing (lay out, general assesment, detail) and Tecknical qualification any standard (API 650; API 2000; API 653; ASME Sec. I-VII; ASME Sec. VIII Div.1&2; ASME Sec.IX; ASTM; ANSI) Etc. And any sorfware Design (Coade Tank; E-Tank; SAP-2000; PV Elite).  Look carefully at SHE/OSHA complience, Goverment regulation and Related parties.  Lead of for Subcontractor / Crew Supervision, Change Order Management.  Review of Equipment / Tools, Facility and Accomodation. Work Experience and Skill :  I. PT. Bangun Bejana Baja – Jakarta, Since February 2011 ~ Up to Now As Position : Project Manager / Project Management Project : a. Relokasi Depot LPG Berikut Sarfas Penunjangnya, PT. Pertamina Tj.Priok-Jakarta, Spherical Tank Cap. 2500MT x 4 Unit. 2011 b. ICA Alumina Plant, Antam-TSK-WIKA, Tayan – Kalimantan Barat, Tank Process Any Type x 130 Unit. 2011 c. Repare Bottom & Accessories 42-T303B x ID. 56.000 x H.18.000 mm, Pertamina Balongan – Jawa Barat. 2011 d. Repare Shell 42-T301B x ID. 48.000 x H.18.000 mm, Pertamina Balongan – Jawa Barat. 2012 e. P & C Benar GS Upgrade Project C871283, PT. Chevron Pacific Indonesia, Duri – Riau. 2012 f. Pembangunan LPG Terminal Makassar, Bosowa Duta Energasindo - Makassar, Spherical Tank Cap. 2500MT x 4 Unit. 2013 g. Tank Senoro Gas Development Project, 16 Unit Storage Tank Any Type Cone and EFR, JOB Pertamina-Medco E&p Tomori Sulawesi, Tripatra Samsung Consortium, 2013 h. Tank Storage Terminal Oiltanking At Karimun, 19 Unit Tank Alumunium Dome Roof + CB Steel Internal Floating Roof Dia. 20; 30; 36; 39,3m x H.22m, FTZ Tanjung Balai Karimun – KEPRI, 2014 Job description : - Continuing the company vision and mission objectives as field service engineering, procrutment and Construction (EPC). - Lead at Kick of meeting and other meeting, Coordinates with planning section for review, take-offs estimates and establishing construction time lines. - As a planner, organizing, coordinating, and controlling resources to achieve the objectives (goals) effectively and efficiently. - Representing the company in the control of management, implementing, managing, directing and controlling the activities of the employees. with Planning, Scop, Cost, Quality, Organizing, directing, Time Schedule and Progress. - Conduct and coordinates site surveys (Pre-bid and Post award) for construction projects.
  • 3. Page 3 of  5    - Review and finalize bid and proposal documents. - Coordinate procurement, shipping, construction schedules, travel requirements to include appropriate country clearances. - Provide schedule updates prior and during construction phase. - Maintain, facilitate and coordinated communication with Contracting Officers and Contracting Officer Technical Representative during project implementation and completion. - Establish, manage and submit change orders. - Keep track of all expenditures and conduct periodic budget reviews. - Manage and evaluate personnel and sub-contractor performance. - Evaluation project-specific risks and uncertainties, lost time. Preparetion and determain Action method II. PT. Shinnetsko Prima - Jakarta, Since August 2001 ~ December 2010 1. Site Manager, to Project : a. Project Linc Terminal Phase 3 Ciwandan – Banten, Storage Tank 10 Unit, Pipe Intalition & Instrument, Period : Feb’10 ~ Dec’10. b. 20 MW MFO Storage Tank & Acessories CDE Karang Joang – Kalimantan Timur, Period : Oct’09 ~ Jan’10. EPC. c. Tank Terminal & Jetty Top Sides Project – Oiltanking-Rotary-SSP – Merak-BANTEN, Period : May’08 ~ Sep‘09. Sub-Fabricasion & Erection Dome-Floater Roof Tank Farm 1 (9 Unit), Farm 2 (7 Unit) & Farm 3 (5 Unit) d. Tank Terminal BBM – AKR Pelabuhan Stagen-Kota Baru, Period : Dec’07 ~ Apl’08. Fabricasion & Erection Tank (8 Unit Kap.5.000 KL, Dia. 23,200 x H. 13,750 m). e. Service Tank – PetroChina International (Bermuda), Ltd – Irian Jaya Barat-PAPUA, Period : Nov’06 ~ Nov’07. Repare Storage Tank Floating Roof D-101-5 (1 Unit Kap.313.000 BBLS, Dia. 200’ x H. 56’). f. SWS Unit 24 Kilang – PT. Pertamina (Persero) UP-VI Balongan-JABAR, Period : March’06 ~ Sep’06. Fabrication & Erection Storage Tank 24-T-102 (1 Unit Kap. 5.000 KL), Pondation, Pipe Intalation & Instrument. g. 740 MW CCPP PLN - Mitsubishi Corporation-Truba Jurong Engineering – Cilegon- BANTEN, Period : Nov'04 ~ Jan’06. Sub-Erection Storage Tank (1 Unit Kap.17.800 KL), (1 Unit Kap. 6.300 KL), (1 Unit Kap. 2.790 KL), (2 Unit Kap. 2.000 KL), (1 Unit Kap. 338 KL), (1 Unit Kap. 236 KL) & Pipe Intalation. Job description : - Committe Tender, Manager the supervising every activities in the Site and Coordination to Management HO, Monitoring & Coordination to subcontractor, all more now such as : Project Activity Fabrication, Erection, Repare, Safe condition works or Comitment at HSE and quality, on schedule, effeciency menpower, equipment tolls, commissioning, cost operational, etc. - Planning of work actifity. - Contact, discuss & presentasion job order with Client. - Prepare Standard Operating Procedure (SOP) and ITP for every kind of work's and process. - Monitoring actifity works and quality. 2. Project Engineer & PPC, to Project : a. Pembangunan Depot BBM Pertamina – PT. Konsorsium Truba dan Indokomas - UPDN III PERTAMINA Cikampek-JABAR, Period : Ags'03 ~ Okt'04. Sub-Fabrication & Erection Storage Tank (3 Unit Kap. 11.500 KL), (3 Unit Kap. 5.000 KL), (3 Unit Kap. 10.000 KL), (2 Unit Kap. 500 KL) and Intalation Pipe, Pump, Instrument, Etc
  • 4. Page 4 of  5    b. Werehouse & Facility – PT. Putra Mahatiti – Kawasan Bandra Cingkareng- JAKARTA, Period : Dec'03 ~ Jul'03. Design, Calculation, Fabrication and Construction Building (Pergudangan Blok. E, 236 Unit). c. Chemical Plan – PT. Bina Karya Prima – Bekasi-JABAR, Period : Mar'02 ~ Jan'03. Chemical Safonificasion Pland, Building of Construction, Reactor & Mixer Instalation, Steam boiler, Pipe, Pump, Instrument and Fabrication and Erection Storage Tank. Job description : - Team succes of technical committe tender. - Design calculation of Pondation, construction, Pump, Piping & Intalation. With familiar any Sofware Program. - Supervising design and shop drawing. - Make shop drawing and as- build drawing. - Prepare Standard Operating Procedure (SOP) and ITP for every kind of work's and process, with complete standard API 650 / 653, ASMI SEC VIII Div 1&2, ASTM, AWS & ANSI. - Make schedule, progress report, menpower, equipments and materials usage and report them to Client and Managent. - Contact and discuss with Clients all scop work and drawing and working. - Supervise the welder sertificate and quality. - Check daily production reports and make monthly reports to Cliend and Management, evaluate progress of production and note down step to be taken to solve problem that arose. - Prepare metode action plan if works progress activity behind. - Direction, control, plan and supervise all technical activities or Fabrication such as : marking, cutting, rolling, banding, welding, grinding, sandblasting and assambling process. - Supervise the daily maintenance of machine and other equipment, make sure all machine troubles and breakdowns are reported to Maintenance department. - Supervise of installation of reactor, stem boiler, pipe, instrument and erection storage tank. - Estimate production cost and offer the quotation to clients. - Prepared of invoice progress performance. - Assist site supervisor in fabrication and erection problem. 3. QA/QC Official a. Unit of Gas Industries – PT. Titis Sampurna – Limau Timur, Palembang-SUMSEL, Period: Jul’01 ~ Jan’02. Fabrication & Erection LPG Tank (3 Unit), Oil Water Tank (3 Unit), Storage Tank (3 Unit). b. Unit of Gas Industries – PT. Budi Artaprima Cemerlang – Pertamina DOH Prabumulih-SUMSEL, Period : Ags’01 ~ Feb’02. Fabrication & Erection Separator (3 Unit), Peco Filter Vessel (1 Unit), Slug Catcher (1 Unit). Job description : - Contact and discuss job order with Client. - Control design suitable with ASME VIII, Sec 1. - Inspection / testing, Prepared report & Document. - Sertificatation with third Party Inspector & Migas. - Monitoring and team commissioning plan. - Make shop drawing and as- build drawing. - Inspect quality of job are met shop drawing and specification in contract document.
  • 5. Page 5 of  5    III. PT. Sinar Antjol (Mar'01 ~ Jul'01) As Position : As Supervisior and Foreman Project. Project : Chemical Safonificasion Pland, Building of Construction, Intalation Reactor, Pipe, Pump, Instrument & Electrical. Location : Pluit Selatan - Jakarta Utara. Job description : - Coordination action plan and evaluation scop work. - Leader for works process the plan. - Quality Control. - Commissioning Team. - Support part sales engineer for his market. - Experience and Design calculation for lay out production. IV. PT. Jawa Barat Textile (JABATEX) (Feb'00 ~ Jan'01) As Position : As Chief Utility Maintenance. Location : Tangerang, Banten. Job description : - Leader and instructor for preventive maintenance of heavy duty equipment. - Planning and Evaluation Maintenance of Machine, Heavy Equipment, Building and Accessories. - Instal or Setting New Engine. - Evaluation & Control Waste Water Treatment. - Support part sales engineer for his market. - Design suitable warehouse for spare parts. - Team for Audit ISO Programe. Course and Training :   Training of Organization for System Orientated HSE Management Methot - PLN Project, by Mitsubishi Heavy Industries Ltd (Takasago Machinery Works), Cilegon (2005)  K3LL Safety Training PERTAMINA - Depot BBM Proyek Cikampek (2003).  Training for Welding & Inspection API/AWS, by Lincoline, Jakarta (2003).  Training of Introduction and Documentation of ISO-9001, PT.Jabatex, by SI (2000).  NDE & Non NDE Inspection & Interpretation Course BATAN (1998 ~ 1999).  Hydraulic and Pneumatic for Industrial Machinery Training-Zerman Hamburg Sub Consultant, Universitas Trisakti Jakarta (1998).  Computer Course, Sarana Informatika Tangerang (1997 ~ 1998).  English Course, KING'S Tangerang (1994 ~ 1997). Education Background :  Institut Teknologi Indonesia ( ITI ), Fakultan Teknologi Industri Teknik Mesin (Strata1) - Bachelor Degree of Mechanical Engineer, Serpong-Tangerang (1995 ~ 2000).  
  翻译: